Loading...
HomeMy WebLinkAboutDRC-2010-006568 - 0901a068801ec27bPage 1 of 1 DRC-2010-006568 Phillip Goble - Cell 1 LDS Repair Schedule .•••..•.•r.':irx..'ii'i;. From: Phillip Goble To: Roberts, Harold Date: 11/22/2010 1:37 PM Subject: Cell 1 LDS Repair Schedule CC: Morton, Loren; Tischler, Jo Ann Harold, Has DUSA determined when they will be conducting the clean out of the Cell 1 standpipe? When we talked last Thursday November 18, DUSA proposed the idea of using a Vacuum Truck. The DRC was ok with that plan provided that the truck was decontaminated and surveyed before it left the mill. During the meeting, the DRC asked that the repair of the Cell 1 LDS be completed and the confirmation video log submitted for DRC review by the end of the year. The DRC also asked that DUSA provide a 7-day written notice of when the "clean up" would begin to allow the DRC to be present. Thanks, Phil Goble file://C:\Documents and Settings\Pgoble\Local Settings\Temp\XPgrpwise\4CEA71FDEQ... 12/27/2010