HomeMy WebLinkAboutDRC-2010-004142 - 0901a068801ad509DENISO
MINES
July 26, 2010
SENT VIA PDF AND FEDERAL EXPRESS
Oonison Rffinet (USA) Corp.
1090 17th Straat Suits 950
Denvar, CO 8G26S
USA
Tel:303 828-779t
Fax: 303 3894129
www.denisonminM.coni
- 20 10-004 U2
Mr. Phil Goble
Hydrogeologist
State of Utah Department of Environmental Quality
195 North 1950 West
Salt Lake City, Utah 84114-4850
Re: Response to Request for Information Dated June 24, 2010
White Mesa Uranium Mill - As-Built Report for Chloroform Monitor Well TW4-
26.
Dear Mr. Goble:
This letter and attachments respond, in part, to your request for information of June 24, 2010,
regarding the Denison Mines (USA) Corp. (Denison) White Mesa Mill Groundvi^ater Quality
Assurance Plan.
Specifically, Item 5 of your letter requests that Denison submit, within 60 days of completion,
the As-built report for MW-26.
In response to your request, this letter transmits for your review and use two copies of the As-
Built report, prepared by Hydro Geo Chem, Inc., for Chloroform Monitor Well TW4-26 which
was installed on May 26, 2010. The report includes:
1. Narrative on construction, completion and development.
2. Location map indicating the location of the new well.
3. As-built schematic.
4. Lithologic log.
Please advise me if you require any fiirther information on this well.
Yours truly,
.Jo C c>K.-c>i^-
Jo Ann Tischler
Director, Compliance and Permitting
cc: David C. Fryenlund
Ron F. Hochstein
Ryan Palmer
Harold R. Roberts
David E. Turk
Kathy Weinel
Enclosures
DENISO
MINES
HYDRO GEO CHEM, INC.
Environmental Science & Technology
July 23, 2010
Mr. David Frydenlund, Esq
Denison Mines (USA) Corporation
1050 17* Street
Independence Plaza, Suite 950
Denver, Colorado 80265
Dear Mr. Frydenlund,
This letter report provides a brief description of the installation of new temporary perched
zone well TW4-26 during May 2010. The approximate location of TW4-26 is shown in Figure 1.
Well installation procedures were similar to those used previously at the site for the
construction of other temporary perched zone wells (HOC, 2005)'. As before, drilling and
construction were performed by Bayles Exploration, Inc., and borings logged by Mr. Lawrence
Casebolt under contract to Denison Mines (USA) Corporation (DUSA). A well construction
schematic based on information generated by Mr. Casebolt is provided in Figure 2. The depth to
water shown in the construction schematic is based on measurements taken at the time of
installation.
A 12 % inch diameter tricone bit was used to drill a boring of sufficient diameter to install an
8-inch-diameter, schedule-40 PVC surface (conductor) casing. This surface casing extended to a
depth of approximately 10 feet below land surface. Once the surface casing was in place, TW4-26
was drilled by air rotary using water and/or foam when needed to maintain circulation. The well was
then drilled to total depth using a 6% inch diameter tricone bit.
Drill cuttings were logged at 2 V2 -foot depth intervals and samples were collected in labeled,
self-sealing, plastic bags and labeled, plastic, cuttings storage boxes. A copy of the lithologic log
submitted by Mr. Casebolt is provided in the Appendix. Fluids and cuttings brought to the surface
during drilling were routed to a pit excavated for that purpose adjacent to the boring. In general, air
was used as a drilling fluid until poor cuttings retrieval necessitated the use of water and/or foam.
The boring was advanced into the Brushy Basin member of the Morrison Formation, then backfilled
with Colorado Silica Sand™ to a depth approximately 3 feet below the contact prior to well casing
installation.
' Hydro Geo Chem, Inc. 2005. Perched Monitoring Well Installation and Testing at the White Mesa Uranium
Mill, April through June 2005. Submitted to International Uranium Corporation.
H:\718000\tw26\wellrepoi1\iw26inst.doc - iC
51 West Wctmore, Suite 101 Tucson, Arizona 85705-1678 520.293.1500 520.293.1550-Fax 800.727.5547-Toll Free
Mr. David Frydenlund
July 23,2010
Page 2
TW4-26 was constructed using 4 inch diameter. Schedule 40, flush-threaded PVC casing and
0.02-slot, factory-slotted PVC screen. Colorado Silica Sand ™ was used as a filter pack and installed
to a depth approximately 4V2 feet above the screened interval. The annular space above the filter pack
was then sealed with approximately 5 feet of bentonite and grouted to the surface using Portland
cement. The completed well was developed by surging and bailing.
