Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2010-005662 - 0901a068801d0766
DENISO MINES October 15, 2010 y,^<orJ^a1^ Received ^-'••1 2010 w Di'-'isioii of p)/ '! Coiiircl Denison aOnes (USA) Corp. 10M171iiStrael,Siiile990 Denver, CO 80269 USA Tel: 303 628-7798 Fai:303 38»4129 www.(leni8onmines.com VIA E-MAIL AND OVERNIGHT DELIVERY Rusty Lundberg Director Division of Radiation Control Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144810 Salt Lake City, UT 84114-4820 DRC-2010- Re: August 19, 2010 DUSA Response Letter to June 16, 2010 DRC Request for Information; June 29, 2010 Submittal Reclamation Plan 4.2 and Updated Surety; March 3, 2010 DUSA Letter, 2010 Surety Update; Request for Information Dear Mr. Lundberg: We are responding to the September 23, 2010 Request for Information from Dave Rupp asking for additional clarification on the August 2010 update. Revision 4.2, of the White Mesa Mill reclamation cost estimates. Mr. Rupp's comments are restated below, in italics, followed by our response. Where necessary, replacement pages are provided for inclusion in the March and August 2010 estimates. These revisions are labeled Revision 4.3, and also include the estimated cost for reclamation of tailings Cell 4B, that was submitted as Revision 3.2 in June 2010. 1. Equipment Maintenance Hourly Rate. The fixed monthly equipment maintenance cost of 565,430 provided by North Central Rental and Leasing (NCRL) is exclusively for the machinery rented from NCRL. Other equipment sources, such as Honnen Equipment or WWR Rental are not covered by this monthly fixed cost. This was confirmed in a telephone conversation between Messrs. Oscar Swenson of NCRL and David Rupp of DRC on September 14, 2010. Therefore, it is appropriate to divide the NCRL monthly fee only by the total hours of NCRL monthly equipment operation to derive an hourly maintenance rate for the NCRL equipment. For the maintenance costs from the other equipment sources, we would be willing to accept the foregoing derived rate for NCRL maintenance extended to that equipment DUSA may also propose other additional documented equipment maintenance rates for the other equipment sources. Please adjust the estimate to include this change in costs for equipment maintenance. The calculated Hourly Equipment Maintenance Rate of $20.53 did in fact exclude the hours for the equipment sourced from other vendors, but did include the outside equipment hours for the calculation of the allocation of the monthly fuel cost for the maintenance equipment. Revising the fuel cost allocation changes the Hourly Letter to Mr.Rusty Lundberg October 15,2010 Page 2 Equipment Maintenance Rate to $20.57 per operating hour for the Butler equipment.This same rate has been used for equipment sourced from other vendors as you suggested.Copies of the estimate summaries affected by this change have been attached to this letter as revision 4.3. 2.No comment. No DUSA response required. 3.Automobile and General Liability Insurance.The DUSA response generally satisfies our comment. Additionally,we request that on the cost summary sheet the related line item be shown as "Motor Vehicles and General Liability Insurance"or similar wording. The summary sheet description has been changed to "Automobile and General Liability Insurance". 4.Reclamation Costs for the New Reagent Storage Building (NRSB).The DUSA response indicates the NRSB has been added to the table for Alternate Feed Circuit Costs.This table has been provided,but there are some inconsistencies needing correction: a.The Haul Truck hours remained the same,but it appears they should be increased,as the loader and truck driver hours,as well as the area ofconcrete to be removed were increased. The haul truck hours have been changed to match the increase in the loader and truck driver hours. b.The increased hours for loader and truck driver were only for 2-hours each.Please correct or justify this as appropriate for the complete NRSB inventory,structure and concrete removal work. The Reagent Storage Building is a relatively small,wood frame structure,with metal siding and no insulation, that can be easily demolished with the time and equipment specified.In order to add some conservatism to the estimate,2 additional hours of the Cat 365 excavator were added to the estimate. c.The Equipment Maintenance unit cost perhour in the costs in the table provided appears erroneous,and needs to be corrected along with the above items. The equipment maintenance unit cost has been corrected. 5.No further comment. No DUSA response required. OENISOJ)~~ MINES 2 Letter to Mr.Rusty Lundberg October 15,2010 Page 3 6.No comment. No DUSA response required. 7.This is a new item.Updated surety estimates were submitted by DUSA letters dated June 29,2010 and August 19,2010.We have a question on the Cell 4A full surface area used in the fill calculations presented by these submittals.In the July 2009 and March 3,2010 DUSA surety estimates,the full surface area for Cell 4A has been presented as 1,829,520 square feet.In the latest estimates mentioned above,that area is presented as 1,785,960 square feet.Please justify the lower figure or provide corresponding corrections to the estimate. The Cell 4A surface area of 1,829,520 ft'is 42.0 acres,which was originally calculated to include the surface area of the cell,40 acres from the crest line perimeter,plus a portion of the top surface of the dikes.When Cell 4B was added to the estimate,the surface area for both of the cells,including a portion of the top surface of the dikes,was calculated at 41 acres,or 1,785,960 ft'.The reduction in the total area for Cell 4A was because a portion of the top surface of the common dike between the cells was allocated to the area calculated for Cell 4B. Each of the cells is now calculated at 41 acres,or 1,785,960 ft'. Please contact the undersigned if you have any questions or require any further information. Yours very truly, DENISON MINES (USA)CORP. Jo Ann Tischler Director,Compiiance and Permitting Attachment cc:Ron F.Hochstein David C.Frydenlund Harold R.Roberts David E.Turk Rich Bartlett Steve Snyder Central files OENISOJ)JJ MINES 3 OENISONI)~~ MINES Donloon Minos (USA)COrp. 1050 17th S....