Phillip Goble - Cell 1 LDS Repair Schedule
.•••..•.•r.':irx..'ii'i;.
From: Phillip Goble
To: Roberts, Harold
Date: 11/22/2010 1:37 PM
Subject: Cell 1 LDS Repair Schedule
CC: Morton, Loren; Tischler, Jo Ann
Harold,
Has DUSA determined when they will be conducting the clean out of the Cell 1 standpipe? When we talked
last Thursday November 18, DUSA proposed the idea of using a Vacuum Truck. The DRC was ok with that plan
provided that the truck was decontaminated and surveyed before it left the mill. During the meeting, the DRC
asked that the repair of the Cell 1 LDS be completed and the confirmation video log submitted for DRC review
by the end of the year. The DRC also asked that DUSA provide a 7-day written notice of when the "clean up"
would begin to allow the DRC to be present.
Thanks,
Phil Goble