HomeMy WebLinkAboutDRC-2010-004642 - 0901a068801bb2e5DENISO
MINES
DRC •2010-004642
August 19, 2010
Denison Mhws (USA) Corp.
1050 17th Street Suits 950
Denver, CO 80265
USA
Tol: 303 628-7798
Fax:303 389-4125
www.denlsonminas.coin
VIA ELECTRONIC FILE AND OVERNIGHT DELIVERY
Mr. Rusty Lundberg
Executive Secretary
Utah Radiation Control Board
Department of Environmental Quality
195 North 1950 West
PO Box 144810
Salt Lake City, Utah 84114-4820
BeC9!V8d
AUG ::c :u
Division of
Radiation Conircf
Re: Denison Mines (USA) Corp.
State of Utah 11e.(2) Byproduct Material License # UTI 900479
White Mesa Mill, Blanding, Utah
License Condition Number 9.5 - Surety Update
Request for Information, June 16, 2010
Dear Mr. Lundberg:
We are responding to the June 16, 2010 Request for Information from Dave Rupp asking for additional
clarification on the March 2010 update, Revision 4.1, of the White Mesa Mill reclamation cost estimates. Mr.
Rupp's comments are restated below, in italics, followed by our response. Where necessary, replacement
pages are provided for inclusion in the March 2010 estimate. These revisions are labeled Revision 4.2, and
also include the estimated cost for reclamation of tailings Cell 4B, that was submitted as revision 3.2 in June
2010.
1. Equipment Maintenance. The Equipment Costs spread sheet with the subtitle White Mesa Mill
Reclamation Costs, shows that the hourly rate for equipment maintenance dropped from $21.15 per
hour in the 2009 estimate to $20.53 per hour in the 2010 estimate. The calculation method to
derive the hourly maintenance rate for 2010 is unclear.
a. Please explain and justify the derivation ofthe hourly equipment maintenance rate for 2010, or
b. Correct the hourly maintenance cost for this estimate.
Below is a summary of the hourly maintenance cost utilized in the last three versions of the Reclamation Cost
Estimate. The fixed maintenance cost remained the same from the March 2009 estimate to the October 2009
estimate, but the totai equipment hours was increased to take into account the maintenance on the Cat 330 with
shear and the two mobile cranes. This equipment will require maintenance attention and was previously
excluded from the estimated hours. The fixed maintenance cost remained the same but the hourly cost was
Letter to Mr. Rusty Lundberg
August 19, 2010
Page 2
down because the total hours had increased. The fixed maintenance cost for the March 2010 estimated
increased from $62,315 per month to $65,430. The total equipment hours decreased slightly because the Cat
16H motor grader was removed from the equipment fleet as it was not utilized in any of the estimated tasks.
The hourly maintenance cost from the October 2009 estimate to the March 2010 estimate actually increased
from $18.58 per hour to $20.53 per hour.
Plan Revision Fixed Maintenance
Cost
Equipment Hours Houriy Cost
March 2009 $62,315 3,168 $21.15
October 2009 $62,315 3,964 $18.58
March 2010 $ 65,430 3,788 $20.53
2. Tankage and Spare Parts Removal. On page 4 of the Mill Decommissioning portion of the
estimate. Misc. Tankage and Spare Parts Removal costs are shown in a table titled the same. Per
DUSA's previous surety letter of October 5, 2009, this table includes only the reclamation of the
newly constructed uranium and vanadium SX feed tanks and the SX raffinate tank. However, the
reclamation of all the other existing tank systems at the mill appears to be omitted from the March
3,2010 estimate.
Please demonstrate that the reclamation of all the existing tank systems at the mill are included in
the current estimate with appropriate hours budgeted for each system. If not, please add this work
to the estimate.
Reclamation of the process equipment, tankage and concrete for the unit operations of the Mill area is included
in the estimates for each of the general areas, such as "Mill Building", "Ore Feed", "SX Building", "CCD Circuit",
"Sample Plant", "Boiler", etc. The demolition of the actual structure is a relatively small part of the total cost of
each of these areas, with the majority of the manpower and equipment time allocated to demolition of the
mechanical equipment, tankage and concrete. No salvage of any equipment or materials is assumed and
therefore no special care as been assumed for preservation of the integrity of the materials or equipment
3. Insurance. Last year we requested several insurance items be included in the estimate. The
Contractor Equipment Floater, Workman's Compensation, and Employer's Liability estimates are
acceptable as included in the current estimate.
