HomeMy WebLinkAboutDRC-2018-001589 - 0901a068807b8da5DWMRC-03
UTAH DEPARTMENT OF ENVIRONMENTAL QUALITY
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
RENEWAL
Pursuant to the Utah Code Annotated, Title 19, Chapter 3 and R313 of the Utah Administrative
Code (Radiation Control Rules) and in reliance on statements and representations heretofore made
by the licensee designated below, a license is hereby issued authorizing such licensee to transfer,
receive, possess and use the radioactive material designated below; and to use such radioactive
material for the purpose(s) and at the place(s) designated below. This licensee is subject to all
applicable rules, and orders now or hereafter in effect and to any conditions specified below.
* * * * {. * * * * * 't< * 't 't< * * * * * * * ,1. ,1. * * * * * * * * * * * * * * * * * * * ,e * * * * * * *. 't 'f tf * * {. * 'F * * * i. * 1. 1. d. * '1. * {< 'l< * * * * * * *
{<**
LICENSEE
l. Name
)
)
Energy Fuels )
Resources (USA) Inc.
2. Address 225 Union
Boulevard, Suite 600
Lakewood, CO
80228
) 4. Expiration Date
) February 16,2028
) * * * * ,1. ,. * * * d< *< * * * * * * !F !F * * * *< {. * * !t !t * * * * {. * ,< * {<
) 5. License Category 2-b
)
* * * * * * * {. t d. tF * t& * {. * !S * * * * * tF !t tF * {. t* t|< '* {< {< * :k * * * * :t< tt ,t * * * * {. t|<
't<
tt tl. * * ,F :t !t ,t * t t * {< * * * tl. * * ,1. * * * * {' * * 'F {<
t|< {< {.
6, Radioactive material
(element and mass number)
Natural Uranium,
11e.(2) By-product
Material, Approved
Altemate Feed Material
,1. {< {< {. rS {< * 't 't * ,t * * * *:& {. * * *. t * * tl. * * * * * * * * *,t< * {. tf '|. * !F * * *. * * * {. * * * * * {' * *< *' * 't !F 'f {< *< * * * * * 1"1' *:* {' * {< * {' *
***
SECTIONg: ADMINISTRATIVECONDITIONS
The authorizedplace of use shall be the licensee's White Mesa uranium milling facility,
located in San Juan County, Utah. The White Mesa uranium mill is located on fee land and
mill site claims, covering approximately 5,415 acres encompassing all or part of Sections
21,22,27,28,29,32, and 33 of T37S, R22E, and Sections and 16 of T38S, R22E Salt Lake
Base and Meridian. [Applicable UDI(MRC Amendment: 8 RenewalJ
3. License Number UT1900479
Amendment # 8 (Renewal)
* * !F !t * * * * * * *,f !f * !f * * *,t< * :F :F * * tf {.'f * *. *< *< {< :$ t< {< {<
7. Chemical and/or
physical form
Any
8. Maximum quantity
licensee may possess at
any one time
Unlimited
9.1
DWMRC-03
Pase2 of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
9.2 All written notices and reports to the Director required under this license, with the exception
of incident and event notifications under R313-15-1202 and R3l3-19-50 requiring telephone
notification, shall be addressed to the Director, Division of Waste Management and
Radiation Control, Utah Department of Environmental Quality, 195 North 1950 West, P.O.
Box 144880, Salt Lake City, UT 84114-4850. All written submittals to the Director shall
include at the time of submittal, a searchable electronic copy, as required by R3l3-I2-lll.
Incident and event notifications that require telephone notification shall be made to the
Director at (801) 536-0200 during normal business hours or after hours to the DEQ Duty
officer at (801) 536-4123. [Applicable UDWMRC Amendment: I RenewalJ
RESERVED [License Condition moved to SECTION l3: CLOSE OUT CONDITION]
A. The licensee may, without prior Director approval, and subject to the conditions
specified in Part B of this condition:
(l) Make changes in the facility or process, as presented in the application.(2) Make changes in the procedures presented in the application.(3) Conduct tests or experiments not presented in the application.
B. The licensee shall file an application for an amendment to the license, unless the
following conditions are satisfi ed.
(l) The change, test or experiment does not conflict with any requirement
specifically stated in this license, or impair the licensee's ability to meet all
applicable regulations.(2) There is no degradation in the essential safety or environmental commitments
in the license application or provided by the approved reclamation plan.(3) The change, test or experiment is consistent with the conclusions of actions
analyzed in the most recent Environmental Assessment conducted by the
Division from the last license renewal and/or major license amendment.
C' The licensee's determinations conceming Part B of this condition shall be made by a
"Safety and Environmental Review Panel (SERP)." The SERP shall consist of a
minimum of three individuals. One member of the SERP shall have expertise in
management and shall be responsible for managerial and financial approval changes;
one member shall have expertise in operations andlor construction and shall have
responsibility for implementing any operational changes; and, one member shall be
the Mill Radiation Safety Officer (RSO) or equivalent, with the responsibility of
assuring changes conform to radiation safety and environmental requirements.
Additional members may be included in the SERP as appropriate, to address
technical aspects such as health physics, groundwater hydrology, surface-water
9.3
9.4
9.5
DIVISION OF WASTE MANAGEMENT AND RADIATION
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
DWMRC.O3
Page3 of21
CONTROL
License #UT1900479
Amendment #8
hydrology, specific earth sciences and other technical disciplines. Temporary
members or permanent members, other than the three above-specified individuals,
may be consultants.
D. The licensee shall maintain records of any changes made pursuant to this condition
until license termination. These records shall include written safety and
environmental evaluations made by the SERP that provide the basis for determining
that changes are in compliance with the requirements referred to in Pan B of this
condition. The licensee shall fumish, in an annual report to the Director, a
description of such changes, tests or experiments, including a sunmary of the safety
and environmental evaluation of each. In addition, the licensee shall annually
submit to the Director changed pages to the Operations Plan and Reclamation Plan
of the approved license application to reflect changes made under this condition.
