Loading...
HomeMy WebLinkAboutDRC-2016-003547 - 0901a068806070e8ENERGYFUELS Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 PRC-ZOUc- OO 354-1 www.energyfuels.com VIA EMAIL AND OVERNIGHT DELIVERY r' a!' MoiijCjomen; ;;nfi Rgrfabor. Oomrol February 3, 2016 Mr. Scott Anderson Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, UT 84114-4820 Re: Energy Fuels Resources (USA) Inc. Notification of Rescheduling of the Radon Flux Measurements for Tailings Impoundment 2 at the White Mesa Mill Dear Mr. Anderson: On January 13, 2016, Energy Fuels Resources (USA) Inc. (“EFRI”) submitted a 30 day notice regarding a radon flux sampling event for Tailings Impoundment 2 (“Cell 2”) at the White Mesa Mill (the “Mill”) that was scheduled to be conducted from February 15-18, 2016. However, due to recent weather events, there is currently too much snow covering Cell 2, and therefore; EFRI is rescheduling the sampling event. This letter serves as notification that the semi-annual sampling event first half of 2016 for Cell 2 Radon Flux is being rescheduled from February 15- 18, 2016 to March 14-17, 2016. As noted in the January 13, 2016 submittal, pursuant to the letter from the Utah Division of Waste Management and Radiation Control (“DWMRC”) dated, July 23, 2014, EFRI is required to measure radon flux at Tailings Impoundment 2 (“Cell 2”) at the White Mesa Mill (the “Mill”) semi-annually in accordance with 40 CFR 61, Appendix B, Method 115. The measured results will be included in the January through June 2016 Semi-Annual Effluent Report, due September 1,2016. Tellco Environmental of Grand Junction, Colorado will perform approximately 100 measurements on the cover area of Cell 2 during the sampling event. Provided that there are no rainouts or events that require remobilization or a delay in measurement, the sampling event is expected to conclude on March 17, 2016. EFRI will provide safety and radiological orientation for any DWMRC personnel observing this event. This orientation will be required before any individual enters the Mill Restricted Area. Individuals monitoring this event should bring their own mandatory Personnel Protective Equipment as required at the Mill, specifically, safety glasses, hardhats, and steel-toed shoes. If you have any questions or require assistance, please contact me at 303-389-4167 or Mr. David Turk, Environmental Health and Safety Manager, at 435-678-4113. Yours very truly, ENERGY RESOURCES (USA) INC. Jaime Massey Regulatory Compliance Specialist cc: D.Frydenlund, L. Shumway, H. Roberts, D. Turk, K. Weinel, S. Bakken (EFRI) P. Goble (DRC)