Loading...
HomeMy WebLinkAboutDRC-2010-005044 - 0901a068801c3621DRC-2010-005044 Page 1 of 2 Phillip Goble - RE: Cell 1 Leak Discussion Meeting From: Jo Ann Tischler <jtischler(@denisonmines.com> To: Phillip Goble <pgoble(@utah.gov> Date: 9/14/2010 9:28 AM Subject: RE: Cell 1 Leak Discussion Meeting CC: Harold Roberts <HRoberts(^denisonmines.com>, David Frydenlund <DFrydenlund(@denisonmines.com> Attachments: Revised Table 1 for June and August 2010.pdf Phil That will work. We will call Loren's office. I have also attached an updated version of Table 1 from both the June and August leak detection system level measurements, with footnotes clarifying the meaning of the raw data. Jo Ann Tischler Jo Ann Tischler Director, Compliance and Permitting t: (303) 389^132 | f: (303) 389-4125 1050 17th Street, Suite 950, Denver, CO 80265 DENISON MINES (USA) CORP www.denisonmines.corri This e-mail is intended for the exclusive use of the person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if you are not the intended recipient(s). From: Phillip Goble [mailto:pgoble(autah.gov] Sent: Tuesday, September 14, 2010 7:32 AM To: Jo Ann Tischler Cc: Loren Morton Subject: RE: Cell 1 Leak Discussion Meeting Alright, how does Tomorrow (Wednesday) at 1:00 work for you. Please call in to Loren's office. Phil >>> Jo Ann Tischler <jtischler(g)denisonmines.com> 9/13/2010 2:56 PM >>> Harold is out of town Thursday through Monday September 16 through 20. We can do today, tomorrow afternoon or Wednesday anytime, or next Monday or Tuesday. Thanks, Jo Ann Tischler Jo Ann Tischler Director, Compliance and Ponvitlinq t: (303) 389-4132 | f: (303) 389-4125 DENISON MINES (USA) CORP file://C:\Documents and Settings\Pgoble\Local Settings\Temp\XPgrpwise\4C8F402FEQD.,. 9/16/2010 Page 2 of 2 1050 17th Street, Suite 950, Denver, CO 80265 www.denisonmines.com This e-mail is intended for the exclusive use of the person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if you are not the intended recipient(s). From: Phillip Goble [mailto:pgoble@utah.gov] Sent: Monday, September 13, 2010 12:53 PM To: Jo Ann Tischler Cc: Loren Morton Subject: Cell 1 Leak Discussion Meeting Jo Ann, I checked with Loren, the best time for us to meet to discuss the Cell 1 Leak Repair Plan is Thursday September 16 at 9:00 a.m., please call Loren's office. Please let me know if that date and time will work for you. Phil file://C:\Documents and Settings\Pgoble\Lpcal Settings\Temp\XPgrpwise\4C8F402FEQD... 9/16/2010 TABLE 1 Estimation of Cell 1 Leakage Rate From June 2010 Date of Fluid Detection Until Leak Detection System Achieved Dryness Date Time Conditions at Time of Level Measurement Approximate Depth to Liquid Level Height of Liquid Column (feet) Calculated Leakage rate (gpm) 06/2/2010 14:50 During routine inspection 55 feet 10 inches 7.5 6/3/2010 08:25 Before pumping standpipe 55 feet 6 inches 7.83 \ • .: 6/3/2010 08:42 After pumping standpipe 63 feet 4 inches (dry)^ 0 6/3/2010 09:30 Before pumping standpipe 61.feet 9 inches 1.58 6/3/2010 09:33 After pumping standpipe 63 feet 4 inches (dry) 0 0.48 6/3/2010 14:05 Before pumping standpipe 58 Feet 8 inches 4.67 6/3/2010 14:10 After pumping standpipe 63 feet 4 inches (dry) 0 0.17 6/4//2010 07:50 Before pumping standpipe 57 feet 0 inches 6.33 6/4//2010 07:59 After pumping standpipe 63 feet 4 inches (dry) 0 0.05 6/4//2010 14:11 Before pumping standpipe 57 feet 5 inches 5.92 6/4//2010 14:17 After pumping standpipe 63 feet 4 inches (dry) 0 0.14 6/7/2010 10:25 Before pumping standpipe 56 feet 6 inches 6.83 6/7/2010 10:31 After pumping standpipe 63 feet 4 inches (dry) 0 ^ Value of 63 feet 4 inches indicates length of standpipe/blow tube before extensions were added in August 2010. TABLE 1 Estimation of Cell 1 Leakage Rate From date of August Fluid Detection Until Leak Detection System Achieved Dryness Date Time Conditions at Time of Level Measurement Approximate Depth to Liquid Level Height of Liquid Column (feet) Calculated Leakage rate (gpm) 8/7/2010 21:30 During routine inspection 61 feet 8 inches'" 1.70 8/8/2010 13:55 Before pumping standpipe 60 feet 8 inches 2.83 0.01 8/9/2010 09:00 Before pumping standpipe 60 feet 2 inches (dry) 3.3 0.02 8/10/2010 14:24 Before pumping standpipe Unable to read while PVC cement was setting^,^ 0.02 8/11/2010 13:15 Before pumping standpipe 63 feet 9 inches (dry) 5.75 0.01 8/12/2010 15:00 Before pumping standpipe 64 Feet 2 inches 5.33 0.02 8/13/2010 10:40 Before pumping standpipe 65 feet 0 inches (dry) 4.5 0.02 8/14//2010 14:20 Before pumping standpipe 66 feet 2 inches 3.33 0.01 8/15//2010 16:15 Before pumping standpipe 66 feet 4 inches (dry) 3.17 0.01 8/16//2010 14:50 Before pumping standpipe 67 feet 5 inches 2.08 0.01 8/17//2010 13:45 Before pumping standpipe 68 feet 5 inches 1.08 0.002 8/18/2010 14:30 Before pumping standpipe No liquid present; no pumping required io;; 8/19/2010 14:45 Before pumping standpipe No liquid present; no pumping required 0 . . • By this date, the environmental staff had added a 2-inch extension to the end of the blow pipe. The pipe length was now 63 feet 6 inches. ^ Based on requests by Dave Rupp and Dean Henderson the LDA standpipe was extended by six (6) feet on August 10,2010 ^ There were no obstructions to the standpipe or blow tube. The PVC cement for the pipe extension had not dried at the time ofthe level measurement. To prevent disturbance ofthe cement before it was properly set, the measurement was deferred to the next day.