Annual reports shall address the previous calendar year and be submitted no later
than March 3l each year.
The licensee's SERP shall function in accordance with the most current version of
the standard operating procedures submitted by letter to the Director dated February
27,2007. [Applicable UDWMRC Amendment 3J
[Applicable UDWMRC Amendment: 8 RenewalJ
The licensee shall at all times maintain a financial surety, approved by the Director,
consistent with R313-24-4 (L}CFR 40, Appendix A, Criteria 9 and 10, as incorporated by
reference), that is adequate to cover the estimated costs, accomplished by a third party, for
decommissioning and decontamination of the mill and mill site, reclamation of any tailings
or waste disposal areas, groundwater remediation as required by License Condition 10.21,
and the long-term surveillance fee. The Licensee is prohibited from use and./or operation of
any tailings disposal cell or related new pennanent fixture or facility not already accounted
for by the currently approved surety, without prior submittal and Director approval of
written evidence of adequate financial surety. Within 60 calendar days of Director approval
of a revised reclamation/decommissioning plan, the licensee shall submit written evidence
of an adequate surety regarding the newly approved plan.
Annual updates to the surety amount, required by R313-24-4 (l0CFR40, Appendix A,
Criteria 9 and 10, as incorporated by reference), shall be submitted for Director approval by
March 4 of each year. Within 30 calendar days of Director approval of an annual update of
surety cost estimates, the licensee shall submit written evidence of adequate surety for
Director approval.
Along with each proposed revision or annual update, the licensee shall submit supporting
documentation showing a breakdown of the costs and the basis for the cost estimates with
adjustments for inflation, maintenance of a minimum 25 percent contingencY fee, changes in
9.6
DWMRC-03
Pase 4 of 2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
engineering plans, activities performed and any other conditions affecting estimated costs
for site closure. The basis for the cost estimate is the current Director-approved
reclamation/decommissioning plan or Director-approved revisions to the plan and guidance
contained in NUREG-I620, "Standard Review Plan for the Review of a Reclamation Plan
for Mill Tailings Sites under Title II of the Uranium Mill Tailings Radiation Control Act of
1978."
The currently approved surety instrument, a Performance Bond issued by Argonaut
Insurance Company in favor of the Director and the associated Standby Trust Agreement,
shall be continuously maintained by the Licensee in an amount not less than the amount
currently approved by the Director pursuant to the requirements of UAC P.3l3-24-4 (10
CFR 40, Appendix A, Criteria 9 and 10 as incorporated by reference).
On or before March 4,2018, the annual surety estimate shall also include all costs necessary
to remediate any groundwater contamination required by License Condition 10.2I, after
facility closure, to be determined by the Director.
[Applicable UDWMRC Amendment: IJfApplicable UDWMRC Amendment 3J
[Applicable UDWMRC Amendment: 8 RenewalJ
Standard operating procedures (SOPs) shall be established and followed for all operational
and non-operational activities involving radioactive material. Up-to-date copies of the SOPs
shall incorporate operating instructions and appropriate safety precautions for licensed
activities. SOPs shall be kept, maintained and made available to employees in the mill area
to which it applies. The written SOPs established shall include activities of the radiation
safety and environmental monitoring programs, the employee training progftlm, a respirator
protection program, operational procedures, analytical procedures, bioassay analyses and
instrument calibration.
At least annually, the uranium milling facility Radiation Safety Offrcer (RSO) shall review
and approve in writing all procedures to determine their continued applicability to the RML
license conditions, Utah rules and Federal regulations. Up-to-date copies of all operational
and non-operational SOPs shall be submitted electronically to the Director by December
3lst of each year. [Applicable UDWMRC Amendment: 8 RenewalJ
In accordance with the Memorandum of Agreement (MOA) negotiated by the Utah State
Historic Preservation Officer (SHPO), the Advisory Council on Historic Preservation
(ACHP), the NRC and Energy Fuels Nuclear Inc. (EFN) and ratified on August 20,1979
and as amended on May 3, 1983 and substantially as implemented in NRC License SUA-
1358:
Before engaging in any activity not previously assessed by the Director, the licensee shall
administer a cultural resource inventory. All disturbances associated with the proposed
9.7
9.8
DIVISION OF WASTE MANAGEMENT AND RADIATION
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
DWMRC-03
Page 5 of2l
CONTROL
License #UT1900479
Amendment #8
development will be completed in compliance with the National Historic Preservation Act
(as amended) and its implementing regulations, and the Archaeological Resources
Protection Act (as amended) and its implementing regulations.
In order to ensure that no unapproved disturbance of cultural resources occurs, any work
resulting in the discovery of previously unknown cultural artifacts shall cease. The artifacts
shall be inventoried and evaluated in accordance with the National Historic Preservation Act
(as amended) and no disturbance shall occur until the licensee has received authorization
from the Director to proceed.
The licensee shall avoid by project design, where feasible, the archaeological sites
designated "contributing" in the report submitted by letter to the NRC dated July 28, 1988.
When it is not feasible to avoid a site designated oocontributing" in the report, the licensee
shall institute a data recovery program for that site based on the research design submitted
by letter from C. E. Baker of Energy Fuels Nuclear to Mr. Melvin T. Smith, Utah State
Historic Preservation Officer (SHPO), dated April 13, 1981.
The licensee shall recover through archaeological excavation all "contributing" sites listed
in the report which are located in or within 100 feet of borrow areuts, stockpile arezls,
construction areas or the perimeter of the reclaimed tailings impoundment. Data recovery
fieldwork at each site meeting these criteria shall be completed prior to the start of any
project related disturbance within 100 feet of the site but analysis and report preparation
need not be complete.
Additionally, the licensee shall conduct such testing as is required to enable the Director to
determine if those sites designated as "Undetermined" in the report and located within 100
feet of present or known future construction areas are of such significance to warrant their
redesignation as "contributing." In all cases, such testing shall be completed before any
aspect of the undertaking affects a site.