An exception is the estimate for contractor's General Liability submitted in the March 3, 2010 surety
update, which we feel needs adjustment We also desire to have insurance for motor vehicles that
will be involved in the work, included in the estimate. For these two insurance types, we are
requesting that DUSA (and the other Utah U-mills) apply the limits of liability used by the Utah Dept.
of Transportation (UDOT), and other adjustments described in paragraphs a and b below:
a. General Liability Insurance. Last year we estimated this amount to be between 0.25 and 0.64%
of the total project cost An average amount of 0.45% was added to the estimate. We have
DENISO
MINES
Letter to Mr. Rusty Lundberg
August 19, 2010
Page 3
discovered this cost range was actually an estimate for Builder's Risk insurance. We are not
currently interested in Builder's Risk insurance for the project However, we are interested in
budgeting for the general liability insurance we originally intended. The extent of liability and
requirements for this insurance must have the following minimum limits of liability:
(1) . $1,000,000 Bodily Injury and Property Damage - Each Accident
(2) . $2,000,000 General Aggregate
(3) . $2,000,000 Products and Complete Operations Annual Aggregate
b. Automobile Liability Insurance. Provide Automobile Liability Insurance for claims arising from
the ownership, maintenance, or use of motor vehicles involved in project work with the following
minimum limits:
(1). $1,000,000 Combined single Limit Bodily Injury and Property Damage per Occurrence
The costs for these insurance must be documented, based on quotes or reputable cost book
figures.
Costs for general Liability and auto insurance have been revised based on a quote from Denison's insurance
carrier, Aon Reed Stenhouse Inc. Insurance costs were estimated for a 7 year period and have been included
as a separate line item in the Cost Summary, replacing the Builder's Risk insurance included in the previous
estimate.
4. Reclamation costs for decommissioning, demolishing and disposal of the New Reagent Storage
Building needs to in the estimate.
Costs for decommissioning, demolishing and disposal of the new reagent storage building have been added to
the estimated costs for the Alternate Feed Circuit.
5. Cosfs of pumping, monitoring and disposal after mill closure:
a. Slimes drain pumpage for Cells 2, 3, and 4A will be 6.5 years or more.
(1) . This adds extra time for pumping facilities and monitoring beyond the 5-years for
environmental monitoring already budgeted, which needs to be added to the
estimate.
The time frame for environmental monitoring has been increased in the estimate from 4.5 years to 7.0 years.
(2) . It seems that if reclamation were to begin now, that the tailings ponds would be
closed to acceptance of tailings and wastewater. If the White Mesa Mill Tailings Cells
are closed to further influent, the costs for a separate pond for storage of pumpage,
or other wastewater treatment method will need to be included in the estimate.
DENISOl
MINES
Letter to Mr. Rusty Lundberg
August 19, 2010
Page 4
For purposes of reclamation costing we have assumed that the free water from the active tailings cells and the
slimes drain pumping will be pumped to the Cell 1 evaporation pond during the early stages of the reclamation
activities. Based on the estimated flow rates from the slimes drains in Cells 2, 3, 4A and 4B for the first three
years after commencement of reclamation, use of Cell 1 wiil be adequate to contain and evaporate the flow
from the slimes drains. For the final dewater effort (years 4 to 7 after commencement of reclamation), a 22 acre
lined containment will be constructed on the tailings surface in Cell 4A or Cell 4B, directly on top of the tailings
sands. This containment will remain active until the dewatering effort is complete. Costs for construction of this
containment have been included under the Miscellaneous category of the cost estimate.
b. Costs for treatment of the chloroform and nitrogen plumes at the White Mesa Mill site need
to be included in the estimate. Facilities and time for aquifer pumping and related
wastewater treatment or disposal pond system must be estimated and justified. A separate
wastewater treatment or disposal pond system from the slimes drainage may be needed. It
may not be feasible to co-mingle wastewater from the chloroform and nitrogen plumes with
slimes drain wastewater pumpage discussed above.
The current average flow rate from pumping of five (5) chloroform wells totals 4.1 gallons per minute. This
volume will continue to be pumped to the evaporation cell, Cell 1, until the 22-acre secondary solution
containment described above is available. Thereafter, it will be pumped into that containment. Based on the
estimated flow rates from the Cell 2, 3, 4A and 4B slimes drains and from the five chloroform pumping wells,
there will be adequate space and evaporative capacity in that containment for the pumped chloroform water.
