Loading...
HomeMy WebLinkAboutDRC-2011-002864 - 0901a0688021219eState of Utah GARY R. HERBERT GREG BELL Lieutenant Governor March 14, 2011 Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director CERTIFIED MAIL (Return Receipt Requested) Ms. Jo Ann Tischler Director, Compliance and Permitting Denison Mines (USA) Corp. (DUSA) 1050 Seventeenth Street, Suite 950 Denver, CO 80265 Dear Ms. Tischler: 011-002864 m zr DP LO or ru DT a o a • or a a (Domestic Mail.Only; No Insurance Coverage Provided) OFFICIAL US*E Postage Certified Fee $ Postmark RE: 3/14/11; response to 2/25/09, closeout/ DR Jo Ann Tischler Denison Mines (USA) Corp 1050 Seventeenth ST. STE 950 Denver, Co 80265 ^RS..Fo|m;;38:(30u^ 2006 v ; See ReA/e.rse'.To'i;.Jpstiu^idiidns;^ SUBJECT: April 23, 2010 DUSA Letter Response to February 25, 2009 [2010] DRC Request for Information Letter; September 30, 2009 Annual Technical Evaluation [The Annual Technical Evaluation Report (ATER)] ofthe White Mesa Mill Tailings Management System for the period of August 2008 through July 2009; Closeout Letter We received the subject DUSA letter dated April 23, 2010. This letter was sent in response to our subject Request for Information letter dated February 25, 2009 [2010]. In the subject April 23, 2010 DUSA response letter, DUSA makes several commitments. These are enumerated below, and include the following: 1 A. "The Settlement Monitor map will be updated for the 2010 ATER and the monitoring data will be included in the report." IB. Comments from previous comment letters, as applicable, will be carried forward into future ATER reports." 3B. As part of the recent proposed modifications to the Radioactive Material License No. UT 1900479 (DRC-04), DUSA committed to provide DRC with a "Movement (Displacement) Monitoring Standard Operating Procedure"... DUSA will endeavor to have a draft of this SOP to DRC at the time of the submittal of the 2010 ATER, and will utilize the draft criteria in the evaluation of the newly acquired movement monument data." 1 In response to the April 23, 2010 DUSA letter, adjustments to DUSA's Radioactive Material License were made, effective June 17, 2010. These changes included new requirements for These item numbers correspond to the item numbers in the subject April 23, 2010 DUSA letter and the February 25, 2009 [2010] DRC letter. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414 www.cieq.utah.gov , Printed on 100% recycled paper Page 2 settlement and movement monitoring standard operating procedures. New License Condition 11.7 and 11.8 discuss these requirements. Therefore our review of the subject September 30, 2009 ATER is closed-out. UTAH RADIATION CONTROL BOARD Rusty Lundberg Executive Secretary RL:DAR: dr F:\drupp\DUSA\ATER\2009\Closeout letter.doc