HomeMy WebLinkAboutDRC-2009-007442 - 0901a06880169cdaDENISOJ,/ ililNES \)1.-)LCYL rcTLlk Dmber lar(Uf{ CortfOl0lrh$r i,&lbttO O.rrYrl, CO Ml u3A Td: t00ll}?llfu: lCt lto.ll2t VIA Overnight Delivery September 30, 2009 Mr. Dane Finerfrock, Executive Secretary, Utah Radiation Control Board, Utah Department of Environmental Quality, Division of Radiation Control 168 North 1950 West Salt Lake City, Utah 84114-4850 Dear Mr. Finerfrock: Re: State of Utah Radioactive Material License No. UT1900479 Annual rechnical Evaluation, white Mesa Mill railings Management system Enclosed please find one (1) copy of the 2008 - 2009 Annual Technical Evaluation of the White Mesa MillTailings Management System, as required by State of Utah Radioactive Material License No. UT1900419. A CD containing electronic files of the full report is also enclosed. lf you should have any questions regarding this matter, please contact me. Yours very truly,2a'- Detrsor.r Mlues (USA) Gonp. Steven D. Landau Manager, Environmental Affairs Ron F. Hochstein Harold R. Roberts David C. Frydenlund Rich E. Bartlett % "a-))/{'1- J)! N{a, A\ (o\d7 ozsretD':' Annual Technical Evaluation ofthe White Mesa Uranium Mill Tailings Management System For the Period of August 2008 through July 2009 prepared for Denison Mines (USA)Corp. in compliance with State of Utah lle.(2)Byproduct Materials License #UT1900479 by Harold R.Roberts,P.E. August 18 -19,2009 Table of Contents Evaluation Summary and Recommendations Site Photographs Annual Movement Monument Survey Settlement Monitors Summary of Monthly Solution Freeboard Measurements Inspection Reports (December 2009) Monthly Inspections for the Evaluation Period (August 2008 through July 2009) Evaluation Summary and Recommendations Annual Technical Evaluation of the White Mesa Uranium Mill Tailings Management System For the Period ofAugust 2008 through July 2009 Evaluation Procedure Denison Mines (USA)Corp.operates the White Mesa Uranium Mill under State of Utah 11 e.(2) Byproduct Materials License No.UT1900479,dated February 16,2005.The License incorporates the White Mesa Mill's Standard Operating Procedures contained in the 1987 U.S Nuclear Regulatory Commission renewal application.These documents reference the White Mesa Environmental Protection Manual,Section 3.1,Appendix E,Revision 1,dated December 1998,and provide the methodologies for monitoring and evaluating the Tailings Management System. Reference documents are listed in the Reference section at the end ofthis summary. This Annual Technical Evaluation was performed on August 18th and 19th,2009,in accordancewith the White Mesa Mill Environmental Protection Manual and consisted of the following elements: •Review ofthe Tailings Management System operation and maintenance procedures, and interviews with current site personnel and management to ensure there is an adequate understanding ofthe requirements. •Review ofrandomly selected daily,weekly,monthly,and quarterly inspectionrepOlis to ensure established procedures are followed and that there are no irregularities that have not been properly documented. •Interview responsible personnel to verify that updated training has been given. •Discuss with inspection personnel,as necessary,any non-routine or abnormal occurrences noted during the review ofthe inspection reports. Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 •Inspection of the tailings embankments and appurtenances for signs of distress or concern that could potentially affect the stmctural integrity of the Cell dikes and containment. •Inspection of the area surrounding the tailings facility to determine condition of diversion ditches.Review additional peripheral items,such as prairie dog activity, which could affect the system. •Review ofthe survey conducted on Movement Monitors along the dike centerlines, and comparison ofthe data to recent surveys. •Review of the tailings slurry and raffinate piping systems to ensure that their operation does not have the potential to affect the integrity of the tailings dikes or liner system. •Review ofmaintenance activities in the tailings area that have the potential to affect the integrity ofthe tailings dikes or liner system. •Photographic documentation ofthe condition ofthe Cell dikes and surrounding areas. •Review recommendations provided in previous technical evaluation reports and document the implementation or continued need for action. Page 2 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 Operations During the period covered by this evaluation,August 2008 through July 2009,the Mill was processing conventional ore from the Company's mines,and had recently started up the new alternate feed processing circuit.UF4 material from Cameco Corporation was being processed in the alternate feed circuit.Effluent discharged to the tailings system during the period covered by this evaluation consisted of conventional uranium/vanadium ore slurry and raffinate (barren solution) from the solvent extraction circuit,small quantities of process water from mill clean-up activities, and a small amount ofprocess tailings from the Cameco UF4 material.During the conventional ore processing,solutions were being recycled from Cell 3 and Cell 1 to the CCD circuit to be used as wash water.Throughout the time period covered bythis evaluation,solutions were moved between Cell 3,Cell 4A and Cell 1-1 to maintain freeboard limits and maximize evaporation potential. Tailings solids were discharge to Cell 3 and Cell 4A during this evaluation period. Site Management Mr.Rich Bartlett is the CUlTent White Mesa Mill Manager.Mr.Bartlett has the overall responsibility to ensure that the Tailings Management System is operated and maintained in accordancewith State ofUtah Radioactive Material License No.UT1900479.Mr.David Turk is the site Radiation Safety Officer.He administers the radiation and environmental safety programs and has day-to-day responsibility for regulatory compliance in the operation ofthe Tailings Management System.The Mill shift foremen,and selected radiation and environmental safety technicians,are trained by Mr. David Turk or Ryan Palmer to do the tailings area inspections.The trained inspectors are the Mill shift foreman; •Roy Atcitty •Eric Balch •Thane Holt Page 3 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 •Gage Sterling. Additional trained inspectors are; •Jerome Benally •Herschel Bennett •Guy Holiday •Tanner Holliday •Sinn Mays •Ryan Palmer •Josh Taylor All ofthe inspectors had documentation ofrecent training on the inspection procedures.Mr.Turk also conducts inspections on days that other individuals are not available because ofother duties or scheduled absence. Records A review was conducted ofall ofthe records kept on a daily,weekly,monthlyand quarterly basis for the period covered by this evaluation.A copy ofthese records for the month ofDecember 2008 is attached to this evaluation.In addition to the review ofall the records,the December 2008 records were examined for technical content and completeness and to evaluate anyunusual events.Monthly summaries for all the Daily Inspections are also prepared by the White Mesa staff to highlight specific events in the tailings area.The Monthly Summaries are reviewed by the Mill Manager to ensure compliance with the inspections and operational procedures.All ofthe Monthly Summaries were reviewed for any unusual events.Copies ofthe Weekly Inspections for December 2008 are also attached to this evaluation with the DailyInspections.Monthlyand Quarterly Inspection reports for the evaluation period are also attached to this evaluation.The record keeping is in excellent order Page 4 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 and consistent with requirements in the Environmental Protection Manual. Diversion Channels Diversion channels constructed to the north ofthe Mill and tailings area were inspected.Diversion Channels #1, #2,# 3 and the belm located north of the Mill facility were inspected.The visual inspection confilmed that the channels have been well maintained.The vegetation in and around diversion channels # 2 and #3 was consistent with the previous year.There was clearly nothing observedduring this evaluation to indicate that vegetation would have an impact on the effectiveness ofthe channels for the intended purpose.Diversion channel #1 had recently been graded and had no vegetation.The channels exhibited evidence of recent inspection activities.There was some evidence ofprairie dog activity in the vicinity ofthe # 1 channel.The attached Photographs No.1 through No.24 show typical sections ofall the diversion channels and the diversion berm nOlih of the Mill facility.Comments in the inspection reports indicate that the inspectors have a good understanding ofthe function ofthe diversion channels and the necessary maintenance required to keep the channels functional. Tailings Disposal Cells Cell 1-1 Cell I-I was the second cell placed into service after being completed in 1981.The Cell was designed to hold and evaporate tailings solution only.No solids are to be placed into the Cell.The solution discharged to the Cell normally comes from the solvent extraction circuit,but solution is Page 5 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 periodically pumped from Cell 3 to maintain required freeboard limits in the entire system.The daily inspection reports indicated that solution was transferred back and forth between Cell 1-1 and Cell 3 dming this evaluation period. Solution freeboard limits for all ofthe tailings cells are established in Section 3.0 to Appendix D of the approved license application and confirmed as License Condition 10.1 ofthe current License. The established maximum fi'eeboard limit for Cell 1-1 is 5615.4 feet MSL.Records examined indicate that there were no instances exceeding this level during the evaluation period. The engineered fill between Cell 1-1 and Cell 2 shows no signs of instability.The attached Photographs No.25 and No.26 show views around the perimeter ofCell 1-1 and the discharge point for transfer ofsolution fi'om Cell 3.Photograph No.25 shows the area ofrecent liner repair.There were nothing unusual observed on the Cell 1 dike or around the perimeter of Cell 1. Cell 2 Cell 2 was the initial Cell constructed and was placed into service when the Mill first began processing ore in 1980.The Cell is cmTently at capacity.The remaining open area ofthe Cell was covered with platform fill during the prior year.The pump and pump barge had been removed from the area.The Cell is not allowed to receive slurried tailings or liquid effluent from the milling process.The Cell has been completely covered with approximately four (4)feet of random fill (platfOlm fill)to prevent the migration of wind blown tailings,and accomplishes the first stage in completion of Cell reclamation.The area is showing moderate growth of native vegetation. Photographs No.27 and No.28 show areas of Cell 2 recently covered with platform fill. Elevation readings on the existing settlement monitors are taken monthly and will ultimately be used to detelmine when acceptable consolidation ofthe tailings sands has occurred.A summary ofthe settlement monitor elevations is included with this report along with graphs ofthe settlement data. Page 6 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 The spillway between Cell 2 and Cell 3 was inspected and showed no signs of obstruction or alternation that could affect its function.Photographs No.29 and No.30 show the spillwaybetween Cell 2 and Cell 3. Cell 3 Cell 3,constructed in 1983,is the current active Cell for disposal oftailings sand as well as 11 (e).2 waste matetials fi'om in-situ uranium producers.A small amount ofclean-up material from Cell4A is still present near the east-central part of the Cell.This material has also been used to aid in the prevention of blowing tailings sand on exposed areas ofthe Cell.During the evaluation period, slurry tailings from conventional ore processing was being discharged to the Cell in several locations.Photographs No.31 and No.32 show the regarding of an area of recently deposited tailings solids.Photographs No.33 and No.34 show the top surface ofthe dike between Cell 3 and Cell 4.The dike crest is exceptionally well maintained. The solution freeboard limit for Cell 3 is established in Section 3.0 to Appendix D ofthe approved license application,and modified by license amendment in October of 1999,and confirmed as License Condition 10.3 ofthe CUlTent License.The established maximum freeboard limit for Cell 3 was evaluated in September of2008 and adjusted to 5602.5 from the previous elevation of 5601.6 feet MSL.Records examined indicate that there was one (1)instance ofthe pond level exceeding this level,by 1.4 inches (0.12 foot),during the evaluation period and prior to the installation and approval ofthe spillway from Cell 3 to Cell 4A.This instance is not considered significant or a threat to the overall safety ofthe tailings system and was reported to be the result of mechanical problems with the Cell pumping system and the problem was quickly remedied.The subsequent weekly solution level readings were well below the freeboard limit. The downstream area ofthe Cell 3 dike showed no signs ofinstability or evidence ofany unusual occurrence in the engineered fill.The dike slope supported moderate vegetative growth and showed little or no evidence of surface water erosion.Photographs No.39 through No.50 show various Page 7 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 sections and views ofthe Cell 3 dike and examples ofvegetative growth on typical areas ofthe Cell 3 dike.As reported during the last evaluation,prairie dog activity was not evident at any point along the dike,or in the areas immediately south ofthe dike fills.Because ofthe installation ofthe new liner on the north side ofCe1l4A it was impossible to view any area ofthe downstream face ofthe Cell 3 dike on the north side ofCell 4A. Approximately 50%ofCell 3 has been covered with random fill.Elevation readings onthe existing settlement monitors are taken monthly and will ultimately be used to determine when acceptable consolidation ofthe tailings sands has occun'ed.A summary ofthe historical settlement monitor elevations is included with this report,along with graphs ofthe settlement data. Cell4A Ce1l4A was originally constructed in 1990 and was neverused for disposal oftailingsmaterial other than process solutions during the first years of its operation.The original 40-mil high-density polyethylene (HDPE)liner was removed from the Cell as well as all contaminated matelials and soil. The Cell was relined with a new HDPE lining system beginning in the fall of2007 and finishing in the summer of2008.The Cell was placed into service in October of2008. The established maximum freeboard limit for Cell 4A is 5595.3 feet MSL.Records examined indicate that there were no instances exceeding this level during the evaluation period. The Cell 4A dikes were inspected and showed no signs of instability or evidence of any unusual occurrence in the engineered fill.The dike slopes supported moderate vegetative growth on the west-facing slope with less vegetative growth on the south-facing slope.Photographs No.51 through No.74 shows the dike slopes and examples oftypical vegetative growth on the Ce1l4A dike slopes. There was some evidence ofminor surface water erosion in several small areas ofthe east-west Cell 4A dike.There was no prairie dog activity along either dike.The top surface ofthe dike was well maintained.Photographs No.75 and No.76 show the top ofboth Cell 4A dikes. Page 8 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 Movement Monuments The usefulness ofthe Movement Monitor data is in comparing the data from year to year,or over a several-year time period,to determine ifthere is CUlTent and continued horizontal or vertical movement in the dike fills.During the Annual Technical Evaluation,the most recent survey data is compared by the evaluator to the last several years'data in order to detect any abnormal occurrences.The majority ofthe Cell4A points were disturbed during the Cell re-lining activities and were re-set in the fall of2008.For these points there is no meaningful comparison back to previous points. Points are sometimes disturbed by maintenance activities.The disturbance of a single point is not significant because any catastrophic or large-scale movement in the dike fills would be noticeable in several ofthe monitor points,not just a single point.The potential for future disturbance ofmonitor points is always possible,and Mill maintenance personnel are cautioned to avoid the areas ofthe movement monitors during routine maintenance activities. None ofthe points along the Cell 3 dike or the two (2)Cell4A dikes show any abnormal movement.There is no trend in the Cell 3 or Cell 4A movement monitors. Survey data provided by Jones and Demille Engineers ofRichfield,Utah,was reviewed during the evaluation.The current data was compared to the previous two (2)years data.Evaluation of the data indicated only very minor movement may have OCCUlTed along the Cell 3 dike and the north south Cell 4A dike.All the possible movements were within expected and acceptable limits. Page 9 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 Settlement Monitors Elevation readings on all settlement monitors were reviewed during the evaluation.Several ofthe monitors in Cell 2 have shown significant vertical movement over thepast three (3)years.The cause ofthe apparent movement is not known,but could be related to on going slimes drain dewatering. The data will continue to be monitored by the Mill environmental staff.A summary ofthe data is included with this RepOli along with graphs ofthe settlement data. lle.(2)Waste Disposal There were 581 tons of11 e.(2)waste material,from two different sources,received and disposed of during the evaluation period. Tailings Transport System The tailings slurry and raffinate pipelines were inspected on a daily basis when the mill was operating according to the inspection reports.Tailings slurry from conventional uranium/vanadium ore processing was being discharged into Cell 3 and Cell 4A during this evaluation period.The slurry was discharged well into the interior ofCell 3 and there was no potential for impact to the Cell dikes or lining system fi'om the slurry discharge activities.The slurry was being discharge into Cell 4A along the north interior slope of the Cell,utilizing the protective splash pads constructed specifically for that purpose.There was no evidence that tailings discharge had adversely affected the liner system. Page 10 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 Conclusions and Recommendations The White Mesa Uranium Mill Tailings Management System is functioning as designed according to the routine inspection reports and the observations from this Annual Technical Evaluation conducted on August 18 and 19,2009.The inspection records were complete and the personnel involved were adequately trained to detect any abnormalities or signs ofdistress in a timely manner.The following items should be monitored or addressed: •The vegetative growth is moderate in all portions ofthe Diversion Ditches No.2 and No.3 and non-existent in Diversion Ditch No.1.Growth of vegetation should continue to be monitored during routine inspections and maintenance action taken as necessary.It is unlikely that significant growth will occur during the remaining months ofthis calendar year. •Vegetative growth along the dike faces is moderate on all areas ofthe dikes.The growth of grasses and weeds on the dikes should be monitored and efforts should be made to remove new growth of taller vegetation from the dike slopes of Cell 3 and Cell 4A in order to facilitate inspection ofthe dikes. •The spillway installed between Cell 2 and Cell 3 and between Cell 3 and Cell 4A,designed to pass the Probable Maximum Flood into the Cell 3and Ce1l4A impoundments,are both in very good condition.The condition ofthe spillways should continue to be monitored. •Annual refreshers on the requirements and operation ofthe Tailings Management System had been given to all personnel that are currently conducting the inspections.Annual refreshers for the inspectors are recommended,patiicularly with the additional requirements that are included in the Ce1l4A BAT Operations and Maintenance Plan.Trainers should ensure that all the inspectors have read and understand the Cell 4A BAT Operations and Maintenance Plan.Documentation ofthe most recent training ofinspection personnel was well organized and available for review. Page 11 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 •The potential for prairie dog activity along the south and west facing slopes ofCell 3 and Cell 4A should be monitored.There is some evidence of any prairie dog activity near Diversion Ditch No.1,but it is not significant at this time.A control program should be implemented is they move nearer to the diversion structures. •The discharge oftailings slurry along several points in Cell 3 has eliminated further potential for wind blown tailings.As the newly fonned beaches begin to dry,potential from blowing tailings should be monitored.There was no evidence ofany recent blowing tailings sand. Conditions should continue to be monitored after the tailings sands are graded to final contour. •Surface water erosion on the exterior slopes ofCell4A should be monitored and repaired as necessary. Respectively submitted, Page 12 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 Selected References The following documents were used or referenced in the annual technical evaluation ofthe White Mesa Uranium Mill Tailings Management System: State ofUtah lle.(2)Byproduct Materials License No.UT1900479,dated February 16,2005 U.S.NRC Materials License SUA-1358 with Amendment No.13,dated February 10,2000 "Site Selection andDesign Study,Tailings Retention andMill Facilities "by Dames &Moore,May 15,1978. "Environmental Report,White Mesa Uranium Project,San Juan County,Utah ". "Engineer's Report,Second Phase Design -Cell 3 Tailings Management System,White Mesa Uranium Project,Blanding,Utah"by D'Appolonia Consulting Engineers,February 1982. "Construction Report,Second Phase,Tailings Management System,White Mesa Uranium Project" by Energy Fuels Nuclear,Inc.,March 1,1983. "Cell 4 Design -Tailings Management System,White Mesa Project,Blanding,Utah"by Umetco Minerals Corporation,August,1988. "Design,Construction and Inspection of Embankment Retention Systems for Uranium Mills", October,1980,Nuclear Regulatory Commission Guide 3.11.1. "Safety Evaluations ofExisting Dams ",Bureau ofReclamation. "White Mesa Mill -Drainage Reportfor Submittal to NRC"dated January,1990. "White Mesa Mill -Environmental Protection Manual,Section 3.1,Appendix E",Revision 1, December 1998.International Uranium (USA)Corporation "Annual Technical Evaluation ofthe White Mesa Mill Tailings Management System",1996,1997, 1998,1999,2000,2001,2002. Page 13 Annual Technical Evaluation White Mesa Uranium Mill Tailings Management System August 18 -19,2009 "Annual Technical Evaluation ofthe White Mesa Mill Tailings Management System",June 2002 through May 2003. "Annual Technical Evaluation ofthe White Mesa Mill Tailings Management System ",June 2003 through May 2004. "Annual Technical Evaluation ofthe White Mesa Mill Tailings Management System ",June 2004 through July 2005. "Annual Technical Evaluation ofthe White Mesa Mill Tailings Management System ",July 2005 through July 2006. "Annual Technical Evaluation ofthe White Mesa Mill Tailings Management System",July 2006 through July 2007. "Annual Technical Evaluation ofthe White Mesa Mill Tailings Management System ",August 2007 through July 2008. Page 14 Site Photographs I I~ Slate:Utah WHITE MESA MILL County:San Juan './ Denison Mines (USA)Corp. REVISIONS Project I Date Bv Location:...... ~m~~~ 10/24107 BM .,.5, 05116108 BM MIll Site Drainage Basins u:: 06/11/08 BM 1219108 OLS Author:HRR 117109 I BM •Scale:1"=2000ft ---~ Sufrace Water Flow Drainage Basins Diversion Ditches Diversion Berm --1 f'1~~7l~o.~:C=;\j.)'~~d'i~\.~~r~~)jrc~o ..I ,,''d"~J ,~~~(\!O<lOoO~'0 ~\!,{;).j 0;;./ .''(~0 \ ,-.----,..~.. o I_..-----~O /0o0/'0 o .... Ji 1000 0 1000 2000I_......I I I W:\White Mesa Mill\dwg\Figure 2_1-6-Q9.dwg,3/30/2009 3:01:20 PM,Canon iR C4080-H1 PS Ver1.2 I--~-~~-~~~.~----- I I Photograph No.1-Diversion Ditch 2 -looking north Photograph No.2 -Diversion Ditch 2 -looking north Photograph No.3 -Diversion Ditch 3 -looking east Photograph No.4 -Diversion Berm -north side of Mill yard Photograph No.5 -Diversion Ditch 1-looking northwest Photograph No.6 -Diversion Ditch 1-looking north Photograph No.7 -Typical prairie dog activity Photograph No.8 -Typical prairie dog activity Photograph No.9 -Diversion Ditch I-looking north Photograph No.10 -Diversion Ditch I-looking west Photograph No.11-Diversion Ditch I-looking west Photograph No.12 -Diversion Ditch 1 -looking west Photograph No.13 -Diversion Ditch 1 Photograph No.14 -Diversion Ditch 1 Photograph No.15 -Diversion Ditch 1 Photograph No.16 -Diversion Ditch 1 Photograph No.17 -Diversion Ditch 1 Photograph No.18 -Diversion Ditch 1 Photograph No.19 -Diversion Ditch 1 Photograph No.20 -Diversion Ditch 1 Photograph No.21-Diversion Ditch 1 Photograph No.22 -Diversion Ditch 1 Photograph No.23 -Diversion Ditch 1 Photograph No.24 -Diversion Ditch 1 Photograph No.25 -Interior of CellI -area of recent liner repair Photograph No.26 -Interior ofCellI -southeast corner I Photograph No.27 -Cell 2 -Interim Cover Photograph No.28 -Interim Cover on Cell 2 -looking northeast Photograph No.29 -Spillway -Cell 2 to Cell 3 Photograph No.30 -Spillway -Cell 2 to Cell 3 Photograph No.31-Re-grading Tailings Sand -Cell 3 Photograph No.32 -Re-grading Tailings Sand -Cell 3 Photograph No.33 -Cell 3 Dike -looking east Photograph No.34 -Cell 3 Dike -looking east Photograph No.35 -Spillway -Cell 3 to Cell4A / I Photograph No.36 -Spillway -Cell 3 to Ce1l4A Photograph No.37 -Spillway -Cell 3 to Cell4A Photograph No.38 -Spillway -Cell 3 to Cell4A Photograph No.39 -Cell 3 Dike looking east Photograph No.40 -Cell 3 Dike looking east Photograph No.41-Cell 3 Dike looking northeast Photograph No.42 -Cell 3 Dike looking northwest Photograph No.43 -Cell 3 Dike looking west Photograph No.44 -Cell 3 Dike looking west Photograph No.45 -Cell 3 Dike looking west Photograph No.46 -Cell 3 Dike looking east I.' Photograph No.47 -Cell 3 Dike looking west Photograph No.48 -Cell 3 Dike looking north Photograph No.49 -Cell 3 Dike -looking west Photograph No.50 -Cell 3 Dike -looking west Photograph No.51 -Cell 4A Dike looking southeast Photograph No.52 -Cell4A Dike looking north Photograph No.53 -Cell4A Dike looking east -typical vegetative cover Photograph No.54 -Cell4A Dike looking south Photograph No.55 -Cell4A Dike looking southeast Photograph No.56 -Ce1l4A Dike -typical vegetative cover Photograph No.57 -Top of Cell 4A Dike looking north Photograph No.58 -Top ofCell 4A Dike looking east Photograph No.59 -Cell4A Dike looking north Photograph No.60 -Cell4A Dike looking north Photograph No.61 -Typical vegetative cover on Ce1l4A Dike Photograph No.62 -Ce1l4A Dike looking east Photograph No.63 -Cell 4A Dike looking west Photograph No.64 -Cell 4A Dike looking west Photograph No.65 -Cell 4A Dike looking west Photograph No.66 -Cell 4A Dike looking west Photograph No.67 -Ce1l4A -Cell 3 Dike looking north Photograph No.68 -Cell4A Dike -looking east Photograph No.69 -Ce1l4A Dike with minor erosion -looking west Photograph No.70 -Ce1l4A Dike with minor erosion Photograph No.71-Ce1l4A Dike -typical vegetation Photograph No.72 -Cell 4A Dike -typical vegetation Photograph No.73 -East end of Ce1l4A Dike looking east Photograph No.74 -East end of Ce1l4A Dike looking west Photograph No.75 -East end of Cell4A Dike looking west Photograph No.76 -East end of Cell4A Dike looking east Annual Movement Monument Survey Z?