The Preliminary Corrective Action Plan ("CAP") submitted to the State in 2007 proposes continued pumping of
the wells for an indeterminate period of time, followed by monitored natural attenuation. The current pumping
costs are incidental to Mill operations. We currently believe it is reasonable to assume that the chloroform
concentration in the groundwater will be reduced by the pumping to levels suitable for natural attenuation within
the seven-year time frame assumed for dewatering of the tailings cells. The annual incremental cost of
pumping over these seven years is negligible and would fall under the Miscellaneous category of the cost
estimate.
Denison also submitted the Nitrate Contamination Investigation Report to the State on December 30, 2009
concerning the apparent nitrate and chloride contamination to the north of the Mill facility, with evidence pointing
to an offsite source of the contamination. At this time Denison does not believe the nitrate/chloride
contamination is from Mill operations or other activities controlled by Denison and we should not be held
accountable for any future cleanup costs. No additional costs have been included in the reclamation estimate
with respect to this contamination.
6. Potential Closure of monitoring well WW2. DUSA is required to submit a plugging and closure plan
in Part I.H.3 ofthe imminent Ground Water Discharge Permit to address the possibility of hydraulic
interconnection ofthe chloroform plume and the deep aquifer (tribal drinking water supply). Please
include the costs for this plan and implementation in the estimate.
Denison is currently working with drilling contractors to evaluate procedures for rehabilitating WW2 for
continued use as a water supply well. The well currently provides potable water to the Mill facility and is a
valuable asset. Denison fully expects to successfully rehabilitate this well to the State's satisfaction, but in the
interim we have included estimated plugging and abandonment costs under the Miscellaneous category.
DENISO
MINES
Letter to Mr. Rusty Lundberg
August 19, 2010
Page 5
If you have any additional questions or comments, please feel free to contact me.
Yours very truly,
DENISON MINES (USA) CORP.
<Jo Ann Tischler
Director, Compliance and Permitting
cc: Ron F. Hochstein
Harold R. Roberts
David C. Frydeniund
Rich E. Bartlett
David Turk
DENISO
MINES
Dmbon Mines (USA) Corp.
1050 17th Straat, Suita 950
DE NI SON m USA
MINES Tel: 303 628-7798
Fax: 303 389-4125
www.denisonmlnes.com
Attachment C
White Mesa Mill Reclamation Plan
Revision 4.2
Revised Cost Estimates
for
Reclamation
of the
White Mesa Mill and Tailings
Management System
August 2010
state of Utahlle.(2) Byproduct Material License # UT1900479
^ Copy 1 State of Utah
Denison Mines (USA) Corp. I lOSO 17th street, Suite SSO I Tel : 303 628-7798
www.danlsonmines.coni | Denver, CO, USA 80265 | Fax: 303 389-4125
Cost Summary
WHITE MESA MILL RECLAMATION COST ESTIMATE
August 2010
Revision 4.2
Mill Decommissioning $2,074,022
Cell 1 $1,696,333
Cell 2 $1,579,075
Cell 3 $2,041,413
Cell 4A $1,336,754
Cell 4B $1,325,780
Miscellaneous $3,295,240
Subtotal Direct Costs $13,348,617
Profit Allowance 10.00% $1,334,862
Contingency 15.00% $2,002,293
Licensing & Bonding 2.00% $266,972
UDEQ Contract Administration 4.00% $533,945
Contractors Equipment Floater $82,250
General liability Insurance $284,600
Long Term Care Fund $797,448
Total Reclamation $18,650,986
Revised Bond Amount $18,650,986
8/19/2010 - 2:24 PM - WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
Mill Decommissioning
MILL DECOMMISSIONING
