Loading...
HomeMy WebLinkAboutDRC-2013-001408 - 0901a06880351f90State of Utah GARY R HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanda Smidi Executive Director DIVISION OF RADL\TION CONTROL Rusty Lundberg Director "3^ to EO m vr ru DT nx o a d ea J] cr a a p- U.S. Postal Service™ CERTIFIED MAIL™ RECEIPT JDomestic Mail Only; No Insurance Coverage Provided) For delivery information visit our website at www.usps.com^ Certified Fee Retum Receipt Fee (Endorsement Required) Restricted Delivery Fee (Endorsement Required) Total Postage & Fees $ Postmark Here CERTIFIED MAIL RETURNED RECEIPT REQUESTED February 21,2013 Jo Aim Tischler Director, Compliance and Permitting Energy Fuels Resources (USA), Inc. 225 Union Blvd., Suite 600 Lakewood, Co 80228 RE: Energy Fuels Resources (USA) Inc. White Mesa Mill Operations and Maintenance Plan Nitrate Pumping System Revision 1.0, ("Plan") dated January 11,2013, White Mesa Uranium Mill, near Blanding, Utah, Modincations to the Plan Sent To 77 y ,„. AjD A^A- orPOBoxNo. V PS Form 3800. August 2006 Sco Rei'ccsc for Inslrucfions 1 Dear Ms. Tischler: 4 08 The Utah Division of Radiation Control ("DRC") has completed the review ofthe Plan. Based on the review the following modifications are needed to the Plan: 1. In the second sentence in section 2.1 add the following wording (added wording underlined): Pumped water will be disposed in the tailings cells or maybe used for the Mill process water. 2. Add a section that defines the pumpmg system with the following wording: Definition of Pumping System: • Structure of pumping well including: well casing, well slotted screen casing, sand/gravel pack, bentonite seal, cement grout seal, protective steal surface casing; • Pump; • All structural materials that hold pump in place; • Electrical power for the pump and well head heat lamps; • Electrical wiring to pump and well head heat lamps; • All hosing, piping, and associated hose and pipe fittings from pump, including sampling ports, to discharge hose at tailing cells; • Temporary water storage tanks; DRC-2013-00140C 195 North 1950 West • Salt Lake City, UT Mailing Address P O Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 'TDD. (801) 536-4414 www deq Utah gov Pnnted on 100% recycled paper Page 2 Protective boxes over wellheads lined with insulating foam. Therefore, please modify the Plan and provide a copy of the Plan to the Director within 30 calendar days of receipt of this letter. Thank you for your cooperation in this matter. Ifyou have any ^ questions or comments regarding this letter, please contact Dean Henderson at (801) 536-0046. Sincerely, Rusty Lundberg ^ Director RL/DH 8