~Rf f:l ~:s:z :"ri:l ~z :i~!"j~~~§~;i~S~~£@["~~~&1~~~~;:>~I§~ (1i ;J;g~r.~g :";~ •Hil ~.l~~~;~~i~1 @ ~B> Denison 2009 Annual Movement Monitor Survey for Cell #3 Monitor Number Control Condition 2007 Elev.2007-2008 C/F 2008 Elev.2008-2009 C/F 2009 Elev. 301 Disturbed 5608.01 302 Good 5607.72 Same 5607.72 CO.13 5607.59 303 Good 5607.77 FO.02 5607.79 CO.19 5607.60 304 Good 5607.79 F0.01 5607.80 CO.ll 5607.69 305 Good 5607.89 F0.01 5607.90 CO.ll 5607.79 306 Good 5607.89 F0.01 5607.90 CO.12 5607.78 307 Good 5607.49 Same 5607.49 CO.12 5607.37 308 Good 5607.53 Same 5607.53 CO.13 5607.40 309 Good 5607.54 Same 5607.54 CO.13 5607.41 310 Good 5607.57 Same 5607.57 CO.12 5607.45 311 Good 5607.78 Same 5607.78 CO.12 5607.66 312 Good 5607.78 F0.01 5607.79 CO.13 5607.66 313 Good 5607.84 F0.01 5607.85 CO.12 5607.73 314 Good 5608.97 Same 5608.97 .(1.10 5607.87 315 Good 5608.00 CO.Ol 5607.99 CO.lO 5607.89 316 Good 5607.86 Same 5607.86 CO.ll 5607.75 317 Good 5607.57 F0.01 5607.58 CO.13 5607.45 318 Good 5607.63 F0.02 5607.65 CO.15 5607.50 319 Good 5607.55 F0.01 5607.56 CO.14 5607.42 320 Good 5607.93 F0.02 5607.95 CO.15 5607.80 321 Good 5607.94 F0.02 5607.96 CO.14 5607.82 322 Good 5608.01 F0.02 5608.03 CO.14 5607.89 323 Good 5607.89 F0.01 5607.90 CO.13 5607.77 324 Good 5607.84 F0.02 5607.86 F0.01 5607.87 325 Good 5607.41 F0.01 5607.42 F0.01 5607.43 326 Good 5607.62 F0.01 5607.63 Same 5607.63 327 Good 5607.86 F0.01 5607.87 Same 5607.87 328 Good 5607.98 FO.Ol 5607.99 CO.Ol 5607.98 329 Good 5607.91 Same 5607.91 CO.Ol 5607.90 330 Good 5607.62 FO.Ol 5607.63 CO.Ol 5607.62 331 Good 5607.44 FO.Ol 5607.45 CO.03 5607.42 332 Good 5607.97 FO.03 5608.00 CO.02 5607.98 333 Good 5608.26 F0.01 5608.27 Same 5608.27 Notes The reference elevation used by Jones and DeMille for point number 333 was the elevation given by Fisher Surveying in 2008 (5608.27). The values established for point 314 differ from the previous years surveys.Jones and DeMille's values are consistent with the surrounding elevations and the GPS shot taken by Fisher Surveying in 2008. Denison 2009 Annual Movement Monitor Survey for Cell #4A Monitor Number Control Condition 2007 Elev.2007-2008 C/F 2008 Elev.2008-2009 C/F 2009 Elev. 400 Good 5584.85 Same 5584.85 CO.02 5584.83 401 Good 5596.83 iSame 5596.83 Fi··.l.lt 5597.94 402 Good 5598.09 Same 5598.09 CO.16 5597.93 403 Good 5598.16 Same 5598.16 CO.lO 5598.06 404 Good 5598.12 Same 5598.12 CO.20 5597.92 405 Disturbed 5598.08 Same 5598.08 CO.21 5597.87 406 Good 5598.04 Same 5598.04 CO.01 5598.03 407 Good 5598.15 Same 5598.15 CO.10 5598.05 408 Good 5598.01 Same 5598.01 CO.25 5597.76 409 Good 5598.01 Same 5598.01 CO.23 5597.78 410 Good 5598.04 Same 5598.04 CO.24 5597.80 411 Good 5597.73 Same 5597.73 CO.05 5597.68 412 Good 5597.69 Same 5597.69 CO.21 5597.48 413 Good 5597.75 Same 5597.75 CO.03 5597.72 414 Good 5597.74 Same 5597.74 CO.02 5597.72 415 Good 5597.92 Same 5597.92 FO.09 5598.01 416 Good 5597.96 Same 5597.96 F 0.22 5598.18 417 Good 5598.06 Same 5598.06 CO.01 5598.05 418 Good 5597.92 Same 5597.92 FO.13 5598.05 419 Good 5597.62 Same 5597.62 F 0.25 5597.87 420 Good 5597.97 Same 5597.97 CO.06 5597.91 421 Good 5598.05 Same 5598.05 CO.10 5597.95 422 Good 5597.97 Same 5597.97 FO.04 5598.01 423 Good 5597.93 Same 5597.93 FO.06 5597.99 424 Good 5598.10 Same 5598.10 F0.16 5598.26 425 Good 5598.23 Same 5598.23 F 0.32 5598.55 426 Good 5598.47 Same 5598.47 F 0.26 5598.73 427 Good 5598.78 Same 5598.78 Same 5598.78 Notes The reference elevation used by Jones and DeMille for point number 427 was the elevation given by Fisher Surveying in 2007 and 2008. The values established for point 401 differfrom previous years surveys.Jones and DeMille's values are consistent with the surrounding elevations. Denison 2009 Annual Movement Monitor Survey for Cell #4 Monitor Number Control Condition 2007 Elev.2007-2008 C/F 2008 Elev.2008-2009 C/F 2009 Elev. 431 Good 5596.79 CO.Ol 5596.78 Same 5596.78 432 Good 5597.30 Same 5597.30 Same 5597.30 433 Good C:C:OQQ7 S~rl1e 5598.87 (:1.01 559];86 434 Good 5598.45 F0.01 5598.46 CO.03 5598.43 435 Good 5598.41 Same 5598.41 CO.Ol 5598.40 436 Good 5598.69 CO.02 5598.67 Same 5598.67 437 Good 5599.75 CO.03 5599.72 CO.05 5599.67 438 Good 5600.35 F0.01 5600.36 CO.03 5600.33 439 Good 5600.80 Same 0.00 Same 5600.79 440 Good 5601.30 Same 5601.30 Same 5601.30 441 Good 5601.78 FO.Ol 5601.79 CO.03 5601.76 442 Good 5602.33 CO.Ol 5602.32 CO.06 5602.26 443 Good 5602.91 Same 5602.91 CO.06 5602.85 444 Good 5603.34 CO.Ol 5603.33 CO.Ol 5603.32 445 Good 5604.10 CO.03 5604.07 CO.06 5604.01 446 Good 5604.46 Same 5604.46 CO.04 5604.42 447 Good 5604.48 F0.01 5604.49 F 0.01 5604.50 448 Good 5604.93 CO.02 5604.91 CO.05 5604.86 449 Good 5605.54 Same 5605.54 CO.05 5605.49 450 Good 5606.02 Same 5606.02 CO.02 5606.00 451 Good 5606.85 Same 5606.85 CO.02 5606.83 452 Good 5607.44 Same 5607.44 Same 5607.44 .453 GOOd 5584.69 Same 5584.69 (0.89 5583.80 454 Good 5587.66 CO.Ol 5587.65 CO.20 5587.45 455 Disturbed 5589.55 CO.06 5589.49 CO.02 5589.47 456 Good 5589.93 CO.Ol 5589.92 FO.Ol 5589.93 457 Disturbed 5591.52 CO.08 5591.44 CO.20 5591.24 458 Good 5595.33 Same 5595.33 See Note See Note 459 Good 5584.69 Same 5584.69 CO.02 5584.67 460 Good 5574.49 CO.02 5574.47 F0.03 5574.50 461 Good 5574.26 CO.03 5574.23 F0.02 5574.25 462 Good 5573.73 CO.03 5573.70 F0.05 5573.75 463 Good 5572.96 CO.04 5572.92 FO.04 5572.96 464 Good 5569.81 Same 5569.81 Same 5569.81 Notes Point number 458 does not have a 2009 value. The reference elevation used by Jones and DeMille for point number 431 was the elevation given by Fisher Surveying in 2008 (5596.78). The reference elevation used by Jones and DeMille for point number 464 was the elevation given by Fisher Surveying in 2008 (5569.81). The values established for points 433 and 453 differfrom previous years surveys.Jones and DeMille's values match Fisher Surveying's coordinate elevations given within 0.13 on point 433 and 0.01 on point 453. Settlement Mon itors Cell 2 and Cell 3 White Mesa Mill -Tailings Settlement Monuments DATE 06/16/89 06/22/89 06/27/89 06/30/89 07/07/89 07/14/89 07/21/89 08/03/89 08/15/89 08/18/89 08/25/89 09/08/89 09/29/89 10/20/89 11/21/89 11/30/89 01/11/90 01/25/90 02/22/90 03/16/90 04/05/90 05/03/90 06/07/90 07/26/90 08/10/90 09/14/90 10/12/90 11/15/90 12/14/90 01/24/91 Cell4A Toe 5577.44 5576.96 5576.97 5576.96 5576.96 5576.96 5576.96 5576.96 5576.96 5576.96 5576.92 5576.96 5576.94 5577.04 ~ 5577.05 5577.05 5577.05 5577.05 5577.04 5577.04 5577.03 5577.04 5577.04 5577.05 5577.04 5577.03 5577.03 5577.04 5577.04 Cell2W1 5619.73 5619.72 5619.68 5619.69 5619.66 5619.68 5619.68 5619.66 5619.67 5619.68 5619.67 5619.67 5619.67 5619.69 5619.65 5619.67 5619.66 5619.70 5619.67 5619.68 5619.66 5619.70 5619.69 5619.68 5619.47 5619.65 5619.46 5619.61 5619.47 Cell2W2 Cell2W3 Cell2W4C White Mesa Mill -Tailings Settlement Monuments Cell4A Toe Cell2W1 Cell2W2 Cell2W3 Cell2W4C DATE 02/22/91 5577.03 5619.59 03/21/91 5577.03 5619.59 04/25/91 5577.01 5619.59 OS/23/91 5577.00 5619.96 06/21/91 5577.00 5619.57 07/26/91 5576.99 5619.60 08/22/91 5577.01 5619.56 5617.28 Initial 5619.38 Initial 5618.38 Initial 09/27/91 5577.01 5619.55 5622.12 nsion ac 5618.34 5618.23 10/31/91 5577.00 5619.54 5622.03 5618.33 5618.20 11/21/91 5577.01 5619.71 5622.08 5618.33 5618.18 01/02/92 5577.00 5619.52 5622.11 5618.37 5618.37 01/31/92 5577.01 5619.45 5622.07 5618.35 5618.20 02/28/92 5576.99 5621.83 5618.27 5618.11 03/25/92 5577.01 04/24/92 5576.99 OS/29/92 5576.99 5619.45 06/19/92 5577.00 5619.46 5621.75 5618.27 5618.13 07/23/92 5576.99 08/27/92 5577.00 09/24/92 5577.00 5619.47 10/28/92 5577.00 5619.15 5621.79 5618.23 5618.05 11/25/92 5577.00 5619.47 5621.41 5617.93 5617.75 12/16/92 5577.00 5618.75 5621.75 5618.23 5618.01 01/16/93 5619.27 5620.99 5617.49 5617.26 02/16/93 5619.46 5621.47 5618.05 5617.83 03/03/93 5576.98 5619.45 5621.68 5618.22 5618.04 03/25/93 5577.00 5621.67 5618.19 5618.03 04/29/93 5576.60 5619.47 5621.67 5618.21 5618.01 OS/24/93 5576.99 5619.47 5621.55 5618.17 5618.04 06/30/93 5576.99 5619.44 5621.60 5618.18 5618.04 White Mesa Mill -Tailings Settlement Monuments Cell4A Toe Cell2W1 Cell2W2 Cell2W3 Cell2W4C DATE 07/29/93 5576.99 5619.45 5621.56 5618.17 5617.95 08/26/93 5577.00 5619.42 5621.51 5618.14 5617.88 09/30/93 5577.01 5619.40 5621.46 5618.13 5617.93 10/27/93 5577.00 5619.41 5621.58 5618.06 5617.88 11/22/93 5576.99 5619.43 5621.41 5618.07 5617.89 12/28/93 5577.22 5619.40 5621.41 5618.07 5617.85 01/27/94 5576.99 5619.35 5621.37 5618.05 5617.85 02/24/94 5576.99 5619.36 5621.35 5618.02 5617.81 03/31/94 5577.00 5619.33 5621.33 5618.02 5617.75 05/04/94 5576.95 5619.33 5621.32 5617.99 5617.75 06/06/94 5577.00 5619.32 5621.31 5618.00 5617.77 07/29/94 5577.00 5619.31 5621.31 5617.96 5617.75 09/29/94 5576.99 5619.31 5621.28 5617.96 5617.72 10/28/94 5576.99 5619.30 5621.27 5617.97 5617.77 12/22/94 5577.01 5619.28 5621.24 5617.72 01/27/95 5576.99 5619.29 5621.26 5617.96 5617.73 02/23/95 5577.00 5619.27 5621.26 5617.95 5617.67 03/31/95 5576.99 5619.26 5621.25 5617.93 5617.72 04/28/95 5576.99 5619.29 5621.25 5617.87 5617.51 06/02/95 5577.01 5619.29 5621.24 5617.93 5617.65 07/31/95 5577.08 5619.25 5621.25 5618.14 5617.73 09/01/95 5577.04 5619.23 5621.22 5617.91 5617.65 09/29/95 5577.04 5619.27 5621.23 5617.93 5617.66 10/19/95 5576.96 5619.27 5621.25 5617.99 5617.55 11/30/95 5576.98 5618.99 5621.21 5617.95 5617.61 12/21/95 5576.98 5619.27 5620.93 5617.61 5617.35 01/26/96 5576.98 5619.27 5621.21 5617.92 5617.65 03/01/96 5576.99 5618.89 5621.19 5617.89 5617.57 04/25/96 5576.99 5619.23 5621.21 5617.91 5617.53 05/30/96 5577.00 5619.26 5621.17 5617.88 5617.56 White Mesa Mill -Tailings Settlement Monuments Cell4A Toe Cell2W1 Cell2W2 Cell2W3 Cell2W4C DATE 06/27/96 5577.00 5619.27 5621.19 5617.89 5617.60 07/26/96 5576.99 5619.26 5621.20 5618.90 5617.60 08/30/96 5576.99 5619.29 5621.19 5617.87 5617.62 09/27/96 5576.99 5619.24 5621.17 5617.93 5617.65 10125/96 5576.98 5619.25 5621.17 5617.90 5617.59 11/27/96 5576.98 5619.28 5621.17 5617.89 5617.58 12120/96 5577.00 5619.31 5621.17 5617.90 5617.63 01/31/97 5577.01 5619.30 5621.23 5617.94 5617.56 02127/97 5576.99 5619.23 5621.21 5617.94 5617.53 03/27/97 5576.98 5619.20 5621.15 5617.86 5617.57 04/26/97 5576.99 5619.22 5621.15 5617.86 5617.49 05/30/97 5576.98 5619.22 5621.16 5617.85 5617.55 06/26/97 5576.82 5619.26 5621.16 5617.85 5617.56 07/31/97 5577.00 5619.20 5621.21 5617.94 5617.61 08/28/97 5576.98 5619.18 5621.16 5617.88 5617.55 09/25/97 5577.00 5619.21 5621.15 5617.87 5617.52 10126/97 5577.00 5619.23 5620.84 5617.89 5617.53 11/18/97 5577.00 5619.23 5621.17 5617.87 5617.53 12/18/97 5577.00 5619.23 5621.16 5617.90 5617.57 01/16/98 5577.00 5619.23 5621.16 5617.89 5617.53 02106/98 5576.98 5619.23 5621.15 5617.88 5617.43 03/06/98 5576.98 5619.22 5621.15 5617.87 5617.41 04/03/98 5576.96 5619.25 5621.19 5617.85 5617.53 05/06/98 5576.96 5619.25 5621.18 5617.89 5617.54 06/01/98 5576.96 5619.21 5621.15 5617.89 5617.49 07/01/98 5577.00 5619.23 5621.15 5617.87 5617.53 08/03/98 5577.00 5619.23 5621.15 5617.89 5617.51 09/03/98 5576.98 5619.25 5621.15 5617.89 5617.51 10101/98 5576.98 5619.24 5621.15 5617.87 5617.53 11105/98 5577.00 5619.19 5621.13 5617.85 5617.47 White Mesa Mill -Tailings Settlement Monuments Cell 4A Toe Cell2W1 Cell 2W2 Cell2W3 Cell2W4C DATE 12/02/98 5577.00 5619.20 5621.12 5617.85 5617.51 01/06/99 5576.98 5619.23 5621.15 5617.86 5617.51 02/03/99 5576.98 5619.23 5621.15 5617.87 5617.53 04/08/99 5577.02 5619.17 5621.11 5617.83 5617.51 05104/99 5577.01 5619.22 5621.11 5617.84 5617.83 06102/99 5577.00 5619.17 5621.11 5617.85 5617.49 06/30/99 5576.98 5619.20 5621.12 5617.84 5617.49 08/03/99 5577.00 5619.21 5621.12 5617.85 5617.48 09108/99 5576.99 5619.20 5621.13 5617.86 5617.51 10107/99 5576.99 5619.19 5621.11 5617.85 5617.46 11/04/99 5577.00 5619.21 5621.14 5617.86 5617.50 12/01/99 5576.99 5619.19 5621.13 5617.87 5617.49 01/05/00 5577.01 5619.20 5621.14 5617.87 5617.48 02/02/00 5576.99 5619.21 5621.11 5617.84 5617.49 03103/00 5576.99 5619.20 5621.10 5617.83 5617.49 04/05/00 5577.00 5619.18 5621.10 5617.83 5617.49 05/03/00 5577.00 5619.17 5621.09 5617.83 5617.46 06/21/00 5576.96 5619.21 5621.14 5617.84 5617.48 07/16/00 5577.00 5619.26 5621.12 5617.94 5617.54 08/30100 5577.00 5619.26 5621.22 5617.96 5617.56 09/18/00 5577.00 5619.26 5621.20 5617.94 5617.58 10/17/00 5577.00 5619.26 5621.16 5617.92 5617.56 11/14/00 5577.00 5619.40 5621.16 5617.96 5617.56 12/20100 5577.00 5619.26 5621.16 5617.92 5617.56 01/02/01 5577.00 5619.24 5621.10 5617.90 5617.52 02/17/01 5577.00 5619.28 5621.15 5617.92 5617.54 03/08/01 5577.00 5619.26 5621.20 5617.92 5617.55 04/29101 5577.00 5619.28 5621.15 5617.92 5617.54 05/12/01 5577.00 5619.22 5621.12 5617.86 5617.54 06/06/01 5576.99 5619.24 5621.12 5617.90 5617.52 White Mesa Mill -Tailings Settlement Monuments Cell4A Toe Cell2W1 Cell2W2 Cell2W3 Cell2W4C DATE 07/09/01 5577.00 5619.24 5621.12 5617.90 5617.52 08/24/01 5577.00 5619.28 5621.18 5617.92 5617.54 09/12/01 5577.00 5619.25 5621.17 5617.90 5617.54 10/08/01 5577.00 5619.28 5621.18 5617.92 5617.54 11/27/01 5577.00 5619.28 5621.18 5617.92 5617.55 12/26/01 5577.00 5619.28 5621.18 5617.92 5617.54 01/16/02 5577.00 5619.28 5621.18 5617.92 5617.55 02/23/02 5577.00 5619.28 5621.18 5617.92 5617.56 03/30/02 5577.00 5619.27 5621.18 5617.92 5617.55 04/11/02 5577.00 5619.28 5621.18 5617.92 5617.54 OS/23/02 5577.00 5619.28 5621.17 5617.92 5617.53 06/25/02 5577.00 5619.28 5621.17 5617.93 5617.54 07/18/02 5577.00 5619.28 5621.17 5617.92 5617.51 08/22/02 5577.00 5619.28 5621.17 5617.93 5617.55 09/25/02 5577.00 5619.28 5621.17 5617.92 5617.53 10/28/02 5576.99 5619.27 5621.18 5617.91 5617.53 11/20/02 5577.00 5619.28 5621.17 5617.91 5617.53 12/24/02 5577.00 5619.28 5621.17 5617.91 5617.53 01/30/03 5577.00 5619.27 5621.17 5617.91 5617.51 02/21/03 5577.00 5619.28 5621.17 5617.91 5617.53 03/25/03 5577.00 5619.28 5621.17 5617.91 5617.53 04/11/03 5577.00 5619.24 5621.15 5617.87 5617.47 OS/29/03 5577.00 5619.28 5621.18 5617.89 5617.50 06/26/03 5577.00 5619.28 5621.18 5617.89 5617.50 07/24/03 5577.00 5619.28 5621.17 5617.90 5617.50 08/20/03 5577.00 5619.28 5621.17 5617.90 5617.50 09/30/03 5577.00 5619.23 5621.15 5617.88 5617.50 10/08/03 5577.00 5619.23 5621.15 5617.88 5617.50 11/12/03 5577.00 5619.23 5621.15 5617.88 5617.50 12/22/03 5577.00 5619.23 5621.15 5617.88 5617.50 White Mesa Mill -Tailings Settlement Monuments Cell 4A Toe Cell2W1 Cell2W2 Cell2W3 Cell2W4C DATE 01/29/04 5577.00 5619.23 5621.15 5617.88 5617.50 02/17/04 5577.00 5619.23 5621.15 5617.90 5617.50 03/24/04 5577.00 5619.23 5621.15 5617.88 5617.50 04/28/04 5577.00 5619.23 5621.15 5617.88 5617.50 OS/20/04 5577.00 5619.25 5621.14 5617.89 5617.49 06/30/04 5577.00 5619.23 5621.15 5617.89 5617.50 07/30/04 5577.00 5619.23 5621.15 5617.89 5617.50 08/19/04 5576.99 5619.24 5621.14 5617.89 5617.47 09/30/04 5577.00 5619.23 5621.14 5617.89 5617.49 10/29/04 5577.00 5619.23 5621.14 5617.89 5617.49 11/30/04 5577.00 5619.23 5621.14 5617.89 5617.49 12/15/04 5577.00 5619.23 5621.14 5617.89 5617.49 01/19/05 5576.99 5619.17 5621.09 5617.85 5617.46 02/17/05 5577.00 5619.17 5621.10 5617.85 5617.48 03/31/05 5577.00 5619.17 5621.10 5617.85 5617.46 04/29/05 5577.00 5619.17 5621.10 5617.85 5617.48 OS/27/05 5577.00 5619.17 5621.10 5617.85 5617.48 06/30/05 5577.00 5619.17 5621.10 5617.85 5617.48 07/22/05 5577.00 5619.26 5621.15 5617.88 5617.44 08/26/05 5577.00 5619.25 5621.13 5617.87 5617.44 09/30/05 5577.00 5619.25 5621.14 5617.88 5617.45 10/28/05 5577.00 5619.25 5621.14 5617.88 5617.45 11/30/05 5577.00 5619.25 5621.14 5617.88 5617.44 12/29/05 5577.00 5619.22 5621.12 5617.87 5617.42 01/27/06 5577.02 5619.23 5621.15 5617.89 5617.45 02/14/06 5577.02 5619.23 5621.13 5617.85 5617.37 02/17/06 5577.00 5619.27 5621.11 5617.85 5617.39 04/26/06 5577.02 5619.23 5621.07 5617.85 5617.37 OS/25/06 5577.03 5619.29 5621.14 5617.86 5617.42 06/29/06 5577.00 5619.23 5621.11 5617.83 5617.38 White Mesa Mill -Tailings Settlement Monuments Cell4A Toe Cell2W1 Cell2W2 Cell2W3 Cell2W4C DATE 07/12/06 5577.01 5619.26 5621.14 5617.87 5617.42 08/24/06 5577.01 5619.25 5621.13 5617.87 5617.41 09/22/06 5577.00 5619.25 5621.12 5617.87 5617.42 10/31/06 5576.99 5619.25 5621.12 5617.87 5617.42 11/29/06 5576.99 5619.23 5621.09 5617.83 5617.35 12/21/06 5577.01 5619.26 5621.12 5617.87 5617.43 01/10/07 5577.12 5619.29 5621.13 5617.85 5617.38 02/24/07 5577.08 5619.24 5620.98 5617.91 5617.47 03/07/07 5577.03 5619.21 5621.11 5617.83 5617.44 04/20/07 5577.04 5619.25 5621.11 5617.83 5617.39 05/03/07 5577.00 5619.19 5621.05 5619.77 5617.32 06/08/07 5577.07 5619.27 5621.13 5617.85 5617.44 07/12/07 5577.09 5619.33 5621.13 5617.92 5617.41 08/01/07 5577.00 5619.23 5621.12 5617.84 5617.50 09/13/07 5577.20 5619.41 5621.29 5618.03 5617.56 10/16/07 5577.22 5619.45 5621.22 5618.05 5617.53 11/21/07 5577.01 5619.24 5621.10 5617.85 5617.40 12/21/07 5577.03 5619.25 5621.16 5617.92 5617.51 01/28/08 5577.21 5619.45 5621.31 5617.99 5617.53 02/28/08 5577.17 5619.39 5621.30 5617.95 5617.51 03/28/08 5577.01 5619.22 5621.10 5617.84 5617.57 04/25/08 5574.50 5619.26 5621.01 5617.80 5617.54 05/30/08 5577.06 5619.35 5621.17 5617.77 5617.21 06/27/08 5576.00 5619.23 5621.07 5617.85 5617.41 07/31/08 5574.50 5619.19 5621.10 5617.85 5617.41 08/29/08 5576.99 5619.21 5621.10 5617.85 5617.41 09/24/08 5577.00 5619.19 5621.08 5617.85 5617.40 10/31/08 5576.98 5619.22 5621.11 5617.86 5617.41 11/26/08 5576.99 5619.21 5621.10 5617.86 5617.42 12/31/2008 5577.00 5619.27 5621.15 5617.89 5617.44 White Mesa Mill -Tailings Settlement Monuments Cell4A Toe Cell2W1 Cell2W2 Cell 2W3 Cell2W4C DATE 1/30/2009 5576.99 5619.18 5621.08 5617.85 5617.40 2/27/2009 5576.98 5619.17 5621.08 5617.86 5617.41 3/31/2009 5576.96 5619.15 5621.09 5617.86 5617.41 4/30/2009 5577.17 5619.37 5621.12 5618.06 5617.62 5/29/2009 5577.01 5619.19 5621.10 5617.86 5617.41 6/30/2009 5577.00 5619.20 5621.09 5617.85 5617.39 7/31/2009 5577.00 5619.21 5621.10 5617.87 5617.42 8/30/2009 White Mesa Mill -Tailings Settlement Monuments DATE ............ 06/16/89 06/22/89 06/27/89 06/30/89 07/07/89 07/14/89 07/21/89 08/03/89 08/15/89 08/18/89 08/25/89 09/08/89 09/29/89 10/20/89 11/21/89 11/30/89 01/11/90 01/25/90 02/22/90 03/16/90 04/05/90 05/03/90 06/07/90 07/26/90 08/10/90 09/14/90 10/12/90 11/15/90 12/14/90 01/24/91 Cell 2E1 5624.31 5624.31 5624.31 5624.32 5624.30 5624.29 5624.28 5624.29 5624.30 5624.61 5624.29 5624.29 5624.29 5624.29 5624.29 5624.29 5624.28 5624.29 5624.31 5624.28 5624.28 5624.27 5624.27 5624.29 5624.29 5624.27 5624.30 5624.29 5623.89 5624.27 2E1-1N 2E1-15 2E1-25 2W7-C 2W5-N White Mesa Mill -Tailings Settlement Monuments DATE 02/22/91 03/21/91 04/25/91 OS/23/91 06/21/91 07/26/91 08/22/91 09/27/91 10/31/91 11/21/91 01/02/92 01/31/92 02/28/92 03/25/92 04/24/92 OS/29/92 06/19/92 07/23/92 08/27/92 09/24/92 10/28/92 11/25/92 12/16/92 01/16/93 02/16/93 03/03/93 03/25/93 04/29/93 OS/24/93 06/30/93 Cell 2E1 5624.06 5624.24 5624.27 5624.27 5624.30 5624.30 5624.30 5624.25 5624.27 5624.30 5624.27 5624.27 5624.33 5624.30 5624.26 5624.27 5624.28 5624.27 5624.27 5624.27 5624.27 5624.29 5624.26 5624.27 5624.27 5624.28 5624.29 5624.28 5624.28 2E1-1N 2E1-1S 2E1-2S 2W7-C 2W5-N White Mesa Mill -Tailings Settlement Monuments DATE 07/29/93 08/26/93 09/30/93 10/27/93 11/22/93 12/28/93 01/27/94 02/24/94 03/31/94 05/04/94 06/06/94 07/29/94 09/29/94 10/28/94 12/22/94 01/27/95 02/23/95 03/31/95 04/28/95 06/02/95 07/31/95 09/01/95 09/29/95 10/19/95 11/30/95 12/21/95 01/26/96 03/01/96 04/25/96 05/30/96 Cell 2E1 5624.28 5624.27 5624.27 5624.26 5624.27 5624.23 5624.23 5624.27 5624.22 5624.25 5624.29 5624.29 5624.29 5624.29 5624.28 5624.07 5624.07 5624.05 5624.05 5624.04 5624.06 5624.08 5624.07 5624.15 5624.80 5624.62 5624.05 5624.03 5624.05 5624.05 2E1·1N 2E1·1S 2E1·2S 2W7·C 2W5·N White Mesa Mill -Tailings Settlement Monuments Cell 2E1 2E1-1N 2E1-15 2E1-25 2W7-C 2W5-N DATE 06/27/96 5624.05 07/26/96 5624.05 08/30/96 5624.03 09/27/96 5624.02 10/25/96 5624.03 11/27/96 5624.04 12/20/96 5624.04 01/31/97 5624.00 02/27/97 5624.06 03/27/97 5623.98 04/26/97 5624.00 05/30/97 5624.01 06/26/97 5624.00 07/31/97 5624.03 08/28/97 5624.01 09/25/97 5624.01 10/26/97 5624.01 11/18/97 5624.02 12/18/97 5624.00 01/16/98 5624.00 02/06/98 5624.03 03/06/98 5624.05 04/03/98 5623.98 05/06/98 5624.00 06/01/98 5624.00 07/01/98 5623.98 08/03/98 5624.02 09/03/98 5624.00 5627.61 5623.07 5619.65 10/01/98 5624.02 5627.61 5623.07 5619.65 11/05/98 5624.00 5627.50 5623.02 5619.58 White Mesa Mill -Tailings Settlement Monuments Cell 2E1 2E1-1N 2E1-15 2E1-25 2W7-C 2W5-N DATE 12/02/98 5624.00 5627.51 5623.02 5619.58 01/06/99 5624.00 5627.52 5623.02 5619.60 02/03/99 5623.98 5627.50 5623.00 5619.60 04108/99 5624.00 5627.50 5623.02 5619.66 05/04/99 5623.99 5627.50 5623.02 5620.64 5622.40 06102/99 5624.02 5627.52 5623.04 5620.64 5622.44 06/30/99 5624.00 5627.50 5623.02 5619.62 5622.44 08103/99 5623.18 5626.72 5622.23 5618.80 5621.62 5618.54 09/08/99 5624.00 5627.51 5623.02 5619.63 5622.44 5618.58 10107/99 5624.03 5627.53 5623.04 5619.62 5622.43 5618.60 11/04/99 5623.99 5627.51 5623.02 5619.62 5622.43 5618.56 12/01/99 5623.97 5627.50 5623.01 5619.59 5622.41 5618.56 01/05/00 5623.97 5627.49 5623.01 5619.58 5622.41 5618.56 02/02/00 5623.97 5627.50 5623.02 5619.62 5622.41 5618.54 03/03/00 5623.97 5627.50 5623.01 5619.60 5622.40 5618.53 04/05/00 5623.98 5627.51 5623.01 5619.61 5622.41 5618.53 05/03/00 5623.97 5627.50 5623.01 5619.61 5622.40 5618.54 06/21/00 5623.96 5627.51 5623.02 5619.64 5622.40 5618.60 07/16/00 5624.02 5627.52 5623.08 5619.66 5622.46 5618.60 08/30100 5623.98 5627.50 5622.98 5619.60 5622.42 5618.59 09/18100 5623.98 5627.50 5623.04 5619.62 5622.42 5618.90 10/17/00 5624.02 5627.48 5623.06 5619.64 5622.46 5618.84 11/14/00 5624.02 5627.48 5623.08 5619.66 5622.44 5618.88 12/20100 5623.98 5627.46 5623.00 5619.56 5622.38 5618.90 01/02/01 5623.96 5627.46 5623.00 5619.60 5622.38 5618.84 02/17/01 5623.96 5627.48 5623.00 5619.59 5622.39 5618.84 03108101 5623.94 5627.48 5623.00 5619.60 5622.38 5618.86 04/29/01 5623.96 5627.48 5623.00 5619.58 5622.38 5618.56 05/12/01 5623.98 5627.48 5623.02 5619.62 5622.40 5618.52 06/06101 5623.97 5627.50 5623.01 5619.60 5622.38 5618.50 White Mesa Mill •Tailings Settlement Monuments Cell 2E1 2E1-1N 2E1-15 2E1-25 2W7-C 2W5-N DATE 07/09/01 5623.96 5627.49 5623.00 5619.60 5622.38 5618.50 08/24/01 5623.97 5627.49 5623.00 5619.60 5622.38 5618.86 09/12/01 5623.96 5627.49 5622.99 5619.60 5622.38 5618.52 10/08/01 5623.94 5627.48 5623.00 5619.60 5622.36 5618.86 11/27/01 5623.95 5627.47 5623.00 5619.60 5622.37 5618.86 12/26/01 5623.94 5627.48 5622.98 5619.58 5622.36 5618.86 01/16/02 5623.95 5627.47 5623.00 5619.60 5622.35 5618.86 02/23/02 5623.94 5627.46 5622.98 5619.60 5622.34 5618.86 03/30/02 5623.94 5627.46 5623.00 5619.59 5622.34 5618.85 04/11/02 5623.94 5627.46 5623.01 5619.60 5622.35 5618.86 OS/23/02 5623.93 5627.46 5622.97 5619.60 5622.34 5618.85 06/25/02 5623.94 5627.47 5622.97 5619.60 5622.34 5618.89 07/18/02 5623.94 5627.46 5622.97 5619.60 5622.34 5618.86 08/22/02 5623.94 5627.46 5622.97 5619.60 5622.34 5618.86 09/25/02 5623.94 5627.46 5622.97 5619.60 5622.34 5618.86 10/28/02 5623.94 5627.46 5622.99 5619.60 5622.33 5618.86 11/20/02 5623.94 5627.46 5622.97 5619.60 5622.34 5618.86 12/24/02 5623.94 5627.46 5622.97 5619.60 5622.34 5618.86 01/30/03 5623.92 5627.46 5622.96 5619.60 5622.33 5618.90 02/21/03 5623.94 5627.46 5622.96 5619.60 5622.34 5618.87 03/25/03 5623.94 5627.46 5622.96 5619.60 5622.34 5618.86 04/11/03 5623.91 5627.44 5622.96 5619.60 5622.31 5618.88 OS/29/03 5623.92 5627.45 5622.96 5619.67 5622.31 5619.06 06/26/03 5623.92 5627.45 5622.96 5619.60 5622.34 5618.90 07/24/03 5623.92 5627.45 5622.96 5619.60 5622.34 5618.88 08/20/03 5623.92 5627.45 5622.96 5619.60 5622.34 5618.88 09/30/03 5623.93 5627.47 5622.97 5619.67 5622.33 5618.88 10/08/03 5623.93 5627.47 5622.97 5619.67 5622.33 5618.88 11/12/03 5623.93 5627.47 5622.97 5619.67 5622.33 5618.88 12/22/03 5623.92 5627.47 5622.96 5619.67 5622.34 5618.88 White Mesa Mill -Tailings Settlement Monuments Cell 2E1 2E1-1N 2E1-1S 2E1-2S 2W7-C 2W5-N DATE 01/29/04 5623.92 5627.47 5622.96 5619.67 5622.33 5618.88 02/17/04 5623.93 5627.45 5622.97 5619.67 5622.33 5618.88 03/24/04 5623.93 5627.47 5622.97 5619.67 5622.33 5618.88 04/28/04 5623.93 5627.47 5622.97 5619.67 5622.33 5618.88 OS/20/04 5623.91 5627.45 5622.99 5619.62 5622.30 5618.90 06/30/04 5623.92 5627.47 5622.97 5619.64 5622.32 5618.88 07/30104 5623.92 5627.47 5622.97 5619.64 5622.32 5618.88 08/19/04 5623.93 5627.47 5622.97 5619.67 5622.33 5618.90 09/30/04 5623.92 5627.47 5622.97 5619.67 5622.32 5618.90 10/29/04 5623.92 5627.47 5622.97 5619.67 5622.33 5618.88 11/30/04 5623.92 5627.47 5622.97 5619.67 5622.33 5618.88 12/15/04 5623.92 5627.47 5622.97 5619.67 5622.33 5618.88 01/19/05 5623.88 5627.42 5622.91 5619.59 5622.26 5618.90 02/17/05 5623.88 5627.42 5622.93 5619.63 5622.30 5618.88 03/31/05 5623.88 5627.43 5622.91 5619.63 5622.30 5618.88 04/29/05 5623.88 5627.42 5622.91 5619.63 5622.30 5618.88 OS/27/05 5623.88 5627.42 5622.91 5619.63 5622.30 5618.88 06/30/05 5623.88 5627.42 5622.91 5619.63 5622.30 5618.88 07/22/05 5623.90 5627.44 5622.94 5619.63 5622.29 5618.90 08/26/05 5623.89 5627.45 5622.96 5619.60 5622.28 5618.93 09/30/05 5623.89 5627.44 5622.95 5619.61 5622.30 5618.90 10/28/05 5623.88 5627.44 5622.95 5619.63 5622.30 5618.90 11/30/05 5623.88 5627.44 5622.94 5619.61 5622.30 5618.90 12/29/05 5623.90 5627.42 5622.97 5619.61 5622.27 5618.92 01/27/06 5623.90 5627.46 5622.98 5619.63 5622.27 5618.97 02/14/06 5624.06 5627.64 5623.16 5619.86 5622.44 5618.87 02/17/06 5623.86 5627.38 5622.94 5619.60 5622.22 5618.91 04/26/06 5623.87 5627.42 5622.96 5619.62 5622.24 5618.93 OS/25/06 5623.87 5627.41 5622.96 