Loading...
HomeMy WebLinkAboutDRC-2010-002081 - 0901a0688016e025State of Utah GARY R. HERBERT Governor GREG BELL Lietitenanr Governor Department of Environmental Quality Amanda Smith E.ferutive Direr tnr D[\1SI0N OF RADIATION CONTROL Dane L. Finerfrock Diri-fior DRC-201C-0C2081 February 25. 2009 CERTIFIED MAIL (Return Receipl Requested) David C. Frydenlund Vice President and General Counsel Denison Mines (USA) Corp. (DUSA) 1050 Seventeenth Slreet. Suite 950 Denver, CO 80265 Dear Mr. Frydenlund: SUBJECT: September 30, 2009 Annual Technical Evaluation of rhe Wliite Mesa MiU Tailings Management System for the period of August 2008 tiirough July 2009; Utah Radioactive Materials License No. UT190O479. Amendment 3, (under timely renewal); April 23, 2009, DRC Closeout Letter with DRC Findings and Request for Improvements to the 2009 ATER Report; October 2L 2008 DRC Comment Letter: Comments and Requesl for Additional Information We received the subject report dated September 30, 2009. This annual technical evaluation report (ATER) is subniitted in accordance with the requirements ofthe subject radioactive materials license. Tiie license condition 10.3 requires that the "report shall be submitted fur Executive Secretary approval no later than September L of each year." The date for submittal ofthis ATER was extended to October 1, 2009 by a DRC Letter dated August 27. 2009. The U7i;re Mesa Mill Tailings Management Syslem and Discharge Minimization Technology (DMT) Monitoring Plan as approved by DRC on May 9. 2007 discusses the required contents ofthe ATER report. According to the Evahiaiion Procedure section in the report, tbe repoit is prepared in accordance with the White Mesa .Mill (WMM) Environmental Protection Manual. We have reviewed the suliject ATER, and have the following comments: 1. Settlement Monitoring. A. In a DUSA letter dated December 30, 2008 regarding the 2007-2008 ATER, DUSA stated, 'The ATER recommended the new settlement monitors to the MilPs management and they have committed that the new monitors, where needed, will be installed and surveyed as to locaiion by no later than June 30, 2009." Lt appears the new monitors correspond to the proposed settlement monitor 2W5-S for Cell 2, and other additional new monitors for the areas recently covered in Ceil 3. 168 North 1<)50 Wesi-SaliLnkcCiry, HT Mailing Address: PO. BOK 1448^^0'Salt Lake Ciiiy, HT 84114-4850 Telephone (801).'i?6-425(}'r;iK (801) 533-4007-TDD {801)536-4414 M Vv r..ilrij.\iliih.jiiiy Printed on 100^ recycled p.-iper David C. Frydenlund February 25, 2010 Page 2 In this regard, the DRC closeout letter for the 2007-2008 ATER dated April 23, 2009 states, ^'Confirmation of this work must be documented in the 2(K)9 ATER Report. The designated names of the new settlement monitors locations will need to be unique, coordinated and updated to be in agreement on various maps and forms, in future Annual Technical Evaluation Reports (ATERs) as well as the DMT Monitoring Plan. Please revise these documents as appropriate for submittal in ihe 2009 ATER Report." Confirmation of this work was not submilted in the subject September 30. 2009 ATER. Please submit the required confinnation of the new settlement monitor installation work with corresponding settlement survey tables and graphs. B. Tn the subject DRC approval letter dated April 23, 2009 we state, "Our previous comment letters . . . have requested that DUSA carr>' forward all applicable comments into future ATER Repon subniittals. Please assure that the applicable items above are carried forward into all future ATER Reports as well." There is no map of the settlement stands provided. Please provide an updated map of (he settlement stand system, incorporating all corresponding adjustments from above. With respect to settlement monitoring, provisions in the license will be added to include requirements for such monitors to be placed, surveyed, mapped, maintained, analyzed and reported on. Reporting of such activities will be in the Annual Technical Evaluation Reports (ATERs). 2. Liner Maintenance. In 2009 a liner damage accident, occurring on May 14. 2009, was reported to DRC by a DUSA notification letter dated May 19, 2009. Necessary repairs to the liner were documented to DRC by DUSA email dated June 26. 2009. In the subject September 30. 2009 ATER, under the monthly summary tab, some of the monthly inspection tables have entries which indicate liner damage, as follows: A. For April 6-7. 2009, the monthly inspection summary table notes smidl puncture(s) in the southwest comer of Cell 4A. The Cell 4A BAT Monitonng, Operations and Maintenance Plan provides a repair method for damaged liner in Cell 4A. B. For April 27-May 1, 2009, the corresponding montlily inspection suinmary tables report that the east bank of Cell 1 has liner being repaired. Liner repair on Cell 1 is to be accomplished by use of the cunent Liner Maintenance Provisions. \n an etnail received from you on February 25, 2010, you slated this rcpair site is the same as that documented in the above paragraph below Liner Maintenance. Please provide copies of the documentation for the repair and testing for item 2A above, in accordance with the applicable procedure. Regarding liner maintenance, provisions in the Ground Water Discharge Pennit will be added defining reporting requirements for liner repairs beginning with Cells 4A and newer tailings cells. 