MILL DECOMMISSIONING
Mill Building Demolition
Resource Description Units Cost/Unit Task Units Task Cost
hrs $18.94 720 $13,636
hrs $16.53 640 $10,577
hrs $12.51 320 $4,002
hrs $1.35 960 $1,296
hrs $93.53 640 $59,860
hrs $16.67 640 $10,671
hrs $133.14 160 $21,302
hrs $128.07 160 $20,491
hrs $151.36 160 $24,218
hrs $78.10 160 $12,497
hrs $51.46 80 $4,117
hrs $20.53 1,360 $27,925
sf $3.30 37,500 $123,750
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
60 Ton Crane
30 Ton Crane
Equipment Maintenance (Butler)
Concrete Removal
Total Mill Building Demolition
Ore Feed Demolition
Resource Description Units Cost/Unit Task Units
$334,341
Task Cost
hrs $18.94 48 $909
hrs $16.53 64 $1,058
hrs $12.51 32 $400
hrs $1.35 96 $130
hrs $93.53 64 $5,986
hrs $16.67 64 $1,067
hrs $133.14 16 $2,130
hrs $128.07 16 $2,049
hrs $151.36 16 $2,422
hrs $51.46 0 $0
hrs $20.53 112 $2,300
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
30 Ton Crane
Equipment Maintenance (Butler)
Total Ore Feed Demolition
SX Building Demolition
Resource Description Units Cost/Unit Task Units
$18,450
Task Cost
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
60 Ton Crane
30 Ton Crane
Equipment Maintenance (Butler)
Concrete Removal
Total SX Building Demolition
hrs $18.94 240 $4,545
hrs $16.53 320 $5,288
hrs $12.51 160 $2,001
hrs $1.35 480 $648
hrs $93.53 320 $29,930
hrs $16.67 320 $5,336
hrs $133.14 80 $10,651
hrs $128.07 80 $10,246
hrs $151.36 80 $12,109
hrs $78.10 0 $0
hrs $51.46 0 $0
hrs $20.53 560 $11,498
sf $3.30 55,970 $184,701
$276,953
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
MILL DECOMMISSIONING
CCD Circuit Removal
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
60 Ton Crane
30 Ton Crane
Equipment Maintenance (Butler)
Concrete Removal
Total CCD Circuit Removal
hrs $18.94 135 $2,557
hrs $16.53 120 $1,983
hrs $12.51 60 $750
hrs $1.35 180 $243
hrs $93.53 120 $11,224
hrs $16.67 120 $2,001
hrs $133.14 30 $3,994
hrs $128.07 30 $3,842
hrs $151.36 30 $4,541
hrs $78.10 30 $2,343
hrs $51.46 15 $772
hrs $20.53 255 $5,236
sf $3.30 15,000 $49,500
$88,986
Sample Plant Removal
Resource Description Units Cost/Unit Task Units Task Cost
hrs $18.94 24 $455
hrs $16.53 32 $529
hrs $12.51 16 $200
hrs $1.35 48 $65
hrs $93.53 32 $2,993
hrs $16.67 32 $534
hrs $133.14 8 $1,065
hrs $128.07 8 $1,025
hrs $151.36 8 $1,211
hrs $51.46 0 $0
hrs $20.53 56 $1,150
sf $3.30 4,200 $13,860
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
30 Ton Crane
Equipment Maintenance (Butler)
Concrete Removal
Total Sample Plant Removal $23,085
Boiler Demolition
Resource Description Units Cost/Unit Task Units Task Cost
hrs $18.94 120 $2,273
hrs $16.53 160 $2,644
hrs $12.51 80 $1,000
hrs $1.35 240 $324
hrs $93.53 160 $14,965
hrs $16.67 160 $2,668
hrs $133.14 40 $5,326
hrs $128.07 40 $5,123
hrs $151.36 40 $6,054
hrs $78.10 0 $0
hrs $51.46 0 $0
hrs $20.53 280 $5,749
sf $3.30 2,900 $9,570
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
60 Ton Crane
30 Ton Crane
Equipment Maintenance (Butler)
Concrete Removal
Total Boiler Demolition $55,696
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
MILL DECOMMISSIONING
Vanadium Oxidation Circuit Removal
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
60 Ton Crane
30 Ton Crane
Equipment Maintenance (Butler)
Concrete Removal
Total Vanadium Oxidation Circuit Removal
hrs $18.94 48 $909
hrs $16.53 64 $1,058
hrs $12.51 32 $400
hrs $1.35 96 $130
hrs $93.53 64 $5,986
hrs $16.67 64 $1,067
hrs $133.14 16 $2,130
hrs $128.07 16 $2,049
hrs $151.36 16 $2,422
hrs $78.10 0 $0
hrs $51.46 0 $0
hrs $20.53 112 $2,300
sf $3.30 1,200 $3,960