~Sullo'SO Don_.CO 80285 USA Tol :303121-7711 Fu:303 3'~125 www.denilonmlnH.com Attachment C White Mesa Mill Reclamation Plan Revision 4.3 Revised Cost Estimates for Reclamation of the White Mesa Mill and Tailings Management System October 2010 State ofUtahlle.(2)Byproduct Material License #UT1900479 Copy 1 State of Utah Denison Mines (USA)Corp. www.denlaonmln••.com 1050 17th Street,Suite 950 Donver.CO,USA 80215 Tel:303626-7798 Fox :303 311-4125 Cost Summary WHITE MESA MILL RECLAMATION COST ESTIMATE October 2010 Revision 4.3 Mill Decommissioning Cell 1 Cell 2 Cell 3 Cell4A Cel14B Miscellaneous Subtotal Direct Costs Profit Allowance Contingency Licensing &Bonding UDEQ Contract Administration Contractors Equipment Floater Automobile and General Liability Insurance Long Term Care Fund Total Reclamation Revised Bond Amount 10/15/2010·8:04 AM·WMM Rec Plan Est October 2010 Rev 4.3 $2,069,722 $1,696,683 $1,579,304 $2,041,742 $1,337,013 $1,326,036 $3,295,247 $13,345,748 10.00%$1,334,575 15.00%$2,001,862 2.00%$266,915 4.00%$533,830 $82,250 $284,600 $797,448 $18,647,228 $18,647,228 Denison Mines (USA)Corp. White Mesa Mill Mill Decommissioning MILL DECOMMISSIONING Mill Building Demolition MILL DECOMMISSIONING Resource Description Units CosUUnlt Task Units Task Cost Equipment Operators hrs $18.94 720 $13,636 Mechanics hrs $16.53 640 $10,577 Laborers hrs $12.51 320 $4,002 Small Tools hrs $1.35 960 $1,296 Cat 770 Haul Truck hrs $93.53 640 $59,860 Truck Drivers hrs $16.67 640 $10,671 Cat 988 Loader hrs $133.14 160 $21,302 Cat 365 Excavator hrs $128.Q7 160 $20,491 PC 300 w/metal Shears hrs $151.36 160 $24,218 60 Ton Crane hrs $78.10 160 $12,497 30 Ton Crane hrs $51,46 80 $4,117 Equipment Maintenance (Butler)hrs $20.57 1,360 $27,973 Concrete Removal sf $3.30 37,500 $123,750 Total Mill Building Demolition Ore Feed Demolition Resource Description Units CosUUnit Task Units $334,389 Task Cost Equipment Operators hrs $18.94 48 $909 Mechanics hrs $16.53 64 $1,058 Laborers hrs $12.51 32 $400 Small Tools hrs $1.35 96 $130 Cat 770 Haul Truck hrs $93.53 64 $5,986 Truck Drivers hrs $16.67 64 $1,067 Cat 988 Loader hrs $133.14 16 $2,130 Cat 365 Excavator hrs $128.07 16 $2,049 PC 300 w/metal Shears hrs $151.36 16 $2,422 30 Ton Crane hrs $51,46 0 $0 Equipment Maintenance (Butler)hrs $20.57 112 $2,304 Total Ore Feed Demolition SX Building Demolition Resource Description Units CosUUnit Task Units $18,454 Task Cost EqUipment Operators hrs $18.94 240 $4,545 Mechanics hrs $16.53 320 $5,288 Laborers hrs $12.51 160 $2,001 Small Tools hrs $1.35 480 $648 Cat 770 Haul Truck hrs $93.53 320 $29,930 Truck Drivers hrs $16.67 320 $5,336 Cat 988 Loader hrs $133.14 80 $10,651 Cat 365 Excavator hrs $128.Q7 80 $10,246 PC 300 w/metal Shears hrs $151.36 80 $12,109 60 Ton Crane hrs $78.10 0 $0 30 Ton Crane hrs $51,46 0 $0 Equipment Maintenance (Butler)hrs $20.57 560 $11,518 Concrete Removal sf $3.30 55,970 $184,701 Total SX Building Demolition 10/15/2010 -8:05 AM-WMM Rec Plan Est October 2010 Rev 4.3 $276,973 Denison Mines (USA)Corp. White Mesa Mill MILL DECOMMISSIONING CGO Circuit Removal Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 135 $2,557 Mechanics hrs $16.53 120 $1,983 Laborers hrs $12.51 60 $750 Small Tools hrs $1.35 180 $243 Cat 770 Haul Truck hrs $93.53 120 $11,224 Truck Drivers hrs $16.67 120 $2,001 Cat 988 Loader hrs $133.14 30 $3,994 Cat 365 Excavator hrs $128.07 30 $3,842 PC 300 w/metal Shears hrs $151.36 30 $4,541 60 Ton Crane hrs $78.10 30 $2,343 30 Ton Crane hrs $51.46 15 $772 Equipment Maintenance (Butler)hrs $20.57 255 $5,245 Concrete Removal sf $3.30 15,000 $49,500 Total CCD Circuit Removal Sample Plant Removal Resource Description Units Cost/Unit Task Units $88,995 Task Cost EqUipment Operators hrs $18.94 24 $455 Mechanics hrs $16.53 32 $529 Laborers hrs $12.51 16 $200 Small Tools hrs $1.35 48 $65 Cat 770 Haul Truck hrs $93.53 32 $2,993 Truck Drivers hrs $16.67 32 $534 Cat 988 Loader hrs $133.14 8 $1,065 Cat 365 Excavator hrs $128.07 8 $1,025 PC 300 w/metal Shears hrs $151.36 8 $1,211 30 Ton Crane hrs $51.46 0 $0 EqUipment Maintenance (Butler)hrs $20.57 56 $1,152 Concrete Removal sf $3.30 4,200 $13,860 Total Sample Plant Removal Boiler Demolition Resource Description Units Cost/Unit Task Units $23,087 Task Cost EqUipment Operators hrs $18.94 120 $2,273 Mechanics hrs $16.53 160 $2,644 Laborers hrs $12.51 80 $1,000 Small Tools hrs $1.35 240 $324 Cat 770 Haui Truck hrs $93.53 160 $14,965 Truck Drivers hrs $16.67 160 $2,668 Cat 988 Loader hrs $133.14 40 $5,326 Cat 365 Excavator hrs $128.07 40 $5,123 PC 300 w/metal Shears hrs $151.36 40 $6,054 60 Ton Crane hrs $78.10 0 $0 30 Ton Crane hrs $51.46 0 $0 Equipment Maintenance (Butler)hrs $20.57 280 $5,759 Concrete Removal sf $3.30 2,900 $9,570 Total Boiler Demolition 10/15/2010 -8:05AM-WMM Rec Plan EstOclober2010 Rev 4,3 $55,706 Denison Mines (USA)Corp. White Mesa Mill MILL DECOMMISSIONING Vanadium Oxidation Circuit Removal Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 48 $909 Mechanics hrs $16.53 64 $1,058 