Loading...
HomeMy WebLinkAboutDRC-2013-004462 - 0901a06880415d33mm State of Utah Mail - Corrected Public Notice regarding Dawn Mining Alternate Fe§_Amendment Request LS/13/15 John Huftquist <jhultquist(g>utah.gov> Corrected Public Notice regarding Dawn Mining Alternate Feed Amendment Request LS/13/15 DRC-2013-004462 i rnesscjgc Radiation Issues <DEQInfo@utah.gov> Mon, Sep 9, 2013 at 3:35 PM Reply-To: Issues for the public for division of radiation control <deq-rad-issues@list.utah.gov> To: Susan White <jhultquist@utah.gov> The Division of Radiation Control is notifying interested parties of a correction to the public notice regarding the public comment period for the Dawn Mining Alternate Feed Amendment Request. The hearing is scheduled for Wednesday, October 9, 2013. The public notice on the following web page has been corrected. We apologize for any inconvienence this may have caused. http://www.radiationcontrol.utah.gov/Uranium_Mills/IUC/ Denison_IUC/dawn_mining.html https ://mai I .g oog I e.corrVmai l/u/0/?ui=2&i k= c7d 1 f77414&vi ew= pt&search=inbox&th=1410496cfaeebe58 1/1 Department of Environmental Quality Amanda Smith Executive Director State of Utah GARY I ,R. HERBERT Governor DIVISION OF RADIATION CONTROL Rusty Lundberg Director GREG BELL Lieutenant Governor September 6, 2013 San Juan Record Legal Advertising Department 49 South Main Street Monticello, Utah 84535 Subject: Public Notice to Be Published on Wednesday September 11th, 2013 To whom it may concern: This letter constitutes authorization to publish the attached Public Notice in the San Juan Record on September 11th, 2013. This Notice will be e-mailed. Please send confirmation by e-mail that this notice will be published on the above mentioned date to Shairose Falahati her email address is: sfalahati@utah.gov Please send invoice and affidavit of publication to: OUR ACCOUNT: P.O. Number UT 19000481 Shairose Falahati, Administrative Secretary Division of Radiation Control P.O. Box 144850 Salt Lake City, Utah 84114-4850 Sincerely, Shairose Falahati, Administrative Secretary Division of Radiation Control Lake City, UT 84114-4850 4097 -T.D.D. (801) 536-4414 195 North 1950 West • Salt Lake City, UT PrmtoH nn 1 OOH4 rorirr\f>A mnpi Mailing Address: P.O. Box 144850 • Salt Telephone (801) 536-4250 • Fax (801-533- www.deq. utah.gov Page 2 PUBLIC NOTICE Amendment to lie. (2) Byproduct License UT1900479 Energy Fuels Resources (USA) Inc. White Mesa Mill San Juan County, Utah The Utah Department of Environmental Quality, Division of Radiation Control (DRC) is requesting public comment regarding a proposed Licensing Action by the Director of the Utah Division of Radiation Control to amend the Energy Fuels Resources (USA) Inc. (Licensee) 1 le.(2) Byproduct License (RML UT 1900479). Licensee Information: NAME: Energy Fuels Resources (USA) Inc. (EFRI) MAILING ADDRESS: 225 Union Boulevard, Suite 600 Lakewood, CO 80228 TELEPHONE NUMBER: (303) 628-7798 FACILITY LOCATION: Hwy 191,5 miles South of Blanding, San Juan County, Utah If approved, the proposed License Amendment will allow Energy Fuels Resources (USA) Inc. (EFRI) to receive and process up to a total of 4,500 tons (dry weight) of uranium material as alternate feed material from the Dawn Mining Company Midnite Mine Site, located in Wellpinit, Washington. EFRI, formerly Denison Mines (USA) Corp (DUSA), submitted a request to the DRC to amend RML No. UT 1900479, in a letter dated April 27, 2011 (amendment request), g EFRI is requesting that the uranium material be authorized for receipt and processing at the White Mesa Mill as alternate feed material based on its uranium content. Byproduct (residuals) from the extraction of source material would be disposed within the Mill's active lined uranium tailings management/disposal cells. A draft License along with a Statement of Basis and Safety Evaluation Report (SER) describing the License change(s) and environmental analysis are available for review and/or copying between 8:00 a.m. and 5:00 p.m., Monday through Friday, at the address listed below. In addition, the amendment request and related documents, draft License, Statement of Basis, and SER are available on the Division website at: http: //www .radiationcontrol .Utah, go v/U ranium_Mills/IUC/Denison_IUC/dawn_mining. html