Please call me in Tucson if you have any questions or comments.
Sincerely,
Stewart Smith
Associate Hydrogeologist
Attachments
H:\718000\tw26\wellrepoit\rw26inst.doc
ATTACHMENTS
FIGURES
1 Site Plan Showing Perched Perched Well Locations and Approximate Location of Well
TW4-26, White Mesa Site
2 TW4-26 As-Built Well Construction Schematic
APPENDIX
A Lithologic Log
FIGURES
TW4-19 o
niz-i
•f
TW4-20
TW4-23
EXPLANATION
perched monitoring well
temporary perched monitorrng weN
perched piezometer
perdied monitoring well
instailed April, 2005
temporary perched monitoring
well instailed April, 2005
temporary perched monitoring well
installed May, 2007
^ TWM-1 temporary perched nitrate
monitoring well
- TW4-26 temporary perched 1? monitoring well
wildlife pond
HYDRO
GEO
CHEM, INC.
siTrrosR
SHOWING PERCHED WELL LOCATIONS
AND APPROXIMATE LOCATION OP WELL TW4-26
, WHITE MESA SITE
vpnovED
SJS H:/718000/tw26/tw26.srf
10
20
30
40
50
60
CL lij Q
70
80
90
100
4 INCH DIA. PVC CAP
OMINAL 12 3/4 INCH DIA'.5r BOREHOLE^
lO'-O"
" SURFACE CASING (8 INCH DIA PVC)
PORTLAND CEMENT GROUT
4 INCH DIA SCH 40 FLUSH
THREAD PVC CASING
BENTONITE SEAL
NOMINAL 6 3/4 INCH DIA.
BOREHOLE
COLORADO SILICA GRAVEL PACK
STATIC WATER LEVEL
4 INCH DIA SCH 40 FLUSH-THREAD
0.02 SLOT PVC SCREEN
NOT TO SCALE
HYDRO
GEO
CHEM, INC.
TW4-26
AS-BUILT WELL CONSTRUCTION SCHEMATIC
Approved"
SS
Data Author Date
07/21/10 MAC 07/21/10 7180247A
riguTB
APPENDIX A
LITHOLOGIC LOGS
7-IS-lO; 9:S0AM;SILVER ARROW STONE ;928B43732S
Dqfe S'2$'f^lP Genln^l^R^:ftf^»/^ DrlMing r.o.'^^/f^/At £itft7i>kfi'»A Hole TW-^^
Propertyli^tisJl^tS&Mu Project AA/arf/ern fni/iiti'<^siibi^]^\\ HQ
Counfy JliiL^jkM . SJate UfAh Locotioh _M^22A__A2i£2Z
Sec._22_ Twp. JZi_ Rge.
Elev.^l6£2_
T.O. PKoae JO(>.S
T.O. OHILL . J&OO
REMARKS
iii
liFSiil
IHii iiniii lEll [iHiili
113111
idll
lEli
v»^^\u r^.hL'^ gmt'W.
inii
iEJii
mm
mm
IHii siaag 1511 flrMshjf Boaift- Cor>W IS fH.o^i, fih^faga
lias
HYDRO GEO CHEM, INC.
Environmental Science &• Technology DRC-2010-004142
July 23, 2010
Mr. David Frydenlund, Esq
Denison Mines (USA) Corporation
1050 17* Street
Independence Plaza, Suite 950
Denver, Colorado 80265
Dear Mr. Frydenlund,
This letter report provides a brief description of the installation of new temporary perched
zone well TW4-26 during May 2010. The approximate location of TW4-26 is shown in Figure 1.
Well installation procedures were similar to those used previously at the site for the
construction of other temporary perched zone wells (HGC, 2005)'. As before, drilling and
construction were performed by Bayles Exploration, Inc., and borings logged by Mr. Lawrence
Casebolt under contract to Denison Mines (USA) Corporation (DUSA). A well construction
schematic based on information generated by Mr. Casebolt is provided in Figure 2. The depth to
water shown in the construction schematic is based on measurements taken at the time of
installation.
A 12 % inch diameter tricone bit was used to drill a boring of sufficient diameter to install an
8-inch-diameter, schedule-40 PVC surface (conductor) casing. This surface casing extended to a
depth of approximately 10 feet below land surface. Once the surface casing was in place, TW4-26
was drilled by air rotary using water and/or foam when needed to maintain circulation. The well was
then drilled to total depth using a 6% inch diameter tricone bit.