$22,410
Main Shop/Warehouse Demolition
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
Equipment Maintenance (Butler)
Concrete Removal
Total Main Shop/Wareiiouse Demolition
hrs $18.94 96 $1,818
hrs $16.53 128 $2,115
hrs $12.51 64 $800
hrs $1.35 192 $259
hrs $93.53 128 $11,972
hrs $16.67 128 $2,134
hrs $133.14 32 $4,260
hrs $128.07 32 $4,098
hrs $151.36 32 $4,844
hrs $20.53 224 $4,599
sf $3.30 19,300 $63,690
$100,591
Decon Pads (2) Demolition
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
Equipment Maintenance (Butler)
Concrete Removal
Total Decon Pads (2) Demolition
hrs $18.94 48 $909
hrs $16.53 64 $1,058
hrs $12.51 32 $400
hrs $1.35 96 $130
hrs $93.53 64 $5,986
hrs $16.67 64 $1,067
hrs $133.14 16 $2,130
hrs $128.07 16 $2,049
hrs $151.36 16 $2,422
hrs $20.53 112 $2,300
sf $3.30 1,350 $4,455
$22,905
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
MILL DECOMMISSIONING
Office Building Demolition
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
Equipment Maintenance (Butler)
Concrete Removal
Total Office Building Demolition
hrs $18.94 72 $1,364
hrs $16.53 96 $1,587
hrs $12.51 48 $600
hrs $1.35 144 $194
hrs $93.53 96 $8,979
hrs $16.67 96 $1,601
hrs $133.14 24 $3,195
hrs $128.07 24 $3,074
hrs $151.36 24 $3,633
hrs $20.53 168 $3,450
sf $1.25 12,100 $15,125
$42,801
Septic Tanks and Drain Fields
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
Equipment Maintenance (Butler)
Total Septic Tanks and Drain Fields
hrs $18.94 16 $303
hrs $16.53 0 $0
hrs $12.51 16 $200
hrs $1.35 32 $43
hrs $93.53 16 $1,496
hrs $16.67 16 $267
hrs $133.14 8 $1,065
hrs $128.07 8 $1,025
hrs $151.36 0 $0
hrs $20.53 32 $657
$5,056
Misc. Tankage & Spare Parts Removal
Resource Description Units Cost/Unit Task Units Task Cost
hrs $18.94 36 $682
hrs $16.53 48 $793
hrs $12.51 24 $300
hrs $1.35 72 $97
hrs $93.53 48 $4,489
hrs $16.67 48 $800
hrs $133.14 12 $1,598
hrs $128.07 12 $1,537
hrs $151.36 12 $1,816
hrs $20.53 84 $1,725
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
Equipment Maintenance (Butler)
Total Misc. Tankage & Spare Parts Removal $13,838
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2 Denison Mines (USA) Corp.
White Mesa Mill
MILL DECOMMISSIONING
Alternate Feed Circuit and Reagent Storage Building
Resource Description
Equipment Operators
Mechanics
Laborers
Small Tools
Cat 770 Haul Truck
Truck Drivers
Cat 988 Loader
Cat 365 Excavator
PC 300 w/metal Shears
Equipment Maintenance (Butler)
Concrete Removal
Units Cost/Unit Task Units Task Cost
hrs $18.94 118 $2,235
hrs $16.53 50 $826
hrs $12.51 50 $625
hrs $1.35 96 $130
hrs $93.53 48 $4,489
hrs $16.67 50 $834
hrs $133.14 34 $4,527
hrs $128.07 32 $4,098
hrs $151.36 52 $7,871
hrs $51.46 166 $8,542
sf $3.30 3,500 $11,550
Total Alternate Feed Circuit and Reagent Storage Building $45,727
Mill Yard Decontamination
Resource Description Units Cost/Unit Task Units Task Cost
hrs $18.94 582 $11,022
hrs $205.10 257 $52,712
hrs $133.14 65 $8,654
hrs $94.96 65 $6,173
hrs $80.38 65 $5,225
hrs $107.49 65 $6,987
hrs $70.59 65 $4,588
hrs $20.53 582 $11,950
Equipment Operators
Cat 637 Scraper
Cat 988 Loader
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 651 Watenwagon
Cat 14G Motorgrader
Equipment Maintenance (Butler)
Total Mill Yard Decontamination $107,311
Ore Storage Pad Decontamination
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Cat 637 Scraper
Cat 988 Loader
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 651 Waterwagon
Cat 14G Motorgrader
Equipment Maintenance (Butler)
hrs $18.94 429 $8,125
hrs $205.10 189 $38,765
hrs $133.14 48 $6,391