A forty-five day public comment period for the proposed Licensing Action will commence on September 5, 2013 by publication of this notice on the DRC's Web site and distribution by electronic mail server notification. The notice will also be placed in the Salt Lake Tribune, the Deseret News, and the San Juan Page 3 comments should be directed either by correspondence to the Utah Division of Radiation Control mailing address at P.O. Box 144850, Salt Lake City, UT 84114-4850, street address at 195 North 1950 West, Salt Lake City, UT 84116, or by email to radpublic@utah.gov. Comments sent via email should be identified by putting the following in the subject line: Public Comment on Energy Fuels Resources Dawn Mining Amendment request. All comments received within the comment period will be considered for inclusion in A public hearing is scheduled for Thursday, October 9, 2013, from 2PM to 5PM. The purpose of the public hearing is to take comments and includes an opportunity for questions and answers. A Hearing Officer will manage the hearing, and the hearing will be recorded and transcribed. A purpose of this hearing is to meet the requirements of 42 U.S.C. § 2021 (o)(3)(A)(i)(ii). Interested persons must submit their questions to the Director at least 10 calendar days before the hearing (September 30, 2013). If a question that an interested person would like to ask relies on information that is not in the record, that information should also be provided with the question. Those who submitted questions will be allowed to follow up with additional questions based on the response provided. All questions submitted will be considered part of the record. The public hearing will be held in the DEQ board room, Room 1015, at the Utah Department of Environmental Quality, 195 North 1950 West, Salt Lake City Utah. All comments received within the comment period will be considered for inclusion in the final Licensing Action. Under Utah Code Ann. Section 19-1-301.5, a person who wishes to challenge a Licensing Action (permit/license amendment approval) must do so in an adjudicatory proceeding and may only raise an issue or argument that he or she has previously raised during the public comment period. Further, the issue or argument must be one that is supported by sufficient information or documentation to enable the director to fully consider the substance and significance of the issue. After (i) the completion of the 45-day public comment period, (ii) the holding of the public hearing, and (iii) a DRC analysis of the information received from the public during the comment period, the DRC will finalize its review of the proposed License Amendment. In compliance with the Americans with Disabilities Act, individuals with special needs (including auxiliary communicative aids and services) should contact Brooke Baker, Office of Human Resources at (801) 536- 4412 (TDD 536-4414) at least 10 working days prior to close of the comment period. the final modified Permit. (2bf&altiMe®ribunp MEDIA^gg DeseretNews Remit to: P.O. Box 704005 West Valley City, UT 84170 Order Confirmation for Ad #0000905592-01 Client DIV OF RADIATION CONTROL Client Phone 801-536-4250 Payor Customer Payor Phone DIV OF RADIATION CONTROL 801-536-4250 Account* 9001387637 Address P.O. BOX 144850 SALT LAKE CITY, UT 84114 USA Payor Account Payor Address 9001387637 P.O. BOX 144850 SALT LAKE CITY, UT84114 Fax EMail sfalahati@utah.gov Total Amount Payment Amt $388.04 $0.00 Amount Due Payment Method Confirmation Notes: Text: Shairose Ad Type Legal Liner $388.04 Ad Size 3.0 X 76 Li Ordered By Shairose Acct. Exec kstowe Tear Sheets 0 Proofs 1 Affidavits 1 PO Number Amend to 11e Color <NONE> Product Salt Lake Tribune:: Scheduled Date(s): Product Deseret News:: Scheduled Date(s): Product sltrib.com:: Scheduled Date(s): Product utahlegals.com:: Scheduled Date(s): Placement Legal Liner Notice - 0998 9/9/2013 Placement Legal Liner Notice 9/9/2013 Placement Legal Liner Notice 9/9/2013 Placement utahlegals.com 9/9/2013 0998 0998 Position Public Meeting/Hear-ing Notices Position Public Meeting/Hear-ing Notices Position Public Meeting/Hear-ing Notices Position utahlegals.com Order Confirmation for Ad #0000905592-01 Ad Content Proof Actual Size 9/6/201310:43:12AM 1 PUBLIC NOTICE Aroeedmeist to 11». (2} Byproduct _mm Utl 900479 Energy Pi«fc Resources (USA} Inc. Yvfctte Mew Mm San Juae Cawty, Utah Tte yrat Depareieet cf Environ mecrctl Quality, Divisicf of Radiation Cert ret (DSC) it request- ing pt«lc :c«—ert regarding ct prepcsed Ucerslrg Aden by tte Director ct tr« Utut Diviner cf Scidiaicr Ccrtrcl rc amend the Erergy Fuels Resources (USAj Ire. (Licensee) 1 \t.