Archaeological contractors shall be approved in writing by the Utah SHPO. The Utah
SHPO will approve an archaeological contractor who meets the minimum standards of the
State of Utah as the principal investigator.
The licensee is hereby authorized to possess byproduct material in the form of uranium
waste tailings and other uranium byproduct waste generated by the licensee's milling
operations authorized by this license. Mill tailings shall not be transferred from the site
without specific prior approval of the Director in the form of a license amendment. The
licensee shall maintain a permanent record of all transfers made under the provisions of this
condition.
DWMRC-03
Pase 6 of21
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #A11900479
Amendment #8
9.9 The licensee is hereby exempted from the requirements of R313-15-902(5) for areas within
the mill, provided that all entrances to the mill are conspicuously posted in accordance with
R313-15-902(5) and with the words, 'oAny area within this mill may contain radioactive
material."
9.10 Release of ore trucks and intermodal containers from the restricted area for restricted release
shall be in accordance with Department of Transportation standards set forth in 49 CFR
173.443 or 49 CFR 173.428, as amended. Release of equipment or packages from the
restricted area for unrestricted release shall be in accordance with Table 2 in the NRC
Regulatory Guide 8.30 Rev. I "Health Physics Surveys in Uranium Recovery Facilities"
dated May 2002, or NRC document "Guidelines for Decontamination of Facilities and
Equipment Prior to Release for Unrestricted Use or Termination of Licenses for Byproduct,
Source, or Special Nuclear Material," dated May 1987 or suitable altemative procedures
approved by the Director prior to any such release.
[Applicable UDWMRC Amendment: 8 RenewalJ
9.11 Reserved [Applicable UDWMRC Amendment:8 RenewalJ
9.12 The Licensee shall at all times have a valid groundwater discharge permit issued by the Co-
Director. No transfer of this License will be approved unless the Ground Water QualityDischarge Permit is also transferred.
[Applicable UDWMRC Amendment: 8 RenewalJ
9.13 The Licensee shall perform all decommissioning and reclamation activities in conformance
to the currently approved Reclamation Plan. [Applicable UDWMRC Amendment: I
RenewalJ
SECTION 10: @ERATIONAL CONTROLS, LIMITS, AND RESTRICTIONS
10.1 A. The mill production rate shall not exceed 4380 tons of yellowcake per year.
B. The licensee may not dispose of any material on site that is not "byproduct material,"
as that term is defined in 42 U.S.C. Section zUa@)Q) (Atomic Energy Act of 1954,
Section 11(e)(2) as amended).
C. The licensee may not receive or process any alternate feed material without first
applying for and obtaining approval of a license amendment. For any such proposal,
the licensee shall demonstrate that it will comply with Condition 10.1(B). Anasuch
demonstration shall include:
Demonstration of compliance with the NRC Regulatory Summary 2000-23
Recent Changes to Uranium Recovery Policy, November 30, 2000; and
(1)
DWMRC-03
PaseT of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
(2) Demonstration of compliance with the November 22,1999 Protocol for
Determining Whether Alternate Feed Materials are Listed Hazardous Wastes,
as approved by the Utah Division of Solid and Hazardous Waste (now Utah
Division of Waste Management and Radiation Control) December 7,1999.
Maximum quantities of feed material stored on the mill site, including altemate feed
materials or other ores, shall not exceed the total material storage quantity found in
the currently approved mill surety pursuant to License Condition 9.5, without prior
approval of the Director.
The licensee may not receive any alternate feed materials or other ores if those
materials would cause the facility to exceed the tailings cell disposal capacity
established by the currently approved tailing cells engineering design and
construction reclamation plan and/or the annual surety report required by License
Condition 9.5 without prior approval of the Director.
fApplicable UDWMRC Amendment: 2J [Applicable UDWMRC Amendment: 8
RenewalJ
10.2 All liquid effluents from mill process buildings, with the exception of sanitary wastes, shall
be retumed to the mill circuit or discharged to the tailings impoundment.
10.3 Freeboard limits, stormwater and wastewater management for the tailings cells shall be
determined as follows:
The Freeboard limit for Cell I shall be set annually in accordance with the
procedures set out in Section 3.0 to Appendix E of the previously approved NRC
license application, including the January 10, 1990 Drainage Report. Discharge of
any surface water or wastewater from Cell 1 is expressly prohibited.
The freeboard limit for Cell48 shall be recalculated annually in accordance with the
procedures approved by the Director. Said calculations for freeboard limits shall be
submitted as part of the Annuat Technical Evaluation Report (ATER), as described
in Condition 12.2 below.
C. The discharge of any surface water, stormwater or wastewater from Cells 3, 44, and
48 shall only be through a Director authorized spillway structure.
[Applicable UDWMRC Amendment 3J [Applicable UDIIMRC Amendment: 4J
[Applicable UDWMRC Amendment: 8 RenewalJ
10.4 Disposal of material and equipment generated at the mill site shall be conducted as
described in the licensee's submittals to the NRC dated December 12,1994 andMay 23,
1995, with the following addition:
D.
E.
A.
B.
DIVISION OF WASTE MANAGEMENT AND RADIATION
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
DWMRC-03
Page 8 of2l
CONTROL
License #AIl900n9
Amendment #8
A. The maximum lift thickness for materials placed over tailings shall be less than four
feet thick. Subsequent lifts shall be less than two feet thick. Each lift shall be
compacted by tracking of heavy equipment, such as aCatD-6, at least four times
prior to placement of subsequent lifts.