5619.59 5622.27 5618.94 06/29/06 5623.89 5627.43 5622.97 5619.62 5622.27 5618.90 White Mesa Mill -Tailings Settlement Monuments Cell 2E1 2E1-1N 2E1-1S 2E1-2S 2W7-C 2W5-N DATE 07/12/06 5623.88 5627.42 5622.99 5619.72 5622.27 5618.92 08/24/06 5623.88 5627.41 5622.97 5619.61 5622.27 5618.92 09/22/06 5623.90 5627.44 5622.99 5619.64 5622.27 5618.92 10/31/06 5623.88 5627.41 5622.95 5619.61 5622.26 5618.92 11/29/06 5623.88 5627.40 5622.96 5619.60 5622.28 5618.90 12/21/06 5623.90 5627.42 5622.98 5619.62 5622.24 5618.93 01/10/07 5623.87 5627.42 5622.95 5619.64 5622.26 5618.93 02/24/07 5623.92 5627.46 5623.00 5619.50 5622.30 5618.97 03/07/07 5623.86 5627.42 5622.94 5619.64 5622.26 5618.90 04/20107 5623.86 5627.39 5622.96 5619.62 5622.26 5618.91 05/03/07 5623.90 5627.44 5622.98 5619.63 5622.28 5618.85 06/08/07 5624.08 5627.50 5623.00 5619.84 5622.38 5618.97 07/12/07 5623.85 5627.42 5622.99 5619.71 5622.30 5618.94 08/01/07 5623.93 5627.44 5622.98 5619.60 5622.25 5618.89 09/13/07 5624.21 5627.69 5623.01 5619.65 5622.34 5618.94 10/16107 5624.20 5627.71 5623.00 5619.59 5622.25 5618.95 11/21/07 5623.87 5627.42 5622.95 5619.59 5622.24 5618.86 12/21107 5623.88 5627.51 5622.99 5619.61 5622.26 5618.89 01/28/08 5624.21 5627.71 5623.03 5619.65 5622.26 5618.94 02/28/08 5624.14 5627.67 5623.01 5619.62 5622.25 5618.91 03/28/08 5623.90 5627.43 5622.97 5619.59 5622.27 5618.87 04/25/08 5623.88 5627.41 5622.96 5619.65 5622.25 5618.91 05/30/08 5623.90 5627.40 5623.06 5619.83 5622.28 5618.87 06/27/08 5625.52 5621.03 5617.65 5620.34 5619.88 5618.87 07/31/08 5625.54 5621.07 5617.69 5620.37 5619.90 5618.87 08/29/08 5625.85 5621.34 5618.00 5620.68 5619.91 5618.87 09/24/08 5625.78 5621.27 5617.93 5620.60 5619.85 5618.26 10/31/08 5625.75 5621.23 5617.89 5620.57 5619.83 5618.88 11/26/08 5622.19 5625.75 5621.23 5617.88 5620.55 5618.86 12/31/2008 5622.31 5625.87 5621.37 5618.03 5620.68 5618.91 White Mesa Mill -Tailings Settlement Monuments Cell 2E1 2E1-1N 2E1-15 2E1-25 2W7-C 2W5-N DATE 1/30/2009 5622.20 5625.76 5621.24 5617.85 5620.58 5618.85 2/27/2009 5622.11 5625.66 5621.14 5617.79 5620.48 5618.85 3/31/2009 5623.23 5626.76 5622.23 5618.85 5621.58 5618.31 4/30/2009 5622.36 5625.91 5621.40 5618.04 5620.74 5618.89 5/29/2009 5622.33 5625.89 5621.35 5617.94 5620.69 5618.86 6/30/2009 5622.23 5625.77 5621.26 5617.94 5620.60 5618.87 7/31/2009 5622.17 5625.72 5621.19 5617.85 5620.52 5618.84 8/30/2009 White Mesa Mill -Tailings Settlement Monuments 2W3-5 3-1N 3-1C 3-15 3-2N DATE 12/02/98 01/06/99 02/03/99 03/0 04/08/99 5613.01 04/0 05/04/99 5617.41 5612.93 OS/2 06/02/99 5617.31 5613.01 06/30/99 5617.16 5612.98 08/03/99 5617.09 5616.71 5612.91 5615.13 5613.10 09/08/99 5617.05 5616.67 5612.87 5615.20 5613.07 10/07/99 5617.00 5616.62 5612.89 5615.23 5613.08 11/04/99 5616.99 5616.69 5612.88 5615.22 5613.08 12/01/99 5616.98 5616.58 5612.87 5615.22 5613.07 01/05/00 5616.97 5616.58 5612.86 5615.23 5613.07 02/02/00 5619.96 5616.68 5612.86 5615.21 5613.07 03/03/00 5616.97 5616.69 5612.87 5615.23 5613.05 04/05/00 5616.96 5616.70 5612.89 5615.24 5613.08 05/03/00 5616.96 5616.64 5612.83 5615.19 5613.04 06/21/00 5616.94 5616.63 5612.89 5615.21 5613.09 07/16/00 5616.90 5616.64 5612.90 5615.22 5613.16 08/30/00 5616.92 5616.58 5612.88 5615.24 5613.04 09/18/00 5616.90 5616.72 5612.88 5615.24 5613.14 10/17/00 5616.86 5616.72 5612.90 5615.25 5613.10 11/14/00 5616.90 5616.72 5612.88 5615.25 5613.10 12/20/00 5616.92 5616.67 5612.86 5615.21 5613.10 01/02/01 5616.82 5616.69 5612.88 5615.22 5613.07 02/17/01 5616.84 5616.66 5612.87 5613.25 5613.10 03/08/01 5616.84 5616.66 5612.85 5615.22 5613.07 04/29/01 5616.84 5616.64 5612.90 5615.22 5613.07 05/12/01 5616.82 5616.72 5612.86 5615.24 5613.08 06/06/01 5616.82 5616.70 5612.88 5615.24 5613.10 White Mesa Mill -Tailings Settlement Monuments 2W3·5 3·1N 3·1C 3·15 3·2N DATE 07/09/01 5616.82 5616.70 5612.88 5615.24 5613.08 08/24/01 5616.82 5616.71 5612.89 5615.27 5613.13 09/12/01 5616.81 5616.71 5612.88 5615.24 5613.10 10/08/01 5616.82 5616.73 5612.93 5615.29 5613.13 11/27/01 5616.82 5616.68 5612.88 5615.23 5613.08 12/26/01 5616.82 5616.69 5612.87 5615.25 5613.09 01/16/02 5616.81 5616.69 5612.89 5615.24 5613.11 02/23/02 5616.80 5616.71 5612.91 5615.27 5613.11 03/30/02 5616.82 5616.70 5612.90 5615.27 5613.10 04/11/02 5616.82 5616.70 5612.91 5615.22 5613.07 OS/23/02 5616.78 5616.68 5612.85 5615.20 5613.06 06/25/02 5616.79 5616.69 5612.82 5615.21 5613.06 07/18/02 5616.76 5616.69 5612.87 5615.23 5613.08 08/22/02 5616.79 5616.69 5612.86 5615.23 5613.08 09/25/02 5616.77 5616.69 5612.86 5615.23 5613.08 10/28/02 5616.78 5616.69 5612.85 5615.21 5613.08 11/20/02 5616.78 5616.69 5612.85 5615.23 5613.08 12/24/02 5616.78 5616.69 5612.85 5615.23 5613.08 01/30/03 5616.76 5616.66 5612.84 5615.20 5613.06 02/21/03 5616.78 5616.66 5612.84 5615.20 5613.06 03/25/03 5616.78 5616.67 5612.84 5615.21 5613.06 04/11/03 5616.74 5616.68 5612.82 5615.19 5613.03 OS/29/03 5616.76 5616.69 5612.82 5615.19 5613.05 06/26/03 5616.76 5616.69 5612.84 5615.19 5613.05 07/24/03 5616.76 5616.69 5612.84 5615.19 5613.05 08/20/03 5616.76 5616.69 5612.84 5615.19 5613.05 09/30/03 5616.76 5616.69 5612.86 5615.23 5613.09 10/08/03 5616.76 5616.69 5612.86 5615.23 5613.09 11/12/03 5616.76 5616.69 5612.86 5615.23 5613.09 12/22/03 5616.76 5616.69 5612.85 5615.20 5613.06 White Mesa Mill -Tailings Settlement Monuments 2W3-5 3-1N 3-1C 3-15 3-2N DATE 01/29/04 5616.76 5616.69 5612.86 5615.23 5613.09 02/17/04 5616.76 5616.69 5612.84 5615.23 5613.07 03/24/04 5616.76 5616.69 5612.85 5615.23 5613.07 04/28/04 5616.76 5616.69 5612.85 5615.23 5613.07 OS/20/04 5616.74 5616.75 5612.82 5615.18 5613.10 06/30/04 5616.76 5616.69 5612.85 5615.23 5613.07 07/30/04 5616.76 5616.69 5612.85 5615.23 5613.07 08/19/04 5616.72 5616.75 5612.83 5615.20 5613.20 09/30/04 5616.72 5616.75 5612.83 5615.20 5613.22 10/29/04 5616.74 5616.75 5612.83 5615.20 5613.20 11/30/04 5616.74 5616.75 5612.83 5615.18 5613.20 12/15/04 5616.72 5616.75 5612.83 5615.20 5613.20 01/19/05 5616.71 5616.74 5612.82 5615.22 5613.20 02/17/05 5616.71 5616.74 5612.82 5615.20 5613.20 03/31/05 5616.71 5616.74 5612.83 5615.20 5613.20 04/29/05 5616.71 5616.74 5612.83 5615.20 5613.20 OS/27/05 5616.71 5616.74 5612.83 5615.20 5613.20 06/30/05 5616.71 5616.74 5612.83 5615.20 5613.20 07/22/05 5616.71 5617.10 5612.90 5615.28 5612.27 08/26/05 5616.70 5617.03 5612.82 5615.21 5613.17 09/30/05 5616.71 5617.03 5612.82 5615.20 5613.18 10/28/05 5616.71 5617.05 5612.82 5615.20 5613.20 11/30/05 5616.71 5617.04 5612.82 5615.20 5613.20 12/29/05 5616.69 5617.02 5612.81 5615.20 5613.19 01/27/06 5616.71 5616.98 5612.78 5615.18 5614.22 02/14/06 5616.63 5617.02 5612.82 5615.20 5614.22 02/17/06 5616.65 5616.98 5612.77 5615.16 5613.14 04/26/06 5616.65 5617.02 5612.80 5615.22 5613.22 OS/25/06 5616.69 5617.01 5612.79 5615.19 5613.14 06/29/06 5616.65 5617.01 5612.80 5615.22 5613.17 White Mesa Mill -Tailings Settlement Monuments 2W3-5 3-1N 3-1C 3-15 3-2N DATE 07/12/06 5616.69 5617.00 5612.80 5615.20 5613.16 08/24/06 5616.68 5616.98 5612.79 5615.18 5613.16 09/22/06 5616.78 5617.01 5612.80 5615.19 5613.16 10/31/06 5616.69 5617.00 5612.80 5615.19 5613.17 11/29/06 5616.70 5616.98 5612.78 5615.18 5613.16 12/21/06 5616.68 5616.97 5612.78 5615.19 5613.16 01/10/07 5616.66 5617.01 5612.81 5615.18 5613.16 02/24/07 5616.74 5616.92 5612.72 5615.14 5613.18 03/07/07 5616.65 5616.96 5612.74 5615.16 5613.12 04/20/07 5616.63 5616.98 5612.76 5615.16 5613.14 05/03/07 5616.65 5617.02 5612.80 5615.17 5613.14 06/08/07 5616.67 5617.08 5612.90 5615.22 5613.02 07/12/07 5616.69 5616.94 5612.72 5615.12 5613.11 08/01/07 5616.66 5616.99 5612.78 5615.17 5613.17 09/13/07 5616.82 5617.06 5612.94 5615.24 5613.23 10/16/07 5616.79 5617.01 5612.89 5615.19 5613.17 11/21/07 5616.66 5617.03 5612.81 5615.21 5613.20 12/21/07 5616.68 5617.01 5612.84 5615.18 5613.18 01/28/08 5616.78 5617.05 5612.91 5615.20 5613.21 02/28/08 5616.72 5617.03 5612.92 5615.17 5613.20 03/28/08 5616.81 5617.01 5612.82 5615.20 5613.18 04/25/08 5616.06 5617.18 5612.90 5615.32 5613.36 05/30/08 5616.59 5619.90 5612.62 5615.04 5613.02 06/27/08 5616.67 5616.98 5612.80 5615.18 5613.16 07/31/08 5616.67 5616.99 5612.81 5615.20 5613.19 08/29/08 5616.68 5617.03 5612.84 5615.19 5613.21 09/24/08 5616.66 5617.04 5612.86 5615.21 5613.23 10/31/08 5616.66 5616.99 5612.80 5615.17 5613.19 11/26/08 5616.68 5617.01 5612.83 5615.18 5613.20 12/31/2008 5616.70 5616.99 5612.80 5615.16 5613.17 White Mesa Mill -Tailings Settlement Monuments 2W3-5 3-1N 3-1C 3-15 3-2N DATE 1/30/2009 5616.66 5617.02 5612.82 5615.17 5613.20 2/27/2009 5616.67 5617.02 5612.84 5615.20 5613.20 3/31/2009 5616.66 5617.04 5612.83 5615.19 5613.20 4/30/2009 5616.69 5617.04 5612.98 5615.22 5613.21 5/29/2009 5616.66 5617.02 5612.82 5615.18 5613.18 6/30/2009 5616.67 5617.00 5613.00 5615.15 5613.16 7/31/2009 5616.68 5617.01 5612.79 5615.16 5613.17 8/30/2009 2W7-N 2W7-S 2W6-N 2W6-C 2W6-S DATE 01/29/04 02/17/04 03/24/04 04/28/04 OS/20/04 06/30/04 07/30/04 08/19/04 09/30/04 10/29/04 11/30/04 12/15/04 01/19/05 02/17/05 03/31/05 04/29/05 OS/27/05 06/30/05 07/22/05 08/26/05 5621.51 5619.95 5620.53 5618.19 5616.61 09/30/05 5621.50 5619.93 5620.52 5618.19 5616.60 10/28/05 5621.49 5619.63 5620.51 5618.19 5616.60 11/30/05 5621.50 5619.93 5620.52 5618.19 5616.60 12/29/05 5621.49 5619.94 5620.51 5618.18 5616.56 01/27/06 5620.90 *5619.98 5620.56 5618.18 5616.56 02/14/06 5621.66 5620.24 5620.55 5618.25 5616.73 02/17/06 5621.46 5619.86 5620.52 5618.16 5616.54 04/26/06 5621.46 5619.84 5620.52 5618.18 5616.56 OS/25/06 5621.48 5619.97 5620.52 5618.19 5616.54 06/29/06 5621.50 5619.94 5620.53 5618.14 5616.52 2W7-N 2W7-S 2W6-N 2W6-C 2W6-S DATE 07/12/06 5621.49 5619.96 5620.52 5618.18 5616.52 08/24/06 5621.49 5619.96 5620.52 5618.18 5616.80 09/22/06 5621.86 5619.96 5620.52 5618.16 5616.77 10/31/06 5621.83 5619.92 5620.51 5618.13 5616.73 11/29/06 5621.82 5619.83 5620.66 5618.15 5616.73 12/21/06 5621.82 5619.96 5620.54 5618.16 5616.78 01/10/07 5621.82 5620.02 5620.52 5618.18 5616.82 02/24/07 5621.84 5619.94 5620.74 5618.54 5616.93 03/07/07 5621.86 5620.00 5620.50 5618.18 5616.72 04/20/07 5621.78 5619.94 5620.66 5617.98 5616.74 05/03/07 5621.75 5619.93 5620.58 5617.63 5616.71 06/08/07 5621.88 5620.14 5620.74 5618.36 5616.94 07/12/07 5621.83 5620.25 5620.55 5618.23 5616.76 08/01/07 5621.81 5620.18 5620.50 5618.15 5616.71 09/13/07 5621.88 5620.20 5620.84 5618.36 5616.79 10/16/07 5621.87 5620.25 5620.81 5618.15 5616.79 11/21/07 5621.82 5620.15 5620.48 5618.13 5616.67 12/21/07 5621.81 5620.17 5620.53 5618.16 5616.70 01/28/08 5621.86 5620.24 5620.73 5618.13 5616.82 02/28/08 5621.82 5620.19 5620.68 5618.15 5616.79 03/28/08 5621.81 5620.02 5620.52 5618.16 5616.68 04/25/08 5621.79 5620.06 5620.51 5618.02 5616.62 05/30/08 5621.74 5620.11 5620.62 5618.32 5616.77 06/27/08 5618.00 5618.57 5616.20 5614.58 5621.23 07/31/08 5618.03 5618.62 5616.19 5614.60 5621.28 08/29/08 5618.34 5618.92 5616.54 5614.89 5621.58 09/24/08 5618.26 5618.84 5616.49 5614.83 5621.51 10/31/08 5618.24 5618.83 5616.45 5614.82 5621.49 11/26/08 5619.82 5618.34 5618.80 5616.44 5614.79 12/31/2008 5619.93 5618.38 5618.94 5616.58 5614.94 2W7-N 2W7-S 2W6-N 2W6-C 2W6-S DATE 1/30/2009 5619.82 5618.22 5618.81 5616.44 5614.78 2/27/2009 5619.74 5618.13 5618.74 5616.34 5614.69 3/31/2009 5621.58 5619.24 5619.82 5617.48 5615.85 4/30/2009 5619.99 5618.52 5618.98 5616.62 5614.88 5/29/2009 5619.92 5618.35 5618.94 5616.59 5614.86 6/30/2009 5619.84 5618.31 5618.84 5616.49 5614.84 7/31/2009 5619.80 5618.17 5618.73 5616.39 5614.72 8/30/2009 2W5-C 2W4-N 2W4-S 3-2C DATE 01/29/04 02/17/04 03/24/04 04/28/04 OS/20/04 06/30/04 07/30/04 08/19/04 09/30/04 10/29/04 11/30/04 12/15/04 01/19/05 02/17/05 03/31/05 04/29/05 OS/27/05 06/30/05 07/22/05 08/26/05 5618.36 5619.26 5616.22 5613.63 09/30/05 5618.36 5619.26 5616.22 5613.63 10/28/05 5618.36 5619.26 5616.22 5613.63 11/30/05 5618.36 5619.26 5616.22 5613.63 12/29/05 5618.35 5619.25 5616.20 5613.63 01/27/06 5618.35 5619.29 5616.23 5613.58 02/14/06 5618.35 5619.21 5616.19 5613.66 02/17/06 5618.31 5619.23 5616.15 5613.56 04/26/06 5618.35 5619.25 5616.17 5613.60 OS/25/06 5618.36 5619.25 5616.19 5613.60 06/29/06 5618.31 5619.23 5616.16 5613.62 2W5-C 2W4-N 2W4-S 3-2C DATE 07/12/06 5618.34 5619.26 5616.19 5613.61 08/24/06 5618.33 5619.25 5616.17 5613.61 09/22/06 5618.32 5619.25 5616.18 5613.61 10/31/06 5618.33 5619.25 5616.18 5613.61 11/29/06 5618.33 5619.20 5616.18 5613.62 12/21/06 5618.33 5619.26 5616.17 5613.60 01/10/07 5618.33 5619.23 5616.13 5613.75 02/24/07 5618.37 5619.24 5616.18 5613.62 03/07/07 5618.29 5619.20 5616.15 5613.76 04/20/07 5618.31 5619.28 5616.13 5613.76 05/03/07 5618.25 5619.31 5616.21 5613.82 06/08/07 5618.37 5619.49 5616.33 5613.80 07/12/07 5618.57 5619.62 5616.21 5613.74 08/01/07 5618.55 5619.56 5616.38 5613.78 09/13/07 5618.61 5619.61 5616.44 5613.85 10/16/07 5618.63 5619.54 5616.44 5613.81 11/21/07 5618.57 5619.45 5616.38 5613.82 12/21/07 5618.59 5619.46 5616.41 5613.80 01/28/08 5618.62 5619.47 5616.43 5613.78 02/28/08 5618.63 5619.46 5616.39 5613.81 03/28/08 5618.59 5619.31 5616.35 5613.65 04/25/08 5618.58 5619.32 5616.31 5613.60 05/30/08 5618.53 5619.29 5616.23 5613.48 06/27/08 5616.39 5618.87 5616.67 5613.64 07/31/08 5616.38 5618.87 5616.67 5613.66 08/29/08 5616.14 5618.87 5616.68 5613.65 09/24/08 5616.13 5618.86 5616.66 5613.66 10/31/08 5616.14 5618.88 5616.66 5613.63 11/26/08 5618.30 5619.25 5616.14 5613.63 12/31/2008 5618.34 5619.28 5616.17 5613.61 2W5-C 2W4-N 2W4-S 3-2C DATE 1/30/2009 5618.27 5619.25 5616.38 5613.64 2/27/2009 5618.28 5619.24 5616.13 5613.65 3/31/2009 5618.31 5619.25 5616.13 5613.65 4/30/2009 5618.31 5619.43 5616.15 5613.69 5/29/2009 5618.29 5619.25 5616.13 5613.65 6/30/2009 5618.29 5619.23 5616.11 5613.61 7/31/2009 5618.31 5619.26 5616.13 5613.65 8/30/2009 DATE 01/29/04 02/17/04 03/24/04 04/28/04 OS/20/04 06/30/04 07/30/04 08/19/04 09/30/04 10/29/04 11/30/04 12/15/04 01/19/05 02/17/05 03/31/05 04/29/05 OS/27/05 06/30/05 07/22/05 08/26/05 09/30/05 10/28/05 11/30/05 12/29/05 01/27/06 02/14/06 02/17/06 04/26/06 OS/25/06 06/29/06 3-25 5612.18 5612.18 5612.18 5612.19 5612.18 5612.12 5612.22 5612.16 5612.20 5612.16 5612.17 DATE 07/12/06 08/24/06 09/22/06 10/31/06 11/29/06 12/21/06 01/10/07 02/24/07 03/07/07 04/20/07 05/03/07 06/08/07 07/12/07 08/01/07 09/13/07 10/16/07 11/21/07 12/21/07 01/28/08 02/28/08 03/28/08 04/25/08 05/30/08 06/27/08 07/31/08 08/29/08 09/24/08 10/31/08 11/26/08 12/31/2008 3·25 5612.16 5612.16 5612.16 5612.16 5612.14 5612.15 5612.15 5612.16 5612.14 5612.14 5612.16 5612.18 5612.05 5612.14 5612.41 5612.38 5612.15 5612.14 5612.36 5612.33 5612.41 5612.51 5612.06 5612.16 5612.14 5612.16 5612.21 5612.16 5612.16 5612.15 DATE 1/30/2009 2/27/2009 3/31/2009 4/30/2009 5/29/2009 6/30/2009 7/31/2009 8/30/2009 3-25 5612.37 5612.17 5612.17 5612.19 5612.16 5612.14 5612.15 ~~'<b ~~ '<b ~:a, '<b ~~ U)'<bE Q)~~~~c::vo'Q;l t)~[j~ ~~'<b ~~'<b ~~'<b White Mesa Mill Cell 4A Settlement Plate •-"---.,~'- ~1 -•-' .1 12/23/1988 ---- - 9/19/1991 611511994 3/11/1997 12/611999 91112002 5/28/2005 2/22/2008 11/18/2010 ~~'<b ~~'<b ~~'<b ~~Q~ ~~-~CI)'Q.!~ c:,Q~CU"b~'Q[j ~ ~~'<b ~~'<b ~~ '<b White Mesa Mill Cell 2W1 settlement plate ~.~.--_. ...W. ',U,\T -- I -- 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~'i-'<b ~~'<b ~~'<b ~~'<b li)~=~CD 'Q.!(:;) c,Q~ iii ~>'Q..!(:;)w ~cP'<b ~~ '<b ~~'<b I White Mesa Mill I Cell 2W2 settlement plate 1-··1~---...-.-.J -\I•III - II 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~.~ ~~.~ ~~.~ ~~.~ (j)~~~ Q)'Q.!<=' c:: .2 ~co ~>'Q~<='w ~~'~ ~~.~ ~~ .~ White Mesa Mill Cell 2W3 settlement plate I~ I~ ".I'I~".• II1II -i - II 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~'Cb ~r¥'Cb ~~'Cb ~~'Cb ~~-tbQ)'Q.!?<:;)cg~~~Q)'Q[j <:;) ~~'Cb ~~ 'Cb ~~'Cb White Mesa Mill Cell 2W4C settlement plate "..~~~-,-.--!......., •..~---.•i 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~.<t> ~~.<t> ~~.<t> ~~.<t> ii)~E ~Q)"<t>~c:~0..~nl a>.<t>jjj ~~.<t> ~~.<t> ~~.<t> White Mesa Mill Cell C2E1 settlement plate J- j I ~-.....•.".-- ~\ 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~"Cb ~~ "Cb ~~"Cb ~~"Cb iii ~E ~j "Cb c:~0..~tV~'Cbw ~~"Cb ~~"Cb ~~"Cb White Mesa Mill Ce1l2E1-1N settlement plate _. II --• • I~\ ~I 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~·Cb ~~·Cb ~~·Cb ~~·Cb Ii)~E ~...~·Cb c:~0:o:l '"b~Q)·Cbw ~~·Cb ~~·Cb ~~·Cb White Mesa Mill Cell 2E1·1S settlement plate --• • I~~ -1.1 12/23/1988 911911991 611511994 3/11/1997 12/6/1999 9/112002 5128/2005 2/22/2008 11/18/2010 ~~'ct> ~~'ct> ~~'ct> ~~'ct> 'iii ~E ~Q)'ct>.!c:~0:al ~~'ct>w ~~'ct> ~~'ct> ~~ 'ct> White Mesa Mill Ce1l2E1-25 settlement plate I •:- --,-..,--• .:.... 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/611999 911/2002 5/28/2005 2/22/2008 11/18/2010 ~~.~ ~~.~ ~~.~ ~~.~ Ii)~E ~Q).~.! c::~0~~>.~Q) jjj ~~.~ ~~.~ ~~ .~ White Mesa Mill Cell 2W7-C settlement plate •-- ~\ '11 12/23/1988 911911991 6/15/1994 311111997 12/6/1999 9/112002 5128/2005 2/22/2008 11/18/2010 ~~.'t> ~~.'t> ~~.'t> ~~.'t> iii ~E ~-Q).'t>~c ~0..~CO6i .'t>iIi ~~.'t> ~~.'t> ~~.'t> White Mesa Mill Cell 2W5-N settlement plate • -1'\1 ~~~ 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~.~ ~~.~ ~~.~ ~tb.~ c;;~E ~Q).~~c ~0..~lU>.~Q) [j ~~ .~ ~~.~ ~~.~ White Mesa Mill Cell 2W3·S settlement plate ~---...--... ,', 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~'<b ~~'<b ~~'<b ~~'<b Ii)~E 'bQ)'<bQ)-c ~0:;:;~tU~'<bill ~~'<b ~~ '<b ~~'<b White Mesa Mill Cell 3-1 N settlement plate ..I --------- 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~ .~ ~~.~ ~~.~ ~~ .~ "iii ~E ~i .~..- c:::~0:;::l ~lU a>.~jjj ~~.~ ~~.~ ~~.~ White Mesa Mill Cell 3-1 C settlement plate - ~- 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 --~~.-- ~~"<b ~~"<b ~~"<b ~~ "<b en ~E ~Q)"<b~c:~0:;:;~COa;"<bw ~~"<b ~~"<b ~~"<b White Mesa Mill Cell 3-1 S settlement plate -•- I 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~"<t> ~~"<t> ~~ "<t> ~~"<t> iii ~E ~Q)"<t>4l-c::~0..~Cll P>"<t>4lw ~~"<t> ~~"<t> ~~"<t> White Mesa Mill Cell 3-2N settlement plate ...• 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~ .~ ~~.~ ~~.~ ~~.~ "iii ~E ~Q).~~c ~0:;::l ~cu>.~Q)iIi ~~.~ ~~.~ ~~ .~ White Mesa Mill Cell 2W7-N settlement plate • I ----,~ • I~'- [!III 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~oct> ~~oct> ~~oct> ~~oct> "iii ~E ~Q)oct>~c:~0:;:::0 '"b~Q)oct>jjj ~~oct> ~19oct> ~~oct> White Mesa Mill Cell 2W7-5 settlement plate lr"- '~, 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~0<t> ~~0<t> ~~0<t> ~~0<t> Ii)~E ~... lR 0<t>-r::~0:;:0 ~~Ql 0<t>iIi ~~0<t> ~~0<t> ~~0<t> White Mesa Mill Cell 2W6·N settlement plate ~ .~~ .r· 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~°ac::> ~~°ac::> ~~0'b ~~0'b "iii ~E ~-Q).'b .!c ~~lU ~ >0'bQ) jjj ~;.>S?0'b ~~°ac::> ~?°ac::> White Mesa Mill Cell 2W6-C settlement plate -~-., t .~\ .rl . 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~'ct> ~~'ct> ~~'ct> ~~'ct> (j)~E ~-Q)'ct>~c:~0..~tV>'ct>Q)w ~~'ct> ~~'ct> ~~l7'ct> White Mesa Mill Cell 2W6-S settlement plate 1 ~~ • ..... 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~oct> ~~oct> ~~oct> ~~oct> "iii ~E ~Q)oct>~c::~0..~CO>oct>Q) iIi ~~oct> ~~oct> ~~oct> White Mesa Mill Cell 2W5-C settlement plate ... .L ~-- \. 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~oct> ~~oct> ~~oct> ~~oct> Cii ~E ~Q)oct>~c ~0~~~Q)oct>ill ~~oct> ~~oct> ~~oct> White Mesa Mill Cell 2W4-N settlement plate ~~- 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~'<b ~~'<b ~~'<b ~~'<b u;~E ~Q)'<b~c ~0:ij ~III>'<bQ) iIi ~~'<b ~~'<b ~~'<b White Mesa Mill Cell 2W4-S settlement plate ~ 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~"<6 ~~"<6 ~~"<6 ~~0<6 Iii ~E ~Q)"<6~c ~0:0:;~ro~"<6w ~/'v"<6 ~~"<6 ~?"<6 White Mesa Mill Cell 3-2C settlement plate ......,.,...... 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 ~~ .~ ~~.~ ~~ .~ ~~.~ "iii ~E ~Qj .~~c ~0..~«l6).~[j ~~.~ ~~.~ ~~ .~ White Mesa Mill Cell 3-25 settlement plate ~."...,- 12/23/1988 9/19/1991 6/15/1994 3/11/1997 12/6/1999 9/1/2002 5/28/2005 2/22/2008 11/18/2010 Summary of Monthly Solution Freeboard Measurements Solution Levels Cell 1,Cell 3 and Cell 4A July 2008 through August 2009 Cell 1 Cell 3 Cell4A Cell 1 Cell 3 Cell4A Elevation Elevation Elevation Freeboard Freeboard Freeboard Change in Change in change in Date Cell 1 Cell 3 Cell4A Elevation Elevation Eleveation Inches Inches Inches 7-Jul-08 5612.35 5601.72 5615.4 5601.6 0.60 (2.52) 11-Jul-08 5612.41 5601.28 5615.4 5601.6 (0."72)5.28 18-Jul-08 5612.5 5601.16 5615.4 5601.6 (1.08)1.44 25-Jul-08 5612.64 5601.06 5615.4 5601.6 (1.68)1.20 7/31/2008 5612.75 5601.3 5615.4 5601.6 (1.32) (2.88) 8/8/2008 5612.94 5601.29 5615.4 5601.6 (2.28)0.12 8/15/2008 5613.16 5601.14 5615.4 5601.6 (2.64)1.80 8/22/2008 5613.4 5600.85 5615.4 5601.6 (2.88)3.48 8/28/2008 5613.6 5601.3 5615.4 5601.6 (2.40) (5.40) 9/5/2008 5613.85 5601.83 5615.4 5602.5 (3.00)(6.36) 9/12/2008 5614.14 5602.49 5615.4 5602.5 (3.48)(7.92) 9/19/2008 5614.5 5602.15 5615.4 5602.5 (4.32)4.08 9/26/2008 5614.44 5602.1 5615.4 5602.5 0.72 0.60 10/3/2008 5614.24 5602.46 5555.14 5615.4 5602.5 5595.3 2.40 (4.32) 10/10/2008 5614.29 5602.04 5564.34 5615.4 5602.5 5595.3 (0.60)5.04 -110.40 10/17/2008 5614.14 5601.45 5564.74 5615.4 5602.5 5595.3 1.80 7.08 -4.80 10/24/2008 5614.26 5601.75 5565.24 5615.4 5602.5 5595.3 (1.44) (3.60)-6.00 10/31/2008 5614.59 5601.5 5565.94 5615.4 5602.5 5595.3 (3.96)3.00 -8.40 11/7/2008 5614.66 5601.32 5566.64 5615.4 5602.5 5595.3 (0.84)2.16 -8.40 11/14/2008 5614.18 5602.02 5568.54 5615.4 5602.5 5595.3 5.76 (8.40)-22.80 11/21/2008 5612.84 5602.76 5570.34 5615.4 5602.5 5595.3 16.08 (8.88)-21.60 11/26/2008 5613.07 5601.81 5571.74 5615.4 5602.5 5595.3 (2.76)11.40 -16.80 12/5/2008 5612.52 5601.12 5572.54 5615.4 5602.5 5595.3 6.60 8.28 -9.60 12/12/2008 5612.39 5601.26 5574.24 5615.4 5602.5 5595.3 1.56 (1.68)-20.40 12/19/2008 5612.36 5602.28 5575.04 5615.4 5602.5 5595.3 0.36 (12.24)-9.60 12/24/2008 5612.64 5602.79 5577.31 5615.4 5602.5 5595.3 (3.36) (6.12)-27.24 1/2/2009 5612.76 5603.05 5579.59 5615.4 5602.5 5595.3 (1.44) (3.12)-27.36 1/9/2008 5612.87 5602.53 5580.23 5615.4 5602.5 5595.3 (1.32)6.24 -7.68 1/16/2008 5612.94 5601.67 5580.76 5615.4 5602.5 5595.3 (0.84)10.32 -6.36 1/23/2009 5613.17 5601.61 5581.22 5615.4 5602.5 5595.3 (2.76)0.72 -5.52 1/30/2009 5613.21 5601.77 5582.06 5615.4 5602.5 5595.3 (0.48) (1.92)-10.08 2/6/2009 5613.3 5600.73 5582.81 5615.4 5602.5 5595.3 (1.08)12.48 -9.00 2/13/2009 5613.4 5599.74 5583.84 5615.4 5602.5 5595.3 (1.20)11.88 -12.36 2/20/2009 5613.27 5599.95 5584.26 5615.4 5602.5 5595.3 1.56 (2.52)-5.04 2/27/2009 5613.28 5599.96 5584.57 5615.4 5602.5 5595.3 (0.12)(0.12)-3.72 3/6/2009 5612.98 5601.59 5585.68 5615.4 5602.5 5595.3 3.60 (19.56)-13.32 3/13/2009 5612.76 5602.89 5586.12 5615.4 5602.5 5595.3 2.64 (15.60)-5.28 3/20/2009 5612.49 5602.72 5587.45 5615.4 5602.5 5595.3 3.24 2.04 -15.96 3/27/2009 5612.33 5601.66 5588.35 5615.4 5602.5 5595.3 1.92 12.72 -10.80 4/3/2009 5612.2 5600.58 5588.4 5615.4 5602.5 5595.3 1.56 12.96 -0.60 4/10/2009 5612.14 5600.43 5588.32 5615.4 5602.5 5595.3 0.72 1.80 0.96 4/17/2009 5612.23 5600.51 5588.44 5615.4 5602.5 5595.3 (1.08)(0.96)-1.44 4/24/2009 5612 5600.68 5588.21 5615.4 5602.5 5595.3 2.76 (2.04)2.76 5/1/2009 5611.86 5600.4 5588.24 5615.4 5602.5 5595.3 1.68 3.36 -0.36 5/8/2009 5611.84 5600.55 5588.72 5615.4 5602.5 5595.3 0.24 (1.80)-5.76 5/15/2009 5611.67 5600.47 5588.77 5615.4 5602.5 5595.3 2.04 0.96 -0.60 5/22/2009 5611.51 5600.38 5589.38 5615.4 5602.5 5595.3 1.92 1.08 -7.32 5/29/2009 5611.48 5600.45 5590.02 5615.4 5602.5 5595.3 0.36 (0.84)-7.68 6/5/2009 5611.4 5600.36 5590.14 5615.4 5602.5 5595.3 0.96 1.08 -1.44 6/12/2009 5611.27 5600.34 5590.11 5615.4 5602.5 5595.3 1.56 0.24 0.36 6/19/2009 5611.14 5600.27 5590.05 5615.4 5602.5 5595.3 1.56 0.84 0.72 6/26/2009 5611.05 5600.1 5589.86 5615.4 5602.5 5595.3 1.08 2.04 2.28 7/2/2009 5610.91 5600.11 5590.83 5615.4 5602.5 5595.3 1.68 (0.12)-11.64 7/10/2009 5611 5599.78 5589.31 5615.4 5602.5 5595.3 (1.08)3.96 18.24 7/17/2009 5611.31 5599.91 5585.75 5615.4 5602.5 5595.3 (3:12)(1.56)42.72 7/24/2009 5611.79 5599.81 5587.41 5615.4 5602.5 5595.3 (5.76)1.20 -19.92 7/31/2009 5612.02 5599.77 5586.8 5615.4 5602.5 5595.3 (2.76)0.48 7.32 8/7/2009 5612.42 5599.65 5585.77 5615.4 5602.5 5595.3 (4.80)1.44 12.36 8/14/2009 5612.78 5599.61 5585.03 5615.4 5602.5 5595.3 (4.32)0.48 8.88 Solution Elevations -Cells 1,3 and 4A - ----......../".......... .-..---~~ / ~ I5560 5610 5620 5550 1-Jul-oS 1-Aug-08 1-Sep-oS 1-0ct-08 1-Nov-oS 1-0ec-OS 1-Jan-09 1-Feb-09 1-Mar-09 1-Apr-09 1-May-09 1-Jun-09 1-Jul-09 1-Aug-09 i 5600 J!...,...c:..5590., E I....J!5580 c' 0iIIii:i 5570 -Cell 1 -Cell3 -CeIl4A --Cell 1 Freeboard Elevation -Cell 3 Freeboard Elevation -CeIl4A Freeboard Eleveation Inspection Reports (December 2008) White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDJIX A (CON1f,) l1JiAlrJLY JINSJPJEC']fJrON DATA Inspector:RtY'lIh 81lmer Date;I;).,i -:L.00 7s Time:octo] 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 1\J /\4A Slurry Pipeline Leaks,Damage,Blockage, Sharp Bends v II J Pipeline Joints Leaks,Loose Connections V vi .; Pipeline Supports Damage,Loss ofSupport V J J Valves Leaks,Blocked,Closed II'J v Point(s)ofDischarge Improper Location or Orientation II 'J c/ II,OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell ;J A 4A Water Level Greater Than Operating Level,Large Change V Vi VSincePreviousInspection Beach Cracks,Severe Erosion,Subsidence 0/oJ ,) Liner and Cover Erosion ofcover,Exposure ofLiner )i<..V V HI,DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W )pes Sloughs or Sliding Cracks,Bulges,J vlSubsidence,Severe Erosion,Moist V .J J V Areas,Areas ofSeepage Outbreak Crest \JVhite Mesa h1i!l -Standard Operating lOJrocedures Boole 11:EnvironmentallP'rotectiol1 Manual,Section 3.1 ICracks,Subsidel1ce,Severe Erosion / 2/07 Revision:DU§A~2 lP'age 18 of25 JIVo FJLOW RATJES I ILSlurryLine(s)Pond Retum S-X Tails Spray S)l§'tem I ./ GPM I 4Cj()!-/~T)m ./AJIPs Vo PHYSICAJL JINSPJECnON OF SJLUJRRY JL][N]ES(S) Walked to Discharge Point Observed Entire Discharge Line J J Vt DUST CONTROJL Cell 2 Cell 3 Cell 4A Dusting v v V Wind Movement ofTailings v \/V Precipitation:()inches liquid General Meteorological conditions:S~N~g C.\e(J'{~ vn.DAILY LEAK DETECTION CHECK I CellI Cell 2 /Cell 3 Cell4A "./ Leak Detection System t/Checked C7 d tJ Checked ",-",;Checked Checked -LWet__Dry __Wet F Dry __Wet__V_Dry ~Wet__Dry Initial level 1FT e"Initial I el Initial level -Initial level 110 I Final level Hi~h M",U Final level -Final levelFinlevel .,\47"31Gal.pumped al.pumped Gal.pumped FlowMeter VIII OBSERVATIONS OF POTENTIAL CONCERN .sov~\"'\:;.C<.J (b\"(\(f or <...e..\l i h"'"L",<'('-€.")