[i\ By. predict License (8ML. ull 900479). Lfeeroee Infer motion; NMflfa Energy Fuels Resources (USA) Ire. (EFRI) MAILING ADDRESSt 225 Drier Boulevard, Sure 600 Lakewccd, CO 80228 TELEPHONE NUMBER; (303) 625-7796 rACU.IT>' LOCATION. Hwy 1 91, 5 miles Scirr tf Blardirg, Sac Juar Cctrry, urat If approved, Te proposed uierse Amerdeierr will ollcw Energy fuels Resources (USA) lix. (tFRh to receive ard process tp rc a rc?al of 4,500 tors (dry weight) cf uranium eraser fal as alteiro'e feed material frem *e Oowr Miring Ccmpary Midn-e Mire Site, lecared fr weiipiwt, washin i/of. EFRI, formerly Center *e fcSA) Ccrp (DUiAl. iibtrsitred a request to *e DSC t« anted IMt Ne. UT 1 900479, ir ci terser dared April 27, 201 1 fjcewwiMM re-quest). FJRI i! requ-eWrg rtat *e uranium manual be aistcriied for receipt ard prccessiisy at tre write Mesa Mill as alternate feed material based cr its uranium ccpteft. Byproduct (residu- als) free! Use extractor cf source ma-erial wetld be disposed wltt* tf* Mill's active tired LI CIS kr tailirgs (s'us a<ps"?r- disposal cells. A draft Useese along wist a Swemert cf Basis and Safety Evafcottoe Report (SER) describ- ing ii* Licer-se *orge(s) ard «-virer«ertal analysis are available for review crd/or copy- it a befw**is 8K50 DM, ard 5i00 pjn, Mceday rtrcigt Friday, ar »e address listedbelow. Ir aodirtor, tf* cn»ttwett request or-d related cicctmes'tv, draft titers*. S-creres t cf Basis,, ard SER ore available or T« Divider website at; fittp;//www.racicsticncontrcl.yfah.gov/ Ur aritum_.Milis/lUC/Denbon JUC/ cawn_minfng Jitiw A forty-five day public ctwert pericd for *e proposed Licerslrg Acier will commerce or September 5, 201 3 by publication cf rtai wwe ch'rfse ORC's w«» site and disr nix tier by electrorsi: mail server notification, Tte (settee will also be placed tr the Salt Lake Tribune, the Qeserer News, and the Scr tear. Record, sAWrter ceesrserm will be accepted uf ll ttt close of buiress cc October 21, 2013. Wrltrer ccirwen should be directed etiter by ccrresperd- erce rc the urcf Division cf Radiaticr Control (sail Its y address or P.O. Box 1 44850, Sals Lake City, UT 641 1 4-4650, street address at 195 North 1950 West, Salt Lane City, UT 641 16, or by email w rpcpuolt.c@utoli.gcv. ccmsem sert vro eenatl '*evld be ider-ified by pot-f»g tf« fcllcwfrg if *te abject lire; FHblic Cotwwert or Erergy Rteis Rescirces Dowr Mir ir g Ajnets-anert reaesr. All cceMsterrs received wirtfe tte soewert period will be ccisidered for I'. 'I'.S is- 1* fircil rectified Peresir. A ptblic hearg is sciediled fcr Thwtdcry, October 9, 2013, from 2PM to 5PM. Tfte pirpese cf the ptulK tea dry Is -c take acesssserts ard irclides ar oppcrwttv fcr qtesticrs and or -rwers. A Hearing Officer will mar age are tecsrirg, ard tte rearing wilt be recorded assd trarscrl- bed. A fxrpcse cf tMs tearing is rc meet -re reqtiremerts cf 42 U.S.C, S 2021 (c)(3)(AI(i)(iI). trterested perscrs «d.srr siot-it teetr qtewers *c *e Director at least 10 calendar days oe- fcie tte tearing (5ep*ember 30, 201 3). If a qie-sricis rfat at interested persor woild like sc as*, relies at Wetmewcr »« is wt ir rte record, that tricretattcr shccld also be provided wltt rise qtestior. Itcse wtc abwirted qUHtMM will be allowed rc follow i-p with additional qtesticrs based ct tte resporse provided. All qiesticrs stbrnttted wilt be corsidered part of tte record. Tte public tear leg will beheld ir »t* DEQ board rec»-, Scwrs 1015, ar -(se Utah Deoartmei-t of Brvirormesnfal Quality, 1 95 North 1950 West, Salt Lake City Utah. All comnerti received wttttr tte ccissniei's period will be considered fcr irclisier ir it* ftral i.icetsing ferns*. Usdei' Utah Code Ar*. Secrior 1 9-1 -201.5, a perse* who wishes rc challenge a LicersM Ac-rior (permit/1icerse aBser.draerr approval) mua do so if ar. odridiccrciy prtceediry ard may crly raise or itsie or