10.5 In accordance with the licensee's submittal to the NRC dated i|day 20,1993, the licensee is
hereby authorized to dispose of byproduct material generated at licensed in-situ leach (ISL)
facilities, subject to the following conditions:
A. Disposal of ISL waste is limited to 5000 cubic yards from a single source.
B. All ISL contaminated equipment shall be dismantled, crushed or sectioned to
minimize void spaces. Barrels containing waste other than soil or sludges shall be
emptied into the disposal area and the barrels crushed. Barrels containing soil or
sludges shall be verified by the Licensee to be fulIprior to disposal. Barrels not
completely full shall be filled with tailings or soil prior to disposal.
C. All ISL waste shall be buried in Cell No. 3 unless prior written approval is obtained
from the Director for alternate burial locations.
All disposal activities shall be documented and records thereof maintained on-site.
The documentation shall include descriptions of the ISL waste and the disposal
locations, as well as all actions required by this License condition.
ISL Disposal Requirements. The licensee shall perform ISL disposal activities in
accordance with the current Director approved Standard Operating Procedure (SOP)
for ISL disposal. Said plan includes the following minimum provisions:
(1) The material disposal area must be located on a tailings beach area of the
disposal cell or on an area of the cell that is underlain by tailings sands;
(2) The elevation of the material disposal area shall not exceed the plane or grade
of the elevations of the uppermost flexible membrane liner of the tailings
cell;
(3) Such ISL byproduct material shall be segregated from any mill material and
equipment disposed of in the cells pursuant to License Condition 10.4, and
the ISL byproduct material from each in-situ leach source shall be segregated
from the byproduct material from all other in-situ leach sources;
(4) Absence of void space inside barrels disposed, including physical verification
before disposal; and(5) Detailed engineering drawings which demonstrate:
D.
E.
DWMRC-03
Page 9 of 2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
a. There are at least four feet of tailings sands under the bottom of each
disposal area; and
b. The bottom of each disposal area is located at least 12 feet from the
sides or dikes of the tailings cell.
F. The Licensee shall notify the Director in writing at least seven calendar days prior to
the proposed scheduled date for disposal of any byproduct material generated at ISL
facilities in the tailings cells.
An annual summary of the amounts of waste disposed of from off-site ISL
generators shall be sent to the Director on or before November I of each calendar
year.
[Applicable UDWMRC Amendment: 4J fApplicable UDWMRC Amendment: 8
RenewalJ
10.6 The licensee is authorizedto receive and process source materials from the Allied Signal
Corporation's Metropolis, Illinois, facility in accordance with the amendment request to the
NRC dated June 15, 1993.
10.7 The licensee is authorizedto receive and process source material from Allied Signal, Inc. of
Metropolis, Illinois, in accordance with the amendment request to the NRC dated September
20, 1996 and amended by letters to the NRC dated October 3 0, 1 996 and November I 1 ,
1996.
10.8 The Licensee is authoizedto receive source material (the SFC Uranium Material) from the
Sequoyah Fuels Corporation Facility located near Gore, Oklahoma, in accordance with
statements, representations and commitments contained in the Amendment Request
submitted to the Director dated December l5,20ll and supplemented by submittals dated
August 30,2013 and October 21,2013. The total amount of material stored and processed
shall not exceed the following parameters:
(l) Altemate feed material stockpiled in bulk form shall not exceed 16,700 tons
gross weight (approximately 7,520 tons dry weight), without prior approval
of the Director; and
(2) The number of bags of the SFC Uranium Material stored on the ore storage
pad shall not exceed 17,250 SuperSaks, without prior approval of the
Director. The weight of any SuperSak contain the SFC Uranium Material
shall not exceed approximately 2,200 pounds.
The following specific provisions apply to off-loading and on-site storage of the SFC
Uranium Material: (l) SuperSaks of the SFC Uranium Material stored (stockpiled) at the
Mill Site shall be covered with a minimum six-inch thick layer of soil to provide resistance
to damage of the fabric bags containing the SFC Uranium Material by ultraviolet (UV)
DWMRC-03
Page l0 of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
radiation and provide shielding of the gamma radiation field emanating from the bagged
material, and to the extent any SuperSacs are damaged or leaking, the SuperSacs shall be
kept in a moist condition by daily water sprays until such time as they are covered with soil;
(2) Soil cover shall be applied over SuperSaks within three days following placement of the
SuperSaks on the ore storage pad; (3) Soil cover shall be monitored daily for apparent
dusting and will be sprayed with water when the cover soil or the ore pad conditions in
general, indicate the potential for dust generation; (4) If at any time, visible dust is observed
to be originating from SFC Uranium Material stored on site or from the cover placed over
this material, the EFRI RSO or his or her authorized representative shall take actions within
30 minutes to stop the generation of visible dust; and (5) All offloading of SuperSaks onto
the storage pad shall cease when wind speeds exceed 20 mph, unless such Super Sacs are
not damaged or leaking upon arrival and during offloading.
[Applicable UDWMRC Amendment: 8 RenewalJ
10.9 The licensee is authorizedtoreceive and process source material from Cabot Performance
Materials' facility near Boyertown, Pennsylvania, in accordance with the amendment
request to the NRC dated April 3, 1997, as amended by submittals to the NRC dated May
19, 1997 and August 6, 1997 .
[Applicable NRC Amendments: 4J
10.10 DELETED by DWMRC Reserved [Applicable UDWMRC Amendment:8 RenewalJ
10.11 The licensee is authorizedto receive and process source material from Cameco
Corporation's Blind River and Port Hope facilities, located in Ontario, Canada, in
accordance with the amendment request to the NRC dated June 4, 1998, and by the
submittals to the NRC dated September 14,1998, September 16,1998, September 25,1998,
October 7,1998 and October 8, 1998.
However, the licensee is not authorized to receive or process from these facilities, the
crushed carbon anodes identified in these submittals, either as a separate material or mixed
in with material already approved for receipt or processing.
