Loren:
See the attached responses to you questions on the Reagent Storage Building.
Harold Roberts
Exoculive ViCD Prcsii:icn!. US Opo'Bbons
1.(303)389-4160 j f; (303) 389-4125
1050 17th Street. Suite 950. Denver, CO 80265
DENISON MINES (USA) CORP
www.denisonmines.com
This e-mail is intended for e^luslve use lhe person(s) menlioned as the recipient(s). This message and any attached flies with it are confidential and may contain privileged or proprietary
infonnation. II you are not the Intended ceciplenKs) please delete this message and notify the sender. You may nol use. distnbute print or copy this message If you are not the intended
reclpleni(s).
From; Richard Bartlett
Sent: Tuesday, October 20, 2009 3:21 PM
To: Harold Roberts
Subject: FW: Fwd: White Mesa Mill Proposed Reagent Building
Harold, we have addressed each ofthe issues. Is this enough information? Rich
Richard Bartlett
I'.AU} Manager
1.435-678-2221x105 I f: 435-678-2224
6425S. Highway 191, POBox 809, Blanding, UT 84511
DENISON MINES (USA) CORP
www.denisQnnnines.coni
This e-mail Is intended for exclusive use the person[s) mentioned as the reclplent(s). This message ana any attached files with It are confidential and may contain privileged or propnetary
information. If you are not the Intended reclplent(sj please delete this message and noliFy ihe sender. You may not use. distribute print or copy this message if you are not the intended
'ec'pjenl(5.i.
From: Steve Snyder
Sent: Tuesday, October 20, 2009 3:09 PM
To; Richard Bartlett
Subject: RE: Fwd: White Mesa Mill Proposed Reagent Building
1. Is the structure a building or an outdoor pad? Some confusion exists here. Is the feature a concrete pad that is
attached to a building, or is it a building with a roof and 3-walls?
a. The structure is a Lester Uni 1 Post Frame Pre Engineered Storage Shed w/ Single Slope Roof II has 3 walls
and one open side. The open side will be proiected from weather by flexible curtians or doors to reduce
precipitation entering the enclosure. The concrete pad is a containment to be built within the building. It
tile:.'yC:'^£)ocuments and SeUings\Lmorton\Local Settings\Temp\XPgrpwise\4ADE241FE0DOMAlNEQR... 11/3/2009
Page 2 of3
will be fially surrounded by the building structure.
2. If the structure is a building with a roof and 3-walls, will what will site grade look like? Will there be any
potential for run-off to enter the building?
a. TTie site grade will be such that run-off will be prevented from entering the building. The curb on the back
and sides will keep run-off out and the grade around the front will run water away from the building.
3. What activities are proposed for the facilily? Will the reagents be packaged in water-tight containers, or will they
be in bulk or loose form?
a. There will be both liquid and dry reagents stored in the building. The liquid reagents are stored in water-
tight containers. The dry reagents are in super sacks or bagged. These are not water-tight hence the need for
the building as protection for storage ofthe reagents. The concrete pad is secondary containment.
4. What kind of water or material will accumulate in the sump, and what will be its fate?
a. The sump will collect any liquid spills that may occur. Should this happen the sump will be pumped back
into a liquid container which will be kept for use in the process circuit. Should water collect for any reason
it would be disposed of in one ofthe tailings cells or in the Mill process.
Steve Snyder
Plant Engineer
t: 435-678-2221 xlOI | c: 435-459-9994 | f: 435-678-2224
6425S.Highway 191, POBox 809. Blanding, UT 84511
DENISON MINES (USA) CORP
www.denisonmines.com
This e-mail is Intended for exclusive use the per50n(s) mentioned as the reciplent(s). This message and any attached files with it are confidential and may contain privileged or propnetary
Information. If you are not the intended reclpient(s) please delete this message and notify the sender You may not use. distnbute print or copy this message If you sfe not the Intended
recipient(s).
From: Richard Bartlett
Sent: Tuesday, October 20, 2009 2:34 PM
To: Steve Snyder
Subject: FW: Fwd: White Mesa Mill Proposed Reagent Building
5teve lets discuss and reply to Harold. Rich
Richard Bartlett
Mill Manage)
1:435-678-2221 x105 | f: 435-678-2224
6425 S. Highway 191, PO Box 809. Blanding, UT 84511
DENISON MINES (USA) CORP
www.denisonmines.CQm
This e-mail Is intended for exclusive use lhe person(5) mentioned as the reclplent(s). This message and any attached files with it are confidential and may contain pnvileged or proprietary
information. If you are not the Intended reciplent(s) please delete this message and notify lhe sender. You may nol use, dislribute print or copy Ihis message If you are not the intended
reclpient(s).
From: Harold Roberts
Sent: Tuesday, October 20, 2009 2:24 PM
To: Richard Bartlett
Subject: Fw: Fwd: White Mesa Mill Proposed Reagent Building
Sent from my Verizon Wireless BlackBerry
From: Loren Morton <LMORTON(^utah.gov>
Date: Tue, 20 Oct 2009 16:04:23 -0400
To: Harold Roberts<HRoberts(2idenisonmines.com>
Cc: Steve Landau<SLandau@denisonmines.com>; Dane Finerfrock<dfinerfrock@utah.gov>; Dave
Rupp<drupp@utah.gov>; John Hultquist<jhultquist(@utah.gov>
file://C:\Documents and Settings\Lmorton\Local Settings\Temp\XPgrpwise\4ADE241FEQDQMArNEQR... 11/3/2009
Page 3 of3
Subject: Fwd: White Mesa Mill Proposed Reagent Building
Harold,
I have a few questions about the engineering drawing that Steve Landau emailed over yesterday regarding a new Reagent
Building. Questions are as follows:
1. Is the structure a building or an outdoor pad? Some confusion exists here. Is the feature a concrete pad that is
attached to a building, or is it a building with a roof and 3-walls?
2. If the Structure is a building with a roof and 3-walls, will what will site grade look like? Will there be any potential
for run-off to enter the building?
3. What activities are proposed for the facility? Will the reagents be packaged in water-tight containers, or will they be
in bulk or loose form?
4. Wliat kind of water or material will accumulate in the sump, and what will be its fate?
Responses to these questions will help DRC decide if there is a need for design review and approval.
Thanks for your help,
Loren
Harold Roberts
Executive Vice Presideni US Opeiations
I (303) 389-4160 I f: (303) 389-4125 DENISON MINES (USA) CORP
1050 I7ih Street, Suite 950, Denver, CO 80265 www.denisonmines.CQm
This e-mail Is Intended (or exclusive use the person(s) mentioned as the reclplent(s). This message and any attached files with it are confidential and may contain privileged or proprietary
Information. Ifyou are nol the Intended reclpient(s} please delete this message and notify lhe sender. You may not use. dislribute print or copy this message Ifyou are not the Intended
reclplent(s).
file://C:\Documents and Settings\Lmorton\Local Settings\Temp\XPgrpwise\4ADE241FEQDOMAINEQR... 11/3/2009