(PD:.,ctl\ Action Required IJJ;L\~(,tew~",AVl-Mp et;i'~ (;,,\~ip()'ScA L;I/«( ~'1 ~ N I @ARl~a~~(tiK@W ~~~@~1 fAiliNGS SLURa,D~StHARGE LOCATKON fHlH ~\;;A I~()'is ~~==-<=,,-==~~~_K~MS~~=£_Cf~O=R '_')\~~~~~ ,. I' White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONTo) DAKLY KNSlP'JECTKON DATA Inspector:~tJ ~rt. Date;,12..J..;JffJ g Accompanied by:_ Time:It('I t 2/07 Revision:DUSA~2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 1'\4A //11,.,,-// Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends 'V/V v/ Pipeline Joints Leaks,Loose Connections r//I V v/ Pipeline Supports Damage,Loss of Supp0l1 II>I 1/"'/ Valves Leaks,Blocked,Closed ,/I ,v y / Point(s)ofDischarge Improper Location or Orientation V (1/-./ IIo OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell AI v1 4A /", / Water Level Greater Than Operating Level,Large Change t/VI .,/ Since Previous Inspection / Beach Cracks,Severe Erosion,Subsidence v V'v/ Liner and Cover Erosion ofcover,Exposure ofLiner fl/I ,../oJ I I HI,DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W //// ;;Iopes Sloughs or Sliding Cracks,Bulges,~//flit /,/"../ Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak Crest White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Mantlal,Section 3.1 Cracks,Subsidence,Severe Erosion 2/07 Revision:JDUSA-2 Page I~of25 KV.FJLOW RATJES , I I Slurry Line(s)Pond Return S-X Tails I Spray System I I GPM ~2.L)rf(OO I ~tI'CJ I A//f / V.PlHfYSlICAJL KNSPJECTliON OF SJLURRY JLlINJES(S) Walked to Discharge Point Observed Entire Discharge Line /J No No------" VI.DUST CONTROJL Cell 2 Cell 3 Cell 4A Dusting //' Wind Movement ofTailings if /" 'I' Precipitation:0 inches liquid General Meteorological conditions: VII.DAILY LEAK DETECTION CHECK I Celli ,Cell 2 Cell 3 C2114A /'IAIIJ-/./ Leak Detection System v Checked ,.,Checked v Checked .Checked Checked __Wet ~Y /~t__DIY__Wet__DIY __Wet__Dry Initial level 1'6 '5"0 ~nitiallevel Initial level Initial level ~.~ Final level Final level Final level Final level Gal.pumped Gal.pumped Gal.pumped Flow Meter SO/03 VIn OBSERVATIONS OF POTJE}'TTIAJL CPl)TCERN ,.j)I~~l(r;wf w/II {(k('A yVtW(A !lt~ I~dN tJ Action Required ~ N I ~AHl~~SP(CJKOW ~~~~nJ TAILINGS SLURR'DiSCHARGE LOCATION I' f:'';- ,I White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) DAIL¥INSPECTIONDATA Inspector:.~,,\.A.l"l:.l'~r,"\ Date;O;s i)a t?i:) Accompanied by:_ Time:I'3>0'30 l~. 2/07 Revision:DUSA-2 Page 17 of2S Any Item nof"OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM.T Inspection Items Conditions ofPotential Concern Celli Cell 2 Cell 3 Cell ..4A Slurry Pipe.~ine ..~akll,Damage,mocka~e,Sharp Bends.,'.,......~.'1.V' PipeUne Joints .Leakll,Loose Connect~ons .,.V'•l I/'.,. Pipeline Supports Dama~e,Loss ofSuooort ""..'v-I/'V' Valves .Leaks,Blocked,Clolled .".,/.,.v Point(s)of Dischar~e hnorooer Location orOtienta,tion .....,/""- .,...... D.OPERATIONAL SYSTEMS I InspeCtion Items Conditions ofPotentialConcem Celli Ce112 .CeO 3 Cell 4A Water Level Greater Th,an Operating Level,L~geChange v Since Previous Insoection ...v'V'II" Beach C~~ks.S,evere Erosiog,Sub§idence V'....,v v Liner and Cover Erosion ofcover,Exoosure orUner v V'V',/ III.DIKES ANI)EMJlANKMENTS .~'.'I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W Slopes Sloughs or Sliding Cracks,Bulges,v-I/',/"'";/V'" Subsidence,Severe Erosion,Moist Areas,Areas ofSeepa,ge Outbreak White Mesa Mill -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA-2 Page 18 of25 ~.A~;.,,~., Crest Cracks,Subsidence,Severe Erosion IV.FLOW RATES I SlurryLine(s)Pond Retum S-XTails Spray System GPM \~'l -Z-Cs;'4.sao ~.- V.PHYSICAL JINSPECnON OF SLURRY LJINES(S). Walked to Discharge Point Observed Entire Discharge Line _____yes __-:V'::..,-__Ye$ _--..::.-__~No _____~No VI.DUST CONTROL 'cellZ Cell 3 Cell 4A Dusting .....,......... Wind Movement ofTailings v ,-'..., Precipitation:~inches liquid I'~ 1 .~~ • !\ General Meteorolo~icalconditions:del\-Cl:. '. ;W!)!!+"\ .'., ,.'. VII.DAILY LEAK DETECTION CHECK . I CellI ..Cell 2 .Ce1l3 ..Cell 4A .,';".. Leak Detection System .r Checked 'v""Checked ......Checked .:......,...';'Checked Checked ""__Wet~ry ~Wet__Dry _'_Wet__Dry__Wet__Dry.. Initial level V'"Initial level V'In~tiall.e~ei t/Initial level v .. Final level v'Final level ,/Fiilallevel v Final level ,/. Gal.DumDed v'Gal.numbed t/Gal.Dumned v Gal.DumDed V vm OBSERVATIONS OF POTENTIAL CONCERN ~ N I OAll~~SP(CTION REPORT TAn Il\lGS SLURRY DHCH/U~Gt lOC/nlOll! DA H :~1..i:l2.~e.'l::l e lIlSP£CTOR:~,J"TC.:~"'1 HILL __A~E_A ~t>~_~n<!o'\l ,' \' '... White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 AJPPENDJlX A (CONTo) DAilLY iNSPECTION DA'fA Inspector:'J4M ~ Date;/2·3 .2(j)~I Accompanied by:_ Time:lIb D 2/07 Revision:DUSA~2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern Cell 1 Cell 2 Cell 3 Cell 4A /J/IL I / Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends 'II \11/v/ Pipeline Joints Leaks,Loose Connections vI/0'"v/ Pipeline Supports Damage,Loss ofSupport VI '/"'/ Valves Leaks,Blocked,Closed V/I vi V/ Point(s)ofDischarge Improper Location or Orientation ..;1 /)(v H.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A iJl//t // Water Level Greater Than Operating Level,Large Change vj ,/1 ,///VSincePreviousInspection/ Beach Cracks,Severe Erosion,Subsidence Ii t/j '/ Liner and Cover Erosion of cover,Exposure ofLiner "X I /"J t HI.DIKES AND EMBANKMENTS I ~ection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W ;lopes Sloughs or Sliding Cracks,Bulges,//JIl4 ///Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak VVhite Mesa Min -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA~2 Page Ig of25 Crest Cracks,Subsidence,Severe Erosion KYo FLOW RATJES I Slurry Line(s)Pond Return S-X Tails Spray System /'. GPM 5:l.fS-p((?&ttJ(J /jI1ff Yo PHYSKCAL JINSPJECTJION OF SLURRY LJINJES(S) Walked to Discharge Point Observed Entire Discharge Line /Ves!7 Ves ______No v.t DUST CONTROL Cell 2 Cell 3 Cell 4A /-'./ Dusting V/7>7 rv' ./ Wind Movement ofTailings v"~--- ,., Precipitation:()inches liquid I A If General Meteorological conditions:;;/,/.11.1 ),..11 1WI {/~JtA (l J VII.DAILY LEAK DETECTION CHECK 114A --.....,L_(Checked 7vet__Dry Initial level 13 .S- 113 Initiallevel,_ Ch7 __Wet__Dry Initiallevel,_ __Wet__Dry Initiallevel _ __Wet__Dry _4--,,--CheckedLeakDetectionSystem Checked Finallevel._Finallevel._Finallevel._Finallevel._ Gal.urn ed Flow Meter SeJ10 ~ ~ N I -------. Dm:/2 ..6ft: I B I, White Mesa MiU -Standard Operating Procedures Boole 11:Environmental Protection Manual,Section 3.1 APPENi>IX A (CONT.) DAILY INSPECTION DATA Date;lOA \)t.t.t>~ Accompanied by:_ Time:0'141 liM 2/07 Revision:DUSA-2 Page 17 of2S Any Item not'''OK''must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM.I Inspection Items Conditions ofPotential Concern CellI Cell 2 CeU3 Cell 4A Slurry Pipe~ine ~aks,Damage,J;Uockage,Sharp Bends .\,",...v:,v.J/ PipeUlle Joints .,~lJk!i,Loose,Connect~ons V".,.,..'V ." PiPeline Supports Damage.Loss ofSupport ....'!".'.r ,;.- Valves Leaks,Blocked,CloseQ y v Y -Point(s)ofDischarge IwproperLocation OrQrie.ntatipll v y ,/v,. ". D.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concelli CellI Cell 2 •Cell 3 Cell 4A Water Level Greater Than Operating Level,Large Change Since Previous Inspection ..',V'v-I/'V Beach Cr~cks.S.evere Erosioll,Sub!!idence v ,Y j,.~V' Liner and Cover Erosion ofcover.Exposure ofUner '"V'v ....- III.DIKES AND J.WQANKMENTS ".,j, Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike 1-1 lA S 4A-W Slopes Sloughs or Sliding Cracks,Bulges,v v I/'V ~v Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak [Crest White Mesa MiII-Standard Operating Procedures Book II:EnvrrolID1ental Protection Manual,Section 3.1 ICracks,Subsidence,Severe Erosion 2/07 Revision:DUSA-2 Page 18 of25 W.FLOW RATES I Slurry Line(s)Pond Retum S-XTaHs Spray System GPM "2-~-zz.o 4<:..s ~~ v.PHYSICAL INSPECTION OF SLURRY LINES(S). Walked to Discharge Point Observed Entire Discharge Line _____yes __---'v'c--_ye!' _____~No ______.No VI.DUST CONTROL .Ce1l2 Cell 3 Cell 4A Dusting '......."'"v-I/" Wind Movement ofTailings ...-"......., Precipitation:~inches liquid ff -t <~~ • I \ General Meteorological conditions:'. eN',a..cM>'r I cni...d, .'.. -...",.,', VII.DAILY LEAKDETECTION CHECK . I ,CellI ..Cell 2 .Cell3 ,Cell4A" Leak Detection System .,Checked ....··Checked ".Checked :',',v'"'/.Checked""', Checked ~Wet__Dry __Wet~Dry ~Wet__Dry ~Wet__Dry.. Initial level .".Initial level v Initial (e~el ....Initial level V'"..--'"...-Final level ,./'Final level Final level Final level Gal.pumped v v Gal.pumped .....Gal.pumped f;./Gal.pumped vm OBSERVATIONS OF POTENTIAL CONCERN Action Required S'--~, ~ N I OAll~~SP(CTION RtPOnT TAn INGS SLURRY IHSCHARGt tOeATlON DATE:C4 bQLlO@ lIlSPECTOR;1<0 AT"(.'~("''1r--=--==-.=--=-~-=--.~:"'-':":"':"::""';~ lUll __~R!~te-:'!-~~r __-......._ I,--_._~----.R1/r'-. /Ii ~H-'"....--.....---~~ •,I I)1~.w,J\.1Icj~ ',1..t,J 1'->)I.' i' IIi White Mesa Mill -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 APPENDJIX A (CON1\) DAJJLY KNSPIECT]fON DATA Inspector:I!¥4.J f4l...a-iL Date;/2 ~If .2011 Accompanied by:_ Time:13 tJ l- 2/07 Revision:JDUSA~2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILiNGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A /fA J JI\ Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends v/IV,-,..,v .,./' Pipeline Joints Leaks,Loose Connections V /V / Pipeline Supports Damage,Loss ofSupport V/~/" Valves Leaks,Blocked,Closed v/I ,/"-'/ Point(s)ofDischarge Improper Location or Orientation v f v ,/ H.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A j'tJ Il.. Water Level Greater Than Operating Level, Large Change ./,.,/ Since Previous Inspection ,/.,./ Beach Cracks,Severe Erosion,Subsidence v/fV/0/ ",' Liner and Cover Erosion ofcover,Exposure ofLiner ./v v I I { HI.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W opes Sloughs or Sliding Cracks,Bulges, -..//';11/4-,/'"//"Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak '\Nhite Mesa Mill -Standard Operating Procedums Book II:Environmental Protection Mamml,Section 3.1 2/07 Revision:DUSA~2 Page 19 of25 Crest Cracks,Subsidence,Severe Erosion N.FJLOW RATJES I I Slurry Line(s)Pond Retum S-X Tails I Spray System I GPM /;'11)'71111 ~qR'I V.PHYS][CAL ][NSPECTllON OF SLUJRJRY L][NJES(S) Walked to Discharge Point Observed Entire Discharge Line ./Yes~Yes ___'/__-:NO No------ VI.DUST CONTROL Cell 2 Cell 3 Cell 4A Dusting /.,.......... ,./ Wind Movement ofTailings ,..-.,/'-- 11 Precipitation:V inches liquid I General Meteorological conditions:n't/.rlLA I~~~I(f v VII.DAILY LEAK DETECTION CHECK I Celli Cell 2 Cell 3 Ce1l4A ?,jl.A~/JILt--/;, Leak Detection System P'Checked ,v ,IChecked V Checked 1/Checked cheWlb~~~--Wet__Dry --Wet__Dry __Wet /Dry __Wet__Dry lJJert-f~1f{)Initial level Initial level Initial level I Initial level II.1 10 fo/allt ~D S ~JV Final level Final level Final level Final level Flow Meter 52 "3t..LeAGal.pumped Gal.pumped Gal.pumped VUIOBSJERVAT][ONS OF POTENTIAL CONCERN Action Required Vd7G W~,.AJ IJ);It~t.,,U::5 tf/f ~~/Iaf, N,ve Ike,(;w eJ . ~ N I @AHl~~~~fCllK~W ~~~ij~J rAn UWS :5l,IJJf.fjllt IHSt:WAtJl~~lt1J~tn K@lIJ ,. j' White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 AJI:»PJENJl])JrX.A (CONT,) Jl})A][JLY KNSJP'JECTJION DATA Inspector:16'f«"1 ~ Date;/2·5'I ZOOIi Accompanied by:_ Time:It3r2 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =:Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell I 4A /,i\,j ~ Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends v//vrr v// Pipeline Joints Leaks,Loose Connections "/,1 '':v'/ Pipeline Supports Damage,Loss ofSupport '"f 1/// Valves Leaks,Blocked,Closed ./f "'/vJ Point(s)ofDischarge Improper Location or Orientation ,"/I v /I/" n.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A ,M Water Level Greater Than Operating Level,Large Change /}II!~/ Since Previous Inspection Beach Cracks,Severe Erosion,Subsidence v 1.1 .,r/"') Liner a,nd Cover Erosion ofcover,Exposure ofLiner X 1:/'" .,\J('"" III,DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W \ )//) )pes Sloughs or Sliding Cracks,Bulges,J .J fJ~,/// Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak 'White !V1IesEl Mill -Standard Operating Procedures Book 11:EnviroumentalPmtection Mmma!,Section 3.1 2/07 Revision:DUSA-2 Page H~of25 Crest I Cracks,Subsidence,Severe Erosion I IV,FLOW RATJES I I I Shm-y Line(s)Pond Return I S-X Tails I Spray System I I GPM I.{S<.I I "7 t.(I 6IJIJ I, Vo PHYSICAL JINSPECTJION OW SLURRY LJINJES(S) Walked to Discharge Point Observed Entire Discharge Line __---=-/-,L/_yes I Yes----- _____---'No No--------' V.II,DUST CONTROL Cell 2 Cell 3 Cell 4A Dusting v ,./ ) .,/' Wind Movement ofTailings ,/,.."<./ Precipitation:0 inches liquid I General Meteorological conditions:r/;/M St..........Wk'i.-J/\/'v f /, VIt DAILY LEAK DETECTION CHECK Cell 3 Ce1l4A Checked Checked __Wet__Dry __Wet ~ry /Wet__Dry Initial level Initial level Initial levelb &" Final level Final level Final level Gal.urn ed Flow Meter Finallevel _ Initiallevel _ Che~ __Wet__Dry Leak Detection System Checked ~ N I @ARL~~~P[~nH@W ~tP@~JTAILRNGSSLURR'DiSCHARGE LOCATION @lHf~l2 -&..~dfl -=--==-=-K~pg$~N,,-=:nOI:77 ?2 I ,. \' ·1" White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPEND'X A (CONT.) DAILY INSPECTION DATA Inspector::'5,'/41.Ke-Hi .All ( Date;/2 -GJ))f Accompanied by:-N.+f1/'I/JJ ( . Time:Ifl'W' 2/07 Revision:DUSA-2 Page 17 of 25 Any Item nof"OK"must be documented.A check mark =OK,X =Action Required ,, I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern Cell I CellZ Cell 3 Cell lA Slurry Pipeline ~akl\,Damage,nlocka~e,Sharp Bends ,,' PipeUne]oints ,Leaks,Loose Connectjpns • I PiPeline Supports Damage,Loss ofSupport , Valves Leaks,Blocked,Clos,oo ""of .d A-IA Point(s)ofDischarge bnproper Location or Qritlntation '0,'.·..,v J.J-"""I'Vt ... D.OPERATIONAL SYSTEMS I InspectionItems Conditions ofPotential Concern CellI Cell 2 •Cell 3 Cell""\.4!'\.~ Water Level Greater'I:han Operating Level,Lty"ge Change Since Previous Inspection .. Beach,Cr!lcks,S.evere Erosicm,Sub§idence , Liner and Cover Erosion ofcover,Exposure oftiner l .(oA .A. (1"'.("....~'r-",.. III.DIKES AND EMQANKMENTS ,,-,I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W--Slopes Sloughs or Sliding Cracks,Bulges,./"--/'"L/"-if!fL Subsidence,Severe Erosion,Moist ~. Areas,Areas ofSeepage Outbreak .~ Crest White Mesa Mill -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 Cracks,Subsidence,Severe Erosion 2/07 Revision:DUSA-2 Page 18 of25 IV,FLOW RATES I Slurry Line(s)Pond Retum S-XTails Spray System /\..".f //:)/'),.//1' GPM C::::/~~r V.PHYSICAL INSPECTION OFSLURR.Y UNES(S). Walked to Discharge Point Observed Entire Discharge Line _____yes __-:/-,-'__Ye~ ___/_--,No ______No VI.DUST CONTROL .cell 2 -!&~Cell 4A, .! Dustin~,;J()N-.~'.~-,.. Wind Movement ofTailings d I /' Precipitation:d inches liquid If ~ 1<ll I • I \.. General Meteorolo~icalconditions:(4,IM!.MI\I Cc,,<;:i ~'- ,.~t J.P- -..",,.'.<. VIL DAll.VLEAKDETECTIONCHECK ,, Celli --Cell 2 ,CeIl3.,Cell4A....,. Leak DetectionSystem ./Checked """'Checked --/Checked 'r i.Checked..Checked ~Wet--1>ry /Wet__Dry__Wet__Dry __Wet-:LDry ., Initial level Initial level Initial level Initial level .' Final level Final U:vel Final level Ffnallevel $'"'1 £LJ-t.., Gal.pumDed Gal,pumped Gal.pumped Gal.pumped vm OBSERVATIONS OF POTENTIAL CONCERN Action Required :S;---'~l ·.1 DAIL~dSPECTIDN REPORT TAu.ll\fGS StuRIn'O·KSnIARGf:loeA nom I' lUll AREA .., CEll Z /JATE:Il -b -qj l1lSPfCiOR:Qj~J<'Mf~~~~=---o<~=--=~"","=,--,:,,,,--.. ~ N I 'J'} White Mesa Mill -Standard Operating Procedures Bool(II:Environmental Protection Manual,Section 3.1 APP~NDIX A (CONT.) DAIL¥INSPECTION DATA Inspector47~JJ Date;«z:.,7 I ;7'15 p Accompanied by:GL)"£~1I /#"7Time:'",~$ 2/07 Revision:DUSA-2 Page 17 of 25 Any Item nof"OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM ,I Inspection Items Conditions ofPotential Concern CellI CeJl2 CeJl3 Cell 4A y-"l /./ Slurry Pipel,ine Leak~,D~mage,nlocka~e,Sharp Bends ,",~VAll ."".'1/".... PipeUne Joints ,Lea.lql,LOQse Cont'lec~ions ;;P~,~.~,.i~/y,.., PIpeline Supports Damage,Loss ofSupport wt:/'f ,;/'/r,/-" Valves Leaks,Blocked,Clo~ed &',."I )/1'",.;r'c Point(s)ofDischarge ImproperLocation orQUenta.ti()q,Jt'f-"ll.,Y l ..,... D.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotentialConcem CellI Cell 2 •CeO 3 Cell 4A , WaterLevel Greater'rlllJ,O Operating Level,Large Change \<~:~r;,,)},V,/ Since Previous Inspection'' Beach Cra.~ks,Severe Erosio.g,Su~§.dence V l ,*(;/ Liner and Cover Erosion ofcover,Exposure ofLiner ~,/'l i/V/ ".,'l Ill.DIKES ANDEJ.\ml\NKMENTS ';-'.'j, Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W ,Slopes Sloughs or Sliding Cracks,Bulges,l~·/f ti,,/i'/1./"/J.,,,/~. Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak ,~ ICrest White Mesa MiIl-Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 ICracks,Subsidence,Severe Erosion I 2/07 Revision:DUSA-2 Page 18 of25 "" IV.FLOWRATES I Slurry Line(s)Pond Retum S-XTails Spray System '"#?..."', GPM V~·{::;I?~+~ V.PHYSICAL INSPECTION OFSLURRY LINES(S). Walked to Discharge Point Observed Entire Discharge Line _---'Vc--~No ______No VI.DUST CONTROL ,Cell2 Cell 3 Cell 4A Dusting <.>'./","": Wind Movement ofTailings /'"";//"J/....,e :f!P)l"""'/'IY~y,/" Precipitation:7-;./inches liquid "-~<l ~ iF~.:::/• I \ General Meteorolo~ical conditions:'. .....,, VII.DAILY LEAKDETECTION CHECK Celli Leak Detection System ,.Checked Checked pi __Wet "'Dry Initiallevel,_ ., Cell 2 ___.,"""""CheckM ',' __Wel__Dry Initiallevel_'_ "Ce1l3.,.,Cell 4A ."F__Wet .¥#"Dry __Wet__Dry In,itial ~evel Initiallevel._ \Finallevel,____Finallevel,-,-_,,--_Final level Finallevel _ ''"~.t~l·."/'"?'''''""rGal.pumped~=__~G~a1.:..1.P~lu~Iri~'i')(e~d~~~t,,=1\.~;.o·~='(':=___1_~G~a1~.p~lu~m~p'~led~Cr=,,~=·,,='~'='ii=.'-1~G~a1~.:.J:p~lum~nDele~d==== vm OBSERVATIONS OF POTENTIAL CONCERN OAll~~SP£CTXON REPOnr fAn ll1IGS SUJnRV IHSCHAIHit lOt/n!01\I j' ~CEll 10 1 N I 'C1CELLU\~ White Mesa Min -StarHiaJ(d Operating Procedures Book 11:EnvirornnentaI Protection Manual,Section 3.1 APPENDIX A (CONTo) lIJ)AITJLY JINSlP'lECTJION DATA mspector:'J:h..-'.cJ10Ie. Date.;12/«.(0 'if Time:/4/)D 2/1J7 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends 'I-'f.y 'f. Pipeline Joints Leaks,Loose Connections y.y..y.'i Pipeline Supports Damage,Loss ofSupport f..'/.'I t Valves Leaks,Blocked,Closed 'I-'f..'j 1 Point(s)ofDischarge Improper Location or Orientation v '/.1 ~ H.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A Water Level Greater Than Operating Level,Large Change I Since Previous Inspection t y 'f 'f Beach Cracks,Severe Erosion,Subsidence ¥y Y.'f Liner and Cover Erosion ofcover,Exposure ofLiner 'f.~r..'f III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W )pes Sloughs or Sliding Cracks,Bulges, f·~~fSubsidence,Severe Erosion,Moist t '{. Areas,Areas ofSeepage Outbreak 'I,lVhite Mesa Mill -Stm1lO1ard Operating Procedures Boole II:EnvironmentallP'mtectioJ.1l M31mml,Section 3.1 2/07 Revision:DUSA-2 Page W of25 ICracks,Subsidence,Severe Erosion ¥I )(reI f KV.JFLOW RATES IJ I I~Slurry Line(s)I Pond Remm I S-X Tails I Spray System I I I iPM I L()(/I <f)--I t7 I -8 V.PJHIYSKCAJL KNSPlECTJION OJF SJLUJRJRY JLlfNES(S) Walked to Discharge Point Observed Entire Discharge Line Yes------:,.--- _----"./:.--__Yes No---=-------'No-----_. VlI:.DUST CONTROJL Cell 2 Cell 3 Cell 4A ~usting X y:« find Movement ofTailings X >'.x: recipitation:0.01-inches liquid eneral Meteorological conditions:Op0"\,+4-...-J_/J"c;(9 U-dor'i.-e-/.€..j Dr.DAILY LEAKDETECTION CHECK I Cell I Cell 2 Cell 3 Cell 4A :ak Detection System v Checked ,Checked ./Checked ,/"Checked lecked __Wet-.0ry __Wet /Dry ~Wet__DIY--Wet__Dry Initial level Initial level Initial level Initial level 1'-1<;-- Final level Final level Final level Final level Gal.pumped Gal.pumped Gal.pumped Flow Meter f7-{)8S- VIlK OBSERVATIONS OF POTENTIAL CONCERN kP/j0C;,/5 ",..-YL-v;.e.A t<-l.51 j f'P'''''"'J <• lVlPil"....~t".kl'L«--'j5 'l4-o'-"~f[-e--{tIV7r7 Jrr{.L'-"-'fiL tlhe-. Action Required! ©~~t~~£r((nK@~~~p@~r IAn UJ~$;\)UirUR1t IHS€:£'i!/{,fg~~1!,,@rt;tHHm ,. j' bJJrff g rzkz/pt _ usPf:ncm :D,Tvrk- ". {c{('U/ cf,~?'t"'Wje ~ N I White Mesa Mill -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) JDAILY INSPECTJION JDATA Inspector;~,",~""'<C Date;/2 ·1-11 Accompanied by:,.v""""'- Time:i'52.() 2/07 Revision:DUSA~2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A '"AI.~/J Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends ,//'~~v-/v Pipeline Joints Leaks,Loose Connections //II'v/... Pipeline Supports Damage,Loss ofSUPP0l1 {'I 'i t// Valves Leaks,Blocked,Closed v/I '/// Point(s)ofDischarge Improper Location or Orientation ,I ¥., I II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell /I 4A IV/I-" Water Level Greater Than Operating Level,Large Change /!VI ;/ Since Previous Inspection // Beach Cracks,Severe Erosion,Subsidence ,f/¥"I / Liner and Cover Erosion ofcover,Exposure ofLiner ./I v 10/' I I III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W ;Jopes Sloughs or Sliding Cracks,Bulges,.//1'14 ,//VSubsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak 'White I\..1esa Mill -Standard Operating Procedures Book II:Envimmnental Protection Manual,Section 3.1 2/07 Revision:DUSA~2 Page 18 of25 le-.C-.C--ree-.st'-.'1 Cracks,Subsidence,Severe Erosion /VI /---/~ )IV.]FLOW RATES I I I Slurry Line(s)Pond Retum I S-X Tails Spray System I GPM ~(tJ ~217--I ~2<c./1//1-, V.PlflIYS1[CAL JINSPECTKON O]F SLURRY LlINES(S) Walked to Discharge Point Observed Entire Discharge Line Yes ---Z-""--Yes ,/No No------ VI.DUST CONTROL Cell 2 Cell 3 Cell 4A //<' Dusting v/v v/ Wind Movement ofTailings v .,/./ Precipitation:()inches liquid II ;J General Meteorological conditions:aPbf'll IAi I Ad...,(~I r1 -7 (Y (.... I I vn.DAILY LEAK DETECTION CHECK I Celli Cell 2 C~113 Ce1l4A I IAllv // Leak Detection System V che7/v Checked V Ch/:V Checked Checked '/wet__DI'Y__Wet__Dry --Wet__Dry __Wet__Dry Initial level Initial level Initial level Initial level /0.t Final level Final level Final level Final level Gal.pumped Gal.pumped Gal.pumped Flow Meter 5"12./~1 Action Required OA~l~~~p(crK~N RePO~r TAILINGS SLURR'~ISCHARGE LOCATION ,. J. l KJJ.lTE ~_~~=~~= USN:crOR: ". ~ N I White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDJIX A (CONlI'o) Jl)AKJLY INSPECTION DATA Inspector:12ywJ .tJlllGi- Date;I)..·If)·2~dt Accompanied by:~ Time:!~()( 2107 Revision:DUSA~2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A /A fly // Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends ,y'/tIp rV /V / Pipeline Joints Leaks,Loose Connections ";1 /v / Pipeline Supports Damage,Loss ofSupport v'/11/"/ Valves Leaks,Blocked,Closed v/v/'V/ Point(s)ofDischarge Improper Location or Orientation .;I II'j/ H.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A ..1'/1 Water Level Greater Than Operating Level,Large Change ~/fl//{;/v" Since Previous Inspection /'~ Beach Cracks,Severe Erosion,Subsidence 11"/../'"...--~/V ,,; Liner and Cover Erosion ofcover,Exposure ofLiner ./I '....., HI.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W //Jl'lt // opes Sloughs or Sliding Cracks,Bulges,t/,/If/IJ V -/,,/ Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak '\Nhite Mesa Mill -Standard Operating Pmcedures Book 11:Envirol1xnentalPmtection IVlamml,Section 3.1 2107 Revision:JDUSA~2 Page H~of25 Crest ICracks,Subsidel1ce,Severe Erosiol1 I .A/~I I If'V.FJLOW RATES I I I Slurry Line(s)I Pond Return S-X Tails I ~prav System I \(~2i)I #GPM '11fJ I J5t/I 'V.PHYSIfCAJL IfNSPlEC'fKON OF SJLUJRJRY JLIfNlES(S) WaHced to Discharge Point Observed Entire Discharge Line /Yes7Yes No------'______N.o VI.DUST CONTROJL Cell 2 Cell 3 Cell 4A /' Dusting V v V' // Wind Movement ofTailings ~V "V ~H Precipitation:()inches liquid...... General Meteorological conditions:rJNJ.:1 s:--II!I~A',tJ.M () r ~/' VII.DAILY LEAK DETECTION CHECK I /CellI Cell 2 Cell 3 ~1I4A //JIYL.-/'/' Leak Detection System rv Ch7d / V /JChecked V Checked V Checked Checked __wet~ry ~et__Dry__Wet__Dry __Wet__Dry Initial level Initial level Initial level Initial level rr·1 Final level Final level Final level Final level Gal.pumped Gal.pumped Gal.pumped FlowMeter 6~72 &'C( ,{Jed t -,~J~Z 5 j]i/JrtJaJ rr~ ViII OB§lERYA~§OF P6fEN~AJLCO~RN.~w;tOa~e'~(fl Jo/w e {wfJ.(),/e 1/#tf'W ~~/,;4 €2 /lied t ~U¢'J k ...dt AJ~&'tW i~e ~V~I'vJkA 1I/P1rt11PC-J I..Jl>s st{re~.. t N I @ARt~~S~(CJH@~~~p~~r TAILIIGS SLUR.'DiSCHARGE LOCATION \' White Mesa Mill -Standard Operating Procedures Bool{II:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) DAILY INSPECTION DATA Date;t I ~~013 Accompanied by:__··..,.__ Time:14 \~\b'l\ 2/07 Revision:DUSA-2 Page 17 of25 Any Item nof"OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM,.1 Inspection Items Conditions ofPotentiai Concern Cell 1 Cell 2 Cell 3 Cell 4A Slurry Pipe1.ine Leaks,Damage,J;Uockage,Sharp Bends ~..t.- 00 r ,~.'I<'" PipeUne Joints .Leak!!,Loose,Connect~ons /.r • I ,/'IV pipeline Supports Damage,Loss ofSUI;mort /','''''1/v : Valves Leaks,Blocked,Clo~ed V"..-./,/' Point(s)ofDischarge Improper Location OfQnent\ltipq ..-"'"v ..... ....,, D.OPERATIONALSYSTEMS I Inspection Items Conditions ofPotential Concern Cell 1 Cell 2 .CellS Ceil 4A Water Level Greater Tl1an Operating Level,Large Change ?"Since Previous Inspection .v ".."" Beach Cr~cks,S,evere Erosion,Sub$.idence "", ;/'vv Liner and Cover Erosion ofcover,Exposure orLiner V"i/....-V Ill.DIKES ANDEMllANKMENTS ",-,I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I lA S 4A-W Slopes Sloughs or Sliding Cracks,Bulges,..-c/'v .,.-v ........ Subsidence,Severe Erosion,Moist Areas,Areas of Seepage Outbreak .~ Crest White Mesa Mill -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 Cracks,Subsidence,Severe Erosion 2/07 Revision:DUSA-2 Page 18 of25 IV.FLOWRATES I Slurry Line(s)Pond Retum S-XTails Spray System GPM 4caO "2<QID 2PiD i V.PHYSICAL INSPECTION OFSLURRY LINES(S). Walked to Discharge Point Observed Entire Discharge Line _____yes __~v,____-ye~ __"'_'No _____~No VI.DUST CONTROL CellZ Cell 3 Cell 4A '. Dusting t-'v ....'.~-. Wind Movement ofTailings ,/."V' Preoipitation:-Q-inches liquid ,f-.~.~~,.,\. General Meteorological conditions:c:\(AI?,t'.tJ J,.., ..'.. ,..,' VII.DAILYLEAKDETECTION CHECK .I Celli ..Cell 2 ,Cell 3 Cell4A. Leak Detection System ...Checked .P"'"Checked"...V'.Checked ..."","';'Checked Checked __/_Wet-Dry __Wet_"'_Dry ~Wet~ry ~Wet__Dry ., Initial level /'Initial level v".·Initial level /Initial level ..-.. -'.,..../'Final levelFinallevelFinallevelFinallevel v· Gal.pumped or Gal.pumped /'Gal.pumped .,...Gal.pumped -' vm OBSERVATIONS OF POTENTIAL CONCERN Action Required ,~--<~ J OARt~dSP£CTXON RePORTTAilINGSSLURRYDISCHARGELOCATION .' I' !---;-,~~fI i "'"'";', ....0 #""_r~'~;"';. r '"1"I,;,.,.J f '-I ./,",I II I I I "I1//1•,I j I II 11'1, 4 ,,".,. CELL VA H :it \)1..(.c@ INSPECTOR:<~,A,-t.,:t';e_,r'-=~-~~~-~~~~~~=-o=-=-~~, ~ N I "; White Mesa MiII-Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) DAILY INSPECTION DATA Date;\1.t>ll.