hrs $94.96 48 $4,558
hrs $80.38 48 $3,858
hrs $107.49 48 $5,159
hrs $70.59 48 $3,388
hrs $20.53 429 $8,809
Total Ore Storage Pad Decontamination $79,053
Equipment Storage Area Cleanup
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Cat 637 Scraper
Cat 988 Loader
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 651 Watenwagon
Cat 14G Motorgrader
Equipment Maintenance (Butler)
hrs $18.94 153 $2,898
hrs $205.10 68 $13,947
hrs $133.14 17 $2,263
hrs $94.96 17 $1,614
hrs $80.38 17 $1,366
hrs $107.49 17 $1,827
hrs $70.59 17 $1,200
hrs $20.53 153 $3,142
Total Equipment Storage Area Cleanup $28,258
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
MILL DECOMMISSIONING
Revegetate Mill Yard & Ore Pad
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Cat 637 Scraper
Cat 988 Loader
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 651 Watenwagon
Cat 14G Motorgrader
Seed Mix
Equipment Maintenance (Butler)
hrs $18.94 231 $4,375
hrs $205.10 132 $27,074
hrs $133.14 0 $0
hrs $94.96 33 $3,134
hrs $80.38 33 $2,653
hrs $107.49 0 $0
hrs $70.59 33 $2,329
Acre $322.50 50 $16,125
hrs $20.53 231 $4,743
Total Revegetate Mill Yard & Ore Pad $60,433
Total Demolition and Decontamination I $1,325,894|
CLEANUP OF WINDBLOWN CONTAMINATION
Scoping Survey
Resource Description Units Cost/Unit Task Units Task Cost
Soil Samples each $50.00 100 $5,000
Sun/ey Crew hrs $15.91 752 $11,961
Sample Crew hrs $15.91 1,312 $20,868
Total Scoping Survey $37,829
Characterization Survey
Resource Description Units Cost/Unit Task Units Task Cost
Soil Samples each $50.00 472 $23,600
Sample Crew hrs $15.91 1,136 $18,069
Total Characterization Survey $41,669
Final Status Survey
Resource Description Units Cost/Unit Task Units Task Cost
Soil Samples each $50.00 300 $15,000
Sample Crew hrs $15.91 3,552 $56,497
Total Final Status Survey $71,497
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2 Denison Mines (USA) Corp.
White Mesa Mill
MILL DECOMMISSIONING
Windblown Cleanup
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
hrs $18.94 1,190 $22,537 Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
hrs $205.10 680 $139,471
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
hrs $94.96 170 $16,144
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
hrs $80.38 170 $13,665
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
hrs $70.59 170 $12,000
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
each $50.00 500 $25,000
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
hrs $15.91 163 $2,593
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler)
hrs $15.91 83 $1,320
Equipment Operators
Cat 637 Scraper
Cat D8N Dozer With Ripper
Cat D7 Dozer
Cat 14H Motorgrader
Soil Samples
Survey Crew
Sample Crew
Equipment Maintenance (Butler) hrs $20.53 1,190 $24,434
Total Windblown Cleanup $257,164
Quality Control
Resource Description Units Cost/Unit Task Units Task Cost
Quality Control Contractor hrs $62.00 2,080 $128,960
Total Quality Control
Total Cleanup Windblown Contamination
$128,960
I $537,1191
Conventional Ore Disposal
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators hrs $18.94 1,070 $20,272
Cat 770 Haul Truck (3) hrs $93.53 612 $57,264
Cat 988 Loader hrs $133.14 204 $27,171
Cat 651 Watenwagon hrs $107.49 204 $21,936
Cat 14G Motorgrader hrs $70.59 50 $3,529
Equipment Maintenance (Butler) hrs $20.53 1,070 $21,978
Total Conventional Ore Disposal
Total Quantity
I $152,151]
120,000 Cubic Yards*
196 Cubic Yards per Truck per hour
612 Truck Hours
* 162,000 tons maximum projected for December 2010
Alternate Feed Disposal
Cabot and FMRI Material
