Loading...
HomeMy WebLinkAboutDRC-2016-003548 - 0901a068806070e9ENERGYFUELS Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 ... _ _ __ i www.ener2vfuels.c01nPRC- Zoifc -no5548 VIA EMAIL AND OVERNIGHT DELIVERY February 3, 2016 Div o' ivio; .00 'and Radiation Oont FF.B - ^ 2016 Mr. Bryce C. Bird Division Director Utah Department of Environmental Quality Air Quality Division 195 North 1950 West Salt Lake City, Utah 84116 Re: Energy Fuels Resources (USA) Inc. Notification of Rescheduling of NESHAPs Radon Flux Measurements for Tailings Impoundment 3 at the White Mesa Mill Dear Mr. Bird: On January 13, 2016, Energy Fuels Resources (USA) Inc. (“EFRI”) submitted a 30 day notice regarding plans to perform a sampling event for NESHAPs Radon Flux measurements for the first quarter of 2016 at Tailings Impoundment 3 at the White Mesa Mill from February 15-18, 2016. However, due to recent weather events, there is currently too much snow covering Tailings Impoundment 3, and therefore; EFRI is rescheduling the sampling event. This letter serves as notification that the first quarter 2016 NESHAPs Radon Flux sampling event for Tailings Impoundment 3 is being rescheduled from February 15-18, 2016 to March 14-17, 2016. As stated in the January 13, 2016 letter, per 40 CFR 61.253, EFRI is permitted to monitor Radon Flux one or more times per year. EFRI will sample Tailings Impoundment 3 on a quarterly frequency in 2016. Tellco Environmental of Grand Junction, Colorado (“Tellco”) will perform approximately 100 measurements on the beach and cover area of Tailings Impoundment 3 during the sampling event. These measurements will be performed in accordance with methods and procedures set forth in 40 CFR Part 61, Appendix B, Method 115. Provided that there are no rainouts or events that require remobilization or a delay in measurement, the sampling event for Tailings Impoundment 3 is expected to conclude on March 17, 2016. EFRI will provide safety and radiological orientation for any Utah Department of Air Quality personnel observing this event. This orientation will be required before any individual enters the Mill Restricted Area. Individuals monitoring this event should bring their own mandatory Personnel Protective Equipment as required at the Mill, specifically, safety glasses, hardhats, and steel-toed shoes. If you have any questions or require assistance, please contact me at 303-389-4167; or Mr. David Turk, Environmental Health and Safety Manager, at 435-678-4113. Yours very truly, Jaime Massey Regulatory Compliance Specialist cc: x^ScottAndersonrtJtafaiJivisioirWasteManagemMranciRadiattorrContrQD Director, Air and Toxics Technical Enforcement Program, U.S. Environmental Protection Agency D. Frydenlund, H. Roberts, L. Shumway, D. Turk (EFRI)