Laborers hrs $12.51 32 $400 Small Tools hrs $1.35 96 $130 Cat 770 Haul Truck hrs $93.53 64 $5,986 Truck Drivers hrs $16.67 64 $1,067 Cat 988 Loader hrs $133.14 16 $2,130 Cat 365 Excavator hrs $128.07 16 $2,049 PC 300 w/metal Shears hrs $151.36 16 $2,422 60 Ton Crane hrs $78.10 0 $0 30 Ton Crane hrs $51.46 0 $0 Equipment Maintenance (Butler)hrs $20.57 112 $2,304 Concrete Removal sf $3.30 1,200 $3,960 Total Vanadium Oxidation Circuit Removal Main ShoplWarehouse Demolition Resource Description Units Cost/Unit Task Units $22,414 Task Cost Equipment Operators hrs $18.94 96 $1,818 Mechanics hrs $16.53 128 $2,115 Laborers hrs $12.51 64 $800 Small Tools hrs $1.35 192 $259 Cat 770 Haul Truck hrs $93.53 128 $11,972 Truck Drivers hrs $16.67 128 $2,134 Cat 988 Loader hrs $133.14 32 $4,260 Cat 365 Excavator hrs $128.07 32 $4,098 PC 300 w/metal Shears hrs $151.36 32 $4,844 Equipment Maintenance (Butler)hrs $20.57 224 $4,607 Concrete Removal sf $3.30 19,300 $63,690 Total Main ShoplWarehouse Demolition Decon Pads (2)Demolition Resource Description Units Cost/Unit Task Units $100,599 Task Cost Equipment Operators hrs $18.94 48 $909 Mechanics hrs $16.53 64 $1,058 Laborers hrs $12.51 32 $400 Small Tools hrs $1.35 96 $130 Cat 770 Haul Truck hrs $93.53 64 $5,986 Truck Drivers hrs $16.67 64 $1,067 Cat 988 Loader hrs $133.14 16 $2,130 Cat 365 Excavator hrs $128.07 16 $2,049 PC 300 w/metal Shears hrs $151.36 16 $2,422 EqUipment Maintenance (Butler)hrs $20.57 112 $2,304 Concrete Removal sf $3.30 1,350 $4,455 Total Decon Pads (2)Demolition 10/15/2010 -8:05 AM·WMMRee Plan Est October 2010Rev4,3 $22,909 Denison Mines(USA)Corp. White Mesa Mill MILL DECOMMISSIONING Task CostTaskUnitsCost/UnitUnits Office Building Demolition Resource Description Equipment Operators hrs $18.94 72 $1,364 Mechanics hrs $16.53 96 $1,587 Laborers hrs $12.51 48 $600 Small Tools hrs $1.35 144 $194 Cat 770 Haul Truck hrs $93.53 96 $8,979 Truck Drivers hrs $16.67 96 $1,601 Cat 988 Loader hrs $133.14 24 $3,195 Cat 365 Excavator hrs $128.07 24 $3,074 PC 300 w/metal Shears hrs $151.36 24 $3,633 Equipment Maintenance (Butler)hrs $20.57 168 $3,455 Concrete Removal sf $1.25 12,100 $15,125 Total Office BUilding Demolition $42,807 Task CostTaskUnitsCost/UnitUnits Septic Tanks and Drain Fields Resource Description Equipment Operators hrs $18.94 16 $303 Mechanics hrs $16.53 0 $0 Laborers hrs $12.51 16 $200 Small Tools hrs $1.35 32 $43 Cat 770 Haul Truck hrs $93.53 16 $1,496 Truck Drivers hrs $16.67 16 $267 Cat 988 Loader hrs $133.14 8 $1,065 Cat 365 Excavator hrs $128.Q7 8 $1,025 PC 300 w/metal Shears hrs $151.36 0 $0 Equipment Maintenance (Butler)hrs $20.57 32 $658 Total Septic Tanks and Drain Fields $5,057 Task CostTaskUnitsCost/UnitUnits Misc.Tankage &Spare Parts Removal Resource Description Equipment Operators hrs $18.94 36 $682 Mechanics hrs $16.53 48 $793 Laborers hrs $12.51 24 $300 Small Tools hrs $1.35 72 $97 Cat 770 Haul Truck hrs $93.53 48 $4,489 Truck Drivers hrs $16.67 48 $800 Cat 988 Loader hrs $133.14 12 $1,598 Cat 365 Excavator hrs $128.Q7 12 $1,537 PC 300 w/metal Shears hrs $151.36 12 $1.816 Equipment Maintenance (Butler)hrs $20.57 84 $1.728 Total Misc.Tankage &Spare Parts Removal $13,841 10/1512010 -8:05 AM-WMM Rec Plan Est October 2010 Rev4.3 Denison Mines(USA)Corp, While Mesa Mill MILL DECOMMISSIONING Alternate Feed Circuit and Reagent Storage Building Resource Description Units CosUUnit Task Units Task Cost Equipment Operators hrs $18.94 120 $2,273 Mechanics hrs $16.53 50 $826 Laborers hrs $12.51 50 $625 Small Tools hrs $1.35 96 $130 Cat 770 Haul Truck hrs $93.53 50 $4,677 Truck Drivers hrs $16.67 50 $834 Cat 988 Loader hrs $133.14 34 $4,527 Cat 365 Excavator hrs $128.07 34 $4,354 PC 300 w/metal Shears hrs $151.36 52 $7,871 Equipment Maintenance (Butler)hrs $20.57 170 $3,497 Concrete Removal sf $3.30 3,500 $11,550 Total Alternate Feed Circuit and Reagent Storage BUilding $41,163 Mill Yard Decontamination Resource Description Units CosUUnit Task Units Task Cost Equipment Operators hrs $18.94 582 $11,022 Cat 637 Scraper hrs $205.10 257 $52,712 Cat 988 Loader hrs $133.14 65 $8,654 Cat D8N Dozer With Ripper hrs $94.96 65 $6,173 Cat D7 Dozer hrs $80.38 65 $5,225 Cat 651 Waterwagon hrs $107.49 65 $6,987 Cat 14G Motorgrader hrs $70.59 65 $4,588 Equipment Maintenance (Butler)hrs $20.57 582 $11,971 Total Mill Yard Decontamination Ore Storage Pad Decontamination Resource Description Units CosUUnit Task Unils $107,331 Task Cost Equipment Operators hrs $18.94 429 $8,125 Cat 637 Scraper hrs $205.10 189 $38,765 Cat 988 Loader hrs $133.14 48 $6,391 Cat D8N Dozer With Ripper hrs $94.96 48 $4,558 Cat D7 Dozer hrs $80.38 48 $3,858 Cat 651 Waterwagon hrs $107.49 48 $5,159 Cat 14G Motorgrader hrs $70.59 48 $3,388 Equipment Maintenance (BUller)hrs $20.57 429 $8,824 Total Ore Storage Pad Decontamination Equipment Storage Area Cleanup Resource Description Units CosUUnit Task Units $79,068 Task Cost Equipment Operators hrs $18.94 153 $2,898 Cat 637 Scraper hrs $205.10 68 $13,947 Cat 988 Loader hrs $133.14 17 $2,263 Cat D8N Dozer With Ripper hrs $94.96 17 $1,614 Cat D7 Dozer hrs $80.38 17 $1,366 Cat 651 Waterwagon hrs $107.49 17 $1,827 Cat 14G Motorgrader hrs $70.59 17 $1,200 Equipment Maintenance (Butler)hrs $20.57 153 $3,147 Total Equipment Storage Area Cleanup 10/15/2010 -8:05 AM-WMM Rec Plan EstOctober 2010 Rev 4.3 $28,263 Denison Mines(USA)Corp. White Mesa Mill MILL DECOMMISSIONING Revegetate Mill Yard &Ore Pad Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 231 $4,375 Cat 637 Scraper hrs $205.10 132 $27,074 Cat 988 Loader hrs $133.14 0 $0 Cat 08N Dozer With Ripper hrs $94.96 33 $3,134 