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators hrs $18.94 158 $2,984
Cat 770 Haul Truck (3) hrs $93.53 65 $6,035
Cat 988 Loader hrs $133.14 22 $2,863
Cat 651 Watenwagon hrs $107.49 22 $2,312
Cat 14G Motorgrader hrs $70.59 50 $3,529
Equipment Maintenance (Butler) hrs $20.53 158 $3,235
Total Cabot & FMRI Material
Total Quantity 12,646 Cubic Yards* (as of 01/31/2010)
196 Cubic Yards per Truck per hour
65 Truck Hours
$20,957
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
MILL DECOMMISSIONING
Includes Linde, Cabot and FMRI
Cameco Barrels and Honeywell Barrels
Resource Description Units Cost/Unit Task Units Task Cost
hrs $16.67 296 $4,929
hrs $55.00 296 $16,260
hrs $18.00 591 $10,643
hrs $20.53 296 $6,070
$37,902
29,563 Barrels (as of 01/31/2010)
40 Barrels per load
0.4 Hours per load
296 Truck Hours
Tons lbs. per barrel No. Drums
CaF2 1,083 727 2,978
Calcined 2,547 320 15,919
Regen 329 406 1.621
KF 1,305 309 8,447
UF4 164 547 599
5,428 29,563
Equipment Operators
Flat Bed Trailer and Tractor*
Fork Lift (2)
Equipment Maintenance (Butler)
Total Cameco and honeywell Barrels
* includes operator
Sub-Total Alternate Feed Disposal
TOTAL MILL DECOMMISSIONING I $2,074,022]
8/19/2010 - 2:24 PM-WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
Miscellaneous
MISCELLANEOUS ITEMS
MISCELLANEOUS ITEMS
Equipment Mobilization
Resource Description Units Cost/Unit Task Units Task Cost
Butler Machinery Mobilization LS $351,322 1 $351,322
Other Equipment Mobilization LS $4,550 1 $4,550
Cranes LS $2,700 2 $5,400
Total Equipment Mobilization $361,272
Office Facilities
Resource Description Units Cost/Unit Task Units Task Cost
Install New Po«/eriine LS $15,000 1 $15,000
Utilities for Offices months $1,000 36 $36,000
Temporary Office Trailer months $1,500 3 $4,500
Temporary Office Trailer, mob, demob & setup LS $3,000 1 $3,000
Total Office Facilities $58,500
Decontamination Pad
Resource Description Units Cost/Unit Task Units Task (Dost
Laborers hrs $13 8,320 $104,046
Construct Wheel Wash Faciiity LS $180,000 1 $180,000
Total Decontamination Facilities
Facilities constructed in 2000 & 2008 ($180,000)
$104,046
Plug and Abandon WW2
Resource Description Units Cost/Unit Task Units Task Cost
Laborers hrs $0 8,320 $0
Contract Services LS $20,000 1 $20,000
Total Plug and Abandon WW2 $20,000
Slimes Drain Evaporation Pond
Resource Description Units Cost/Unit Task Units Task Cost
Equipment Operators hrs $18.94 200 $3,788
60 mil HOPE Liner sq.ft. $0.35 960,000 $336,000
Cat 637 Scraper hrs $205.10 100 $20,510
Cat 825 Compactor hrs $93.85 25 $2,346
Cat D7 Dozer hrs $80.38 25 $2,010
Cat 651 Watewagon hrs $107.49 25 $2,687
Cat 14G Motorgrader hrs $70.59 25 $1,765
Equipment Maintenance (Butler) hrs $20.53 200 $4,107
Total Slimes Drain Evaporation Pond $373,213
MANAGEMENT/SUPPORT
Resource Description Units Cost/Unit Task Units Task Cost
Manager/Engineer hrs $58.19 6,240 $363,114
Radiation Safety Officer hrs $45.47 6,240 $283,713
Secretary hrs $18.39 6,240 $114,744
Clerk hrs $15.13 4,866 $73,621
Environmental Technician ( Part time, 4.5 years) hrs $25.60 4,866 $124,590
Maintenance Foreman hrs $33.36 6,240 $208,185
Chemist hrs $26.77 2,080 $55,678
Security hrs $9.85 18,720 $184,462
Safety Engineer hrs $25.60 4,160 $106,513
Misc. Materials & Supplies hrs $36.45 6,240 $227,448
Health Physics Costs hrs $64.81 2,080 $134,800
Environmental Monitoring Costs, Laboratory years $71,620.00 7.0 $501,340
Totai Management/Support $2,378,209
TOTAL MISCELLANEOUS ITEMS $3,295,2401
8/19/2010 - 2 24 PM - WMM Rec Plan Est August 2010 Rev 4.2
Denison Mines (USA) Corp.