<:.t:'~ Accompanied by:,_ Time:"I'~ 2/07 Revision:DUSA-2 Page 17 of25 Any Item not'''OK''must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TMNSPORT SYSTEM I Inspection Items Conditions ofPotentiaI Concern CellI CeU2 Cell 3 Cell 4A Slurry Pip€1line Leaks,Dama~e,J;Uocka~e,Sharp Bends v ,,,.,.,,tV:-....- PipeUne Joints ,~aks,LOQse Connectjons l,-v .,........- Pipeline Supports Damage,Loss ofSupport .r-Y'y-'.......' Valves Leaks,Blocked,Clos~d v v ..-.r Point(s)ofDischarge hnproper Location Or Oril:;ota,tioo i'v v v ." II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI CeU2 •CeO 3 Cell 4A Water Level Greater Than Operating Level,L~ge Change Since Previous Inspection ..'.--v ...-".... Beach Cr~pks,S,evere ErosiQO,SubsIdence v y--'v Liner and Cover Erosion ofcover,Exposure orLiner -,'..-v V Ill.DIKES ANDEMllANKMENTS ~..,I Inspection Items Conditions ofPotential Concern bike Dike 1-Dike 2 Dike 3 Dike4A-Dike 1-1 lA S 4A-W Slopes Sloughs or Sliding Cracks,Bulges,."...,..i/'...-~.--....... Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak Crest White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 Cracks,Subsidence,Severe Erosion 2/07 Revision:DUSA-2 Page 180£25 JIV.FLOW RATES r SlurrvLine(s)Pond Retum S-XTaiis Spray System GPM '~t1 '22~~qo •.-. V.PHYSiCAL INSPECTION OF SLURRY LINES(S), Walked to Discharge Point Observed Entire Discharge Line _____yes ,,/Ye$ ___"_'__~No _____~No VI.DUST CONTROL .cell 2 Cell 3 Cell 4A " Dustin~.. Wind Movement ofTailings Precipitation:....e--inches liquid /-:I <~~.."'-General Meteorolo~ical conditions:k:ak.ClewM ~tlicA '. ,I ,."." VII.DAILY LEAKDETECTION CHECK . I CellI .'Cell 2 ,CeIl3,.Cell 4A". Leak Detection System w,...-,Checked 1.,.;../'Checked ..i.>,Checked ,:v."/Checked Checked __Wet-.:::...ory i;.....-•..•--=:::::'Wet~ry __t..._,Wet__Dry __Wet__Dry " Initial level ,..,-Initial level -Initial tetel v,..Initial level .,./ ..or-.-.,,- Final levelFinallevelFinallevelFinallevel _.. Gal.pumped /'Gal.Dumped '"Gal.Dumlled ;/Gal.pumDed "...-' vm OBSERVATIONS OF POTENTIAL CONCERN (~••"! ~ N I OAll~~SP(CTXON REPORT TAn Xl1IGS SUJIHH'CHSCHAR(;JI[tOeA T1 ON otrrE:)2 ~{(.~~ VlSPfCiOR :-~,ii.-re.t"t,'1 ,. •J ~ White MesaMill -Standard Operating Procedures Book 11;Env.irorunental Protection Manual,Section 3.1 APlPENDJIX A (CONl") JllAlIJLY lINSPECTION lllATA Inspector:~cy­ Date;0.:11_og 2/07 Revision:DUSA-2 Page 17 of25 Accompanied by: Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell ,tJll\4A Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends J v',/ Pipeline Joints Leaks,Loose Connections /i/J Pipeline Supports Dama~e,Loss ofSupport i/J II Valves Leaks,Blocked,Closed ,(\/V Point(s)ofDischarge Improper Location or Orientation tI ~Ii V II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell .tJ IH 4A Water Level Greater Than Operating Level,Large Change J JI JSincePreviousInspection Beach Cracks,Severe Erosion,Subsidence J v'J Liner and Covel'Erosion ofcover,Exposure ofLiner ~v J (f III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W 'pes Sloughs or Sliding Cracks,Bulges, Subsidence,Severe Erosion,Moist ;)1/t/1//l,/"'"i/' Areas,Areas ofSeepage Outbreak \l\Thite MIesa Mill -Standard Operating Procedures Book 11:Envu'Ol1!ilentaJ Protection Manual,Section 3.1 2/07 Revision:DUSA-2 Page 1~of25 ICracks,Subsidence,Severe Erosion vi V vi v'I V Jf'Vo JFLOW RATES I I I Slurry Line(s)I Pond Return S-X Tails I Sprav Svstem I I ~ GPM 445 I 'SO &,30-L/ 'Vo PHYSICAL INSPECTKON OJF SLURRY LJINJES(S) Walked to Discharge Point Observed Entire Discharge Line ___....,--_Yes r/Yes----"--- No------No------ Vt DUST CONTROL Cell 2 Cell 3 Cell 4A Dusting i/J t/ Wind Movement ofTailings v v v Precipitation:()inches liquid General Meteorological conditions::""'"'}''' VII.DAILY LEAK DETECTION CHECK I /' Cell I Cell 2 /Cell 3 Cell 4A /' Leak Detection System \I Checked Check V Checked V Checked Checked __Wet~Dry __Wet--LDry t/Wet__Dry--Wet Dry Initial level -Initial Ie I Initial level .-Initial level 10·1 Final level Fina evel Final level ~Final level;- r b\L\18Gal.pumped -al.pumped Gal.pumped FlowMeter J Vin OBSERVAT][ONS OF POTENTIAL CONCERN Action Required @ARL~~~P(tJH@W ~~~@~1 TAILINGS StURe,DiSCHARGE LOCATION .. j' So\tl\\~D1\' (C(!.!L log mrr~g i~I\·.Ob ._ _=---<=--o,=-=~~--=~_U=$_~E~«:~HlJ~r.=-.""g.,\l"""'fl<{11 0 IhL,~ 1I~ N I White Mesa Min -Standard Operating PmcedllJ"es Book 11:Enviromnental Protection Manual,Section 3.1 APJPENlIJJJfX A (OON1I'.) Jl)AKJLY INSlP'JECTJION Jl)ATA Inspector:PyAII!&"rluu;R.... Date;!J ·tl·Zoot Accompanied by:_ Time:L3 tJ tJ 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem Celli Cell 2 Cell 3 Cell 4A It Y\"Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends v/IV -I v"/v/ Pipeline Joints Leaks,Loose Connections 11'/1 v/; Pipeline Supports Damage,Loss of Support v//v// Valves Leaks,Blocked,Closed v./>":/ Point(s)ofDischarge Improper Location or Orientation V I v II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem Celli Cell 2 Cell 3 Cell 4A Water Level Greater Than Operating Level,Large Change v"Iff/it-/1 V Since Previous Inspection "1 ./ Beach Cracks,Severe Erosion,Subsidence v"/v>v/ Liner and Cover Erosion ofcover,Exposure ofLiner "I v V f III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W "opes Sloughs or Sliding Cracks,Bulges,v'/;(jr1 j v//Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak 'White Mesa Mill -Standard Operating Procedures Book ~I:Enviromnental Protection Manual,Section 3.1 2/07 Revision:DUSA.°2 Page 18 of25 Crest Cracks,Subsidence,Severe Erosion I Hr.FLOW RATES I I I I Slurry Line(s)I Pond Retum I S-X Tails I Spray System I I I GPM liSe)I /£)()I h of)'I /Vtf-J- v.PHYSiCAL iNSPECTJrON OF SLURRY LiNES(S) Walked to Discharge Point Observed Entire Discharge Line ~Yes /Yes No------'_____-'No VI.DUST CONTROL Cell 2 Cell 3 Cell 4A Dusting v .~t? Wind Movement ofTailings ./(,(,/ Precipitation:()inches liquid General Meteorological conditions:JI!;J;zu (-fJ/}'1 .J VII.DAILY LEAK DETECTIONCHECK I Ce111 Cell 2 Cell 3 --ee1l4A /JI/tJ-.// Leak Detection System V Che~II v Checked 'V Cheer 'V /Checked Checked 7__Wet__Dty --Wet__Dry __Wet__Dry __Wet__Dry Initial level Initial level Initial level Initial level )~.'3 Final level Final level Final level Final level Gal.pumped Gal.pumped Gal.pumped Flow Meter hi 47-g VUK OBSERVATIONS OF POTENTIAL CONCERN /ob/h 1M?). Action Reqnired ~ N I @~Rl~~S~(CrH@~~tP@~l TAALXWGS StUIIV @lSCHARGE LOCATJ@N @trr~g 0 (2-(2.-2()fjf _.=--==--=--~~~~K~JliS~P~f.C-=..:T@-=~-=:l-jtL ~.;::-~.-~--~ :50LT'(~-'-:I White Mesa Mill -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) DAILY INSPECTIONDATA Inspector:(;tlfP~S+V I.'\1 Date;I;).-r S-0 <6 Accompanied by:S,'1\1\V'Vl1 15 Time:1·2 3D fN\. 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark ==OK,X ==Action Required I.TAILINGS SLURRY TRf\NSPORT SYSTEM I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A ()i.[Jl.VA 1Jf.r CJI/ SlurryPipeline Leaks,Damage,Blockage,Sharp Bends I i'.,?:I Pipeline Joints Leaks,Loose Connections \I .;\\ Pipeline Supports Damage,Loss ofSupport \""\) Valves Leaks,Blocked,Closed }\1 / Point(s)ofDischarge ImproperLocation or Ori~ntation J ,J // II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A ','~_"AY';:,-,-••".'\Ok'i1//4-tJ).J Ii Ar Water Level Greater Than Operating Level,Large Change ~((,.."":~~Since PreviousJnspection 'I- Beach Crl;.cks,SevereErosion,Subsidence \-...,·'''';'oi;i'cc Linerand Cover Erosion ofcover,Exposure ofLiner \J I ) \/(I \..... III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I lA S 4A-W Slopes Sloughs orSliding Cracks,Bulges,Ok-()J-{"'fV(/t-OU-OV Dt-rSubsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak [Crest White Mesa MilI-Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 ICracks,Subsidence,Severe Erosion Z/D?Revision:DUSA-2 Page 18 of25 IV.FLOW RATES I Slurry Line(s)Pond Retum S-XTails Spray System aPM j'50 4/,{/V'J ~D!')'I p/.,¥\../,OrJ ~.a-v-./£///:1. /J /1 V.PHYSICAL INSPECTION OF SLURRY LINES(S), Walked to Discharge Point Observed Entire Discharge Line ___".c",--_Yes_--"Z'--__Yes /_____~No _____~No VI.DUST CONTROL Cell 2 Cell 3 Cell 4A Dusting Wind Movement ofTailings 1l/~,r/rA. Precipitation:C)..:·inches liquid .,~~",.,\ General Meteorological conditions:c'o/d " VII.DAILY LEAK DETECTION CHECK Celli I Cell 2 CeU3 Cell4A Leak Detection System Checked V Checked __,_'Wet~'· InitiafiJevel _ Finallevel._ Gal,pumped ,,/1//A Checked '_'__Wet_,__Dry ,,Initiallevel_-:--__ Finallevel -- Gal,pumped ,V Checked;::: __Wet__Dry Initiallevel,-- Fiilallevel,_ Gal.pumped _--J<'/"'"_C·hecked __Wet ~Dry Initial level r::>·5 Finallevet ,,~:'" Gal.pumped 6/15}- VIII OBSERVATIONS OF POTENTIAL CONCERN ..\ Action Required Oill U ill£PHrUHD REPORTTAALINGSSLURRYDISCHARGELOCATION DATE:J d-r:s-O e: UlSG'£CiOR:0 ,Ute 7 ~So }I/J"(J '\ CELL 1",1 '...~, N I z ,. j' White Mesa Mill -Standard Operating Procedures Book 1I:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA-2 Page 17 of25 .A.J,JIP{lNI)I~A(;QNt.) DMLYTh1SPEC']fIONDA.TA. Inspet;:tor:Gq yc-.SIv I,'>17I Date;J~-(4 -0 ~ Accompanied by:'5 (1'111 If'/'-Vf S -.--"; Any Item not'''OK''must be documented.A check mark =OK,X =Action Required Inspection Items Conditions ofPotentialConcem InspeCtiOn Items C()ri:di~ioris ofPotentialCbI1cem Celt 4A Cell 3 Cell 4A: '/-S iJU.:l • I (..\ \. .1....I .J I CellI Cell 2 Of':!&/A ,;;f .f \.",...y..:.... J J J f "..' I CellI Cell2 ........-.-. I.T.AILINGS SLURRY TRANSPORT SYS'J,'EM Valves Water Level .'.,;"·,(JreaterT,b@ QHer~ting Level,LargeChattge (l't !L '*0:sbice l'reviouSXfispedion'·:..'. ..,.,,'..•--- I-:B::"e-a-ch:-".-------1-.;::C::.:fic7=:,~:ki:..s,::.::S::.:e.:;.:ve:.:l1::::es:EFro£.s::;io:.:.:n:.;;;.S~u'":'b:.-s.i:-:d--'en....;c-e~--..;.;~.,..-jf-'-T-\~b,.-1t~:,:....,.....4.H\·lH",.;.",;;..,~:..,;,....+J---t~~~ Liner and Cover Erosion ofcover.Exposure of'Liner \}, / I I I Inspection Items Conditions ofPotential Concern I . Dike 1-1 . Dike 1-Dike 2 Dike 3 IA Dike4A- S Dike 4A-W ~Iopes Sloughs or Sliding Cracks.Bulges, Subsidence.Severe Erosion.Moist Areas.Areas ofSeepage Outbreak White Mesa MiII-Standrurdl Oper8!Kiiilg Pmcedures Book 11:Environmental Pmtectiol1 Manual,Section 3.1 2/07 Revision:DUSA-2 Page Ipof25 Crest Cracks,Subsidence,Severe Erosion Iff·. / J!V.FlLOWRATJES I Slurry Line(s)Pond Retum S-XTails Spray System GPM '10-7 'JCD I(J 'J./\A//4 "'C,V.PHYSICAL INSPECTION OF SUJRR¥ LINES(S). Walked to Discharge Point Observed Entire Discharge Line ____-r<Xes :7Ve$ _--=/~_'__NO ________No VI.DUST CONTROL ,Cell 2 CeU3 Cell 4A Dusting .' Wind Movement ofTailings /tIilA~ Precipitation:()inches liquid .;.:.,-"I ~~~ ;!"'-General Meteorolo~ica:l conditions:.Le/i:f " ! -.'., ~'"."I..,',;'....~."..",i'>.""....,.."...>, ""'.'c --c "i ".,' '-."~' Cell4A..,..." ~')Chei::ked -_._Wilt ~Dry Initialillvel 9·0 ......";. FiilitI leveI.-C.--,--,-__ ../__'_,_Wet_·'_'_.Dry .lqitiatlllYtltL_~.~-""'..." .;;"/-' ,k""Checked Finallevell--,-'-"_----" Initrarfb.vel,"",~,,~__ pinallevel•..,-_ CellI Cell 2 VII.DAILY LEAKDETECTIONCHECK.I ./............ Leak OefectionSystem//'Checked checked Gal.pumDed Gal.DumDed Gal:Dumi:ied Gal.lJumoed Cae.51 VIII OBSERVATIONS OF POTENTIAL CONCERN ActibD'Required ,"' ~ N I OARl~~SP£crHD~R~PORr TAH.UJGS SUJIlIH IHSlH.lU~G~lOCAT10l\J onE:I''d--/4 -()cl INSPECTOR:tz«f<..<),~=-=-~=-=~~~=..:::.:..::~~ j' White Mesa Min -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 AlP'JPENDJIX A (CON1'o) lDJAKJLY KNSlP'JECJrJrON DATA Inspector:'l:nn er Ho 11;jC\.} Date;1;;L·IS .~-;).DO f5 Accompanied by:_~_ Time:1300 2/1J7 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark ::=OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem Celli Cell 2 Cell 3 Cell 4A Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends 1/V J Pipeline Joints Leaks,Loose Connections /oJ 1/ Pipeline Supports Damage,Loss ofSupport J J vi Valves Leaks,Blocked,Closed 'II II 1/ Point(s)ofDischarge Improper Location or Orientation I \/v' II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern Celli Cell 2 Cell 3 Cell 4A \ Water Level Greater Than Operating Level,Large Change J II JSincePreviousInspection Beach Cracks,Severe Erosion,Subsidence V (J Liner and Cover Erosion ofcover,Exposure ofLiner \/J j III DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W opes Sloughs or Sliding Cracks,Bulges,/I .;I ISubsidence,Severe Erosion,Moist (Areas,Areas ofSeepage Outbreak Crest \JVhite Mesa Mill -§i:andard Operadng Procedures Book]I:EnvrronmentalProtection Mamml,Section 3.1 I Cracks,SlJlbsidleJrilce,Severe Erosion J I J 2/07 Revision:DUSA-2 Page W of25 ;/I /' ][V,Fl,OW RA'fJES I I I I / Sluny Line(s)I Pond Return ,S-X Tails I Spray Svste'm I I I / GPM 'Sf:,S I 37'1 I b;).O·1/IJ/f'Jr V,PHYS][CAl,INSPECTKON OF Sl,URRY l,JINJES(S) Walked to Discharge Point Observed Entire Discharge Line /. 'vI No------' No------ VI,DUST CONTROl, Cell 2 Cell 3 Cell 4A Dusting J ,I t/ Wind Movement ofTailin~s V v J Precipitation:inches liquid General Meteorological conditions:LhCf.Y\u Q\:;'y\ou~Sl1oltJe.r). VII.DAILY LEAK DETECTION CHECK I / Celli Cell 2 /Cell 3 Ce1l4A ,/.. Leak Detection System V Checked Checl d \/Checked V Checked Checked __Wet~Dry ~Wet__Dry--Wet Dry __Wet~Dry Initial level -Initial Ie el Initial level .....Initial level Uj .s -Fina evel ;J 7AFinallevel Final level /"'Final level ....- Gal.pumped .,/I.pumped Gal.pumped -FlowMeter C3(;,S\ V VHK OBSERVATIONS OF POTENTIAL CONCERN Acti.on Requnred @AHL~~S~~tVH@~~[~@~rTAILINGSSLUIIVD1SCHARGEL@CATJOM fD!lH ~l;t-15 -;loa g =--<~~~_-=-E~jlg=$!J~f_ii:~H»=R'"-';);'\6,0cu:Ho\L!1 ~~O\0'~'\'on AlHU CEU Jog AREA ~,... N I ·/''-\\d,(,\--'.(:HIl Z Ir White Mesa Mill -Stand@rd Operating Procedures Book II:Environmental Protection Manual,Section 3.1 AJP'JPENDJLX A (CON'fo) DAJIILY JINSPJECTKON DATA J/Accompanied by:R'G6-'"!-c,tV\<J Time:IGI (}S 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAIILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI ~Cell 3 Cell 4A Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends ,/vi r/ Pipeline Joints Leaks,Loose Connections v ./v Pipeline Supports Damage,Loss ofSupport v ;/\/ Valves Leaks,Blocked,Closed v j vi Point(s)ofDischarge Improper Location or Orientation tJ v / Xl OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A Water Level Greater Than Operating Level,Large Change //1 /Since Previous Inspection Beach Cracks,Severe Erosion,Subsidence {tI l/ Liner and Cover Erosion ofcover,Exposure ofLiner .;11 1/ HI.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike l~Dike 2 Dike 3 Dike4A-Dike I-I lA S 4A-W opes Sloughs or Sliding Cracks,Bulges,ISubsidence,Severe Erosion,Moist (I ///Areas,Areas ofSeepage Outbreak Crest White l\1esa Mill -Si:andard Operating Procedures Boole 11:Environmental Pmi:ediol1l Marmal,Section 3.1 ICracks,SubsideJ.llce,Severe Erosion / 2/07 Revision:DU§A~2 Page Jg of25 77 JIVo FJLOW RATES [J I I Slurry Line(s)I Pond Return S-X Tails I ~nw Systetn I I /' GPM 375 I ;;:J.;2L)S7S·1/ Vo JP'JHIYSJICAJL JINSJP'ECUON OF SJLUJRJRY JLllNES(S) Walked to Discharge Point Observed Entire Discharge Line ___--;:r-_yes Z Yes ./______N.o No------ VI.DUST CONTROJL Cell 2 Cell 3 Cell 4A Dusting ../,/v Wind Movement ofTailings /J 1/ Precipitation:If),1 _nil o~:;nfj<-J inches liquid General Meteorological conditions:L-\.(/\J'LA t-h~\'1\-'~~sl1o..,..).f,howu~" () VII.DAILY LEAK DETECTION CHECK I /' Celli Cell 2 /'Cell 3 Ce1l4A //' Leak Detection System \/Checked Checke ,/Checked t./Checked Checked __Wet_~Dry Wet JDry ~Wet__Dry--Wet Dry ---- Initial level Initial Ie I Initial level ~Initial level ';l.S- ,/ Final level Fina evel Final level -Final level - Gal.pumped ~I.pumped Gal.pumped ---Flow Meter h~{.."S I VIII OBSERVATIONS OF POTENTIAJL CONCERN Action Required ©AHL~~~~(CJK©~~~~@~1TAILINGSSLURRVD1SCHARGELOCATION .. " 6JA H ~/2 -IC:,-J (')C?'6 =---=..-,,,--=~~,--=~E~Pn~$~~[_(I~i1J=t<l~~i£,-.feU H>U:Jv'1f ~S 0 l\.A-\-(O~mu Cnl log AREA I} N I :tg,~ ,/\\}.,.@r',-e;CELL Z (\leJ-. White Mesa Mill -Standard Operating Procedures Book 11:Envirolli11ental Protection Manual,Section 3.1 APPJENIDJIX A (CONI'.) DAHLY HNSlP'JECTHON DATA {;! 2/07 Revision:DUSA~2 Page 17 of25 Inspector:I!y4d tttlf'l1t:::L Date;/.2 .I -;·20CJfS ,.,r /1---Accompanied by:J~1/r1(/J.j (.{(~ Time:/3~5 5 4. Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A /All+-// Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends .//.v/v / Pipeline Joints Leaks,Loose Connections "/1//If' Pipeline Supports Damage,Loss ofSupport "/v/,// Valves Leaks,Blocked,Closed "l v/v/I--- Point(s)ofDischarge Improper Location or Orientation (/v ~ II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A /Jl/fl / Water Level Greater Than Operating Level,Large Change V f Y Y V Since Previous Inspection /]/,- Beach Cracks,Severe Erosion,Subsidence V/I ¥/y ........v Liner and Cover Erosion ofcover,Exposure ofLiner V'I V v I I III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W opes Sloughs or Sliding Cracks,Bulges,//fUll V ././ Subsidence,Severe Erosion,Moist Areas,Areas of Seepage Outbreak Crest \l\!hite Mesa Mill -Standard Operating Procedures Book 11:Environmental Pmtection MamwJ,Section 3.I Cracks,Subsidence,Severe Erosion 2/07 Revision:DUSA~2 Page 18 of25 KVo FJLOW RATJES '-J I[Slurry Line(s)I Pond Retum S-X Tails I SpraY System I I I GPM I ~3"I 12t:Jl.?S"7-S-'I /V~ Vo lP'HYSICAJL JINSlP'ECTJION OF SlLUJIm.Y JLJINJES(S) Walked to Discharge Point Observed Entire Discharge Line ____~yes ~Yes No------' No------ VIo DUST CONTROJL Cell 2 Cell 3 Cell 4A Dusting ,..,....y 4/"~ Wind Movement ofTailings v ---...... ...-7 <;.,..il(1./:1t1t..~~/A .;~ Precipitation:/(.{fiches liquid (". General Meteorolo~~conditions:Vt"'f 1/ft,LAAt,1~.oit..,Iv ~bV';'"t?AJ ~1£/Aftf)~( (to /• VII.DAILY LEAK DETECTIONCHECK I Celli Cell 2 Cell 3 Cell4A /'M A /"----Leak Detection System V Checked /..Checked v Checked V Checked Checked __Wet ~IY / --Wet__Dry __Wet__Dry __Wet__DIY Initial level Initial level Initial level Initial level /1.5" Final level Final level Final level Final level Gal.pumped Gal.pumped Gal.pumped Flow Meter ?3~S/, / Action Required ~ N I ,. \' White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manwd,Section 3.1 AIPPJENlDJ]IX A (CON'fo) ][))AHJLY JINSPECTION ][))ATA InspectOr:-CM<,~.\I:~ Date;\d.-I~-.d-OO~ Accompanied by:---- Time:\YLj,S 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell ;-//4-4A q'?t> Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends t/1/.v Pipeline Joints Leaks,Loose Connections ./II J Pipeline Supports Damage,Loss ofSupport if I v J Valves Leaks,Blocked,Closed V 1./J Point(s)ofDischarge Improper Location or Orientation v ,,/V' II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell LILl 4A Water Level Greater Than Operating Level,Large Change J J Since Previous Inspection ../J, Beach I Cracks,Severe Erosion,Subsidence /\J J Liner and Cover Erosion ofcover,Exposure ofLiner .../\1/JlI 1 I III.DIKES AND EMBANKMENTS I ~ Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W opes Sloughs or Sliding Cracks,Bulges,\/I /I JSubsidence,Severe Erosion,Moist IiAreas,Areas ofSeepage Outbreak '\)Vhite Mesa Mill -Standard Operating Procedures Boole 11:Enviromnental Protection Mmuml,Section 3.1 2/07 Revision:DUSA-2 Page Ut of25 Crest I Cracks,Subsidence,Severe Erosion /t/'I /1 KVo FJLOW RATES I I ILSlurryLine(s)I Pond Return S-X Tails I Spray System I I I ,/ GPM I 41..\~I f 5()I 570 1/'>0# Vo JP'lHfYSIfCAJL KNSJP'EC'Jf'.[ON OF SJLU.lRRY JLIfNES(S) Walked to Discharge Point Observed Entire Discharge Line ___-r-_yes __-",-Z_'_Yes VI.DUST CONTROJL CeH2 Cell 3 Cell 4A Dusting v',/J Wind Movement ofTailings ,/v"J Precipitation:").i;inches liquid General Meteorological conditions:()-.I,;,r c<..;';.+<:.1"'1'\<:"-at>SI1CvJ :s1 mo>cc::' VIJ[.DAILY LEAKDETECTION CHECK I Celli Cell 2 Cell 3 CeIl4A /,.. Leak Detection System V'Checked Checlq:6 \j Checked v Checked Checked __Wet1DrY __Wet t/Dry ~Wet__DrywfDry Initial level ".,..InitialZ Initial level r Initial level ~.q, ,-"Final level Fz~vel Final level Final level Gal.pumped G .pumped Gal.pumped Flow Meter h~7Ltct. I VIII OBSERVATIONS OF POTENTIAL CONCERN Action Required ~ N I ©ARt~aSP(CJH@N ~~~@~rTAILINGSSLUR.,DiSCHARGE L@CATIOM Sol \1(\~0,,\. cnl log 5 iJ[J:O\ CEll 4...A ~~.~\I I .. i' 'I:.' White Mesa Mill -Standard Operating Procedures Book 11:Envirommmtal Protection Manual,Section 3.1 APlPENIUX A (CON1ro) DAKlLY KNSlP'lECTJION DATA Date;I)",Iq·Aod ;:;, Accompanied by:1\'\CV'-Pc.J""cC" '-J Time:!:)O() 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem Cell I Cell 2 Cell 3 Cell IVA-4A Slurry Pipeline Leaks,Damage,Blockage,Sham Bends \/,/,/ Pipeline Joints Leaks,Loose Connections v",/v Pipeline Supports Damage,Loss ofSupport /'./~ Valves Leaks,Blocked,Closed v ~-/ Point(s)ofDischarge Improper Location or Orientation 1/,/J IIo OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell Alit 4A Water Level Greater Than Operating Level,Large Change /,/1 (Since Previous Inspection Beach Cracks,Severe Erosion,Subsidence V J 'II Liner and Cover Erosion ofcover,Exposure ofLiner V j ,/ HI,DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W opes Sloughs or Sliding Cracks,Bulges,II ,I I'ISubsidence,Severe Erosion,Moist I'IAreas,Areas ofSeepage Outbreak ICrest VVhite M©sa IvHU -Standard Operating lP'wceaur©s Book]1:El1vironrtl©l1tallP'rotectioli Mantlal,Section 3.1 I Cracks,Subsidence,Severe Erosion 2/07 Revision:DUSA-2 lP'age U!of25 I IfV'o FJLOW RATJES I I I I I I SlimlY Line(s)I Pond Return I S-X Tails 1Sorav Svstefu I I I / GPM I CJ.70 I \5 \000,1/ Yo PHYSIfCAJL JrNSPJECTJ[ON OF SJLUJRRY JLlfNJES(S) Walked to Discharge Point Observed Entire Discharge Line v;:Yes=====I=~===Yes No------No------" Yl DUST OONTROJL Cell 2 Cell 3 Cell 4A Dusting .;1/;/ Wind Movement ofTailing;s V V-i/ Precipitation:c.J inches liquid General Meteorological conditions:r",cH,\clc)\~J\ ()i VII.DAILY LEAK DETECTION CHECK I CellI Cell 2 ,/",Cell 3 Ce1l4A ///'/ Leak Detection System V Checked ::z r/Checked 1/Checked Checked __Wet-LDry __WetLDry --..LWet__Dry__Wet Dry Initial level ,-Initial lev Initial level -Initial level 0,'7z:.N&Final level -Final level -Final level ~ Gal.pumped -al.pumped Gal.pumped r Flow Meter C?S 71.,1 q I YIH OBSERVATIONS OF POTENTIAL CONCERN Action Required ~ N I tJJIVE g Id-14 <'),oQ ~===~~~~g:.:I\l~!iP~[~C~6O~R~:'!ANNE 12,-lkt-:f Oit'1 White Mesa Mill -Standard Operating Procedures Boole II:Environmental Protection Manual,Section 3.1 .~1PJ£~IXA'«J{)Nt.) l»MLYlNSFECTIONDA.TA . 2/07 Revision:DUSA-2 Pa.ge 17 of 25 Accompanied by:.__-_·_._ Time:\z.~'L ~, Any Item nof"OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORTSYSrEM Inspection Items Conditions ofPotential Concern PiPeline Supports PQint(s),ofPischlJige u.OPERAfiONALSYSTEMS".... Inspection Items ConditiOns OfPotential Concern I CellI Cell 2 CeJl3 Cell 4A' '"~,v If:.,v~.... V V t ~.v V' V .,y-·····r .~.v· </"V'V',/ I.I'"'.yt...~..+". I CellI CellZ CeU3 Cell 4A Water Level .'.""rcQreater ThllJ]Qe~~!ing Level,Large Ghange V'¥f .t-::-~-:-------'-~_:'~-_~-I-'~.=.S"=tn;.:;,ce",,,·c-P;:;.:rec.;,v.;;.ioc.;,u..,:..S,,::)o:---'s;.,o."'p'-ccec-,t.,..io-:::":-·:-.'-::-'-:;-"..;.."....'~._.,....'"",......:"."","';.--'.-I-'----4-.~.'~--f~",,;t-"'~4.¥;"""';;'V"~-1'~__'.'~.f:*" Beach Ct'lcks.Severe Erosi()n,Sub!!idence V'")':".~V. Linerand Cover Erosion ofcover,Exposure oftiner v i/'y",/.... m.DIKES ANJ)~MIM.NIrnENTS ,I. Inspection'Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike 1-1 IA S 4A-W Slopes Sloughs orSliding Cracks,Bulges,;r v-V"V V V Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak White Mesa Mill -Standard!Opemtiiilg Procedures Book j 1:Enviromnental Protection Manual,Section 3.1 2/07 Revisiolffi:DUSA-2 Page 18 of25 !Crest ICracks,Subsidell1ce,Severe Erosioll1 w.FlLOW JJViTES I Slurry Line(s)Pond Retum S-XTails Spray System GPM 'Z..<;o \S~~S-.P .""'" ,~,Vo PHYSICAL llNSPECTION OF SUJRRY LJINES(S). Walked to Discharge Point Observed Entire Discharge Line VI.DUST CONTROL Dusting Wind Movement ofTailings General :Meteorolo~icalc6~dltions:'Cll.4-.~C!\tA. Yes V Ye~ Cell 2 :'.. V' or '.,,' , _---=-~No ______,No Cell 3,Cell 4A "".,,"..,." vn.DAILY LEAK DETECTION CHECK I CellI Cell 2 .,.",CelH,Cell4A ,,,',"vi /Checked Gal.Dumped V' ,'::I?""Checked' ~Wet_,'_'_Dry -.~Wet_:_._Dry Initiallevel,_~v"'....;'__ Fi~JI~t:t-(~"'"'~~F GaI.pumbed ..-. ?'Fiilat level"--,-'--__ }~idlllle~el '/'"'~-:,:. _--""v....;.".':='Ch¢i:kelf,',I""Checked .::''7Finallevel,..,--_ Gal.pumDed ,,.WW~f'<f':<if~~lfs.tii;''':'~""Wet~Dry Initfiif.f~el,"",",,_""'___.','.;.Initial lev~I",-.----'./~'..".,...,.".-,-,.',;.-".-~..~ Pinallevel_----'-'_'--- Gal.pumped /' Leak Detection System Checked vm OBSERVATIONS OF POTENTIAL CONCERN ..~ ~ N I OARt~~~P(CHHON ReP~ijr TAALIIGS SLURRY D1SCHA~GE L~CATI~N D/U'E:iCl D1lL i9~ USPEnCHl :12:,A't~'';1"''''r-~~~~=-..~=-=~.....:..::--==~, lUll '"_~R~Ay~~.~ /r~?rF::'::~.:=::::~ II I II.~~~OJ,.. ---,'If -• J ~I I~-;" I "'I ~-""r r ..._.J t" .. l ' .White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA-2 Page I7 of2S ..•~P~NQIXA ••(~ONT.) JllAILYJrNSPECTION DATA Inspec;:tor:~"t.A,V(,~'i-'1 Accompanied by:__-_"'__ Time:104'1 ~~ Any Item not'''OK''must be documented.A check mark =OK,X =Action Required " II.OPERAtiONAL SYSn;M$'•..' I Cell I Cell 2 Cell 3 Cell '.4A v k".w:'V V"I-~•'V""¥'"' 1/-;,.;,.'..V"w- i/'r/.r/-V .C '':'"''..<."'~ ...;. I CellI Cell 2 Cell 3 Cell 4A I.TAILINGS SLURRY TRj\NSPORT SYStEM Inspection Items Conditions ofPotential Concern Inspection Items C()ll:ditioDsOfPotential Cdhcern Valves PtpelineSupports Poitl~(S)ofDisth~e 'vf ','""'."P '\'z;....- v v ...... Water Level "_~".,(JreaterTb@ QRe.raUng Level.Large Change.~'''';~~:~'''-'.--.,.,.",.:<.:~".:--..;~~:,.-~,~---.,-"-,~.,--".-,>-....pA~'-'Sinc~.PreviousJfisPectiOI1·..'....'._,<.'.'''''''I-B--e-a-c:-h--------I-=-G::::r~:.=.ck;;.,.sc-,::':S:-;'e";:';'ve:';;l1;;;:'e.'"=E""ro:Ls-cio'-'Jl-.•-=S-llb:-,s-:-jd-:-.e";"n-ce~·"----"-'-'-'"-,.-;~---t::""'~~+t-~~'"*''"-'i''----lq~, Liner and Cover Erosion ofcover.Exposure ofLiner V" " m.DIKES ANDE.MJl.ANKMENTS ,.I , Inspection'Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W Slopes Sloughs or Sliding Cracks,Bulges,v i/v .,/V v Subsidence.Severe Erosion.Moist Areas.Areas ofSeepage Outbreak .~ White Mesa Mill-Standard!Operating Procedures Book II:Environmental Protection MamJal,Section 3.1 2/07 Revision:JDUSA-2 Page 1&of25 Crest Cracks,Subsidence,Severe Erosion " JIV.FLOW RATES I .,. SlurryLine(s)Pond Retum S-XTaiIs Spray System GPM -Z;1e>I $"2-47..,;-- C".V.PHYSICAL INSPECTION OF SUJJi.Un{ UNES(S). General Meteorolo~icalc<lpdltions:Cl~.\ep\'i . Precipitation: Wind Movement ofTailings No No CeU3 Cell 4A v-<-- V'...- i 11 ~/' ~),'-1 c·,,', . d·••••' _____yes V'Ye~ .inches liquid VI.DUST CONTROL Walked to Discharge Point Observed Entire Discharge Line Dustin~ .