HomeMy WebLinkAboutDRC-2011-001234 - 0901a068801f7023State of Utah
GARY R. HERBERT
Governor
GREG BELL
Lieutenant Governor
Department of
Environmental Quality
Amanda Smith
Executive Director
DIVISION OF RADIATION CONTROL
Rusty Lundberg
Director
C- 201 1-00 1234
January 20, 2011
CERTIFIED MAIL
(Retum Receipt Requested)
Ms. Jo Ann Tischler
Director, Compliance and Permitting
Denison Mines (USA) Corp (DUSA)
1050 17* Street, Suite 950
Denver, CO 80265
Dear Ms. Tischler:
SUBJECT: January 10, 2011 DUSA Letter, Transmits Revised DMT and BAT O&M Plans, which
addresses White Mesa Uranium Mill Tailings Cell 4B, etc.; January 6, 2011 DRC Letter,
Review of Revised DMT and BAT O&M Plans;
Contingent Approval of the Proposed DMT Plan
We have reviewed the subject letter from DUSA dated January 10, 2011, which is a response to the subject
DRC comment letter of January 6, 2011. The DUS A letter proposes the two subject documents, noted
above. However, this letter only addresses the proposed DMT Plan, as revised, known as The White Mesa
Mill Tailings Management System and Discharge Minimization Teclinology (DMT) Monitoring Plan
(DMT Plan), 01/11 Revision: Denison-11.1.
After review of this plan, we have no further comments. Therefore, the DMT Plan as titled immediately
above, is approved, contingent upon DUSA receiving written DRC authorization to use Cell 4B.
UTAH RADIATION CONTROL BOARD
Rusty Lundberg, Execufive Secretary
DAR: dr
Cc: Harold R. Roberts, DUSA
Phillip Goble, DRC
F:\DUSA\ GWDPermit\DMT Plan HistoryXDMT Plan ContApproval 01-20-2011.doc
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 ' T.D.D. (801) 536-4414
www.deq.uiah.gov
Printed on 100% recycled paper