10.12 DELETED by DWMRC Reserved fApplicable UDWMRC Amendment: 8 RenewalJ
10.13 DELETED by DWMRC Resewed[Applicable UDWMRC Amendment:8 RenewalJ
10.14 DELETED by DWMRC Reserved[Applicable UDWMRC Amendment:8 RenewalJ
10.15 DELETED by DWMRC Reserved[Applicable UDWMRC Amendment: 8 RenewalJ
10.16 DELETED by DWMRCResewed[Applicable UDWMRC Amendment: 8 RenewalJ
DIVISION OF WASTE MANAGEMENT AND RADIATION
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
DWMRC-03
Page I I of21
CONTROL
License #UT1900479
Amendment #8
10.17 The licensee is authorizedto receive and process source material from the Molycorp site
located in Mountain Pass, California, in accordance with statements, representations and
commitments contained in the amendment request to the NRC dated December 19,2000,
and supplemental information in letters dated January 29,200I, February 2,2001, March
20, 2001, August | 5, 2001, October 17, 2001 and November I 6, 2001.
[Applicable NRC Amendment: 20J [Applicable UDWMRC Amendment: 8 RenewalJ
10.18 DELETED by DWMRC Resewed[Applicable UDWMRC Amendment: 8 RenewalJ
10.19 The licensee is authorizedto receive and process source material from Ponds 2 and 3 of the
FMRI's Muskogee Facility located in Muskogee, Oklahoma, in accordance with statements,
representations and commitments contained in the amendment requests and submittals to the
Director dated March 7 , 2005 , Jtrne 22, 2005 , and April 28, 2006 .
[Applicable UDIryMRC Amendment: 2J
10.20 The licensee is authorizedto receive and process source material from Dawn Mining
Company's Midnite Mine site in Wellpinit, Washington, in accordance with statements,
representations and commitments contained in the Amendment Request submitted to the
Director, Division of Radiation Control dated Aprll27,2011 and submittals to the Director
dated December 5,2012, June 14, 2013 and August 7,2013. The Licensee is authorized to
receive no more than 1,000 tons per year and a total limit of 4,500 tons (dry weight) under
this license condition without prior approval from the Director.
A. (l) Unless contained within a closed SuperSac or other container that is not
damaged or leaking,-Dawn Mining Uranium Material stored (stockpiled) at the Mill
Site longer thanl4 days shall be covered with a durable geomembrane cover resistant
to damage by ultraviolet (JV) radiation and suffrcient ballast shall be placed over
the cover to prevent wind uplift of the cover during peak wind conditions at the site;
and
(2)lf at any time, visible dust is observed to be originating from Uranium Material
stored on site, the EFRI RSO or his or her authorized representative shall take
actions within 30 minutes to stop the generation of visible dust.
[Applicable UDWMRC Amendment: 7J
10.2I The licensee shall remediate, in accordance with applicable rules and regulations, any
groundwater contamination found at or near the White Mesa facility in a manner and
schedule approved by the Director. Any wastewater or contaminated groundwater
generated, recovered or produced by a remediation process or activity at the White Mesa
facility shall be 1le.(2) byproduct material. As of May 1,2017, groundwater contaminants
DWMRC-03
Page 12 of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
that require remediation at or near the site include, but are not limited to, chloroform, carbon
tetrachloride, dichloromethane, chloromethane and nitrate.
fApplicable UDWMRC Amendment: 8 Renewal]
SECTION 11: MONITORING, RECORDING, AND BOOKKEEPING REQUIREMENTS
1 1 .1 The results of sampling, analyses, surveys and monitoring, the results of calibration of
equipment, reports on audits and inspections, all meetings and training courses required by
this license and any subsequent reviews, investigations and corrective actions, shall be
documented. Unless otherwise specified in the Radiation Control Rules, all such
documentation shall be maintained for a period of at least five years.
ll.2 The licensee shall implement an effluent and environmental monitoring program as
described in Sections 2 through 7 of the NRC Regulatory Guide 4.14 Radiological Effluent
and Environmental Monitoring at (Jranium Mills and as revised with the following
modifications, additions and exceptions:
A. Stack sampling shall include a determination of flow rate.
B. Surface water samples shall be anaLyzed semiannually for total and dissolved U-nat,
Ra-226,and Th-230, with the exception of the Westwater Creek, which shall be
sampled annually for water or sediments and analyzed as above. A sediment sample
shall not be taken in place of a water sample unless a water sample was not
available.
C. Groundwater sampling shall be conducted in accordance with the requirements in the
current Utah Ground Water Discharge Permit No. UGW370004.
D. With the exception of groundwater sampling, the licensee shall utilize lower limits of
detection in accordance with Section 5 of the NRC Regulatory Guide 4.14, as
amended, for analysis of effluent and environmental samples.
E. The inspections performed semiannually of the critical orifice assembly committed
to in the submittal to the NRC dated March 15, 1986, shall be documented. The
critical orifice assembly shall be calibrated at least every two years against a positive
displacement Roots meter to obtain the required calibration curve.
[Applicable UDWMRC Amendment 3J [Applicable UDWMRC Amendment: 8
RenewalJ
I 1.3 The licensee shall implement a monitoring program of the leak detection systems for
disposal Cells 44 and 48 in accordance with requirements of the Permit. The licensee shall
DWMRC-03
Page 13 of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
also implement an operation, maintenance and monitoring program of the leak detection
systems for disposal Cells l, 2, and 3 as follows:
A. The licensee shall maintain all leak detection system piping, including any access
pipes, open, fully functional and free of soil, debris or detritus. All access pipes shall
be capped to prevent inflow of rainwater, soil, debris or detritus when not in use for
monitoring or pumping. The licensee shall conduct annual video logs of all access
pipes to demonstrate the physical condition of the system. In the event that the
licensee determines any access pipe is blocked, partially blocked or otherwise not
fully functional, the licensee shall: 1) remove all blockages within 14 calendar days
of discovery , and 2) submit a written report for Director approval within 30 calendar
days of discovery.
B. Leak Detection System. The licensee shall measure and record the inches of water
pressure head on the pump transducer in each of the tailings disposal cell leak
detection system standpipes on a weekly basis in a manner approved by the Director.