--.': VII.DAILY LEAKDETECTION CHECK CellI I Cell 2 I Ce/l4A ~Wet_·.__Dn'-.---...!::::..-.Wet_._.~Dry Leak Detection System Checked -'----'-'-v_·_CheCI<oo .'?t:-Checked',p--';Checked Initial level I--'..;,0.;·:Initiallevill..V"lnitiallevd,.......;;.;·V""C.c.c:..:"':,;".•---:-,/'.,--.--,..-..,;.'v .-.,c,;" Finallevel._-,-,..~.~-,-Fiilid level.-'-,--,-,-__ InitratfeveL V' ~~Y' Finalleve....,l_''_"_ Gal.Durnned Gal.DumDed Gal.Durnlled (..--Gal.Dumned vm OBSERVATIONS OFPOTENTIAL CONCERN ..It t .,., ~ N I OAHl~~~P£CTjaM RePORTTAALINGSSLURR'DiSCHARGE LOCATION DUE:"Ul '~H.e~ r~~~--=~~~~~~_I::..:n~s:..:.p...:£;,.::C..:,r..:.O..:R~;~.~~~"'H... ~.,.,~_..-~-----~~ 'I ,.. White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 AlPJP'JENJI))J[X A (CONl'.) DAKJLY JINSJP'JECTJION DATA Inspector:!:rJMZ 1,..1.:,/LhO Date;l~-*~:JDo\S Accompanied by:~Jn PC~'Ml{ Time:IlflS 2/07 Revision:DUSA<Z Page 17 of25 Any Item not "OK"must be documented.A check mark ==OK,X ==Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell A J1/\4A •V(11 Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends vi ",J ./ Pipeline Joints Leaks,Loose Connections v J J Pipeline Supports Damage,Loss ofSUPPOlt J rJ J Valves Leaks,Blocked,Closed J \/v Point(s)ofDischarge Improper Location or Orientation II \,/J II.OPERATIONAlL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A A}l11 Water Level Greater Than Operating Level,Large Change J ,/1 J Since Previous Inspection Beach Cracks,Severe Erosion,Subsidence II J J Liner and Cover Erosion ofcover,Exposure ofLiner II V rJ HI.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W Dpes Sloughs or Sliding Cracks,Bulges,,j I I (~Subsidence,Severe Erosion,Moist J Areas,Areas ofSeepage Outbreak Crest White Mesa Mill -Standard Operating Procedures Book 11:EnvironrnentalProtection M2rimal,Section 3.1 I Cracks,Subsidence,Severe Erosion III :7 2/07 Revision:.DU§A~2 Page 1[t of25 llV.FLOW RATES I I IISlurryLine(s)Pond Return ,S-X Tails I SiJl"7st.ern I I I GPM I IS ICfK SCfO V v.PHYS]fCAL INSPECTKON OF SLURRY LINES(S) Walked to Discharge Point Observed Entire Discharge Line _____-...:No No------ Vli.DUST CONTROL Cell 2 Cell 3 Cell 4A Dusting ,/v L/ Wind Movement ofTailings i/V'" Precipitation:•:.21 inches liquid General Meteorological conditions:Ll,.",J I-eh,,,,.,!',.nl &:'f'!r)w S\'bW<:i,) "...) VII.DAILY LEAK DETECTION CHECK I / Celli Cell 2 /Cell 3 Cell 4A //I Leak Detection System \/Checked .L V Checked V Checked Checked __Wet1Dry __Wet~Dry LWet__DI"Y__Wet _Dry Initial level ~~Initial level -",Initiallevel ~\,d-- Final level -Fin level Final level ~'Final level - Gal.pumped <al.pumped Gal.pumped -'Flow Meter h.~11..)q/" VHI OBSERVATIONS OF POTENTIAL C9NCERN I/-t r (S.NA0 tJd ~I~' Action Required ~ N I White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPJENDJ[X A (CONI',) DAlfJLY lfNSJPJECTlfON DA'][A Inspector:-1 ~nn"~I,I\L~ Date;\ci -.d-=::'~d.OOb Accompanied by:---- Time:1330 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required t TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concel11 Celli Cell 2 Cell 3 Cell A )(JJ.4A I' Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends vi I 1/vi Pipeline Joints Leaks,Loose Connections \/v / Pipeline Supports Damage,Loss ofSupport ~/'.// Valves Leaks,Blocked,Closed 1/;/./' Point(s)ofDischarge Improper Location or Orientation ~\// n.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concel11 Celli Cell 2 Cell 3 Cell A .Ii\4A Water Level Greater Than Operating Level,Large Change /\I./Since Previous Inspection I V Beach Cracks,Severe Erosion,Subsidence 1/I 1/tI Liner and Cover Erosion ofcover,Exposure ofLiner /I v'v' \ HI,DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concel11 Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W opes Sloughs or Sliding Cracks,Bulges,/'./'J I JSubsidence,Severe Erosion,Moist y IAreas,Areas ofSeepage Outbreak ,Crest / \JVhite Mesa Mill -Standard Operating Pmcedl.lres Book ]I:Environmental Protection Manual,Section 3.1 I Cracks,Subsidence,Severe Erosion /1 2/07 Revision:D1U§A~2 Page 19 of25 I Hr.]FJLOW RATJES I ,I J/ I Slurry Line(s)Pond Return I S-X Tails I Spray Systel.TI I I I .<-"."~</' GPM l~'::)&10 I ~OO I Ll70 I./",,,,,P V.PlHIYSKCAJL KNSPJECTKON O]F SJLlURRY JLKNJES(S) Walked to Disch.arge Point Observed Entire Discharge Line Vl DlUST CONTROJL Cell 2 Cell 3 Cell 4A Dusting J ;/J Wind Movement ofTailings Ii j ) Precipitation:0 inches liquid General Meteorological conditions:i-IQ""L~wi ,-h("r,L~o~~'(W~',h(I\';;U~ VII.DAILY LEAK DETECTION CHECK I ." Celli Cell 2 ,,/Cell 3 CeIl4A i //' Leak Detection System v Checked Checl~ed v Checked V Checked Checked / ,. __Wet~Dry I__Wet__Dry __WetL-Dry __Wet__Dry ;' Initial level ~,,,,Initiallt:<v~';Initial level -Initial level \:lq ('/ Final level .'Fin,llevel Final level ..Final level ,~' ,/tS7YL\Gal.pumped 0',/6al.pumped Gal.pumped -Flow Meter VHI OBSERVATIONS OF POTENTIAJL CONCERN Action Requ.ired ~ N I White Mesa Min -Standard Opelwting ProcedllR"iss Book 11:Environmental Protection MamwJ,Section.3.1 APPENDIX A (CON'JL) DAJlLY lfNS1P'JECTJfON DATA 2107 Revision.:JDUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required l TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem Cell 1 Cell 2 Cell 3 Cell 4A A)I~/ Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends v'/t/i/ Pipeline Joints Leaks,Loose Connections /J J' Pipeline Supports Damage,Loss ofSupport II /j Valves Leaks,Blocked,Closed J \)~ Point(s)ofDischarge Improper Location or Orientation i/\1/L! J H.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem Cell 1 Cell 2 Cell 3 Cell 4A A}L\ Water Level Greater Than Operating Level,Large,Change /til (,/Since Previous Inspection Beach Cracks,Severe Erosion,Subsidence l ,II V Liner and Cover Erosion ofcover,Exposure ofLiner \),I t/ HI.DIKES AND EMBANKMENTS r Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W 'pes Sloughs or Sliding Cracks,Bulges,I j I)\/Subsidence,Severe Erosion,Moist ,;\/Areas,Areas ofSeepage Outbreak Crest GPM '\Nhite IViIes31 Mill -Starud31ni Operating Procedures JBook II:JEnviroIlrJ(le:ntalpj'otection Manual,Section 3.1 ICracks,Subsidence,Severe Erosion V.JPJHIYSlICAlL INSJPJEC'fliiDN OF SlLlIJRJRY lLIINJES(S) Walked to Discharge Point Observed Entire Discharge Line JJ 2/07 Revision:DUSA~2 Page Hlof25 /II 7- II S-X Tails II ; No-----~ _____--cNo VII.Jl))lIJST CONTROlL Cell 2 Cell 3 Cell 4A Dusting if ,/) Wind Movement ofTailings /'/J Precipitation:()inches liquid General Meteorological conditions:uU(>$'v4 VII.DAILY LEAK DETECTION CHECK I .. Cell I Cell 2 /"Cell 3 Ce1l4A //f Leak Detection System ,j Checked Chec ed .J Checked 1/Checked Checked __WetLDIY __Wet~IY ~Wet__Dry--Wet Dry Initial level --Initial Ie el Initial level ~Initial level i'11 Final level -Fina evel~,~ Final level (,51YC\.Final level GaL pumped /'aL pumped GaL pumped ---FlowMeter, VUII OBSERVATIONS OF POTENTIAL CONCERN Action Requiired ~ N I @A«t~~£~[CJH@W ~[r@~V fAn,UJ(ffi§SltllJl'UkV I!H.$n3~g;gli!J~1L@~~r H@re IJ5JAVir g k+-dJ~-30,oB: ~=-=~~~~~U=$_~=£,v;=a~@~~:~h"t\,\\l~J T~o\J;b>~-\l /'~CELL 1·1 ~,,'J....~_ @ = \,, \' White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) DAILY INSPECTIONDATA Inspector:(btA.-lll Date;Jd--~OC/ Accompanied by:_ Time:_ 2/07 Revision:DUSA-2 Page 17 of 25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concern Cell 1 Cell 2 Cell 3 Cell 4A /".///' Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends 1/./v./.,;/v/ Pipeline Joints Leaks,Loose Connections r/1././.i//1// Pipeline Supports Damage,Loss ofSupport r///./t//V Valves Leaks,Blocked,Closed '//r/v1 ,// Point(s)ofDischarge Improper Location or Ori~ntation t/il V n.OPERATIONALSYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A ..':,.",;".··,;:··&;~r,-·,·",:.~...-/) Water Level Greater Than9perating Level,Large Change l~J ;//.<~-;-~-SincePrevious.Inspection . Beach C~cks,Severe Erosion,Subsidence 1vp'/i/jO V/" Liner and Cover Erosion ofcover,Exposure ofLiner ,/1/1/i/ III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W ./ Slopes Sloughs or Sliding Cracks,Bulges,/~//Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak Crest White Mesa MiIl-Standard Operating Procedures Book 1I:Environmental Protection Manual,Section 3.1 Cracks,"Subsidence,Severe Erosion 2/07 Revision:DUSA-2 PagelS of 25 IV.FLOWRATES I Slurry Line(s)Pond Retum S-XTails Spray System /:V'"'....... GPM /0CJ (j1JJ:?t Vl/ V.PHYSICAL INSPECTION OF SLURRY LINES(S), Walked to Discharge Point Observed Entire Discharge Line ---'t-7c--_Yes----1y'-'-)_Ye$ __f,-tJ__,NO _____~No VI.DUST CONTROL CellZ Cell 3 Cell 4A Dustin,g / Wind Movement ofTailings J/'/ Precipitation:inches liquid ",-._.J".,\ General Meteorological conditions:/'<: '. "J(laJlV7tIJ / VII.DAILY LEAKDETECTION CHECK I ~elll Cell 2 Ce1l1 Cell4A //' LeakDetection System {/Checked Checked V Checked Checked Checked __._-Wet-;;.,"',""'Dry _'__Wet_.__Dry __Wet__Dry ..__Wet__Dry Initi!ll'Jevel -'-.Initial level Initial level Initial level ,'-Final level "~~JIaFinallevelFinallevelFiilallevel Gal.pumped Gal.pumped Gal.pumped Gal.pumped VIII OBSERVATIONS OF POTENTIAL CONCERN Action Required ( ...<,.....~.:•• ~ N I OAll~dSP(CTION REPORT TAALlNGS SLURRY D1SCHARGE LOCATION ,..';',:f 1I KILLAREA White Mesa Mill -Standard Operating Procedures Boole 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) DAILY INSPECTIONDATA Inspector:-<GoJJ", Date;lJ-;;"(p~-crr Accompanied by:_ Time:_ 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TR!\NSPORT SYSTEM I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell /4A //';////' SlurryPipeline Leaks,Damage,Blockage,Sharp Bends til il/If>/1"Pipeline Joints Leaks,Loose Connections v/1/':r//vr// Pipeline Supports Damage,Loss ofSupport J/,J/vi 1/ Valves Leaks,Blocked,Closed //II 1/i/ Point(s)ofDischarge Improper Location or Ori~ntation il il II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell 4A ,',",;..~,;:."",,"'1'""'C</-/I Water Level Greater Than()perating Level,Large Change if c/L!.::~-Since PreviousJnspection Beach Cl1lcks,SevereErosion,Subsidence //if;,/'uf Liner and Cover Erosion ofcover,Exposure ofLiner J 1/'\I III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike 1-1 lA S 4A-W ,//~/ Slopes Sloughs or Sliding Cracks,Bulges,AI .//,,-///// Subsidence,Severe Erosion,Moist l/~/Areas, Areas ofSeepage Outbreak t Crest White Mesa Mill -Standard Operating Pwcedures Book I1:Environmental Protection Manual,Section 3.1 Cracks,Subsidence,Severe Erosion 2/07 Revision:DUSA-2 Page 18 of25 IV.FLOW RATES I Slurry Line(s)Pond Retum S-XTaiIs Spray System J)1f)/1 /1/1 /./}? GPM /vv ~rr /C--/ '-"v V.PHYSICAL INSPECTION OF SLURRY LlNES(S), Walked to Discharge Point Observed Entire Discharge Line ./---r-/_'__Yes_~(/_,Ye$ _--«//'---_'_'_,No _____~No VI.DUST CONTROL Cell 2 Cell 3 Cell /'4A // Dusting V /./< Wind Movement ofTailings 1/;/ Precipitation:inches liquid /~,,~.'.,\ General Meteorological conditions:/')I \\.. l JI/fJj CCA..t;-,l fl /(J/1 tJ: t:){)n{,ttJ ( VII.DAILYLEAK DETECTION CHECK I CellI Cell 2 Cell 3 Cell4A Leak DetectionSystem Checked Checked Checked Checked Checked __'_.Wet~,"<""'-J)ry _'__Wet_,__Dry __Wet__Dry .__Wet__Dry InitiaJilevel .-Initial level Initial level Initial level ,,-Final level '-'_IFFinallevelFinallevelFiilallevel Gal.pumped Gal.pumped Gal.pumped Gal.pumped vm OBSERVATIONS OF POTENTIAL CONCERN Action Required / ~ N I OAIl)~SP(CT!ON REPOnT TAAlINGS SLURRY &ISCHARGE LOCATION <"•".~; 1I MILL AREA White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 AlPf'JEN)j))JIX A (CONT.) DAKlLY RNSPlECTRON DATA Inspector:~d­ Date.;1d.•~G.-:i.oo h Accompanied by:_ Time:1d.:)5 2/07 Revision:DUSA~2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell Al ~4A Slurry Pipeline Leaks,Damage,Blockage, Sharp Bends if J'.\/ Pipeline Joints Leaks,Loose Connections ./j II Pipeline Supports Damage,Loss ofSupport /././ Valves Leaks,Blocked,Closed J ..//./ Point(s)ofDischarge Improper Location or Orientation tI II'./ II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A tV 11 Water L~vel Greater Than Operating Level,Large Change I /1 / Since Previous Inspection Beach Cracks,Severe Erosion,Subsidence {J if Liner and Cover Erosion ofcover,Exposure ofLiner I ,/.I HI.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W lopes Sloughs or Sliding Cracks,Bulges, ////Subsidence,Severe Erosion,Moist /-/ Areas,Areas ofSeepage Outbreak W1lite Mesa Mill -Standard Operating Pl'OCeallreS Book II:EiwimmnentalProtection Mmmal,Section 3.1 2/07 Revision:DUSA~2 Page 18 of25 ICrest /I Cracks,Subsidence,Severe Erosion 7 vI IIV.FLOW RATES IJ I I Slurry Line(s),Pond Return I S-X Tails I SpravSv~ I I I / GPM p;I 4t:i~I 4L;o V... v.PJHYSlICAL lINSPECTKON OF SLURRY LlINES(S) Walked to Discharge Point Observed Entire Discharge Line __/-/-1__Yes \I Yes---"--- _____-:No No------ VI DUST CONTROL Cell 2 Cell 3 Cell 4A Dusting j v'/ Wind Movement ofTailings V /II' Precipitation:1.0L\inches liquid General Meteorological conditions:!>"'....~..,J/I=-(,.J doV\J,.<, VII.DAILY LEAK DETECTION CHECK I Cell 1 Cell 2 "Cell 3 Cell4A "// Leak Detection System if Checked Chec d v Checked V Checked Checked __Wet~Dry __Wet~Dry ~Wet__Dry__We __Dry r-lnitiallevel~Initial level -Initial vel Initial level IV/It --Final level ~Fi allevel Final level Final level ----Flow Meter '571'1Gal.pumped al.pumped Gal.pumped VllH OBSERVATIONS OF POTENTIAL CONCERN Action Required ~ N j @AHt~~£~(trH@~~~r~~JrAH,UJ~S S;tl1JttttV [HS(F,!1!H~{3~1l,(iJ((;AfWM liUL JUU',!\ ·.j' 1 ,White Mesa Mill -Standard Operating Procedures Roo!(II:Environmental Protection Manual,Section 3.1 ,'~JP}Fj~IJi;~.(CQNl'.) JlJAThYINSPECTIONDATA Inspel;:tor:~J\n'T~"', 2/07 Revision:DUSA-2 Page 17 of25 Accompanied by:,__·...,..__ Time:'010 ~. Any Item noe"OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORTSYSrEM Inspection Items Conditions ofPotential Concern I CellI Cell 2 Cell 3 Cell 4A PlpeUne$upports Valves /- D.OPERA.TIONALSYSTEM$"I InspeCtion Items Conditions ofPotential Concern Water Level Beach Liner and Cover ",',"Greater T,b.,an Qp~t:a~ing Level,Large Change ,•~~"~'.,:..__.,,'_.':'...>.;",-..:""":_~-~""~:;">_~',.c .',".••' ,..:.,'. ..,'.'''''---'Si'ncePrevious;Inspection ' ""'" C~ks,Se'VereErosioQ,Subs.idence Erosion of<::over,Exposure ofUner CellI Cell 2 Cell 3 Cell 4A- v'V?VI "'.','v:"~,~ jr'",;rl ';--';"'"""p,. V'v-II"'""'" m.DIKES AND J!;MQA,N~NTS "I Inspection.Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I lA S 4A-W Slopes Sloughs or Sliding Cracks,Bulges,v v v v V'-Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak White Mesa MiIl-Standard Operating Pmcedures Book 11:Enviromnental Pmtection Manual,Section 3.1 2/07 Revision:DUSA-2 Page I8of25 [Crest ICracks,Subsidence,Severe Erosion JIV.FlLOWRATES I I Slurry Line(s)Pond Retum S-XTails Spray System I GPM I ~,~~."- '"';'V.PHYSICAL mSPECTION OF SLURRY JLiNES(S). Walked to Discharge Point Observed Entire Discharge Line _____yes __--:.-__ye~ __'"--__,No _____~No VI.DUST CONTROL Cell 4A Dusting Wind Movement ofTailings ," ;I I "i General Meteorological cilMttions:.rkAo...'lle\~.'_'."i ""..,'..'". ......"'.VII.DAILY LEAK DETECTION CHECK CellI I Cell 2 ...•,CeU3 ,.Cell4A ~..' -.....-.-,,'-;', 'V'·...;·Checked Gal.Dumoed .''\'"..Checked' ----.:.K..-Wet_·,__Dry -.~Wet_.·_,_Dry Initial level V' ,',:vy:,;":",,'.:-Ieg·:V'··Finalleve__l _ ....,Checked Initriitfe.Vel""V'~~.,'tilitiallev~1.V',Jniti~Jev~l v:. .....~". .-.;~.'.~ Final level ------".-.Final level .,... Fiit8I level v- Gal.Dumped II'"Gal.pumped ""Gal.Dumbed v Leak Detection System Checked VIII OBSERVATIONS OF POTENTIAL CONCERN Actiort Required ..~ ..-.•... HILL ARE'A 1"'¢'l\t!I ~""""'''-''J--.------.....--~J'I .. J'f'r"';-'-*!"":-'~"~- - - - " I 1.1. " I ~I_~~<l.'.!.~I~l=_--.;,' :oj ':'II 11 / DA'i'E :z;,D<l...e...c~_ r~~~,-=~~~~_=---=~I::..:1.~lS;,.:.p~£,.::C..:,r.:.().;,R~:"\2.,}>,.'\~,;,.,..'1 OAXl~~SP(CTHO~REPOnT fAn UU;S 5UJIUn I:HS(H!Ul!G~lOCJH Will ~ N I .White Mesa MilK -Smndartd Operating Procedures Bool(II:Environmental Protection Manual,Section 3.1 i\flF)ENI)lIX·A{t!oNr.) JD)itJLYINSJP1EC'JrJION DATA 2/07 Revision:DUSA-2 Page 17 of25 Accompanied by:_ Time:\4 <3>1 14fl.'>., Any Item nof"OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM Inspection Items Conditions ofPotential Concern L CellI Cell 2 Cell 3 Cell I'"4A ll.OPERATIONAl..SYS~MS ", PlpeJil1.e$upp()rts Valyes Paint(s).ofPispharge ...."','- ...".v. v I V ,IV v.""..... v InspectionItems ConditiOns ofPotentialC6tJ.cern Cell 1 Cell 2 Cell 3 Cell 4A Water Level '~.,"qreaterTIt.anQpeJ.;~tingLevel,LargeChange it"v' t-=_-::--:F_:':_'":'f-·:.:::it-=ln~C~~c.p=re:..:v.:;io:..:u:::-~"=:tn:=::s::.:~p~lec;;:;,;·t:::.:io~n:_·::_:_7"'-:-'-.--"--~.....;:..,c.-.....:."...•.,.,....,.r---"--b~-+~r.:;,;'~:.;;p...:'-'i-v"~-1.~~_'~.-~f.ii Beach Ct1~ks,Seve..eErosi<m,Sl.1ps.iclence vV'.'i'.,)..v'~ Liner and Cover Erosion ofcover,Exposure ofLiner ,/II'"V'V., m.DIKES A.ND El\m1\NKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike4A-Dike I-I IA S 4A-W Slopes Sloughs or Sliding Cracks,Bulges,v-v-i/'v-I/'v Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak White Mesa Mill -Standard Opem~ing JP'mced!lres Book j I:Environmental P-{otec~iofj Maf!.Ual,Section 3.1 2107 Revision:DUSA-2 Page Ipof25 [Crest ICracb,Subsidence,Severe Erosion ,,/ IV.FLOWRATJES I SluwLine(s)Pond Retum S-XTails Spray System GPM ~~~--ltJ\'\\1>""",...>•\..Ie>~c~$),-, V.PHYSICAL INSPJECnON OFSLURRY LINES(S), Walked to Discharge Point Observed Entire Discharge Line _____yes __-'v'''-'---__ye~ _----'v''--,No ________No VI.DUST CONTROL ,Cell 2 Cell 3 Cell 4A ::", Dusting t/'v-I-' Wind Movement ofTailings V'v .... Precipitation:~"W';'S"AA-k.t.~..inches liquid "",-1 .~~l~{Wll\l'~\e...,Qi"'Q,t-ii-;!\. General Meteorolo~ical copditions:L1IMh 'Ilok~,",'- '.'"1.<,;.'"i,"",,'","",:,>" .'; VII.DAILY LEAKDETECTION CHECK I CellI Cell 2 "",CeU3,Cell4A ""',,, Gal pumped ...- :""Checked ~Wet_,__Dry -.~Wet_._,_Dry """'Checked ~'t-.:'lfiitial !ev~t v In!ti~le~f:.~.,"~',..\~....,".' Final level Fiilid level Gal.pumped It'Gal.pumoed ".. ,It"Checked Gal.pumped ,:'~c''Wg';-~'''';'~ffi;i~,tk"'~Wet....:.!:-Dry Initi-litre-Vel,,v" Leak Detection System Checked VIII OBSERVATIONS OFPOTENTIAL CONCERN Action R.equlred OAll~~SP(CTHO~R~PORr fAn,HlGS HIJIHH'IHSCWAfH~~ILOCAT HU'-8 I' DArE:"2.'$Dq.e-6>9. KMSPECTOR:\O!.,•Mc..;·r'r,,\• MILL _~R_E~.!:'",~Ji_ll..O'IAe.N ,...~ t,-;'r:t:~-.:'-~~~_:'--:::-~1,'. , I ;:i ......,I;),~S<:'HA~~:,_'....+--..........--.__~-"'-S,. '""I"I, 11 /~ N I White Mesa Milil -Standard Operating Procedt.mos Book 11;Environmental Protection Manual,Section 3.1 AJ?PJENDJfX A (CON'Jf.) DAKJLY KNSPJECl'KON DATA Inspector:14@1 !k Date;12 ·Z~LCJ~~ Accompanied by:------ Time:II(t)r 2/07 Revision:DUSA.-2 Page 17 of25 Any Item not "OK"must be documented.A check mark ::=OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell 4A ./All ~'/./ Sluny Pipeline Leaks,Damage,Blockage,Sharp Bends V/'~.v/~ Pipeline Joints Leaks,Loose Connections v/~""..,)? Pipeline Supports Damage,Loss ofSupport ,/'i ",;"./ Valves Leaks,Blocked,Closed "':-v "/ PointCs)ofDischarge Improper Location or Orientation II'v tr n.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concem CellI Qill Cell 3 Cell 4A "Water Level Greater Than Operating Level,Large Change ,/\,/I ./ Since Previous Inspection ./\I /'./ Beach Cracks,Severe Erosion,Subsidence "/\,v/.,/ Liner and Cover Erosion ofcover,Exposure ofLiner y \Jf v t/ ... 1\I.~.v I v ,\ HI,DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concem Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I IA S 4A-W )pes Sloughs or Sliding Cracks,Bulges,t/~IVA-//~ Subsidence,Severe Erosion,Moist Areas,Areas ofSeepage Outbreak Crest \JVhite Mesa Mill -Starudard Operating Pwcec!lLIres Book II:Environmental Protection MamJ.3J,Section 3.1 Cracks,Subsidence,Severe Erosion 2/07 Revision:DU§A~2 Page Ht of25 ,KYo FJLOW RATES I I I Slurrv Line(s)Pond Return ,S-X Tails I Spray System I I GPM /(1 )rl I ./n).I \...-/"-../............ Yo PHYS]fCAJL KNSPJE<CTJ[ON OF SJLllJRJRY JLKNJES(S) Walked to Discharge Point Observed Entire Discharge Line ____-;;ryes ~Yes No-----_. No------ VI.DUST CONTROJL Cell 2 Cell 3 Cell 4A / Dusting v ,,/"~ Wind Movement ofTailings V ~....- Precipitation:t12 inches liquid :~;i General Meteorological conditions:d~N1 e::,//-A n.uJI (UJ. VII.DAILY LEAK DETECTION CHECK I CellI ~2 Cell 3 Ce1l4A /'71/T-I-/'./ Leak Detection System v Checked ,checked v Checked '.....Checked Checked __Wet ~"y __wet~"Y ~t_'_Dry--Wet__Dry Initial level Initial level Initial level Initial level '5.5. Final level Final level Final level Final level L1/.,,.•J Gal.pumped Gal.pumped Gal.pumped Flow Meter -;//'?n ....., /?V <. Vin OBSERVATIONS OF POTENTIAJL CONCERN ~a~~~ad~~1- 5C~Vt')5(\~t. Action Required ~ N I ,! White Mesa Mill -Standard Operating Procedures Book 11:EnviromnentalProtection Manual,Section 3.1 AJP>PJENDJIX A (CONT.) DAlDLY JINSlP'JEC1rJION DATA Date;Q,.-~O -200'IS Accompanied bY:~Ar\-~.". Time:ll\()(j 2/07 Revision:DUSA~2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem CellI Cell 2 Cell 3 Cell tJ L\4A Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends 1/I I Pipeline Joints Leaks,Loose Connections I I V Pipeline Supports Damage,Loss ofSupport .j J V Valves Leaks,Blocked,Closed I I v' Point(s)ofDischarge Improper Location or Orientation V ~J 11 H.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern CellI Cell 2 Cell 3 Cell tJ J~4A Water Level Greater Than Operating Level,Large Change V /1 JSincePreviousInspection Beach Cracks,Severe Erosion,Subsidence J ,/J Liner and Cover Erosion ofcover,Exposure ofLiner if J ,( I III.DIKES AND EMBANKMENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike 1-1 IA S 4A-W opes Sloughs or Sliding Cracks,Bulges,j I .jSubsidence,Severe Erosion,Moist .j J \/ Areas,Areas ofSeepage Outbreak Crest 'VVhite Mesa MiIl-Standard Operating Procedures Book ]1:Environmental Protection Marmal,Section 3.1 I Cracks,SnbsideJ:llce,Severe Erosion 2/07 Revision:DUSAo 2 Page Ut of25 IfV,FJLOW RATJES I ,I Slurry Line(s)Pond Rerum SoX Tails I Spray Sys1el1f- I Z GPM IS 15L\·i;tO 1/'.II.)/I?t- v,JP'lHf1[§KCAJL lINSPJEC1fKON OJF SJLl]JRRY JLINJES(S) Walked to Discharge Point Observed Entire Discharge Line ,/No------' No------ VI.Dl]JST CONTROJL Cell 2 Cell 3 Cell 4A Dusting !/V J Wind Movement ofTailings V ./V Precipitation:(J inches liquid General Meteorological conditions:S'Nlt'\J\ (,J VII.DAILY LEAK DETECTION CHECK I CellI Cell 2 Cell 3 Cell4A / Leak Detection System /Checked Check /Checked U Checked Checked LWet__Dry--Wet-LDIY --Wet DIY __Wet__L._PIY Initial level -Initial Ie el Initial level -Initial level '4.\ , N(h ~Final level Fin level Final level Final level - Gal.pumped ~al.pumped Gal.pumped ~FlowMeter (r;.l.f.')..L\~ VIn OBSERVATIONS OF POTENTIAL CONCERN Action Required ~ N I @AHt~~£~(tTH@~~f~©~l TAILINGS SLUR.,DiSCHARGE LOCATION ,. I' White Mesa Mill -SUmdard Operating Procedures Book 11:Envirollillental Protection Manual,Section 3.1 APPENDIX A (CON1L) lllAliJLY JINSlP'JECTJION DATA Date;t~-3/-,aco?$ '0Accompaniedby:R'JAN r fJ L-/Vl.el\ Time:10 0 C( 2/07 Revision:DUSA-2 Page 17 of25 Any Item not "OK"must be documented.A check mark =OK,X =Action Required I.TAILINGS SLURRY TRANSPORT SYSTEM I Inspection Items Conditions ofPotential Concem Cell 1 Cell 2 Cell 3 Cell ;JA 4A Slurry Pipeline Leaks,Damage,Blockage,Sharp Bends v Ii ../ Pipeline Joints Leaks,Loose Connections ..;J ../ Pipeline Supports Damage,Loss ofSupport Ii v vi Valves Leaks,Blocked,Closed II II V Point(s)ofDischarge Improper Location or Orientation if J V II.OPERATIONAL SYSTEMS I Inspection Items Conditions ofPotential Concern Cell 1 Cell 2 Cell 3 Cell ;JA 4A Water Level Greater Than Operating Level,Large Change //1 vi Since Previous Inspection Beach Cracks,Severe Erosion,Subsidence /./v Liner and Cover Erosion ofcover,Exposure ofLiner /J v' \ HI.DIKES AND EMBANKMJENTS I Inspection Items Conditions ofPotential Concern Dike Dike 1-Dike 2 Dike 3 Dike 4A-Dike I-I lA S 4A-W / opes Sloughs or Sliding Cracks,Bulges,/~~(//Subsidence,Severe Erosion,Moist IIAreas,Areas ofSeepage Outbreak Crest '\J1Jhhe Mesa Min -Sftandard OpenJ..ting Procedures Book I I:Em/iromnei11:aI Protection Manual,Section 3.1 ICracks,Subsidence,Severe Erosion 2/07 Revision:DUSA~2 Page Uj;of25 1/7 KYo JFJLOW RATJES IJ I IISlurryLine(s)Pond Return I S-X Tails I SpraY Systein I I I /--/,/ GPM I S()~"7Q I It¢,O t/ Yo PHYS]fCAJL JrNSPJEC'f]fON OJF SJLURRY JLJrNJES(S) Walked to Discharge Point Observed Entire Discharge Line __----r__yes j Yes----- ___'/__---'NO No------' Vt DUST CONTROJL Cell 2 Cell 3 Cell 4A Dusting II t/",,,j Wind Movement ofTailings J v (,/ ~ Precipitation:U inches liquid General Meteorological conditions::)y-ftlV\a / VII.DAILY LEAK DETECTION CHECK I / Celli Cell 2 /Cell 3 Ce1l4A //I ) Leak Detection System II Checked ~7d v Checked t/Checked Checked __Wet-LDIY __Wet---.L.DIY 1Wet__DIY__We Diy Initial level ,..~Initial level ./'Initial level '\5,;1 ./.,,- Final level Fi level Final level Final level - //bb24J,Gal.pumped al.pumped Gal.pumped FlowMeter Y][U OBSERVAT][ONS OF POTENTIAL CONCERN Jt7 (v/.J~f'l1W L..-~.......~ ttt~Ie,y'l{.tJT. Action Required " @AHl~~£~(trHC~~~P@~1TAILINGSSLURR'DISCHARGE LOCATION I:'> .',. .... --1 I QjJlH g I~~5)-~OOO =---,=--=,--=~~~=-U=sP~£~c===.!O~R~:~=-'--==_ So llA+~dYl: CELl 10 K~ N I Weekly Inspections for December 2008 White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT) 2107 Revision:DUSA~2 Page 20 of25 Date:/2·6 ·200 '6 1.Pond elevations (msl,ft) DENmON MINES (USA)CORP, WEEKLY TAILINGS INSPECTION Inspectors:It (ld Rt~&r,a ;·c 1'!h0;,.. Cell 1:(a)Pond Solution Elevation 5(,IZ.S-G (b)FML Bottom Elevation __5597__ (c)Depth ofWater above FML «a)-(b»IS.S=? Cell 3:(a)Pond Solution Elevation ($&01.I Z. (b)FML Bottom Elevation 5570 (c)Depth ofWater above FML «a)-(b»--.3=-(,'12."'--- Roberts Pond:(a)Pond Solution Elevation S(p.l £i #'t3 (b)FML Bottom Elevation __.;;5612.34 (c)Depth ofWater above FML «a)-(b»C.ar - 2.Slimes Drain Liquid Levels Cell 2 If.Y Pump functioning properly VJ3S Pump Timer set at 15min on 45 min off If/d tfi",r"'SrJlrtyt\; ~£::...:2=---:-.--,:'I=":f--:-r__Depth to Liquid pre-pump-6~"",~""".,-=S=--I'I Depth to Liquid Post-pump (all measurements are depth-in-pipe) Pre-pull]2.head is 38'-Depth to Liquid Pre-pump = 1,5".53 Post-pump head is 38'-Depth to Liquid Post- pump =I s:lit While Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA-2 Page 21 of25 ].Leak Detection Systems 4.Tailings Area Inspection (Note dispel'alof Observation: CellI Cell 2 Cell]Ce1l4A /NI4-/'-' Is LDS wet or dry?wet at dry wet dry wet Vdry v""wet dry Ifwet,Record Ftto Ftto Ft to FHo liquid level:Liquid Liquid Liquid Liquid Ifsufficient fluid is Volume Volume Volume Volume present,record Flow Rate Flow Rate Flow Rate Flow Rate volume offluid .6.8pumpedandflow{sLf [;''11rate: Was fluid sample --'yes__no --'yes__no --'yes__no ---'yes__no collected?fJtiJ ,x ,Nt-erA ,,~k.