3. Movement Monitoring. A. In the subject April 23, 2009 DRC letter it states, "we request DUSA provide the criteria used for evalualion of monitor movement in the text of the ATER report. Include the David C. Frydenlund February 25, 2010 Page 3 conesponding analysis of the most active single grouping of monuments within the ATER report. Please submit this infomiation for approval." In the subject September 30, 2009 ATER. page 9, the first paragraph stales that, "The majority ofthe Cell 4A poinls were disturbed during the Cell re-lining activities and were re-set in ihe fall of 2008. For these points there is no meaningful comparison back to previous points." The remark above appears to refer only to the disturbance movement monitors located on the dikes of Cell 4A. However, there are also movement monitors on the soulhem dike of Cell 3. No evaluation was submitted regarding these movement monitors. Please discuss the use of these monitors for movement evaluation as mentioned in first paragraph given in 3A above. B. In our subject letter dated April 23, 2(K)9 with respect to the movement monitors we stated, "Specifically, DRC is asking for the quantitative criteria DUSA uses to evaluate movement of these monitors, and for such to be printed in the actual text ofthe ATER report." Continuing on this subject in the above letter, it states, ". .. we are asking for the upcoming ATER report text to provide this infomiation. DUSA needs to develop quantitative criteria to evaluate horizontal monitor movement and include this with evaluation of the most active group of monitors in the text of the annual ATER reports. This needs to commence with the 2009 report." The September 30, 2009 ATER makes some reference to quantitative analysis', but the specific criteria requested is not printed in the text of this report, as requested. We therefore requesl that DUSA provide the previously requested criteria DUSA uses to evaluate movement of monitors, and for such to be printed in the actual text of the ATER report. The criteria used for evaluation of monitor movement needs to be put into the cunent ATER text. The criteria musl stand alone. The criteria may be applied whenever valid movement monitor data is available. C. The contains a copy of a drawing titled UMETCO Minerals Corporation, Sut^^ey Control at Wliite Mesa Mill. Blanding, Utah, dated August 27, 1992. The drawing has many labeled numeric points which are illegible even with a magnifying glass. Please supply a clear legible copy of this map. With respect to movement monitoring, provisions in the license will be added to include requirements for such monitors to be placed, surveyed, mapped, maintained, analyzed and reported on. Reporting of such activities will be in the Annual Technical Evaluation Reports (ATERs). In the subject September 30: 2009 ,^TER, page 9. it i^taies. '"None uf the points along the Celt 3 dike or the (wo (2) Cell4A dikes show any abnormal movement. There is no Irend in ihe Cell 3 or Cell 4A movemeni monitors." 'Survey data provided by Jones and DeniilJc Eneinecrs . . . was reviewed during the evalualion. The current data was compared lo Ihe previous iwo (2) years dala. Evaluation of the data indicated only very minor movement may have occurred along the Cell 3 dike and the north soulh Cell 4A dike. All the possible movements were within expected and acceptable limits." David C. Frydenlund Febniary 25, 2010 Page 4 4. Drainage map. We received a map drawing titled. Mill Site Drainage Basins, labeled as Figure 1, referenced as figure 2_l-6-()9.dwg, original date 2005, with latest revision 1/7/09 initialed by BM. This map appears to contain all map drainage information previously requested. This figure will be reviewed by other DRC staff for use in upcoming inspections. 5. Carrying Forward Applicable Documents inlo ATER Submittals. We continue to request that DUSA carry forward all applicable documents into all future ATER submittals. These documents include, but are not limited to all maps, drawings, tables and graphs. These documents need lo be updated for the next ATER period. Wilh respect to carrying forward applicable documents inlo ATER submittals, provisions in the license will be added lo include requirements carrying forward documents in the ATERs. Please review the above notes and comments and respond in writing, furnishing the information requested. In an email sent from you on February 25, 2010, you agreed to respond fully to this letter within 60 days of receipl. Please contact me ifyou have any questions. Sincerely, David A. Rupp, P.E. Geotechnical Services Section LBM:DAR: dr Fi\drupp\wp\llJC\DUSA\A'rER\CMTl 25F(;h20IC).doc