The transducer and pump shall be placed as low as reasonably practical in the
standpipe as approved by the Director. The system shall be set such that the alarm
will be triggered when the transducer senses a pressure of two inches of water head
or greater. The pump shall turn on when the transducer senses a water head pressure
on the transducer at or above the level for the cell specified in the following table:
Cell Water Head Pressure on Transducer
Cell 1 12 inches
Cell2 18 inches
Cell3 12 inches
If fluid is present in the leak detection system (LDS) of any cell above the water
head pressure on the transducer specified in the table set out in License Condition
1 1.3B, the licensee shall:
1. Pump the fluid from the LDS immediately upon discovery to a water head
pressure on the transducer at or below the level for the cell specified in the table
set out in License Condition I 1.3B.
2. Immediately commence and continue daily monitoring of LDS water head
pressure on the transducer and volumes removed, until otherwise approved by
the Director.
C.
DIVISION OF WASTE MANAGEMENT AND RADIATION
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
DWMRC-03
Page 14 of2l
CONTROL
License #UT1900479
Amendment #8
D.
3. Maintain the water head pressure on the transducer at or below the level for the
cell specified in the table set out in License Condition I 1.3(B).
4. Return any LDS fluid pumped to an approved disposal cell.
If fluid is pumped from a LDS, the licensee shall calculate the flow rate either by a
flow meter or by dividing the recorded volume of fluid recovered by the elapsed
time since fluid was last pumped or increases in the LDS fluid levels were recorded,
whichever is the more recent. The licensee shall document the results of this
calculation.
If the flow rate calculated under License Condition 11.3(D) is gteater than zero for
30 continuous calendar days, but does not exceed one gallon per minute, the licensee
shall, unless it determines the root cause of the failure through other means, reduce
the solution level in the Cell by up to 12 inches elevation to determine whether or
not the reduction in solution elevation materially reduces the flow rate. If the flow
rate is materially reduced, this will be considered to indicate that one or more liner
repairs are required above the reduced elevation level, where exposure to wave
action and the elements are most likely to have impacted the liner. If any such
repairs are required, the licensee will submit a plan and schedule for Director
approval for an investigation of the liner above such reduced solution level and for
completion of such repairs.
If the licensee is unable to determine the root cause of the leak after following the
steps described in this license condition, the licensee shall meet with the Director to
determine whether or not any further actions are warranted and practicable in the
circumstances.
Either of the following events shall constitute a violation of this License: 1) Failure
to maintain the LDS fluid level elevation pursuant to License Condition I1.3(CX1),
above, and such failure is not rectified within two days after discovery; or 2) the
flow rate calculated under License Condition 11.3(D) is equal to or greater than one
gallon per minute. Immediately upon determination of such an event, the licensee
shall:
(1) Evaluate the root cause of the event and take appropriate and timely actions
to mitigate the event and any consequent potential impacts;
(2) Continue to measure and record LDS water head pressure on the transducer
and removed volume measurements daily until otherwise approved by the
Director; and(3) NotiS the Director by telephone within 48 hours, in accordance with License
Condition 9.2, and submit a written report, for Director approval, within 30
E.
F.
DWMRC-03
Page 15 of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
calendar days of the telephone notice, in accordance with License Condition
9.2. The written report shall include a description of the mitigative action(s)
taken and a discussion of the mitigative action results. In the event that
mitigative actions have yet to be taken, the written report will include a
detailed workplan and schedule.
G. In addition to the reporting required in License Condition I1.3(A), (B), (C), and (D),
all sampling, analysis and evaluation of LDS fluids shall be documented and all records
retained onsite until license termination for Director inspection.
[Applicable UDWMRC Amendment 3J [Applicable UDWMRC Amendment: 4J
fApplicable UDWMRC Amendment: 8 RenewaU
ll.4 Annually, the licensee shall collect, during mill operations, a set of air samples covering
eight hours of sampling, at ahigh collection flow rate (i.e., greater than or equal to 40 liters
per minute) in routinely or frequently occupied areas of the mill. These samples shall be
analyzed for gross alpha. In addition, with each change in mill feed material or at least
annually, the licensee shall analyze the mill feed or production product for U-nat, Th-230,
Ra-226, and Pb-210 and use the analysis results to assess the fundamental constituent
composition of air sample particulates.
fApplicable NRC Amendment: 7]
I 1.5 Calibration of in-plant air and radiation monitoring equipment shall be performed as
specified in the license renewal application, under Section 3.0 of the "Radiation Protection
Procedures Manual," with the exception that in-plant air sampling equipment shall be
calibrated at least quarterly and air sampling equipment checks shall be documented.
I1.6 The licensee shall perform an annual ALARA audit of the radiation safety program in
accordance with the NRC Regulatory Guide 8.31.
ll.7 Settlement Monitoring Standard Qperating Procedure. The licensee shall perform
settlement monitoring for vertical settlement in the tailings management cell area in
accordance with the current Director approved Settlement Monitoring Standard Operating
Procedure (SOP). The licensee shall document settlement monitoring data and compare
such data to previous data to track potential settlement. All data collected by the Licensee
for these purposes shall be included in an annual report to be submitted to the Director,
pursuant to License Condition 12.2. The SOP shall include the following minimum
provisions:
A. Require that settlement monitors (e.g., settlement stands) be promptly installed
following placement of temporary cover over placed tailings;
DWMRC-03
Page 16 of 21
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
B.Require installation of one or more representative settlement monitoring stand(s)
above each ISL source disposal area that has been closed to further disposal pursuant
to License Condition 10.5.A. There shall be at least one settlement monitoring stand
for each ISL source disposal area, estimated to be about 22,500 square feet.