-~L/JI cY{! 5.Control Me~~Implemented:tlJd e;;kvd ;t-~at;;e#«.~~L ~~f 7.Contaminated Waste Dump:~tJ,+-/t.l!!o'--_ 8.Cell #4a Barge and Walkway / #4>77ZP;:;£AuT 6k~&t"C6JJ 4?d/~5.,12JW("it ~~7 ' White Mesa Mill-Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT) DENKSON MlfNE§(lU§A)CORP, WEEKLY TAJfLING§lfN§PECTION 2/07 Revision:DUSA-2 Page 20 of25 Date:jJ ./)·J6()Y 1.Pond elevations (msl,ft)Cell 1:(a)Pond Solution Elevation .'5C,/2.37 (b)FML Bottom Elevation 5597 j----::;~- (c)Depth ofWater above FML ((a)-(b»1,<;··57 Cell 3:(a)Pond Solution Elevation ~'()1"2(, (b)FML Bottom Elevation 5570~__ (c)Depth ofWater above FML ((a)-(b»_31.2k Robe11s Pond:(a)Pond Solution Elevation S-r;/%.[)b (b)FML Bottom Elevation __."...5612.34 (c)Depth of Water above FML ((a)-(b»G"6),.- Cell 'til 2.Slimes Drain Liquid Levels Cell 2 /9.I Pump functioning properly ytS' Pump Timer set at 15min on'45 min off /fief!t &0aiS'1.>r<3p,,- -=:,;{-'---',--'/c,-~_5-=g"~_----,Depth to Liquid pre-pump -<OZy:.·>-LI-=-,-<'fL-"Y==--__Depth to Liquid Post-pump (all measurements are depth-in-pipe) Pre-pump head is 38'-Depth to Liquid Pre-pump = /tY,b2 Post-pump head is 38'-Depth to Liquid Post- pump =It.57 White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA~2 Page 21 of25 3.Leak Detection Systems Observation: Cell 1 Cell 2 Cell 3 Cell4A /A./A-.// Is LDS wet or dry?wet JLdry wet dry wet Vdry v wet dry Ifwet,Record Ft to Ftto Ft to FHo liquid level:Liquid Liquid Liquid Liquid Ifsufficient fluid is Volume Volume Volume Volume present,record Flow Rate Flow Rate Flow Rate Flow Rate volume offluid /3·3pumpedandflow&/LrNtrate:,/ Was fluid sample ---yes v no ---yes__no ---yes {/110 ---yes ,/no collected? I : 5.Control Methods Implemented:--'A:-::u'-"'/'-CA-l-_ 7.Contaminated Waste Dump:_'-,--Ic-12_1c_1J_-1_'/--",0e.-:II=l,U+le-:Js--,-T_n_1f--"-t/'l-,,-,i1~o/i-,,'e-'--fE-j1",,,_"",«~:&N=,,-«-e-,,-b,,---_ l 8.Cell #4a Barge and Walkwa))t~J}i tV~/!IL-</?1 IVVf<C ~?ttt;/ White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT) DENISON MiNES (USA)CORlP', WEEKLY TAILINGS INSPECTION 2/07 Revision:DUSA~2 Page 20 of25 Date:/~'j r (J g Inspectors:~1/-t;fL tI.rf 12'1~~t. 1.Pond elevations (msl,ft)Cell 1:(a)Pond Solution Elevation S~i2.3t (b)FML Bottom Elevation 5597-:-_ (c)Depth ofWater above FML «a)-(b»----:'5·3? Cell 3:(a)Pond Solution Elevation 5&0')."l~ (b)FML Bottom Elevation __5570__ (c)Depth ofWater above FML «a)-(b»{2.2isCo- Roberts Pond:(a)Pond Solution Elevation 5"If).bg (b)FML Bottom Elevation __5612.34 (c)Depth ofWater above FML «a)-(b»__-\C",....,~3=-1.--'-'~:: G(..tl q i~ 2.SUmes Drain Liquid Levels Cell 2 01 /H I<t sll lI!,J 111~"5&2&. JAd 't ttl)::, cJ jl'11 6~1t\.tlt J:tv 1 LJ L/] Pump functioning properly Ire:) Pump Timer set at 15min on 45min off A),~A"J,eJ;<f/ov.1 505.1<:j'l. ----<).J,<-=.."'-"""d-_"/Depth to Liquid pre-pump ~ll"-""",~""","5"",,,6__-,Depth to Liquid Post-pump (all measurements are depth-in-pipe) Pre-pump head is 38'-Depth to Liquid Pre-pump = /5;.73 Post-pump head is 38'-,-Depth to Liquid Post- pump =/s:.r White Mesa Mill -Standard Operating Procedures Book 11:Enviwnmentall?wtection Manual,Section 3.1 3.Leak Detection Systems 2/07 Revision:DUSA-2 Page 21 of25 Observation: CellI Cell 2 ,1\Cell 3 Cell4A /IV ,'''-// Is LDS wet or dry?wet Ldry wet dry wet "dry Vwet dry Ifwet,Record Ft to Fito Ft to Ftto liquid level:Liquid Liquid Liquid Liquid Ifsufficient fluid is Volume Volume Volume Volume present,record Flow Rate Flow Rate Flow Rate Flow Rate volume offluid *.~.t-pumped and flow @5'1l{trate:I Was fluid sample ----'yes~no ----.Yes__no ----.Yes~no ----.Yes__no collected? 4. 5.Control Methods Implemented:_-",j.h-"-,,,,-~=-~-I-t------------------ 7.Contaminated Waste Dump:----'6_?<L-"!.~=__='_'_£_+_----------------- White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA-2 Page 20 of25 APPENDIX A (CONT) DENISON MINES (USA)CORP. WEEKLY TAILINGS INSPECTION Date:IJ.-:l4 ~OD Inspectors:--r.::",11,]Itj,..--_ 1.P<;md elevations (msl,ft)Cell I:(a)Pond Solution Elevation S,"la.~y. (b)FML Bottom Elevation 5597 _ (c)Depth ofWater above FML «a)-(b»\5."'" Cell 3:(a)Pond Solution Elevation sc..OJ..]9 (b)FML Bottom Elevation 5570 _ (c)Depth ofWater above FML «a)-(b»34...1'1. Roberts Pond:(a)Pond Solution Elevation ~~\1.'US (b)FML Bottom Elevation ,5612.34 (c)Depth ofWater above FML «a)-(b»__--"'£>~.(","'-"{_=___ ) Pump functioning properly I,l~s Pump Timer set at 15min on 45 min off ,vo tl",'k-?~;(.,Flo(..J .~)(;,J<:I"""2.Slimes Drain Liquid Levels Cell 2 ----,-'tr,,-'4->-,-,-\'~-",:-,Depth to Liquid pre-pump ---<.,.,:...-'-.-L:-Ll,---,L-lS..".~..~__,Depth to Liquid Post-pump (all measurements are depth-in-pipe) Pre-pump head is 38'-Depth to Liquid Pre-pump = 1~.'S1 Post-pump head is 38'-Depth to Liquid Post- pump =l~,~S White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 3.Leak Detection Systems 2/07 Revision:DUSA~2 Page 21 of25 Observation: CellI Cell 2 Cell 3 Ce1l4A "/ Is LDS wet or dry?wet I dry wet dyY wet I dry V wet dry Ifwet,Record Ft to Ftty Ft to Hto liquid level:Liquid Liquid Liquid Liquid Ifsufficient fluid is Volume Volume /Volume Volume present,record Flow Rate FlO!Flow Rate Flow Rate l,S1r.t '\ volume offluid 1"",~\;",\pumped and flow \~=1 rate:I / Was fluid sample ~es~no -j-Yes__no ---'yes .:l no ~es L no collected? I 7.Contaminated Waste Dump:'_.l..;(::1"i-'.x:::60''::..Jl""':''''\-'lr---'-'~-'.:'-::::JI'-J./---------- 8.Cell #4a Barge and Walkway Il/{i-:(,.If../I/l1/?;'/1.5.rdt).d,C;<>r~C-(/e c.1~;?-f/A/I;'.(~r£ White Mesa Mill -Standard Operating Procedures Book 11:Enviromnental Protection Manual,Section 3.1 APPENDIX A (CON1r) DENlfSON MJINES (!USA)CORP. WEEKLY 1rAILINGS INSPECTlfON 2/07 Revision:DUSA-2 Page 20 of25 Date:(J/--.2 r tt Inspectors:r;"it«'/I.'~II!e 1.Pond elevations (msl,ft)Cell 1:(a)Pond Solution Elevation Sf,/2 ,1-(; (b)FML Bottom Elevation __--:5597 _ (c)Depth ofWater above FML «a)-(b»t£b -,.6 Cell 3:(a)Pond Solution Elevation .~,~05,6,!- (b)FML Bottom Elevation 5570 _ (c)Depth ofWater above FML «a)-(b»3:3~().$~ Roberts Pond:(a)Pond Solution Elevation $'-20"'f-b (b)FML Bottom Elevation 5612.34 (c)Depth ofWater above FML «a)-(b»8,,",,--,,__'i1-J'::2."",'=- ~~n~~<-'elf Y4 fs.e. 'F"""-L B~,Ih-"""'- 2.Slimes Drain Liquid Levels Cell 2 Pump functioning properly y £S Pump Timer set at 15min on 45 min off.....:M~,<--'---Ft'-.<kef S7'"N·v\.- ~.2","-'.!-I.:....._iJ_fs'--.Depth to Liquid pre:..pump _.2-.·'-'I.C--1'-'J'------.Depth to Liquid Post-pump (all measurements are depth-in-pipe) PrejPump head is 38'-Depth to Liquid Pre-pump = )fc-1.1 Post-pump head is 38'-Depth to Liquid Post- pump =21.Cis VVhite Mesa Mill -Standard Operating Procedures BODle 11:Enviromnental Protection Manual,Section 3.1 3.Leak Detection Systems 2/07 Revision:DUSA-2 Page 21 of25 Observation:I i' CellI Cell 2 /Cell 3 Ce1l4A /,/ ,// Is LDS wet or dry?wet II dry wet i/dly wet '-dty V wet dty Ifwet,Record .-Ftto Ft,to ~FHo 5·~Ftto liquid level:Liquid Liquid //Liquid Liquid Ifsufficient fluid is Volume ,-.Volum~/Volume .,.-Volume present,record Flow Rate -Flow}tate Flow Rate ~Flow Rate IblG-Y~ volume offluid /<'-:''\,\1.-c...I(.\ pumped and flow ).'f\t .~ /~!$I//rate:/ Was fluid sample ---'yes~no j---Yes__no ---'yes~no ---'yes-.J.Lno collected? 4.Tailings Area Inspection (Note dispersal ofblowing tailings): 11AnJ&>J/~~~,:.A egA~ 5.Control Methods Implemented:_ 8.Cell #4a Barge and Walkway Monthly Inspection for December 2008 White Mesa MiIl-Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) MONTHLY INSPECTION DATA --r-Inspector::J-,a.<k.!.!M.<./'=,,~_ '80 Date:J;;.::Jd"2lJt)[{ 2/07 Revision:DUSA-2 Page 22 of25 Pipe Thickness:1'14 C{o be measured only during periods when the Mill is operating) 2.Diversion Ditches and Diversion Berm: Diversion Ditch 2 Diversion Ditch 3 Diversion Berm 2 Observation: Diversion Ditches: Sloughing Erosion Undesirable Vegetation Obstruction ofFlow Diversion Berm: Stability Issues Signs ofDistress Diversion Ditch 1 __yes~o __yes-f:0 __yes '~ __yes_·_no __yes ~o yes---6o __yes__,./nno /___yes__no __yes '~PO .yes~ __yes__no /__._yes__no .,.' ~__yes_~ __yes__no. White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 2/07 Revision:DUSA-2 Page 23 of25 4.Overspray Dust Minimization: Overspray s¥stem..futrcl:lomng properly: Nj4- __-Jyes -nl:J- Overspray carried m~-than 50 feet from the cell:yes no If"yes",was system immediately shut off?__yes -no- Comments:~-----;:- 5.Remarks:~--.....::.c.-------~------------, ,t" 6.Settlement Monitors Cell 2 Wi:Sc::'/1..11 Cell 2 W2:SC:,Z/,I ~ Cell 2 W3:S"/7 f{'1 Cell 2 W4:'-.tC:)-(:dt,If If .Ce1l2W7-C:S(C;Jt!"r'cE( Ce1l4A-Toe:55?"7,CO CeIl2W3-S:~0 /~.r CeIl2Ei-N:5&2<;;;·n CeIl2EI-IS:SCe2l3 7:r CeIl2Ei-2S:s-tr,/~(/3 Cell 2 East:,)'0 zz ~:.S ( Ce1l3-IN:S;&/(;0 cpr CeIl3-IC:.5:h /2.3tJ Ce1l3-IS:<..~?Q;::16 CeIl3-2N:>k~/3"IT CeIl2W5-N:St,'13"~<J I ., 8.Monthly Slimes Drain Stqtic Head Measurement for Cell 2 (Depth-in-Pipe Water Level Reading):.II.7&'.I Location Trans.Shot Base Applied Elevation IC~(:l1 4/\b.4 5574.5 5577 Name:Tanner H.,Ryan P. !ntitiiJI 1,9 5582.4 Date:12/312008 C2W1 3.4 5612.77 5619.27 C2W2 1.52 5612.77 5621.15 C2W3 4.78 5612.77 5617.89 C2W4 5.23 5612.77 5617.44 Initial 9.9 5622.67 5623.14 5622.31 5623.14 5625.87 5623.14 5621.37 5623.14 5618.03 5623.14 5620.68 5623.14 5619.93 5623.14 5618.38 5623.14 5618.94 5623.14 5616.58 5623.14 5614.94 5627.47 2W5-C 4.33 5612.77 5618.34 2W4-N 3.39 5612.77 5619.28 2W4-S 6.5 5612.77 5616.17 2W5-N 3.76 5612.77 5618.91 2W3-S 5.97 5612.77 5616.7 Initial 4.94 5617.98 3-1N 0.99 5613.04 5616.99 3-1C 5.18 5613.04 5612.8 3-18 2.82 5613.04 5615.16 3-2N 4.81 5613.04 5613.17 3-2C 4.37 5613.04 5613.61 3-28 5.83 5613.04 5612.15 Monthly and Quarterly Inspections for the Evaluation Period (August 2008 through July 2009) August 2008 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop D3 =Diversion Ditch 3,etc. Prepared By:12 /~~L y:g: Reviewed BY~~ Reviewed By:-i-+.+h-til-"='-6------- Date Frequency Area General Observations -Areas of Potential Concern 08/01/08 Daily All Nothinq to report. 08/02/08 Daily All Nothinq to report. 08/03/08 Daily All Nothinq to report. 08/04/08 Daily All Nothinq to report. 08/05/08 Daily All Three reports handed in forthe 5th,two by Eric Balch and one by Josh Taylor 08/06/08 Daily All Nothing to report. 08/07/08 Daily All Two Reports handed in one by Josh Taylor the other by Roy Atcity.Roys comments (C4A out of service,repairs completed. 08/08/08 Daily All Two Reports handed in one by Josh Taylor the other by Roy Atcity.Roy's comments C4A out of service,repairs completed. 08/09/08 Daily All Two Reports handed in one by Josh Taylor the other by Roy Atcity.Roy's comments C4A out of service,repairs completed. 08/10/08 Daily All Two Reports handed in one by Josh Taylor the other by Roy Atcity.Roy's comments C4A out of service,repairs completed. 08/11/08 Daily All Two Reports handed in one by Josh Taylor the other by Roy Atcity.Roy's comments C4A out of service,repairs completed. 08/12/08 Daily All Two Reports handed in one by Gaqe Sterlinq the other by Roy Atcity.Roy's comments (C4A out ofservice,repairs completed.) 08/13/08 Daily All Two Reports handed in one by Gaqe Sterlinq the other by Roy Atcity.Roy's comments (C4A out ofservice,repairs completed.) 08/14/08 Daily All Two Reports handed in one by Gaqe sterlinq the other by Thayne Holt. 08/15/08 Daily All Two Reports handed in one by Gaqe sterlinq the other by Thayne Holt.Thayne's report stated he did not perform inspection. 08/16/08 Daily All Three reports handed in forthe 16th,two by Gaqe Sterlinq Crew and one by Thayne Holts crew. 08/17/08 Daily All Two Reports handed in one by Gaqe Sterlings crew and one by Thayne Holt's crew. 08/18/08 Daily All Nothing to report. 08/19/08 Daily All Nothing to report. 08/20/08 Daily All Nothing to report. 08/21/08 Daily All Nothinq to report. 08/22/08 Daily All Nothinq to report. 08/23/08 Daily All Nothing to report. 08/24/08 Daily All Nothing to report. 08/25/08 Daily All Nothing to report. 08/26/08 Daily All Nothinq to report. 08/27/08 Daily All Nothinq to report. 08/28/08 Daily All Notbinq to report.:"'"""i .2 K>hc.1S IL.'!!,""?N' 08/29/08 Daily All No Report handed in.~;;.-(LS.~'Ii .,/-~i_"-."/I • I /'-""'/'~I. 08/30/08 Daily All No Report handed in."::::L ;?417fll'lt'lfet .kN "1!roop /.4.(.1(/Q -l[ft(Jf~1 I/v;<>.-/tio?ff1,/.,f;u"7 '7 :-~Jjc%f';//'1/ 08/31/08 Daily All No Report handed in.F-,of',«/11 d 08/08/08 Weekly All Cell 4A sand bag project nearing completion.Cell 4A fence is half done.LDS was installed on cell 4A 08/15/08 Weekly All Hot and Dry causing dusty road ways.Exposed liner on C1 was covered. 08/22/08 Weekly All New tailings line installed,discharqe point in north east corner ofC3. 08/28/08 Weekly All Exposed liner on C3 was covered.Sand baq project finished this week waitinq for approval from state of Utah in order to use newly constructed cell. 08/29/08 Monthlv All Received multiple reports for same day on daily tailings inspections.Exposed liner covered on both C1 and C3.LDS installed on C4A still not operation; At time of installation there was water present in LDS line.Newtails line placed in north east corner of C3. September 2008 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop 03 =Diversion Ditch 3,etc. P~::i:W::~: Reviewed By:61/IJ,+1 _ ,C '-\. Date Frequency Area General Observations -Areas of Potential Concern 09/01/08 Daily All Eric Balch --No Comment 09/02/08 Daily All Eric Balch --No inspection submitted 09/03/08 Daily All Eric Balch --No inspection submitted 09/04/08 Daily All Roy Atcity Cell 4A liner completed--LDS section done wrona 09/05/08 Daily All Roy Atcity Cell 4A liner completed--LDS section done wrona 09/06/08 Daily All Roy Atcity Cell 4A liner completed--LDS section done wrona 09/07/08 Daily All Roy Atcity Cell 4A liner completed--LDS section done wrono 09/08/08 Daily All Roy Atcity Cell 4A liner completed--LDS section done wrona 09/09/08 Daily All Rov Atcitv Cell 4A liner completed--LDS section done wrona Gaae sterlina also submitted report 09/10/08 Daily All Rov Atcity Cell 4A liner completed--LDS section done wrona Gaae sterlina also submitted report 09/11/08 Daily All Thayne Holt --No inspection submitted (aaae sterlina submitted report,report was incomplete) 09/12/08 Daily All Thavne Holt --No inspection submitted (aaae sterlina submitted report,report was incomplete) 09/13/08 Daily All Thayne Holt --No inspection submitted 09/14/08 Daily All Thavne Holt --No comment left,report left incomplete 09/15/08 Daily All Thavne Holt --No comment left,report left incomplete 09/16/08 Daily All Thayne Holt --(did not ao to tails) 09/17/08 Daily All Thayne Holt --No inspection submitted 09/18/08 Daily All Gaae sterlina --No comment report was incomplete 09/19/08 Daily All Gaqe sterlina --No comment report was incomplete 09/20/08 Daily All Gaae sterlina --No comment report was incomplete 09/21/08 Daily All Gaae sterlina --No comment report was incomplete 09/22/08 Daily All Gaae sterlina --No comment report was incomplete 09/23/08 Daily All Gaae sterlina --No comment report was incomplete 09/24/08 Daily All Gaae sterlinq --No comment report was incomplete 09/25/08 Daily All Eric Balch --No Comment 09/26/08 Daily All Eric Balch --No inspection submitted 09/27/08 Daily All Eric Balch --No Comment 09/28/08 Daily All Eric Balch --No Comment 09/29/08 Daily All Eric Balch --No Comment 09/30/08 Daily All Eric Balch --No Comment 09/05/08 Weekly All Cell 4A fence proiect put on hold once aqain.Archeoloaical work continues at new decon pad. 09/12/08 Weekly All Physical construction of Cell 4A was approved still waitina on some paperwork to be passed off.Cell 1 roadway needs some re-surfacina work 09/19/08 Weekly All Flow meter was replaced on MW-4.Water fowl has started to increase once aaain around tailings ponds.Re-surfacinq work on Cell 1 road has been de 09/26/08 Weekly All Replaced restricted area sians that were damaaed.Also fixed west fence where deer had ran through.Transfer solutions from C1 and C3 into C4A. 10/03/08 Weekly All Continue transferrina solutions into Cell 4A.Covered exposed liner on south east corner of Cell 1. 09/24/08 Monthly All C1 road was resurfaced and araded.C4A is ooerational and fence oroiect is nearina completion.Solutions beina transferred from C1 and C3 into C4A. 09/26/08 Quarterly All exposed liner covered on C1 and C3.C4A is operational fence proiect nearlv complete.C1 road fixed.RA fence line and siqns were replaced as neede( October 2008 TAILS REPORT Prepared BY.12....edd::::-~__:_ Reviewed BY:O~ Reviewed By:IIMl./ It H( 03 =Diversion Ditch 3,etc. RA =Restricted Area MS =Maintenance Shop Report C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Date Frequency Area General Observations -Areas of Potential Concern 10/01/08 Daily All Eric Balch-nothino to report /' 10/02/08 Daily All Roy Atcity-Cell 4A work completed refillino with solution.-LOS section filled out improperly 10/03/08 Daily All Roy Atcity-Cell 4A work completed refilling with solution.-LOS section filled out improperly 10/04/08 Daily All Roy Atcity-Cell 4A work completed refilling with solution.-LOS section filled out improperly 10/05/08 Daily All Roy Atcity-Cell 4A work completed refillino with solution.-LOS section filled out improperly 10/06/08 Daily All Roy Atcity-Cell 4A work completed refillino with solution.-LOS section filled out improperly 10/07/08 Daily All Roy Atcity-Cell 4A work completed refillino with solution.-LOS section filled out improperly 10/08/08 Daily All Roy Atcity-Cell 4A work completed refilling with solution.-LOS section filled out improperly 10/09/08 Daily All Ryan Palmer-Minor erosion problems on south side Cell 1.cell 4A raft was pulled closer in to the access point and transfer lines placed on raft. 10/10/08 Daily All Tanner Holliday--unathorized vehicle travel on cell 3 dike.Southwest corner of cell 4A fence was fixed. 10/11/08 Daily All Thayne Holt--inspection sheet lost in transfer from CC room to environmental office. 10/12/08 Daily All Thayne Holt--need bumper poles replaced on Monitor Well on cell 4 roadway. 10/13/08 Daily All Tanner Holliday--North side of cell one has multiple small areas of exposed liner,Utility crew has been contacted to dump dirt alono north bank. 10/14/08 Daily All Ryan Palmer--North side of cell one has exposed liner,ersosion channells on cell 3 and cell 4A dikes. 10/15/08 Daily All David Turk--erosion channells on south and west side of cell 4a. 10/16/08 Daily All Tanner Holliday--cell 1 exposed liner north side,erosion channells on cell 3 and 4A. 10/17/08 Daily All Ryan Palmer--liner on cell 1 showing on south side.Erosion channells on cell 3 and 4A. 10/18/08 Daily All Gage sterling --No report handed in.Gage Sterling has not had new tails training. 10/19/08 Daily All Gage Sterling--nothing to report.(LOS was not filled out)Gaoe has not had new tails trainino. 10/20/08 Daily All Ryan Palmer--south bank cell 1 exposed liner,erosion channells on cell 3 and cell 4a. 10/21/08 Daily All Tanner Holliday--washed out dikes on C3 and C4A. 10/22/08 Daily All Tanner Holliday--water erosion on dikes Cell 4. 10/23/08 Daily All Tanner Holliday--exposed liner C1 and erosoin channells on C3 and C4a. 10/24/08 Daily All Tanner Holliday--Erosion):;ell 4a dike,exposed liner on cell 1 was covered. 10/25/08 Daily All Eric Balch--No report ,/ 10/26/08 Daily All Eric Balch--No report ,/ 10/27/08 Daily All Ryan Palmer--Erosoin on C3 and C4a dikes. 10/28/08 Daily All Tannner Holliday --erosion on C3 and C4A dikes. 10/29/08 Daily All Ryan Palmer--Utility crew used heavy equipment to fix erosion problems on C3 and C4A. 10/30/08 Daily All Tanner Holliday--Nothing to report 10/31/08 Daily All Tanner Holliday--hugger on transfer line was leaking on north side of cell 4A.Problem was fixed by maintanance. 10/10/08 Weekly All Fence was repaired around barge entrance on C4A.Transfer lines were placed on barqe on cell 4A. 10/17/08 Weekly All repaired transfer pump on C1.continue to transfer from C3 into C4A.Clean up project for tailinos area has beoun. 10/24/08 Weekly All Looks good. 10/31/08 Weekly All Over all the tailinos area is lookino ooad. 10/31/08 Monthlv All repaired transfer pump on C1.Clean up project for tails was basically completed.transfer lines were placed on new barge on C4A. November 2008 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop D3 =Diversion Ditch 3,etc. Prepared By:-c?v",,if IJJMeJ2.1iA-RevIewed BY:~• Reviewed By:.~ I ~, Date Frequency Area General Observations -Areas ofPotential Concern 11/01/08 Daily All Roy Atcitty,No Comment 11/02/08 Daily All Roy Atcitty,No Comment 11/03/08 Daily All Ryan palmer,No Areas of concern 11/04/08 Daily All Ryan Palmer,High winds may expose liner on C1.Barge and Walkway on C4A need to be moved closer. 11/05/08 Daily All Ryan Palmer,Windy conditions need to keep an eye out for exposed liner and water fowl. 11/06/08 Daily All Tanner Holliday,exposed liner on C1 covered with dirt. 11/07/08 Daily All Tanner Holliday,exposed liner on C1 covered with dirt.Also leaky flange on transfer line,maintenance tightened flange. 11/08/08 Daily All Eric Balch,No Comment 11/09/08 Daily All Roy Atcitty,No Comment 11110/08 Daily All Ryan Palmer,Leak in Transfer line between C3 and C4A north east of spillway.Maintenance repaired leak in line. 11111/08 Daily All David Turk,Exposed liner C1 south bank-C1 Ids pump being installed-Raft on C1 and C3 need attention. 11112/08 Daily All Ryan Palmer,LDS on C1 not checked as maintenance is working on pumpinq solutions out. 11/13/08 Daily All Tanner Holliday,No comment 11/14/08 Daily All Ryan Palmer,Waiting on LDS for C1-Barge on C4A is out about 6 feet from access point. 11/15/08 Daily All Eric Balch,No Report turned in 11/16/08 Daily All Eric Balch,No Report turned in isP-p'(,,:;,"'""'-PH'-$:k,11-0 tu;•.c£,-'-7'"h c.L,-eh.-4.r"C-<--< 11/17/08 Daily All Ryan Palmer,Monitor levels on C3-Barqe needs to be moved in on C4A. 11/18/08 Daily All Tanner Holliday,C1 liner exposed and dirt used to cover. 11/19/08 Daily All Ryan Palmer,Waiting on LDS for C1-Barge on C4A is out and needs to be moved back before lines fall into solution. 11/20108 Daily All Ryan Palmer,Discharge point on C3 is mounding and producing back flow-Walkway on C3 is under solution needs to be fixed-Barge on C4A needs m< 11/21/08 Daily All Tanner Holliday,Barge and walkways on C3 and C4A have been repaired and discharge point on C3 has also been moved. 11/22/08 Daily All Thayne Holt,No comment 11/23/08 Daily All No Report turned in--Thayne Holt. 11/24/08 Daily All Tanner Holliday,No comment 11/25/08 Daily All Ryan Palmer,LDS on C1 is blocked with solids near the bottom. 11/26/08 Daily All Ryan Palmer,East bank ofC1 has exposed liner north of C1 raft.Utility crew contacted.] 11/27/08 Daily All No Report Turned in--Gage sterling 11/28/08 Daily All Gage sterling,Tails to muddy to perform inspection. 11/29/08 Daily All Thayne Holt,No comment 11/30/08 Daily All Thayne Holt,No comment 11/07/08 Weekly All Some small areas of exposed liner on C1 other than that it looks pretty good. 11/14/08 Weekly All LDS on C1 being worked on.Barge on C4A needs to be pulled in. 11/21/08 Weekly All Walkways and barges on C3 and C4A were worked on and both are again accessable. 11/26/08 Weekly All LDS on C1 seems to have dried up and has no more solutions but is still blocked with solids neer the bottom of the pipe. 11/26/08 Monthly All LDS on C1 was found wet and has been worked on,more work is still needed.C1 has had exposed liner.C3 and C4A walkways,barges,and acces po December 2008 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop 03 =Diversion Ditch 3,etc. Reviewed By··-l~If-1'<-f{--'(;.L'-I/'-------- Date Frequency Area General Observations -Areas of Potential Concern 12/01/08 Daily All Ryan Palmer-south east corner of c1 has exposed liner,contacted utility crew to dump soil. 12/02/08 Daily All Ryan Palmer-discharqe will need to be moved on C3 before lonq. 12/03/08 Daily All Ryan Palmer-Liner on south bank C1,discharqe on C3 needs moved,LDS on C1 blow tube broke in half and needs reparied. 12/04/08 Daily All Ryan palmer-wronq materials were purchased for repair on LDS C1.high voltaqe work on C4A is complete.New discharqe line installed on C3. 12/05/08 Daily All Ids on C1 needs a total depth from Steve SnYder.C4A barae needs to be moved.Exposed liner on south bank C1. 12/06/08 Daily All Sinn Kino Mays-nothina to report 12/07/08 Daily All Thayne Holt-nothina to report. 12/08/08 Daily All David Turk-roads are wet and slippery.Maintenance is movinq discharqe line on C3. 12/09/08 Daily All Ryan Palmer-Maintenance tryinq to reconnect the wave break on C1. 12/10/08 Daily All Ryan palmer-New blow tube is needed on C1 LDS.Barqe on C4A needs to be pulled closer to access point. 12/11/08 Daily All Tanner Holliday-liner exposed on south east corner of C1. 12/12/08 Daily All Ryan palmer-Everythinq looks qood. 12/13/08 Daily All Gaqe Sterlinq-Nothinq to report 12/14/08 Daily All Gaqe Sterlinq-Nothinq to report 12/15/08 Daily All Tanner Holliday-Nothinq to report. 12/16/08 Daily All Tanner Holliday-looks qood. 12/17/08 Daily All Ryan palmer-Cannot conduct a very qood inspection as there is 10-12 inches of snow and it is still falling. 12/18/08 Daily All Tanner Holliday-Nothinq to report. 12/19/08 Daily All Tanner Holliday-As we tried to take a total depth on C4A we have concluded that we have bequn hittinq the slope and can no lonqer reach bottom. 12/20/08 Daily All Roy Atcity-Nothing to report. 12/21/08 Daily All No Report handed in.~£J.tff;:;~"77::~/j;'JI-:rT 12/22/08 Daily All Tanner Holliday-A lot of snow on the qround makinq tails look very clean and orderly. 12/23/08 Daily All Tanner Holliday-Nothinq to report. 12/24/08 Daily All Tanner Holliday-Nothinq to reprot. 12/25/08 Daily All Eric Balch-Snowinq 12/26/08 Daily All Tanner Holliday-Nothina to report. 12/27/08 Daily All Roy Atcity-Nothina to report. 12/28/08 Daily All Roy Atcity-Nothinq to report. 12/29/08 Daily All Ryan palmer-Tailinqs area covered in snow and ice makinq it very slick. 12/30/08 Daily All Tanner Holliday-Nothinq to report. 12/31/08 Daily All Tanner Holliday-Very muddy and slick now that the snow has beaun to melt. 12/05/08 weekly All waiting for length measurements from steve snYder in order to set the Ids blow tube properly in C1. 12/12/08 weekly All Railed walkway down to barae on C4A was installed by maintenance.Overall the tailinqs area looks pretty qood. 12/19/08 weekly All New Walkway with rails is completely finished with discharqe lines layed on walkway to keep out of solution.Received 10-14 inches of snow. 12/24/08 weekly All C1 east bank had erosion problems with some exposed liner.Dirt was used to cover. 