arginei-t that he cr she has prevtoKly raised dtrtrg it* ptbllc ccrsv-fer- period. Forther, rf* issie or argwert w< be ere "tar « »pperted by afficiert irforncrior cr dct- imeftattof to erable the director rc fclly consider the sibsrarce ard tigr.IfKar.ce cf tte issce. After (r) the completion cf tte 45-dav pssblR and period, (ii) the hcldira tf rfse ptblfc teoucgr. ard (in) a DRC analysis tf rise irfcrmatK* received from rt* siolic dirtrtj she cm- DH6 pet ft cl, t e DSC will finalize its review cf *e proposed ucerse maMm-t. If ccisspirar :e witt it* Amertcacj wltt Disabilities Ac, tedrvtdiats with special reeds (trdtdiicj aixiliary ccir.rnriccrive aids ard services* stolid ccfact Brooke BaKer, Office of >tmar Re-sets rces at (801 ) 536-441 2 (TDD 536-441 4) at least t o wcrXirg days prior to close cf tte rommer* pericd. 905592 UPAXLP 9/6/201310:43:12AM 2 * Order Confirmation for Ad #0000905592-01 Ad Content Proof 135% PUBLIC NOTICE Artwdrrtert to 1 la. {2) Byproduct Lfcmig UT1900479 &*rgy f%»S$ Reswres* (USA) toe, WMte Mesa Ml Son jpaii Ccurty, Utds The Ural' Oeparane»rr ct &rvir©r<meriTal Quality, Dfyfttei. cf Radiaticr Control (DRC) » requeu- ing public ccmmert regarding a proposed Ucer-sirg Airier by the Director cf tte Utah Division cf Radiaticr Control tc cmer-d the Energy fiuels Resources (USA) Ire. (Licensee) 1 le.(2) By-product Licerse (RML UT1 900479). licensee Information: NAMEt MAILING ADDRESS: TELEPHONE NUMBER: FACILITY LOCATION: Erway Fuels Resources (USA) toe. (EFRI) 225 Urier Boulevard, Suite 600 Lakewccd, CO 802 28 (303)626-7796 Hwy 191.5 miles Scmt of B larding, Sar km County, Utcd If approved, tre proposed License Atr=wdmert will allow Energy Fuels Resources (USA) Ire. (EFRI) rc receive ard process up tc a tcTal cf 4,500 tors (dry weight) cf uranium material as alternate feed material from tte Dawn Mirtog Comp cry Midrite Mire Sire, lecared ir WellpWif, Washington. EFRI, formerly Denison Mires (USA) Ccrp (DUSA), submitted a request tc tfe DRC tc amend RML No. UI 1 900479, rr> a letter dated April 27, 201 1 (amendment re- quest). EFRI is requesting tat tre uranium material be authorized for receipt ard processing at tre Write Mesa Mill as alternate feed material based er its uranium cement. Byproduct (residu- als) from tre extraction cf source material would be disposed within tte Mill's active lined uranium tailirgs man agement/disposal cells. A draft Licerse alcrg with, a Statement cf Basis ard Safety Evaluation Report (SER) describ- ing tte Licerse cr arge(s) ard environmental aralysis are available fcr review ard/cr copy- ing between 8*0 ajr>. ard 5«00 pjru, Morday through Friday, at the address listed below. Ir addition, tre amendment request ard related document*, draft License, Statement cf Basis, ard SER are available w tre Divisicf website at. Jittos//www.rociaticficcntrol.Utah.gov/ Ur onf«m_Mf I Is/I uC/DenbqnJ.UC/ca wn_mfci?jig Jhtml A ferry-five day public ccmmert pericd fcr tte proposed Licersirg Action will commence m September 5, 201 3 by publication of this notice or the DSC's Web site ard distribution by electror-ic mail server rctifKatioin, The retice will also be placed ir the Salt Lake Tribute, the Deseret News, ard the San juan Record. Written cemmer ts will be accepted until the close of business er October 21, 2013. Writter comments shovld be directed either by correspond- ence to fe Utah Division of Radiaticr Control mailing address at P.O. Box 1 448 50, Salt Lake City, UT 841 1 4-4650 street address at 1 95 :Ncith 1 950 West, Salt Lake City, UT 841 1 6, er by email K> ''acpiiblfc@Jtoti.gov, Comments serf via email shovld be identified by put- ting the following ir the subject lire: Public Comment or Energy Fuels Resources Dawn Miring Amendment request. All ccmmert! received with* tte comment period will be considered for ircksier ir tre final modified Permit, A public rearing is scheduled fcr Thursday, October 9, 2013, from 2PM to 5PM. The purpose cf the public tearing is to take comments and includes ar opportunity fcr questions and ar- swers. A Hearing Officer will murage fe hearing, ard tte hearing will be recorded ard transcri- bed. A purpose ef tris hearing is tc meet the requirements cf 42 U.S.C. S 2021 (c)(3)(A)(i)(ii). Interested person mm submit their