Cat 07 Dozer hrs $80.38 33 $2,653 Cat 651 WatelWagon hrs $107.49 0 $0 Cat 14G Motorgrader hrs $70.59 33 $2,329 Seed Mix Acre $322.50 50 $16,125 Equipment Maintenance (Butler)hrs $20.57 231 $4,751 Total Revegetate Mill Yard &Ore Pad Total Demolition and Decontamination CLEANUP OF WINDBLOWN CONTAMINATION Scoping Survey Resource Description Cost/Unit Task Units $60,441 $1,321,4971 Task Cost Soil Samples each $50.00 100 $5,000 Survey Crew hrs $15.91 752 $11,961 Sample Crew hrs $15.91 1,312 $20,868 Total Scoping Survey $37,829 Characterization Survey Resource Description Units Cost/Unit Task Units Task Cost Soil Samples each $50.00 472 $23,600 Sample Crew hrs $15.91 1,136 $18,069 Total Characterization Survey $41,669 Final Status Survey Resource Description Units Cost/Unit Task Units Task Cost Soil Samples each $50.00 300 $15,000 Sample Crew hrs $15.91 3,552 $56,497 Total Final Status Survey $71,497 10/15/2010 -8:05 AM-WMM Rec Plan EstOctober2010 Rev 4.3 Denison Mines (USA)Corp. WillIe Mesa Mitl MILL DECOMMISSIONING Task CostTaskUnitsCosVUnitUnits Windblown Cleanup Resource Description Equipment Operators hrs $18.94 1,190 $22,537 Cat 637 Scraper hrs $205.10 680 $139,471 Cat D8N Dozer With Ripper hrs $94.96 170 $16,144 Cat 07 Dozer hrs $80.38 170 $13,665 Cat 14H Motorgrader hrs $70.59 170 $12,000 Soil Samples each $50.00 500 $25,000 Survey Crew hrs $15.91 163 $2,593 Sample Crew hrs $15.91 83 $1,320 Equipment Maintenance (Butier)hrs $20.57 1,190 $24,476 Total Windblown Cleanup $257,206 Units Quality Control Resource Description Quality Control Contractor Cost/Unit Task Units Task Cost I~hr,,-s -"$",62",.0,,,,0 1L-_-=:".2,0~8~OLI _~$1~2~8,~96~0 I Total Quality Control $128,960 Total Cleanup Windblown Contamination $537,161 1 Conventional Ore Disposal Task CostTaskUnitsCost/UnitUnitsResourceDescription Equipment Operators hrs $18.94 1,070 $20,272 Cat 770 Haul Truck (3)hrs $93.53 612 $57,264 Cat 988 Loader hrs $133.14 204 $27,171 Cat 651 Waterwagon hrs $107.49 204 $21,936 Cat 14G Motorgrader hrs $70.59 50 $3,529 EqUipment Maintenance (Butler)hrs $20.57 1,070 $22,016 Total Conventional Ore Disposal $152,1891 Total Quantity 120,000 Cubic Yards' 196 Cubic Yards per Truck per hour 612 Truck Hours •162,000 tons maximum projected for December 2010 Alternate Feed Disposal Task CostTaskUnitsCosVUnitUnits Cabot and FMRI Material Resource Description Equipment Operators hrs $18.94 158 $2,984 Cat 770 Haul Truck (3)hrs $93.53 65 $6,035 Cat 988 Loader hrs $133.14 22 $2,863 Cat 651 Waterwagon hrs $107.49 22 $2,312 Cat 14G Motorgrader hrs $70.59 50 $3,529 Equipment Maintenance (Butler)hrs $20.57 158 $3,240 Total Cabot &FMRI Material $20,963 Total Quantity 12,646 Cubic Yards'(as of 01/31/2010) 196 Cubic Yards per Truck per hour 65 Truck Hours 10/15/2010 -8:05AM-WMM Rec Plan EstOctober 2010 Rev 4.3 Denison Mines (USA)Corp Wllite Mesa Mill MILL DECOMMISSIONING •Includes Linde,Cabot and FMRI Task CostTaskUnitsCost/UnitUnits Cameco Barrels and Honeywell Barrels Resource Description Equipment Operators hrs $16.67 296 $4,929 Flat Bed Trailer and Tractor*hrs $55.00 296 $16,260 Fork Lift (2)hrs $18.00 591 $10,643 Equipment Maintenance (Butler)hrs $20.57 296 $6,081 Total Cameco and honeywell Barrels $37,912 .,includes operator 29,563 Barrels (as of 01/31/2010) 40 Barrels per load 0.4 Hours per load 296 Truck Hours Tons Ibs.per barrel No.Drums CaF2 1,083 727 2,978 Calcined 2,547 320 15,919 Regen 329 406 1,621 KF 1,305 309 8.447 UF4 164 547 599 5,428 29,563 Sub-Total Alternate Feed Disposal $58,8751 TOTAL MILL DECOMMISSIONING $2,069,7221 10f15/2010 -8:05 AM-WMM RecPlanEstOctober2010 Rev 4.3 DenisonMines (USA)Corp. White Mesa Mill Celli RECLAMATION OF CELL 1 RECLAMATION OF CELL 1 Units Dewatering of Cell 1 Resource Description Dewatering of Cell 1 Cost/Unit Task Units Task Cost I:.::hr~s $::.:0~.4::..8IL_----.::.6.:;:,2,...:.:40::::01_-----'$::::3::2.°,°::.:°::..°I Total Dewatering of Cell 1 $30,000 Task CostTaskUnitsCost/UnitUnits Crystal Removal Resource Description Equipment Operators hrs $18.94 2,695 $51,040 Cat 770 Truck hrs $93.53 2,157 $201,745 Truck Drivers hrs $16.67 2,157 $35,966 Cat 988 Loader hrs $133.14 539 $71,762 Cat D8N Dozer With Ripper hrs $94.96 539 $51,186 Cat 365 Excavator hrs $128.07 539 $69,029 Cat 651 Waterwagon hrs $107.49 539 $57,935 Cat 14G Motorgrader hrs $70.59 539 $38,047 Equipment Maintenance (Butler)hrs $20.57 4,852 $99,797 Total Crystal Removal $676,507 Task CostTaskUnitsCost/UnitUnits Contaminated Materials Removal Resource Description Equipment Operators hrs $18.94 616 $11,666 Cat 637 Scraper hrs $205.10 308 $63,172 Cat D8N Dozer With Ripper hrs $94.96 77 $7,312 Cat 825C Compactor hrs $93.85 77 $7,227 Cat 651 Waterwagon hrs $107.49 77 $8,276 Cat 14G Motorgrader hrs $70.59 77 $5,435 Equipment Maintenance (Butler)hrs $20.57 616 $12,670 Total Contaminated Materials Removal $115,759 Task CostTaskUnitsCost/UnitUnits Topsoil Application Resource Description Equipment Operators hrs $18.94 202 $3,826 Cat 637 Scraper hrs $205.10 82 $16,819 Cat D8N Dozer With Ripper hrs $94.96 40 $3,799 Cat 651 Waterwagon hrs $107.49 40 $4,299 Cat 14G Motorgrader hrs $70.59 40 $2,824 Equipment Maintenance (Butler)hrs $20.57 202 $4,155 Total Topsoil Application $35,721 10/15/2010 -8:06 AM -WMM Rec Plan Est October 2010 Rev 4,3 Denison Mines (USA)Corp. While Mesa Mill RECLAMATION OF CELL 1 Task CostTaskUnitsCost/UnitUnits Construct Channel Resource Description Equipment Operators hrs $18.94 758 $14,356 Cat 637 Scraper hrs $205.10 348 $71,376 Cat 770 Truck hrs $93.53 404 $37,786 Truck Drivers hrs $16.67 404 $6,736 Cat 988 Loader hrs $133.14 170 $22,634 Drilling &Blasting Contractor BCY $2.25 67,000 $151,050 Cat 14G Motorgrader hrs $70.59 120 $8,471 Cat D8N Dozer With Ripper hrs $94.96 120 $11,396 Equipment Maintenance (Butler)hrs $20.57 1,162 $23,900 Total Construct Channel $347,705 Place Clay Liner Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 355 $6,723 Cat 637 Scraper hrs $205.10 0 $0 Cat 825 Compactor hrs $93.85 60 $5,631 Cat D8N Dozer With Ripper hrs $94.96 60 $5,698 Cat 07 Dozer hrs $80.38 0 $0 Cat 651 Waterwagon hrs $107.49 60 $6,449 Cat 980 Loader hrs $92.10 60 $5,526 5000 Gallon Water Truck hrs $62.33 30 $1,870 Highway Trucks hrs $68.33 435 $29,722 Truck Drivers hrs $16.67 435 $7,253 Cat 14G Motorgrader hrs $70.59 85 $6,000 Equipment Maintenance (Butler)hrs $20.57 1,225 $25,196 Total Place Clay Liner $100,068 Place Lower Random Fill Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 602 $11,401 Cat 637 Scraper hrs $205.10 172 $35,278 Cat 825 Compactor hrs $93.85 86 $8,071 Cat D8N Dozer With Ri pper hrs $94.96 86 $8,167 Cat 07 Dozer hrs $80.38 86 $6,913 Cat 651 Waterwagon hrs $107.49 86 $9,244 Cat 14G Motorgrader hrs $70.59 86 $6,071 Equipment Maintenance (Butler)hrs $20.57 602 $12,382 Total Place Lower Random Fill $97,527 10/15/2010 -8:06 AM"WMM Rec Plan Est October 2010 Rev 4.3 Denison Mines (USA)Corp. White Mesa Mill RECLAMATION OF CELL 1 Clay Cap Task CostTaskUnitsCost/UnitUnitsResourceDescription Equipment Operators hrs $18.94 305 $5,776 Cat 637 Scraper hrs $205.10 0 $0 Cat 825 Compactor hrs $93.85 55 $5,162 Cat D8N Dozer With Ripper hrs $94.96 55 $5,223 Cat 07 Dozer hrs $80.38 0 $0 Cat 651 Waterwagon hrs $107.49 55 $5,912 Cat 14G Motorgrader hrs $70.59 55 $3,882 Cat 980 Loader hrs $92.10 55 $5,065 5000 Gallon Water Truck hrs $62.33 30 $1,870 Highway Trucks hrs $68.33 440 $30,063 Truck Drivers hrs $16.67 440 $7,337 Equipment Maintenance (Butler)hrs $20.57 305 $6,273 Total Place Clay Cap $76,564 Task CostTaskUnitsCost/UnitUnits Upper Random Fill Resource Description Equipment Operators hrs $18.94 688 $13,030 Cat 637 Scraper hrs $205.10 172 $35,278 Cat 825 Compactor hrs $93.85 86 $8,071 Cat D8N Dozer With Ripper hrs $94.96 86 $8,167 Cat 07 Dozer hrs $80.38 86 $6,913 Cat 651 Waterwagon hrs $107.49 86 $9,244 Cat 14G Motorgrader hrs $70.59 86 $6,071 5000 Gallon Water Truck hrs $62.33 86 $5,360 Equipment Maintenance (Butler)hrs $20.57 688 $14,151 Total Place Upper Random Fill $106,285 10/15/2010·8:06AM -WMM Rec Plan Est October 2010 Rev 4.3 Denison Mines (USA)Corp. White Mesa Mill RECLAMATION OF CELL 1 Rock Armor and Rip Rap Filter Resource Description Units CosUUnit Task Units Task Cost Equipment Operators hrs $18.94 90 $1,704 Cat D7 Dozer hrs $80.38 30 $2,411 Cat 651 Waterwagon hrs $107.49 30 $3,225 Cat 14G Motorgrader hrs $70.59 30 $2,118 Rock Cost Delivered CY $5.77 8,607 $49,638 Equipment Maintenance (Butler)hrs $20.57 90 $1,851 Total Place Rock Armor and Rip Rap Filter $60,948 Units Quality Control Resource Description Quality Control Contractor Total Quality Control TOTAL RECLAMATION OF CELL 1 10/15/2010 -8:06 AM -WMM Rec Plan Est October 2010 Rev 4.3 CosUUnit Task Units Task Cost IL~r-,-s -,-$6::.::;2c..::.O-,-01__---.:8:..:.°"-'°1_----.:$c.:.49:..c,6::.::;0-=.J01 $49,600 $1,696,683 1 Denison Mines (USA)Corp. While Mesa Mill Cell 2 RECLAMATION OF CELL 2 Obtain Permits for Clay Borrow Site -Section 16 Resource Description Units Permits &Licenses I.:;e.:;a _ Total Obtain Permits for Clay Borrow Site -Section 16 Cost/Unit Task Units Task Cost $1 0,00000 1L-__---.:::5IL_-'$::::50::!.,0~0~0I $50,000 Place Remainder of Bridging (Platform)Lift Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 0 $0 Cat 627F Scraper hrs $205.10 0 $0 Cat 815C Compactor hrs $93.85 0 $0 Cat D8N Dozer With Ripper hrs $94.96 0 $0 Cat D7 Dozer hrs $80.38 0 $0 Cat 651 Waterwagon hrs $107.49 0 $0 Cat 14G Motorgrader hrs $70.59 0 $0 Equipment Maintenance (Butler)hrs $20.57 0 $0 Total Place Remainder of Bridging (Platform)Lift Place Lower Random Fill (12") Resource Description Units Cost/Unit Task Units $0 Task Cost Equipment Operators hrs $18.94 902 $17,083 Cat 637 Scraper hrs $205.10 402 $82,452 Cat 825 Compactor hrs $93.85 100 $9,385 Cat D8N Dozer With Ripper hrs $94.96 100 $9,496 Cat D7 Dozer hrs $80.38 100 $8,038 Cat 651 Waterwagon hrs $107.49 100 $10,749 Cat 14G Motorgrader hrs $70.59 100 $7,059 Equipment Maintenance (Butler)hrs $20.57 902 $18,553 Total Place Lower Random Fill (12") Clay Layer Resource Description Units Cost/Unit Task Units $162,815 Task Cost Equipment Operators hrs $18.94 1,720 $32,575 Cat 825 Compactor hrs $93.85 325 $30,502 Cat D8N Dozer With Ripper hrs $94.96 300 $28,489 Cat D7 Dozer hrs $80.38 0 $0 Cat 651 Waterwagon hrs $107.49 300 $32,246 Cat 14G Motorgrader hrs $70.59 320 $22,588 Cat 980 Loader hrs $92.10 300 $27,629 5000 Gallon Water Truck hrs $62.33 175 $10,908 Highway Trucks hrs $68.33 2,400 $163,982 Truck Drivers hrs $16.67 2,400 $40,018 Equipment Maintenance (Butler)hrs $20.57 1,720 $35,377 Total Place Clay Layer 10/15/2010 -8:05 AM -WMM Ree Plan Est October 201 0 Rev 4.3 $424,315 Denison Mines (USA)Corp. White Mesa Mill RECLAMATION OF CELL 2 Upper Random Fill Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 1,990 $37,688 Cat 637 Scraper hrs $205.10 796 $163,263 Cat 825 Compactor hrs $93.85 199 $18,677 Cat D8N Dozer With Ripper hrs $94.96 199 $18,898 Cat D7 Dozer hrs $80.38 199 $15,996 Cat 651 Waterwa90n hrs $107.49 199 $21,390 Cat 14G Motorgrader hrs $70.59 199 $14,047 5000 Gallon Water Truck hrs $62.33 199 $12,404 Equipment Maintenance (Butler)hrs $20.57 1,990 $40,931 Total Place Upper Random Fill Rock Armor and Rip Rap Filter Resource Description