Drill cuttings were logged at 2 Vi -foot depth intervals and samples were collected in labeled,
self-sealing, plastic bags and labeled, plastic, cuttings storage boxes. A copy of the lithologic log
submitted by Mr. Casebolt is provided in the Appendix. Fluids and cuttings brought to the surface
during drilling were routed to a pit excavated for that purpose adjacent to the boring. In general, air
was used as a drilling fluid until poor cuttings retrieval necessitated the use of water and/or foam.
The boring was advanced into the Brushy Basin member of the Morrison Formation, then backfilled
with Colorado Silica Sand^'^ to a depth approximately 3 feet below the contact prior to well casing
installation.
' Hydro Geo Chem, Inc. 2005. Perched Monitoring Well Installation and Testing at the White Mesa Uranium
Mill, April through June 2005. Submitted to International Uranium Corporation.
H:\7l8000\tw25\wellreport\lw26inst.doc , y(2
51 West Wctmore, Suite 101 Tucson, Arizona 85705-1678 hl^" 520.293.1500 520.293.1550-Fax 800.727.5547-ToIl Free
Mr. David Frydenlund
July 23,2010
Page 2
TW4-26 was constructed using 4 inch diameter. Schedule 40, flush-threaded PVC casing and
0.02-slot, factory-slotted PVC screen. Colorado Silica Sand ™ was used as a filter pack and installed
to a depth approximately 4'/2 feet above the screened interval. The annular space above the filter pack
was then sealed with approximately 5 feet of bentonite and grouted to the surface using Portland
cement. The completed well was developed by surging and bailing.
Please call me in Tucson if you have any questions or comments.
Sincerely,
Stewart Smith
Associate Hydrogeologist
Attachments
H:\718000\tw26\wellrepoit\tw26inst.doc
ATTACHMENTS
FIGURES
1 Site Plan Showing Perched Perched Well Locations and Approximate Location of Well
TW4-26, White Mesa Site
2 TW4-26 As-Built Well Construction Schematic
APPENDIX
Lithologic Log
TW4-1fl O
REZ-1
IIW-31
•
TW4-20
<^
TW4-23
EXPLANATION
perctied monitoring well
tem|»rary perched monitonng well
perctied piezometer
percfied monitoring well
installed April, 2005
temporary perctied monitoring
well installed April, 2005
temporary perched monitoring well
installed May, 2007
A temporary perched nitrate monitoring well
^ TW4-26 ri*" ternporary perched V monitoring well
iwildlife pond
HYDRO
GEO
CHEM, INC.
STTTPLAN
SHOWING PERCHED WELL LOCATIONS
AND APPROXIMATE LOCATION OF WELL TW4-26
WHITE MESA STFE
SJS H:/718000/tiw26/tw26.srf
10
20
30
40
50
Ul UJ
u. 60
Q. UJ Q
70
80
90
100
4 INCH DIA. PVC CAP
^T#NOMINAL 12 3/4 INCH DIA.gf
^BOREHOLE
SURFACE CASING (8 INCH DIA PVC)
PORUAND CEMENT GROUT
4 INCH DIA SCH 40 FLUSH
THREAD PVC CASING
NOMINAL 6 3/4 INCH DIA.
BOREHOLE
COLORADO SILICA GRAVEL PACK
4 INCH DIA SCH 40 FLUSH-THREAD
0.02 SLOT PVC SCREEN
NOT TO SCALE
HYDRO
GRO
^ CHEM, INC.
TW4-2e
AS-BUILT WELL CONSTRUCTION SCHEMATIC
Approved "
SS
Saw*
07/21/10
Author
AMC
Data
07/21/10
FaeNaifie
7180247A
7-i6-lO; 9:S0AM;SILVER ARROW STONE ;9286437328 5/
Date d'-Zt'^/a &^a\n^^^^sAio/T^ Drilling r.n. 'if^///i £y}/b/6filA Hole Wo Ti^J^I-ZS,
Property ^iffii M//Project 6Mori>if'^ fn/f3f(j^^ffy[in\\ No. Sec._22__ Twp. Rge.
County J4iL2k<l4^_ Slote -i^j/y Locotion ^i^H'f.'Jl* /f^?-^7; Elev.?5&£2_
. OF.
r.o. Fito»e lo/y.^
T.O. OHILL . JQOO
REMARKS