Installation of the settlement monitoring stand and initial elevation survey shall be
completed by the licensee within 30 calendar days of completion of each ISL source
disposal area;
Indicate that the licensee will utilize settlement monitoring devices and methods that
are resistant to shifting in their positions as a result of such forces as frost heave,
erosion, burrowing animals, or other environmental factors;
Include provisions to prevent man-caused damage to settle{nent monitoring devices,
including, but not limited to vehicle and construction traffic damage. Such measures
will include: l) all equipment, procedures and provisions needed to protect the
settlement monitoring devices, 2) schedules for rapid verbal and written reporting of
any such damage, and 3) corrective actions taken or to be taken by the licensee to
replace and/or repair said devices;
Indicate that settlement monitors will be:
(1) Initially surveyed by a Utah Licensed Professional Land Surveyor within 30
calendar days of installation;
(2) Surveyed monthly; and
(3) Surveyed annually by a Utah Licensed Land Surveyor. Review of the data
and an analysis shall be performed and certified by a Utah Licensed
Professional Engineer and submitted annually as part of the ATER required
by License Condition 12.2;
Include procedures requiring that such settlement monitors be placed, surveyed,
mapped and maintained; that corrective action and maintenance activities be
performed to maintain existing monitoring devices in a reliable, good working
condition, as needed; that the addition, surveying and mapping of new settlement
monitoring devices installed be documented; and that records be made of
observations of site conditions as they relate to the conditions at and in the vicinity
of the installed monitoring devices;
Provide quantitative performance criteria and describe how such criteria will be used
to evaluate vertical movement;
Indicate that any settlement monitoring device that is irreparably damaged as a result
of environmental stresses or through man-caused contact, including but not limited
C.
D.
E.
F.
G.
H.
DIVISION OF WASTE MANAGEMENT AND RADIATION
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
DWMRC-03
Page 17 of21
CONTROL
License #UT1900479
Amendment #8
to cell construction or other operational equipment, shall be promptly replaced with
an identical or equivalent monitoring device and provisions provided to guide the
interpretation of data from both the former and the replacement device;
I. Indicate that where survey evidence suggests that significant apparent movement in a
settlement monitor has occurred, in excess of the approved performance criteria, that
the departure(s) will be investigated and explained and errors corrected and resolved
in a timely manner, subject to Director approval;
J. Indicate that photographs shall be taken of the monitoring areas at least annually to
document site and device conditions. Additionally, the SOP shall indicate that
photographs shall be taken following any instances of turusually severe weather or
incidents involving equipment if they result in physical damage or disturbance to any
settlement monitoring device or significant changes to the ground surface areas
adjacent to or surrounding a settlement or displacement monitoring device;
K. Include a list of records that will be prepared for documenting settlement data for
each settlement monitoring device and related site observations and activities; and
L. Indicate that results and records of settlement monitoring shall be submitted annually
as part of the ATER required by License Condition 12.2.
[Applicable UDWMRC Amendment: 4J
11.8 Movement (Displacement) Monitoring Standard Operating Procedure. The licensee shall
perform monitoring for potential vertical and horizontal movements in the constructed dike
portions of the tailings management cells in accordance with the current Director approved
Movement Monitoring Standard Operating Procedure (SOP). The licensee shall document
displacement monitoring data and compare such data to previous datato track potential
movement (displacement). All data collected by the licensee for these purposes shall be
included in an annual report to be submitted to the Director, pursuant to License Condition
I2.2. Said SOP includes the following minimum prwisions:
A. Require that movement monuments be promptly installed following completion of
construction of cell dikes:
Indicate that the licensee shall utilize movement monuments and monitoring
methods that are resistant to shifting in their positions as a result of such forces as
frost heave, erosion, burrowing animals or other environmental factors;
Include an obligation for the licensee to prevent man-caused damage to movement
monuments, including but not limited to, vehicle and construction traffrc damage.
Such measures will include: 1) all equipment, procedures and provisions needed to
B.
C.
DWMRC.O3
Page l8 of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
D.
protect said settlement monitoring devices, 2) schedules for rapid verbal and written
reporting of any such damage, and 3) conective actions taken or to be taken by the
licensee to replace and/or repair said devices;
Indicate that movement monuments will be:
(1) Initially surveyed by a Utah Licensed Land Surveyor within 30 calendar days
of installation;(2) Surveyed semi-annually for the first three years following installation by a
Utah Licensed Land Surveyor.
(3) Surveyed annually after the first three years by a Utah Licensed Land
Surveyor(4) Subjected to accelerated monitoring conducted under certain circumstances,
at a frequency and in a manner approved by the Director; and
(5) Reviewed annually by a Utah Licensed Professional Engineer, who shall
perform and certifr an analysis of all survey data. This analysis shall be
submitted pursuant to License Condition 12.2;
Include procedures requiring that such movement monuments be placed, surveyed,
mapped and maintained; that corrective action and maintenance activities be
performed to maintain existing movement monuments in a reliable, good working
condition, as needed; that the addition, surveying and mapping of new movement
monuments installed be documented; and that records be made of observations of
site conditions as they relate to the conditions at and in the vicinity of the installed
monuments;
Provide quantitative performance criteria and describe how such criteria will be used
to evaluate movements (displacements);
Indicate that any movement monument that is irreparably damaged as a result of
environmental stresses or through man-caused contact, including but not limited to
cell construction or other operational equipment, shall be promptly replaced with an
identical or equivalent movement monument and provisions provided to guide the
interpretation of data from both the former and the replacement device;
Include a list of records that will be prepared for documenting movement
(displacement) data for each movement monument and related site observations and
activities; and
Indicate that results and records of movements (displacements) shall be submitted
annually as part of the ATER required by License Condition 12.2'
[Applicable UDWMRC Amendment: 4J
E.
F.
G.
H.