Units Cost/Unit Task Units $343,294 Task Cost Equipment Operators hrs $18.94 900 $17,045 Cat D7 Dozer hrs $80.38 300 $24,115 Cat 651 Waterwagon hrs $107.49 300 $32,246 Cat 14G Motorgrader hrs $70.59 300 $21,176 Rock Cost Delivered CY $5.77 72,945 $420,688 Equipment Maintenance (Butler)hrs $20.57 900 $18,511 Units Total Place Rock Armor and Rip Rap Filter Quality Control Resource Description Quality Control Contractor Total Quality Control TOTAL RECLAMATION OF CELL 2 $533,781 Cost/Unit Task Units Task Cost IL:CGrc.:cs c.:c$6=::2CC:'0c.:c0LI __-,-1C"-'05=01_---:$c.:c65::..c,1:-;:0c.:c0I $65,100 $1,579,3041 10/15/2010 -8:05 AM -WMM Rec Plan Est October 2010 Rev 4.3 Denison Mines (USA)Corp. While Mesa Mill Cell 3 RECLAMATION OF CELL 3 RECLAMATION OF CELL 3 Units Dewatering of Cell 3 Resource Description Dewatering of Cell 3 Total Dewatering of Cell 3 CosVUnit Task Units Task Cost 1",hr.::;..s__---'c--__$:...:.0"'.4"'81 __-=-62=..c,"'40-=-0 1_---=$-=-30'-'-,0'--'0"'01 $30,000 Place Remainder of Bridging (Platform)Lift Resource Description Units CosVUnit Task Units Task Cost Equipment Operators hrs $18.94 1,856 $35,155 Cat 637 Scraper hrs $205.10 825 $169,211 Cat 825 Compactor hrs $93.85 206 $19,357 Cat D8N Dozer With Ripper hrs $94.96 206 $19,586 Cat 07 Dozer hrs $80.38 206 $16,579 Cat 651 Waterwagon hrs $107.49 206 $22,169 Cat 14G Molorgrader hrs $70.59 206 $14,559 Equipment Maintenance (Butier)hrs $20.57 1,856 $38,180 Total Place Remainder of Bridging (Platform)Lift Place Lower Random Fill (12") Resource Description Units CosVUnit Task Units $334,796 Task Cost Equipment Operators hrs $18.94 1,422 $26,931 Cat 637 Scraper hrs $205.10 452 $92,707 Cat 825 Compactor hrs $93.85 194 $18,207 Cat D8N Dozer With Ripper hrs $94.96 194 $18,423 Cat 07 Dozer hrs $80.38 194 $15,594 Cat 651 Waterwagon hrs $107.49 194 $20,852 Cat 14G Motorgrader hrs $70.59 194 $13,694 Equipment Maintenance (Butler)hrs $20.57 1,422 $29,248 Total Place Lower Random Fill (12") Clay Layer Resource Description Units CosVUnit Task Units $235,657 Task Cost Equipment Operators hrs $18.94 1,835 $34,753 Cat 637 Scraper hrs $205.10 0 $0 Cat 825 Compactor hrs $93.85 350 $32,849 Cat D8N Dozer With Ripper hrs $94.96 320 $30,389 Cat 07 Dozer hrs $80.38 0 $0 Cat 651 Waterwagon hrs $107.49 320 $34,396 Cat 14G Motorgrader hrs $70.59 350 $24,706 Cat 980 Loader hrs $92.10 320 $29,471 Cat 651 Waterwagon hrs $62.33 175 $10,908 Highway Trucks hrs $68.33 2,560 $174,915 Truck Drivers hrs $16.67 2,560 $42,685 Equipment Maintenance (Butler)hrs $20.57 1,835 $37,743 Total Place Clay Layer 10/15/2010 -8:06 AM -WMM Rec Plan Est October2010 Rev 4.3 $452,813 Denison Mines (USA)Corp. White Mesa Mill RECLAMATION OF CELL 3 Upper Random Fill Resource Description Units CosUUnit Task Units Task Cost Equipment Operators hrs $18.94 2,364 $44,762 Cat 637 Scraper hrs $205.10 868 $178,031 Cat 825 Compactor hrs $93.85 249 $23,393 Cat D8N Dozer With Ripper hrs $94.96 249 $23,670 Cat D7 Dozer hrs $80.38 249 $20,035 Cat 651 Waterwagon hrs $107.49 249 $26,791 Cat 14G Motorgrader hrs $70.59 249 $17,594 5000 Gallon Water Truck hrs $62.33 249 $15,536 Equipment Maintenance (Butler)hrs $20.57 2,364 $48,613 Total Place Upper Random Fill Rock Armor and Rip Rap Filter Resource Description Units Cost/Unit Task Units $398,425 Task Cost Equipment Operators hrs $18.94 870 $16,477 Cat D7 Dozer hrs $80.38 290 $23,311 Cat 651 Waterwagon hrs $107.49 290 $31,171 Cat 14G Motorgrader hrs $70.59 290 $20,470 Rock Cost Delivered CY $5.77 70,455 $406,328 Equipment Maintenance (Butler)hrs $20.57 870 $17,894 Units Total Place Rock Armor and Rip Rap Filter Quality Control Resource Description Quality Control Contractor Total Quality Control TOTAL RECLAMATION OF CELL 3 10/15/2010 -8:06 AM -WMM Rec Plan Est October 2010 Rev 4.3 $515,651 CosUUnit Task Units Task Cost ILhrc::.s c::.$6:::.::2::..::.0c::.01__----'..!.1,::.:20c::.0 1_---'$L74L'4:..:0.:.J01 $74,400 $2,041,7421 Denison Mines (USA)Corp. White Mesa Mill Cell4A RECLAMATION OF CELL 4A Dewatering of Cell 4A Resource Description Dewatering of Cell 4A Total Dewatering of Cell 4A Units Cost/Unit Task Units Task Cost I=hr=--s__I $0.481 62,4001 $30,0001 $30,000 ptace Bridging (Platform)Lift Resource Description Units Cost/Unit Task Units Task Cost Cat 637 Scraper hrs $205.10 671 $137,545 Cat 637 Scraper Operators hrs $17.72 671 $11,881 Cat 825 Compactor hrs $93.85 168 $15,735 Cat 825 Compactor Operator hrs $13.09 168 $2,194 Cat D8N Dozer With Ripper hrs $94.96 168 $15,921 Cat D8N Dozer Operator hrs $13.09 168 $2,194 Cat 07 Dozer hrs $80.38 168 $13,476 Cat 07 Dozer Operator hrs $13.09 168 $2,194 Cat 651 Waterwagon hrs $107.49 168 $18,020 Cat 651 Waterwagon Operator hrs $16.67 168 $2,795 Cat 14G Motorgrader hrs $70.59 168 $11,834 Cat 14G Motorgrader Operator hrs $18.91 168 $3,170 Equipment Maintenance (Butler)hrs $20.57 2,850 $58,621 Total Place Bridging (Platform)Lift Place Lower Random Fill Resource Description Units $295,582 Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 882 $16,698 Cat 637 Scraper hrs $205.10 392 $80,370 Cat 825 Compactor hrs $93.85 98 $9,194 Cat D8N Dozer With Ripper hrs $94.96 98 $9,303 Cat 07 Dozer hrs $80.38 98 $7,874 Cat 651 Waterwagon hrs $107.49 98 $10,530 Cat 14G Motorgrader hrs $70.59 98 $6,915 Equipment Maintenance (Butler)hrs $20.57 882 $18,134 Total Place Lower Random Fill Clay Layer Resource Description Units $159,017 Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 1,060 $20,075 Cat 637 Scraper hrs $205.10 0 $0 Cat 825 Compactor hrs $93.85 200 $18,771 Cat D8N Dozer With Ripper hrs $94.96 180 $17,094 Cat 07 Dozer hrs $80.38 0 $0 Cat 651 Waterwagon