White Mesa Mill
General Liability Insurance
&
Auto Insurance
General Liability and Auto Insurance
Project Life 7 years
GL Insurance per full year $ 35,000
Auto $ 1,200 $ 12,000
Vehicles Vehicle Ins. GL Insurance
Year 1 5 $ 6,000 $ 20,000
Year 2 10 $ 12,000 $ 35,000
Years 10 $ 12,000 $ 35,000
Year 4 10 $ 12,000 $ 35,000
Years 10 $ 12,000 $ 35,000
Years 10 $ 12,000 $ 35,000
Year/ 3 $ 3,600 $ 20,000
$ 69,600 $ 215,000
Project Cost $ 284,600
8/19/2010 WMM Rec Plan Est August 2010 Rev 4.2
Harold Roberts
From:
Sent:
To:
Subject:
Jim Anderson
Thursday, July 29, 2010 7:16 AM
Harold Roberts
FW: Denison Mines
Harold, is Tom's assumption correct?
Jim Anderson
Executive Vice President & Cliief Financial Officer
t; 416-979-1991 x372 | f: 416-979-5893
595 Bay Street, Suite 402, Toronto, ON M5G 2C2
DENISON MINES CORP
www.denisonmines.com
This e-mail is intended for exclusive use the person{s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged
or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if
you are not the intended recipient(s).
From: Thomas.McBeath@aon.ca [mailto:Thomas.McBeath@aon.ca]
Sent: July 29, 2010 8:07 AM
To: Jim Anderson
Subject: Re: Denison Mines
Jim,
Would it be correct to assume that the $16mil reclaimation project would be done over several years? The letter hints at
this with 5 years of monitoring, and 6.5yrs of pumping. I have used that assumption and recommend the following
premiums:
a) General Liability: $35,000 per year
b) Automobile: $1,200 per vehicle per year. Thus, $12,000 for 10 vehicles.
Trust this meets your needs. Feel free to call if questions.
Sincerely,
Tom
Thomas McBeath, P.Eng. | Aon Reed Stenhouse Inc.
Vice President | Risk Management Practice
20 Bay Street, Toronto, ON M5J 2N9
Tel: 416.868.2449 | Fax: 416.868.5580
thomas.mcbeath(a>aon.ca
www.aon.ca
Jim Anderson <JAnderson(a)denisonmines.com>
Jul/23/2010 02:29 PM AST
To "Thomas.McBeath@aon.ca" <Thomas.McBeath@aon.ca>
cc
Subject Denison Mines
Tom, we are re-estimating our reclamation liability for the White Mesa mill in the US.
The attached letter outlines some additional information required by the State. On page
two in the paragraph marked they require some specific estimates on insurance. Once you
have had a chance to review, could you give me a call to discuss how best to address
this?
Jim Anderson
Executive Vice President & Chief Financial Officer
t: 416-979-1991 x372 | f: 416-979-5893
595 Bay Street, Suite 402, Toronto, ON M5G 2C2
DENISON MINES CORP
http://www.denisonmines.com/
This e-mail is intended for exclusive use the person(s) mentioned as the recipient(s).
This message and any attached files with it are confidential and may contain privileged
or proprietary information. If you are not the intended recipient(s) please delete this
message and notify the sender. You may not use, distribute print or copy this message if
you are not the intended recipient(s).
[attachment "Scanned001.pdf" deleted by Thomas McBeath/ARS/CA/AON]
This communication (and any attachments) is directed in confidence to the addressee(s) listed above, and may not otherwise be distributed, copied or
used. The contents of this communication may also be subject to privilege, and all rights to that privilege are expressly claimed and not waived. If you
have received this communication in error, please notify us by reply e-mail or by telephone and delete this communication (and any attachments) without
making a copy. Thank you.
La presents communication (et tout fichier rattache) s'adresse uniquement au(x) destinataire(s) precite(s) et ne peut etre autrement distribuee, copiee
ou utilisee. Le contenu de cette communication peut etre assujetti au privilege. Tout droit a ce privilege est expressement revendique et nullement
abandonne. Si vous avez regu cette communication par erreur, veuillez nous en avertir immediatement en repondant a ce courriel ou en nous appelant.
Veuillez egalement effacer cette communication (et tout fichier rattache) sans en conserver une copie. Merci.
This e-mail is intended for exclusive use the person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged
or proprietary information. If you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if
you are not the intended recipient(s).