HomeMy WebLinkAboutDRC-2011-006609 - 0901a06880245791Page 1 of2
Phillip Goble - RE: Notice of Plan to Install Well pumps
From: Jo Ann Tischler <jtischler(gdenisonmines.com>
To: Phillip Goble <Pgoble(gutah.gov>, Kathy Weinel <KWeinel@denisonmines.coni>
Date: 6/9/2011 10:54 AM
Subject: RE: Notice of Plan to Install Well pumps
CC: David Frydenlund <DFrydenlund(^denisonniines.com>, David Turk
<DTurk(gdenisonmines,com>, Harold Roberts <HRoberts(gdenisonmines.com>, Meredith
Goble <MGoble@denisonmines.com>, Richard Bartlett <RBartlett(@denisonmines.com>,
Ryan Palmer <RPalmer(gdenisonmines.com>, "LorenMorton" <lmorton(gutah.gov>, Rusty
Lundberg <rlundberg.EQSHW.EQDOMAIN(^utah.gov>
Phil,
Thank you for your response to Kathy. Based on your response we will proceed to install the dedicated pumps
(made of inert materiais) in MW 35, 36, 37, as described in our letter of June 7, 2011.
Thankyou,
Jo Ann Tischler
Jo Ann Tischler
Director, Compliance and Permitting
t: 303-389-4132 | f: 303-389-4125
1050 17th Street, Suite 950
Denver, GO, US, 80265
DENISON MINES (USA) CORP
www.denisonmlnes.com
This e-mail is intended for tlie exclusive use the of person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may
contain privileged or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute
print or copy this message if you are not the intended recipient(s).
From: Phillip Goble [maiito:Pgoble(g)utah.gov]
Sent: Thursday, June 09, 2011 10:38 AM
To: Kathy Weinel
Cc: David Frydenlund; David Turk; Harold Roberts; Jo Ann Tischler; Meredith Goble; Richard Bartlett; Ryan
Palmer; Loren Morton; Rusty Lundberg
Subject: Re: Notice of Plan to Install Well pumps
Kathy,
Monitoring well MW-35 was approved by the Executive Secretary in the February 15, 2011 Permit Modification.
The As-Built report for wells MW-36 and MW-37 is due on or before June 30, 2011. Until the As-Built is
approved, Section 6.2.4 of the DUSA QAP gives DUSA some latitude on the sampling equipment they choose to
use for sampling (bailer, non-dedicated bailer, dedicated pump, or non-dedicated pump).
After the As-Built report is approved. Part I.E.ll is in effect for those wells. The intent of Part I.E.ll of the
Permit, is for DUSA to notify the Executive Secretary when they wish to change an analytical procedure
or analytical method for analysis from the method specified in Table 1 of the DUSA QAP. DUSA is also not
allowed to change the equipment or design of the monitoring wells without approval from the Executive
Secretary.
file://C:\Documents and Settings\Pgoble\Local Settings\Temp\XPgrpwise\4DF0A650EQD... 6/9/2011
Page 2 of 2
Therefore, DUSA is free to use any of the sampling equipment specified in Section 6.2.4 ofthe DUSA QAP, as
long as they are made of inert materials.
If you have any questions please let me know.
Sincerely.
Phil
>>> Kathy Weinel <KWeinel(g)denisonmines.com> 6/7/2011 4:16 PM >>>
Mr. Lundberg,
Attached please find Denison's request for the Executive Secretary's approval for the instaUation of dedicated
pumps in three monitoring wells at the White Mesa Mill.
If you have any questions regarding this transmittal please feel free to call me.
Sincerely,
Kathy Weinel
Kathy Weinel
Quality Assurance Manager
mt'rsl?:j.'sl^r^-'''' DENISON MINES (USA) CORP
Denver, CO, US, 80265 www.denisonmines.com
This e-mail is intended for the exclusive use the of person(s) mentioned as the recipient(s). This message and any.attached files with it are confidential and may
contain privileged or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute
print or copy this message if you are not the intended recipient(s).
file://C:\Documents and Settings\Pgoble\Local Settings\Temp\XPgrpwise\4DF0A650EQD... 6/9/2011