hrs $107.49 180 $19,347 Cat 14G Motorgrader hrs $70.59 200 $14,118 Cat 980 Loader hrs $92.10 150 $13,815 5000 Gallon Water Truck hrs $62.33 150 $9,350 Highway Trucks hrs $38.33 1,440 $55,189 Truck Drivers hrs $16.67 1,440 $24,011 Equipment Maintenance (Butler)hrs $20.57 1,060 $21,802 Total Place Clay Layer WMM Rec Plan Est October 2010 Rev 4.3 $213,571 Upper Random Fill Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 1,175 $22,258 Cat 637 Scraper hrs $205.10 470 $96,421 Cat 825 Compactor hrs $93.85 118 $11,030 Cat D8N Dozer With Ripper hrs $94.96 118 $11,161 Cat 07 Dozer hrs $80.38 118 $9,447 Cat 651 Waterwagon hrs $107.49 118 $12,633 Cat 14G Motorgrader hrs $70.59 118 $8,296 5000 Gallon Water Truck hrs $62.33 118 $7,326 Equipment Maintenance (Butler)hrs $20.57 1,175 $24,173 Total Place Upper Random Fill Rock Armor and Filter Layer Resource Description Units $202,745 Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 720 $13,636 Cat 07 Dozer hrs $80.38 240 $19,292 Cat 651 Waterwagon hrs $107.49 240 $25,797 Cat 14G Motorgrader hrs $70.59 240 $16,941 Rock Cost Delivered CY $5.77 48,695 $280,833 Equipment Maintenance (Butler)hrs $20.57 720 $14,809 Total Place Rock Armor and Filter Layer $371,308 Quality Control Resource Description Quality Control Contractor Total Quality Control TOTAL RECLAMATION OF CELL 4A Ihrs Units Cost/Unit Task Units Task Cost 1 $62.001 1,0451 $64,790 1 $64,790 $1,337,0131 WMM Rec Plan Est October 2010 Rev 4.3 Cell4B RECLAMATION OF CELL 48 Dewatering of Cell 4B Resource Description Dewatering of Cell 4B Total Dewatering of Cell 4B Units CosUUnit Task Un'lts Task Cost l_hrs__1 $0481 62,4001 __$,---3---,°,_°°_°1 $30,000 Place Bridging (Platform)Lift Resource Description Units CosUUnit Task Units Task Cost Cat 637 Scraper hrs $205.10 671 $137,545 Cat 637 Scraper Operators hrs $17.72 671 $11,881 Cat 825 Compactor hrs $93.85 168 $15,735 Cat 825 Compactor Operator hrs $13.09 168 $2,194 Cat D8N Dozer With Ripper hrs $94.96 168 $15,921 Cat D8N Dozer Operator hrs $13.09 168 $2,194 Cat D7 Dozer hrs $80.38 168 $13,476 Cat D7 Dozer Operator hrs $13.09 168 $2,194 Cat 651 Waterwagon hrs $10749 168 $18,020 Cat 651 Waterwagon Operator hrs $16.67 168 $2,795 Cat 14G Motorgrader hrs $70.59 168 $11,834 Cat 14G Motorgrader Operator hrs $18.91 168 $3,170 Equipment Maintenance (Butler)hrs $20.57 2,850 $58,621 Total Place Bridging (Platform)Lift Place Lower Random Fill Resource Description Units $295,582 CosUUnit Task Units Task Cost Equipment Operators hrs $18.94 882 $16,698 Cat 637 Scraper hrs $205.10 392 $80,370 Cat 825 Compactor hrs $93.85 98 $9,194 Cat D8N Dozer With Ripper hrs $94.96 98 $9,303 Cat D7 Dozer hrs $80.38 98 $7,874 Cat 651 Waterwagon hrs $10749 98 $10,530 Cat 14G Motorgrader hrs $70.59 98 $6,915 Equipment Maintenance (Butler)hrs $20.57 882 $18,134 Total Place Lower Random Fill WMM Rec Plan Est October 2010 Rev 4.3 $159,017 Clay Layer Resource Description Units Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 1,060 $20,075 Cat 637 Scraper hrs $205.10 0 $0 Cat 825 Compactor hrs $93.85 200 $18,771 Cat D8N Dozer With Ripper hrs $94.96 180 $17,094 Cat D7 Dozer hrs $80.38 0 $0 Cat 651 Waterwagon hrs $107.49 180 $19,347 Cat 14G Motorgrader hrs $70.59 200 $14,118 Cat 980 Loader hrs $92.10 150 $13,815 5000 Gallon Water Truck hrs $62.33 150 $9,350 Highway Trucks hrs $38.33 1,440 $55,189 Truck Drivers hrs $16.67 1,440 $24,011 Equipment Maintenance (Butier)hrs $20.57 1,060 $21,802 Total Place Clay Layer Upper Random Fill Resource Description Units $213,571 Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 1,199 $22,709 Cat 637 Scraper hrs $205.10 480 $98,372 Cat 825 Compactor hrs $93.85 120 $11,253 Cat D8N Dozer With Ripper hrs $94.96 120 $11,387 Cat D7 Dozer hrs $80.38 120 $9,638 Cat 651 Waterwagon hrs $107.49 120 $12,888 Cat 14G Motorgrader hrs $70.59 120 $8,464 5000 Gallon Water Truck hrs $62.33 120 $7,474 Equipment Maintenance (Butler)hrs $20.57 1,199 $24,662 Total Place Upper Random Fill Rock Armor and Filter Layer Resource Description Units $206,847 Cost/Unit Task Units Task Cost Equipment Operators hrs $18.94 600 $11,363 Cat D7 Dozer hrs $80.38 200 $16,076 Cat 651 Waterwagon hrs $107.49 200 $21,497 Cat 14G Motorgrader hrs $70.59 200 $14,118 Rock Cost Delivered CY $5.77 48,695 $280,833 Equipment Maintenance (Butler)hrs $20.57 600 $12,341 Total Place Rock Armor and Filter Layer $356,229 Quality Control Resource Description Quality Control Contractor Total Quality Control TOTAL RECLAMATION OF CELL 4B Units Cost/Unit Task Units Task CostI""hrs=--_I $62.00 1_---'1e..:,0--"45:.1-1_---:.$'-=624,7.:...:9:.::.0I $64,790 $1,326,0361 WMM Rec Plan Est October 2010 Rev 4.3 Miscellaneous MISCELLANEOUS ITEMS MISCELLANEOUS ITEMS Equipment Mobilization Resource Description Units Cost/Unit Task Units Task Cost Butler Machinery Mobilization LS $351,3221 1 $351,322 Other Equipment Mobilization LS $4,550 1 $4,550 Cranes LS $2,700 2 $5,400 Total Equipment Mobilization $361,272 Task CostTaskUnitsCost/UnitUnits Office Facilities Resource Description Install New Powerline LS 815,000 1 $15,000 Utilities for Offices months $1,000 36 $36,000 Temporary Office Trailer months $1,500 3 $4,500 Temporary Office Trailer,mob,demob &setup LS $3,000 1 $3,000 Total Office Facilities $58,500 Decontamination Pad Resource Deseri lion Units Cost/Unit Task Units Task Cost Laborers Construct Wheel Wash Facility hrs $13 LS 8180,000 8,320 $104,046 $180,000 Total Decontamination Facilities Facilities constructed in 2000 &2008 (S1ilO,OOO) $104,046 Plug and Abandon WW2 Resource Oescri tion Units Cost/Unit Task Units Task Cost Laborers Contract Services hrs LS $0 $20,000 8,320 $0 $20,000 Total Plug and Abandon WW2 $20,000 Slimes Drain Evaporation Pond R 0esourceescnption Units Cost/UnIt Task Units Task Cost Equipment Operators hrs $18.94 200 $3,788 60mit HOPE liner so.ft.