questions to n-e Director at least to calendar days be- fore the hear it g (September 30, 201 3), If a question that ar. interested person would like tc ask relies or information fat is net ir *e record, that information should also be provided with the question. Those wte submitted questions will be allowed to follow up wit additicr al questions based or. the response provided. All questions submitted will be considered part cf the record. The public rearing will be held ir the DEQ board room, Room 1015, at tte Utah Department cf Environmental Qualify, 1 95 North 1950 West, Salt Lake City Utah. All comments received wlittr tte ccmmert period will be considered fcr inclusion ir the final Licensing Action. Ureter Utah Cede Ann. Section 1 9-1 -301 .5, a perscr who wishes to challenge a Licensing Ac- tion (permit/license amendment approval) must do sc in ar adjudicatory proceeding and may only raise ar issue or argument that he or she has previously raised during the public ccm- mem pericd. Further, the issue or argument must be ore that is supported by sufficient mfcrmatior or doc- umentation to enable the director to fully consider f e substance and significance ef fe issue. Afer (i) ?te completion ef tte 45-day public comment period, (ii) tte reldirg ef tte public tearing, ard (iii) a DRC aralysis cf the information: received from the public during fe com- metst pericd, ihe DRC will finalize its review cf te proposed Licerse Amendment. In compliance with te Americans with Disabilities Act, individuals with special reeds (ireluding auxiliary communicative aids ard services) shotHd contact Brooke Baker, Office of Human Re- sources at (801 ) 536-441 2 (TDD 536-441 4) at least 10 working days prior to close of tte comment pericd. 905592 UPAXLiP 9/6/201310:43:12AM 3 Dawn mining Alternate Feed Arrierrctarent Request -LS/13/14 John Hultquist <jhultquist@utah.gov> Public Comment Period -Dawn mining Alternate Feed Amendment Request - LS/13/14 2 messages Radiation Issues <DEQInfo@utah.gov> Thu, Sep 5, 2013 at 9:49 AM Reply-To: Issues for the public for division of radiation control <deq-rad-issues@list.utah.gov> To: "Sarah M. Fields" <jhultquist@utah.gov> The Utah Department of Enwonrnental Quality, Division of Radiation Control (DRC) is requesting public comment regarding a proposed Licensing Action by the Director of the Utah Division of Radiation Control to amend the Energy Fuels Resources (USA) Inc. (Licensee) 11 e.(2) Byproduct License (RML UT1900479). A forty-five day public comment period for the proposed Licensing Action will commence on September 5, 2013 by publication of this notice on the DRC's Web site and distribution by electronic mail server notification. The proposed License Amendment will allow Energy Fuels Resources (USA) Inc. (EFRI) to receive and process up to a total of4,500 tons (dry weight) of uranium material as alternate feed material from the Dawn Mining Company Midnite Mine Site, located in Weilpinit, Washington. EFRI, formerly Denison Mines (USA) Corp (DUSA), submitted a request to the DRC to amend RML No. UT1900479, in a letter dated April 27, 2011 (amendment request). EFRI is requesting that the uranium material be authorized for receipt and processing at the White Mesa Mill as alternate feed material based on its uranium content. Byproduct (residuals) from the extraction of source material would be disposed within the Mill's active lined urariium tailings management/disposal cells. A draft License along with a Statement of Basis and Safety Evaluation Report (SER) describing the License change(s) and environmental analysis are available for review and/or copying between 8:00 a.m. and 5:00 p.m, Monday through Friday, at the address listed below. In addition, the amendment request and related documents, draft License, Statement of Basis, and SER are available on the Division website at: http ://www.radktioncon^ 9/5/13 State of Utah Mail - Public Comment Period • ov Radiation Issues <DEQInfo@utah.gov> Thu, Sep 5, 2013 at 9:50 AM Reply-To: Issues for the public for division of radiation control <deq-rad-issues@list.utah.gov> To: John Hultquist <jhultquist@utah.gov> [Quoted text hidden] https ://mai I .g oog le.conVmai l/u/0/?ui=2&i k= c7d1 f77414&view= pt&search= i nbox&th= 140eed0b7bcc7b7a 1/1