DIVISION OF WASTE MANAGEMENT AND RADIATION
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
DWMRC-03
Page 19 of2l
CONTROL
License #A11999479
Amendment #8
SECTION 12: REPORTING REQUIREMENTS
l2.I The licensee shall submit a detailed decommissioning plan to the Director atleast 12
months prior to planned final shutdown of mill operations that includes a detailed Quality
Assurance Plan. The plan will be in accordance with NRC Regulatory Guide 4.15,
"Quality Assurance for Radiological Monitoring Programs" and NUREG-I57l, "Multi-
Agency Radiation Survey and Site Investigation Manual (MARSSIM)" or equivalent most
current guidance.
[Applicable NRC Amendment: I3J[Applicable UDWMRC Amendment: lJ
[Applicable UDWMRC Amendment: 2J
12.2 Annual Technical Evaluation Report (ATER). The licensee shall submit an ATER for
Director-approval no later than December I of each year, to coincide with the annual
freeboard calculation date of November Itt of each year when using the new Freeboard
Calculation Method, as described in the letter from David A. Rupp of the Utah Division of
Radiation Control to Mr. David C. Frydenlund of Denison Mines (USA) Corp, dated April
29,2010. Each ATER shall incorporate all documents and attachments, including
applicable updates to previously submified documents with attachments that support
information presented in the ATER, including, but not limited to maps, drawings, tables
and figures. The licensee shall include, as part of the ATER, results of tailings cell
temporary cover settlement and dike displacement monitoring activities. The content of
the tailings cell temporary cover settlement and displacement monitoring progftlm related
information shall include those records required under the Settlement Monitoring and
Movement Monitoring SOPs (License Conditions I 1.7 and 1 1.8) as approved by the
Director.
[Applicable UDWMRC Amendment: 4J
12.3 The licensee shall conduct a survey of land use (private residences, grazing areas, private
and public potable water and agricultural wells, non-residential structures and uses and
assess population growth or industry growth) in the area within five kilometers radius
once every two years of the White Mesa Uranium Mill facility property boundaries and
submit a report of this survey to the Director. The report shall be submitted on or before
June 30 on even numbered years. This report shall indicate any differences in land use
from that described in the last report including the following: 1) providing references
and/or a description of methods utilized to obtain information included in the report;2)
listing all water wells, owners, approved use and contact information within the specified
search radius; and 3) including information on an updated land use map to be included
with the report. [Applicable UDWMRC Amendment: 8 RenewalJ
SECTION 13: CLOSEOUT CONDITIONS
DWMRC-03
Page20 of21
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #UT1900479
Amendment #8
13.1 Except as specifically provided otherwise by this license, the licensee shall conduct
operations in accordance with the statements, representations and procedures contained in
the documents, including any enclosures, listed below. Whenever the word "will" is used in
the documents referenced below, it shall denote a requirement. The Radiation Control Rules
shall govem unless the statements, representations and procedures in the licensee's
application and correspondence are more restrictive than the rules.*
A. Licensee's Standby Trust Agreement, as amended;
B. Licensee's letter to the NRC dated August 23,l99l (including the license renewal
application);
C. Licensee's revision submitted to NRC January 13,1992;
D. Licensee's revision submitted to NRC April 7, 1992;
E. Licensee's revision submiued to NRC November 22,1994;
F. Licensee's revision submitted to NRC July 27, 1995;
G. Licensee's revision submitted to NRC December 13,1996;
H. Licensee's revision submitted to NRC December 31,1996;
I. Licensee's revision submitted to NRC January 30,1997.
J. Licensee's letter dated May 25,2012 (Transfer of Control)
K. Licensee's letter dated Jvne 27 ,2012 (Transfer of Control)
L. Director's Letter dated June 27 ,2012 (Transfer of Control Approval)
M. Licensee's letter dated August 3,20t2 (Name Change)
N. Electronic Mail from David Frydenlund dated August 15,2012 (Change Mailing
Address)
O. Electronic Emails from David Frydenlund dated October 22 and23,2013
P. Licensee's letter dated December 13,2013 (Performance Bond)
a. Director's letter dated December 20,2013
R. Licensee's letter dated April 27,201 I (Dawn Mining Alt feed)
S. Licensee's letter dated December 5,2012 (Dawn Mining Alt feed)
T. Licensee's letter dated June 14,2013 (Dawn Mining Alt feed)
U. Licensee's letter dated August 7,2013 (Dawn Mining Alt feed)
V. Electronic Email from Kathy Weinel dated Apil24,20l4to John Hultquist
requesting minor mod to LC 11.9.
W. White Mesa Uranium Mill License Renewal Application State of Utah Radioactive
Materials License No. UT1900479, Volumes I through 5, from Denison Mines
(USA) Corp. dated February 28,2007 to Utah Division of Radiation Control.
X. Health Physics and Engineering Interrogatories, Rounds I through 3, from Utah
Division of Radiation Control dated November 24,2008, July 2,2009, and
December 28,2009 to Denison Mines.
Y. Responses to DWMRC Health Physics and Engineering Interrogatories, From
Denison Mines dated February 5,2009, April20, 2009, May 15, 2009, August 14,
2009, September 14, 2009, September 28, 2009, November 24, 2009, November 25,
2009. and March 5.2010 to Utah Division of Radiation Control
DWMRC-03
Page2l of2l
DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL
RADIOACTIVE MATERIALS LICENSE
SUPPLEMENTARY SHEET
License #IJf1900472
Amendment #8
Z. Sequoyah Fuels Altemate Feed Request dated December 15,2012, from Energy
Fuels Resources Inc. to the Division of Radiation Control.AA. White Mesa Uranium Mill Reclamation and Decommissioning Plan Rev 5.1B, from
Energy Fuels dated February 8,2018 to the Division of Radiation Control.
* For 13. LB through I3.l.I- NRC Amendment: 2;
For 13. I.J through I3.I.N- UDWMRC Amendment 5
For 13.L0 through 13.1.Q - UDWMRC Amendment 6
For I3.LR through 13.1. V- UDWMRC Amendment 7
For I 3. 1 W through I 3. IAA - UDWMRC Amendment 8
GEMENT AND RADIATION CONTROLDIVISION OF W