$0.35 960,000 $336,000 Cat 637 Scraper hrs $205.10 100 $20,510 Cat 825 Compactor hrs $93.85 25 $2,346 Cat 07 Dozer hrs $80.38 25 $2,010 Cat651 waterwagon hrs $107.49 25 $2,687 Cat 14G Motorgrader hrs $70.59 25 $1,765 Equipment Maintenance (Butter)hrs $20.57 200 $4,114 Total Slimes Drain Evaporation Pond $373,220 MANAGEMENT/SUPPORT R 0esourceescription Units Cost/Unit Task Units Task Cost Manager/Engineer hrs $58.19 6,240 $363,114 Radiation Safety Officer hrs $45.47 6,240 $283,713 Secretary hrs $18.39 6,240 $114,744 Clerk hrs $15.13 4,866 $73,621 Environmental Technician (Part time,4.5 years)hrs $25.60 4,866 $124,590 Maintenance Foreman hrs $33.36 6,240 $208,185 Chemist hrs $26.77 2,080 $55,678 Security hrs $9.85 18,720 $184,462 Safety Engineer hrs $25.60 4,160 $106,513 Misc.Materials &Supplies hrs $36,45 6,240 $227,448 Heafth Physics Costs hrs $64.81 2,080 $134,800 Environmental Monitoring Costs,Laboratory years $71,620.00 7.0 $501,340 Total ManagementfSupport $2,378,209 TOTAL MISCELLANEOUS ITEMS $3,295,2471 1011512010·8:06AM •WMM Rec PlanEstOctober2010 Rev4.3 Oenison Mines(USA)Corp. WhitoMesa Mill Equipment Costs EQUIPMENT COSTS WHITE MESA MILL RECLAMATION COST HOURLY EQUIPMENT COSTS 2010 DOLLARS $1,940.000 $650.000 $550,000 $250,000 $300,000 S 345,000 $2,000,000 $425,000 $250,000 $175.000 5 265.000 Replacement CostRATEMTCEFUELFUEL@::Tj,,,.~ndGET TOTAL MoblDemob MoblDemob o eratin Hrs MONTHLY HOURLY EXPENOABLES USAGE $1.806 COST permachine Totals per Month 26,200 148.86 8.80 23.5 42.44 5.00 $205.10 $23,300 $93.200 704 13,000 73.86 4.75 8.5 15.35 1.00 $94.96 $15.500 $15.500 176 11,000 6250 4.24 7.0 12.64 1.00 $80.38 $13.700 $13,700 176 11,550 65.63 4.25 13.0 23.48 0.50 $93.85 $14.300 $14,300 176 11,650 66.19 4.65 9.0 16.25 5.00 $92.10 $14,100 $14,100 176 18,000 102.27 6.00 11.0 19.87 5.00 $133.14 $17,000 $17,000 176 11.850 67.33 6.85 8.5 15.35 4.00 $93.53 $14.600 $58,400 704 17.000 96.59 7.00 13.0 23.48 1.00 $128.07 $26,400 $26,400 176 12.150 69.03 5.75 17.0 30.70 2.00 $107.49 $15.750 $15.750 176 6.850 38.92 3.35 10.0 18.06 2.00 $62.33 $7.100 $7.100 '176 9,100 51.70 3.95 55 9.93 5.00 $70.59 $11.150 $11,150 '176 4 1 1 1 1 Unils 4 1 1 Actual equipmentrales quoted from North Central Rental &Leasing.LLC.12 month rental period March 2,2010 637E Scraper D8R Dozer D7R Dozer 825H Compactor 980 H Loader 988 H Loader 770 Haul Truck 365BLExcavator 651 Water Wagon 5000 gal Water Truck 14H/RipperMotor Grader r-$286,6001 2.992 Equipment Renlal Rate Quoted by WorldWide Renta[Services(02/191201O)for PC 300 Excavatorwith Shear PC 300 I'll Shear 19.500.00 110.80 17.99 12.5 22.58 I $151.361 MoblDemob 54.550 s 450.000 Small tools allocation -Demolition - S1.35/mechanic labor hourfor oxygen/acetylene,expendables D Bulier Equipment Maintenance Cost Crane Rental Rates 60 ton Hydraulic Crane 30 ton Hydraulic Crane Butler Maintained Planned Equipment Operating Total Maintenance Monthly Planned hoursfmonlh Operating Fuel Cost per Cost per Maintenance Operating (other hours per Fuel Usage month,21 Operating Flat Rate Hours/month equipment month per day,gal.days Hour MoblDemob $65,430 3.218 570 3,788 20 S 758.52 $20.57 $64,722 AA"MTCE FUEL FUEL TOTAL MONTHLY HOURLY EXPENDA8LES USAGE $1.806 COST 8,600 48.86 2.15 15.0 27.09 $78.10 5,500 31.25 2.15 10.0 18.06 $51.46 s s 250.000 175.000 Rental Rates updated from Honnen Equipment 02f22/2010 Power Motive -Screen deck and conveyors s 200,000 S 8.225,000 $82,250 10115:20'0.807AM.WMM R=P'anE~,Oc[obc,20,0Rc~~.3 i".:crr'.~"on~[U'~";um(l'SA)CO'DWh,:C ~,~c,~M;'; Rock Production ROCK PRODUCTION COST Assumptions: Rock is obtained from gravel source north ofBlanding,Utah.BLM Public Pit Rip Rap Rock is processed by screening only,no crushing is required,1.25 CY of feed for 1 CY of product Filter material is produced from Rip Rap reject Rock is produced and stockpiled at the site Site is 7 road miles from the mill;6 miles ofwhich is paved public highway Rock will be hauled in 22 CY bellydump trucks,contract haulers ($85.00/hr) Rock will be dumped in windrows on Tailings Cells by trucks,spread by grader,and spread by 07 Dozer Trucks can average 30 MPH (1.75 rounds/hr) Rip Rap matrial fed to plant Filter material fed to plant PRODUCTION OF RIPRAP Resource Description Product Required (CY) 189,000 25,500 214,500 Units Reject Factor 25.0% 10.0% Cost/Unit Material Feed to Plant (CY) 236,250 28,050 Task Units Plant Plant Throughput Operating (CY/hr)Hours 122 1,900 122 __---,,.,2"'0"'-0 2,100 Task Cost Equipment Operators hrs $18.94 2,475 $46,874 Laborer hrs $12.51 2,100 $26,262 Cat D8N Dozer With Ripper hrs $94.96 375 $35,612 Cat 980 Loader hrs $92.10 2,100 $193,404 Screening Plant w/conveyors*hrs $64.13 2,100 $134,670 BLM Usage Fee CY $0.60 214,500 $128,700 Contract Highway Trucks -Bellydumps"hrs $85.00 5,571 $473,571 Equipment Maintenance (Butler)hrs $20.57 2,475 $50,906 Total Production ofRipRap RIPRAP COST PER CUBIC YARD DELIVERED $1,089,999 $5.771 •Cost Quoted from Power Motive Corporation,Denver,Colorado updated February 22,2010 $7,000 plus $3,700 for conveyors,176 hours per month for one month,plus screen set up at $2,000. Mob and Demob - $5,000.00 ..Cost quoted from Dennis Cosby,Cosby Trucking,Inc.,Blanding,Utah,Updated March 01,2010 (includes ownership expense,fuel,maintanence and operator) 1Qf15J2Q10 -8:07 AM -WMM Ree Plan Est October 2010 Rev 4.3 International Uranium (USA)Corp While Mesa Mill