01/02/09 weekly All larqe amounts of snow are not aliowinQ a very Qood inspection to be performed 12/30108 Monthly All Walk way on C4A was installed.C1 has had some exposed liner.Received a larqe amount of snow in the middle of the month makinq tails area slick. 12/29/08 Quarterly All Electical work completed on C4A.Pumped solutions from C1 into C3 and C4A.Newwalkway instaled on C4A.A lot of snow but lookinq pretty qood. January 2009 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop D3 =Diversion Ditch 3,etc. Prepared BY:-I==;r~/~'/~·~~7JJ~.;~:t...........- Reviewed B'I.'_I_"/+!f'/4J:.;;<.Wc....../-\:-(_ Reviewed By:;fL:-~ Date Frequency Area General Observations -Areas of Potential Concern 01/01/09 Daily All Thayne Holt-inspection not fully filled out,nothinq to report 01/02/09 Daily All Tanner Holliday-nothinq to report. 01/03/09 Daily All Eric Balch-two reoorts handed in for same day.Nothina to reoort on either one. 01/04/09 Daily All Ray Atcitv-report filled out wrono,nothino to report. 01/05/09 Daily All Tanner Holliday-roadways are still snowoacked and muddy. 01/06/09 Daily All Ryan Palmer-tails looks qood other than muddY,slick roads.Four wheel drive needed at all times. 01/07/09 Daily All Tanner HoilidaY-roads are slick when not frozen.Replaced flow meter on TW4-15. 01/08/09 Daily All Ryan Palmer-Bad roads,as snow melts it will cause erosion problems. 01/09/09 Daily All Tanner Holliday-roads are sloppy,Cell 4A walkway has a section under solution. 01/10/09 Daily All Jerome Benally-not filled out completely,nothinq to report. 01/11/09 Daily All Valaddin Charlie-not filled out completely,nothinq to reoort. 01/12/09 Daily All Ryan oalmer-Maintenance workino on walkway and barae on cell 4A. 01/13/09 Daily All Ryan Palmer-work beinq done C4A.Roberts pond is hiah and needs to be watched. 01/14/09 Daily All Tanner Holliday-roads are muddY,maintenance workina on C4A. 01/15/09 Daily All Tanner holliday-Roads are muddy. 01/16/09 Daily All Tanner Holliday-mudday roads but beqinninq to dry up some. 01/17/09 Daily All Thayne Holt-nothinq to report,filled out oroperly. 01/18/09 Daily All Jerome Benally-not filled out comoletely,nothina to reDort. 01/19/09 Daily All Ryan palmer-snow meltinq creatina bad roadways,Cell 4A still needs work done on walkway. 01/20/09 Daily All Ryan Palmer-Cell 4A is hayina transfer Dumo beina installed on barae 01/21/09 Daily All Tanner Holliday-Maintenance crew workino on installina pump on Cell 4A. 01/22/09 Daily All Tanner Holliday-Section ofwalkway on C4A is under solution and needs fixed,roadways are beginning to dry out 01/23/09 Daily All Tanner Holliday-Nothinq to report. 01/24/09 Daily All Thayne Holt-to muddy to 00 to tails. 01/25/09 Daily All Thayne Holt-to muddy to qo to tails. 01/26/09 Daily All Ryan Palmer-Discharae line is under sands and needs moved.Transfer line between 3 and 4A has been taken apart and needs to be fixed. 01/27/09 Daily All Ryan palmer-SX dishcarae line needs to be extended down to solution leyel.Two sections ofwalkway on Cell 4A need removed. 01/28/09 Daily All Tanner Holliday-SX line was extended to solution.Motor on BHV 4 was reolaced.Loader began moving mud around to try and aid dryinq out orocess. 01/29/09 Daily All Tanner Holliday-Replaced sions on west end of restricted area fence line. 01/30/09 Daily All Tanner Holliday-roadways could still use some work. 01/31/09 Daily All No Report Turned In (Gaoe Sterlino) 01/09/09 weekly All walkway on cell 4A needs repaired,roads are a muddy mess. 01/16/09 weekly All Tailinqs area is very muddy but other than that they look aood. 01/23/09 weekly All wait for mud to dry up some before roads can be araded.Watch tailinas discharae Doint as it is beinq burried under the sands.Monitor walkway C4A. 01/30/09 weekly All small areas of poolino solutions need to be taken care of.Walkway on C4A needs to be repaired. 01/30/09 Monthly All tailinos area is in oood condition.Roads are muddy,and some small areas of poolino solution.Both of these issues are beinq remedied. All February 2009 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop 03 =Diversion Ditch 3,etc. Prepared BYZji ~ Reviewed B~r Reviewed By:.c /;;1J 1 Date Frequency Area General Observations -Areas of Potential Concern 02/01/09 Daily All Thayne Holt-Nothinq to report,LDS on C4A incomplete also no flow rates listed. 02/02/09 Daily All Ryan palmer-section of barqe under solution on C4A.Some poolinq ofsolutions around tailinqs area.Unable to take flow rates,computer down. 02103/09 Daily All Ryan Palmer-Nothing to report. 02/04/09 Daily All Ryan Palmer-Maintenance workinq on walkway and barqe on C4A. 02/05/09 Daily All Tanner Holliday-Rouqh roads,also TWN-1 ,2,3,4.have all been drilled on north side of property. 02/06/09 Daily All Tanner Holliday-Power problems on slimes drain C2 and C4A experiencing power problems.Pump on slimes drain C2 seems to be slowing may be gc 02/07109 Daily All Gage Sterling-Nothing to report. 02108/09 Daily All Gage Sterling-Nothinq to report. 02/09/09 Daily All Ryan Palmer-Stated snowinq aqain,roads are muddy. 02/10109 Daily All Tanner Holliday-.42 snow,roads are snow packed and qettinq muddy aqain. 02/11/09 Daily All Ryan Palmer-Muddy roads. 02/12/09 Daily All Tanner Holliday-roads are in horrible condition. 02/13/09 Daily All Tanner Holliday-Muddy and sloppy roads. 02/14/09 Daily All Roy Atcity-Hioh solution levels,limit water usaqe. 02/15/09 Daily All Sinn Keno Mays-Nothinq to report. 02/16/09 Daily All Tanner Holliday-Roads need graded. 02/17109 Daily All Tanner Holliday-Roads need work,C3 south embankment needs shovel work. 02/18/09 Daily All Tanner Holliday-nothino to report. 02/19/09 Daily All Tanner Holliday-Nothinq to report. 02/20109 Daily All Tanner Holliday-unable to check LDS on C3 due to barricade tape.Graphite was applied to all ofthe locks around tailinqs area. 02/21/09 Daily All Roy Atcity-High solution levels,limit water usaoe. 02/22/09 Daily All Roy Atcity-Hioh solution levels,limit water usaqe. 02/23/09 Daily All Tanner Holliday-Exposed Liner on south east corner of C1.Pump and discharge point were fixed on slimes drain. 02/24/09 Daily All Tanner Holliday-nothinq to report. 02/25/09 Daily All Tanner Holliday-C1 had exposed liner on the southern corners.Covered with dirt. 02/26/09 Daily All Tanner Holliday-High winds blowino tailinos around.Exposed liner on C1,covered with dirt. 02/27109 Daily All Tanner Holliday-nothino to report. 02/28/09 Daily All Eric Balch-Nothinq to report. 02/06/09 weekly All Walkway on C4A repaired.Pump on Cell 4A seems to be slowing,placed work order to have pump replaced. 02/13/09 weekly All Bad Roadways,not other problems. 02/20109 weekly All LDS on C3 was not checked due to barricade tape.Cannot find pump for slimes drain on C2.will try to repair pump on Monday. 02/27109 weekly All Covered exposed liner on C1.Pump placed on C1 to transfer solutions.Slimes drain pump is ok found a blockaqe at discharoe point. 02/27109 Monthly All Marsh area north of mill is being filled in.new acid line is being installed overhead through marsh area.drisco line was installed to prevent pooling in me All Water fowl has been minimal.Archeological site by new decon pad should be finished UP bY first week of March. All All All March 2009 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop D3 =Diversion Ditch 3,etc. Reviewed BYI-~~ Date Freouency Area General Observations -Areas of Potential Concern 03/01/09 Daily All Roy Atcity,high solution levels need to limit water usage. 03/02/09 Daily All Tanner Holliday,Nothinq to report. 03/03/09 Daily All Tanner Holliday,Nothing to report. 03/04/09 Daily All Tanner HollidaY,Wind is blowing tailinos to the north.Tryino to put a plan together to limit dusting and blowinq of tails. 03/05/09 Daily All Tanner Holliday,Wind Blowing tailings to the north.Maintenance is working on gettino some sprinklers out there. 03/06/09 Daily All Tanner Holliday,Nothing to report. 03/07/09 Daily All Eric Balch,Nothinq to report. 03/08/09 Daily All Eric Balch,Nothing to report. 03/09/09 Daily All Tanner Holliday,wind blowinq tailinqs to the north.Increase ofwaterfowl.Cell 4A needs a section taken out of walkway. 03/10/09 Daily All Tanner Holliday,Cell 4A needs section taken out of walkway. 03/11/09 Daily All Tanner HollidaY,Cell 4A walk way has been repaired. 03/12/09 Daily All Tanner Holliday,Nothing to report. 03/13/09 Daily All Ryan Palmer,slimes pump went out.C3 level is high going to slow transfer down from C1.Dirt cover is being placed on sands C3 helping with dusting. 03/14/09 Daily All Thayne Holt,Nothing to report. 03/15/09 Daily All Eric Balch,Nothing to report. 03/16/09 Daily All OavidYl.Il;k;ndl;epor-tturriedirlL 03/17/09 Daily All Tanner Holliday,Cell 3 still has high solution levels.Pump on TW4-19 broke. 03/18/09 Daily All Tanner Holliday,Tailings area looks good. 03/19/09 Daily All Tanner Holliday,Discharqe line on C4A is of splash pad.Pump still havinq problems on Slimes C2.Flow meter is broke on C4A LDS. 03/20/09 Daily All Ryan Palmer,six foot section of exposed liner SW corner of C1.leakino joint found on pond return line SW corner C4A. 03/21/09 Daily All 'J!haVrieYHplkNdrepor-tWl;hedio. 03/22/09 Daily All Thayne Holt,Nothing to report. 03/23/09 Daily All Ryan Palmer,Exposed liner on West bank C1. 03/24/09 Daily All Tanner Holliday,Slimes C2 pump completely broke,did not pump overnight.Solution transfer from C1 to C3 has been stopped for now. 03/25/09 Daily All Tanner Holliday,Nothing to report. 03/26/09 Daily All Ryan Palmer,Hioh winds causinq some dustino and blowino of tails from C3,have been workino on placing cover on C3 sands. 03/27/09 Daily All Ryan Palmer,High Wind Gusts.C2 LDS 9 inches solution. 03/28/09 Daily All Sinn Keno Mays,Nothing to report. 03/29/09 Daily All Thayne Holt,Nothing to report. 03/30/09 Daily All Ryan Palmer,LDS on Cell 4A is having problems.(full report found in Central Files). 03/31/09 Daily All Ryan Palmer,LDS on Cell 4A had problems that have been adressed,now the new pump needs to pump head back down and system should be good. 03/06/09 weekly All Heayy winds causino blowino of tailinos.Cell 4Awalkway needs section removed.Wainting for work around C3 barge to be completed. 03/13/09 weekly All Maintenance removed section from C4A walkway.Dirt work on various pooling areas has started up again. 03/20/09 weekly All TW4-19 pump was replaced.Discharqe line on C4A was moved back to splash pad.Exposed liner on C1 was covered with soil.Slimes C2 pump problE 03/27/09 weekly All Hiqh winds,kept roads wet and cont.work on C3 cover. 03/31/09 Monthly All Tw4-19.slimes C2,and LDS C4A pumps were all replaced.Exposed liner found on west bank of C1.solutions being transferred C1 to C3.C3 to C4A. 03/31/09 Quarterly All Roadwork was done to keep roadways as functional as possible.Liner was covered on C1.Marsh area is being filled in.Construction has begun for AF April 2009 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop D3 =Diversion Ditch 3,etc. Prepared By:"1--I <~""""I.--- Date Frequency Area General Observations -Areas of Potential Concern 04/01/09 Daily All Ryan Palmer-LDS on Cell 4A is workinq aqain.Monitor due to hiqh volume qoinq throuqh flow meter. 04/02/09 Daily All Tanner Holliday-southwest corner of Cell 4A has a minor puncture of liner.Cell 4A LDS down dueto electrical problem. 04/03/09 Daily All Tanner Holliday-Wind out of the south blowing tailings on cell 3.utility crew putting some cover material on C3 to limit amount oftails beinq blown. 04/04/09 Daily All Gage Sterling-No Report Turned In. 04/05/09 Daily All Gage Sterlinq-nothinq to report. 04/06/09 Daily All Tanner Holliday-Small puncture on Southwest Corner of Cell 4A. 04/07/09 Daily All Tanner Holliday-Small puncture on Southwest Corner of Cell 4A. 04/08/09 Daily All Ryan palmer-Afternoon produced high winds which blew tailings and created a dusting problem.Water wagon used until the pump went out,(in for rep; 04/09/09 Daily All Ryan Palmer-Tailings area looks good.some increase in water fowl around tailings area. 04/10/09 Daily All Ryan Palmer-Prarie dogs have started to appear around north side of cell 1. 04/11/09 Daily All Roy Atcity-Nothing to report 04/12/09 Daily All Gage Sterling-nothing to report. 04/13/09 Daily All Ryan palmer-A lot ofelectrical work beinq done around tailinqs area,new poles,new over head and underqround lines. 04/14/09 Daily All Ryan Palmer-didn't complete inspection form. 04/15/09 Daily All Ryan Palmer-.02 precip.very high winds blowing dust and tailings.BHV-6 motor problems,replaced and still not working. 04/16/09 Daily All Ryan Palmer-Have been having more water fowl appearinq around tailinqs area. 04/17/09 Daily All Ryan Palmer-hiqh winds makinq inspections difficult.Ordered BHV motors. 04/18/09 Daily All Roy Atcity-Nothinq to report 04/19/09 Daily All Roy Atcity-Nothinq to report 04/20/09 Daily All Ryan palmer-Dry roadways.Start slimes monthly head test on cell 2. 04/21/09 Daily All Ryan palmer-a lot ofwater fowl recently.Warm and dry conditions. 04/22/09 Daily All Ryan palmer-Everything looks good. 04/23/09 Daily All Ryan Palmer-scheduled work on circuits is finished UP.Will beqin depositinq solutions and tailinqs in Cell 4A aqain in the next few days. 04/24/09 Daily All Ryan palmer-Winds and dustinq in late afternoon. 04/25/09 Daily All Eric Balch-.25 precip.Nothinq to report. 04/26/09 Daily All Roy Atcity-Nothinq to report 04/27/09 Daily All Ryan Palmer-C1 has some liner being repaired on the east bank. 04/28/09 Daily All Ryan Palmer-East bank of Cell 1 has repairs beinq done. 04/29/09 Daily All Ryan Palmer-Repairs still beinq done on East bank of Cell 1. 04/30/09 Daily All Ryan Palmer-Maintenance removinq old wave break from north side of Cell 1.Repairs on C1 still underway,waitinq for supplies. 04/03/09 Weekly All Ipower is qoinq to be shut down almost daily to tailinqs area.Powerwill be hit and miss on tailings area. 04/10/09 Weekly All Power continues to be turned on and offfor repairs. 04/17/09 Weekly All Very Windy,increase in waterfowl.Mill still underqoinq maintenance shut down. 04/24/09 Weekly All Windy and Dusty week,seen some increase in water fowl aqain. 04/30/09 Monthly All Power problems throuqhout the month.Wind caused dustinq and blowinq of tails.Seen increase in water fowl. All All May 2009 TAILS REPORT C2 =Cell 2,etc. FWP =Fresh Water Pond MW =Monitor Well MA =Mill Area Report RA =Restricted Area MS =Maintenance Shop D3 =Diversion Ditch 3,etc. Prepared B 2.'~.y..~r1 Reviewed BI!!W '"~ Reviewed BY:~--",,"60 Date Frequency Area General Observations -Areas of Potential Concern 05/01/09 Daily All Ryan Palmer-Repairs were completed east bank C1.Inspections will be done to determine if any additional work needs to be done. 05/02/09 Daily All Eric Balch-.25 precipitation,nothinq more to report. 05/03/09 Daily All Eric Balch-Nothing to report. 05/04/09 Daily All Ryan Palmer-Power was shut off to tails for most ofthe day as overhead lines were being repaired. 05/05/09 Daily All Ryan Palmer-nothinq to report. 05/06/09 Daily All Ryan Palmer-Repairinq the wave break on C1.overhead power lines still beinq worked on.Mr.Rupp inspection (maintenance work on C3 and C4A). 05/07/09 Daily All David Turk-Wave break on C1 beino installed. 05/08/09 Daily All David Turk-Unloaded UF4 truck 05/09/09 Daily All Thayne Holt-Report was lost. 05/10/09 Daily All Eric Balch-Report was lost. 05/11/09 Daily All Tanner Holliday-Nothinq to report. 05/12/09 Daily All Ryan Palmer-Everything looks ok. 05/13/09 Daily All Ryan Palmer-Tailinqs line blew out alonq east bank exposing liner,slimes drain on C2 trippinq breakers will trouble shoot. 05/14/09 Daily All Ryan Palmer-Operations repaired line along east bank C1 and covered liner.order replacement pump for slimes drain C2. 05/15/09 Daily All Ryan Palmer-C4A has a section with some broken boards.Notified that when C1 line was repaired a tear was found by operations crew before they co 05/16/09 Daily All Tanner Holliday-nothino to report. 05/17/09 Daily All Tanner Holliday-Roads need to be watered. 05/18/09 Daily All Tanner Holliday-C1 section still waiting to be repaired. 05/19/09 Daily All Jeremy Arthur-Started removinq dirt on C1 section to make repairs. OS/20/09 Daily All Jeremy Arthur-Slowly workino on repairino C1 section. OS/21/09 Daily All Tanner Holliday-Liner on C1 beino repair or exposed. OS/22/09 Daily All Tanner Holiliday-Liner on C1 still under way. OS/23/09 Daily All Gaoe Sterlinq-No Report turned in. OS/24/09 Daily All Thayne Holt-Nothing to report. OS/25/09 Daily All Thanyne Holt-Nothing to report. OS/26/09 Daily All Ryan Palmer-Slimes drain on C2 not workino. OS/27/09 Daily All Ryan Palmer-Maintenance is conxtuctino an additional wave break for C1.Slimes was reparied. OS/28/09 Daily All Tanner Holliday-Maintenance workinq on Wave break. OS/29/09 Daily All Ryan Palmer-small area of exposed liner on east bank C1.annual maintenance work performed on C3 and C4A embankments.Wave break still beino 05/30/09 Daily All Tanner Holliday-found rodents north of C1. 05/31/09 Daily All Tanner Holliday-Rodents seen north of C1 aoain.Wave break beino constructed. 05/01/09 Weekly All Wave break removed north side C1.repairs made east bank C1. 05/08/09 Weekly All New wave break installed on north side C1.Maintenance workinq on spray system as time permits. 05/15/09 Weekly All tailinqs line blew out on East side C1.laterfound a tare in linerwhere ioint blew out.Repairs will be made when everythinq is in place. OS/22/09 Weekly All C1 repair job has been started but not yet finished. OS/29/09 Weekly All Covered small area ofexposed liner east C1.wave break beino constructed.Annual maintenance work on C3 and C4A embankments. OS/29/09 Monthly All DD were found to be in oood shape for most part.Tailinqs cells are beqinninq to look qood aqain.Repairs still need completeed on C1. June 2009 TAILS REPORT Reviewed By:,f tV //!/r Reviewed By: Prepared By:1'1~~ Report C2 =Cell 2,etc.RA =Restricted Area FWP =Fresh Water Pond MS =Maintenance Shop MW =Monitor Well MA =Mill Area 03 =Diversion Ditch 3,etc. Date Frequency Area General Observations -Areas of Potential Concern ( 06/01/09 Daily All Ryan Palmer,Trash was hauled and roadways were graded in tailings area. 06/02109 Daily All Tanner Holliday.Elapsed time indicator on BHV-6 was repaired. 06/03/09 Daily All Tanner Holliday.Liner on C1 exposed due to repairs.Maintenance replacina pump on C3. 06/04/09 Daily All Tanner Holliday.C1 repairs continued on liner project. 06/05/09 Daily All Tanner Holliday.Slimes pump tripped the breaker was reset and pump started up again. 06/06/09 Daily All Ryan Palmer.C1 liner job still underway. 06/07/09 Daily All Ryan Palmer.C1 liner job still underway. 06/08/09 Daily All Tanner Holliday.Neshap samplina beqan today,will run throuah the week. 06/09/09 Daily All Tanner Holliday.Rodents are showina up on North side of cell 1 aaain.C1 project and neshaps still being performed. 06/10/09 Daily All Tanner Holliday.Flanae on slimes drain was found leakina.Will replace tommorrow. 06/11/09 Daily All Tanner Holliday.Cell 3 new UF4 discharge line had a loose flange,leaking.Gased rodents on north side of cell 1. 06/12109 Daily All Tanner Holliday.C1 repair job has been completed,in process of covering exposed liner with top soil. 06/13/09 Daily All Tanner Holliday.Slimes #2 flanae leakina,will replace aaskets and tiahten bolts. 06/14/09 Daily All Ryan Palmer.C2 slimes flanae still leakina some.Roadway were repairs were made on east C1 needs some work done. 06/15/09 Daily All Ryan Palmer.Finishing up the water drain line and dirt work around C1 repair area.Trying to start up UF4 circuit.Started monthly slimes test on C2, 06/16/09 Daily All Tanner Holliday.Work being done on roadway east of C1.took flange apart on C2 slimes.Gased more rodent holes north C1. 06/17/09 Daily All Ryan Palmer.Evaportation system under construction for C1 as time permits.Roadway East C1 looking better. 06/18/09 Daily All Tanner Holliday.East end of C3 tailinq area beina leveled out.Evaporation system for C1 underconstruction. 06/19/09 Daily All Tanner Holliday.New overflow drisco line complete for C1 discharae. 06/20/09 Daily All Tanner Holliday.East end of C1 could use some additional work. 06/21/09 Daily All Ryan Palmer.Tailings area looks good. 06/22109 Daily All Tanner Holliday.Monthly slimes test complete,rodents found on north side of cell 1 need to gas more holes. 06/23/09 Daily All David Turk.Rodents C1.palletts beinq burned.Some reflector post need reparied or replaced.Sians around cell 4 need replaced. 06/24/09 Daily All Tanner Holliday.Sians around perimeter need replaced.Slimes 2 pump found down aaain. 06/25/09 Daily All Tanner Holliday.Slimes pump has been fixed.Poison pellets were placed on rodent holes. 06/26/09 Daily All Tanner Holliday.Evaporation system on C1 under construction. 06/27/09 Daily All Ryan Palmer.Looks aood. 06/28/09 Daily All Ryan Palmer.Looks aood. 06/29/09 Daily All Ryan Palmer.Sands on C3 beina moved with dozer. 06/30/09 Daily All Ryan Palmer.Found a few new areas rodents have been digging,pellets were placed on rodent holes. 06/05/09 Weekly All Pump replaced on C3.repairs were made on new tailings line that discharges into C3.storm moving in,C1 liner project was tarped in case it rains. 06/12109 Weekly All C1 repairs are complete.Water over flow drain line is beina extended all the way to C1. 06/19/09 Weekly All tailinas area looks aood,various maintenance projects are aoina well. 06/26/09 Weekly All Finished chloroform samplina event,tailinas area looks aood. 06/29/09 Monrthly All Evap system for C1 under construction.Liner on C1 repaired.Neshap testing was performed.Diversion ditches were cleaned up and araded. 06/29/09 Quarterly All Diversion Ditches were graded.UF4 circuit compelte.Liner repair completed on C1.General maintenance work performed on maintenance area. All July 2009 TAILS REPORT C2 =Cell 2,etc.RA =Restricted Area FWP =Fresh Water Pond MS =Maintenance Shop MW =Monitor Well MA =Mill Area D3 =Diversion Ditch 3,etc. Report Prepared ,1 Date Frequency Area General Observations -Areas of Potential Concern 07/01/09 Daily All Tanner Hollidav-Evap system for C1 still under construction.Slimes Dump found off.Rodents found north of C1. 07/02/09 Daily All Rvan Palmer-Rodents on north side C1.some reflector oost around C1 and C4A need reparied or replaced. 07/03/09 Daily All Rvan Palmer-Tailings area looks good. 07/04/09 Daily All Tanner Holliday-nothing to report everythina looks aood. 07/05/09 Daily All Tanner Hollidav-nothina to reoort evervthina looks aood. 07/06/09 Daily All Tanner Hollidav-BHV 6 motor broken aaain,Pump on TW4-20 found off and believed to be broken. 07/07/09 Daily All Tanner Hollidav-Slimes on C2 was tripped.BHV 6 and TW4-20 broken. 07/08/09 Daily All Tanner Holliday-BHV 6 motor being fixed bv electricians.TW4-20 will be fixed ASAP. 07/09/09 Daily All Tanner Holliday-Evap system being installed.C4A solution transfer to C1.BHV 6 reoaired.Identified six new locations for new nitrate wells. 07/10109 Daily All Tanner Holliday-TW4-20 will be fixed next week.Water waaons used to keeps dust down. 07111/09 Daily All Tanner Hollidav-Slimes on C2 was found off.Solutions beina transferred from C4A into C1. 07/12/09 Daily All Tanner Holliday-Transferring solutions from C4A into C1. 07/13/09 Daily All Tanner Holliday-Slimes #2 was tripped 07/14/09 Daily All Ryan Palmer-No Report turned in. 07/15/09 Daily All Tanner Hollidav-Flanae on evap stvsem was leakina,south roadway on C1 was covered with crust from solution oversprav. 07/16/09 Daily All Tanner Hollidav-Slimes C2 was found tripped.Flange on C1 evap system was leakina aaain depositing solutions on roadway south side of C1. 07/17/09 Daily All Rvan Palmer-some oversprav on south side of C1 from evap system. 07/18/09 Daily All Rvan Palmer-Nothing to report 07/19/09 Daily All Rvan Palmer-Transfer solutions from C3 and C4A into C1. 07/20/09 Daily All Ryan Palmer-Additional Evap line beina installed on C1 makina total of three.Transfering of solutions from C4A,and C3 into C1. 07/21/09 Daily All Rvan Palmer-Additional Evap line was completed.Reset GFI on Slimes C2. 07/22/09 Daily All Tanner Hollidav-some of the sprinkler heads on evap system are pluaaed. 07/23/09 Daily All Tanner Hollidav-Sprinklers plugged.Slimes C2 was found off aaain. 07/24/09 Daily All Tanner Hollidav-flange on C1 evao system leakina but leakina into containment area.C2 slimes backup pump installed but also failed.Started montr 07/25/09 Daily All Tanner Holliday-sprinklers oluaaed,some oversprav from C1 evap sYstem. 07/26/09 Daily All Tanner Hollidav-Leakino flanaes on evap system but leakina into containment area.Some overspray south side. 07/27/09 Daily All Rvan Palmer-main evap system line was leaking along south roadway,oversprav on south roadway. 07/28/09 Daily All Rvan Palmer-Nothing to report 07/29/09 Daily All Rvan Palmer-Winds out of north blowina evap sYstem on south roadway. 07/30109 Daily All Ryan Palmer-Finished Julv monthIv recoverv test on C2.slimes pump fixed and will be turned on. 07/31/09 Daily All Tanner Hollidav-oversprav on roadway between C3 and C4A.Slimes pump on C2 still broken,maintenance was contacted. 07/02/09 Weekly All slimes pump found to be tripped again. 07/10/09 Weekly All Evap system on C1 being installed.Solutions being transferred into C1.six new nitrate well locations have been identified. 07117/09 Weekly All some minor problems with new evap system on C1.pump problems with slimes drain C2. 07/24/09 Weekly All Slimes pump and back up were both inooerable.Maintenance is trvina to reoair both oumps. 07/31/09 Weekly All Slimes pump being repaired,archeoloaist have started some mapoina for C4B tailinas area. 07/31/09 Monthly All ~L,__fW l..'7 1..".,.:..II ,I •\r._.A -:Tl ~..:.'"F-:....e:.d r~..~~-..(lJljl-lt~?..,.~Au,,L White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) WIDTE MESA MILL TAILINGS MANAGEMENT SYSTEM QUARTERLY INSPECTION DATA Inspector:~M.L:".q ~t Date:/2·2f#2JJ1JJ 2/07 Revision:DUSA-2 Page 24 of25 White Mesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) WIDTE MESA MILL TAILINGS MANAGEMENT SYSTEM QUARTERLY INSPECTION DATA Inspeclor:~1£f ~f Date:1·2(,.Zoo J.( 2/07 Revision:DUSA-2 Page 24 of2S ( '" White Mesa Mill -Standard Operating Procedures Book II:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) WillTE MESA MILL TAILINGS MANAGEMENT SYSTEM QUARTERLY INSPECTION DATA Inspector:~/("J P4 ~H1:{ Date:;5-cS 1.2C?()'1I 2/07 Revision:DUSA-2 Page 24 of25 ( '". ;,. ( '" WhiteMesa Mill -Standard Operating Procedures Book 11:Environmental Protection Manual,Section 3.1 APPENDIX A (CONT.) wmTE MESA MILL TAILINGS MANAGEMENT SYSTEM QUARTERLY INSPECTION DATA 2. 4. 2/07 Revision:DUSA-2 Page 24 of25