Loading...
HomeMy WebLinkAboutDRC-2016-011808 - 0901a0688068ea89mgfM ENERGY FUELS Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www.cncrgvluals.com December 5, 2016 Div of Waste Management and Radiation Control SENT VIA E-MAIL AND EXPRESS DELIVERY DEC - 6 2016 Mr. Scott Anderson DR.C-2016- 011808 Director of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, UT 84114-4880 Re: Transmittal White Mesa Uranium Mill Reclamation Plan, Revision 5.1 Dear Mr. Anderson: Pursuant to discussions with the Division for Waste Management and Radiation Control (“DWMRC”) regarding the draft Stipulation and Consent Agreement (“SCA”, dated July 1, 2016) for the Cell 2 cover placement activities, Energy Fuels Resources (USA) Inc. (“EFRI”) provided the DWMRC with the White Mesa Uranium Mill Reclamation Plan, Revision 5.1 (“Reclamation Plan”) on August 10, 2016. DWMRC provided written review comments to EFRI on both documents, including draft redlines on the SCA on September 28, 2016. EFRI revised the SCA and select sections of the Reclamation Plan to address DWMRC’s review comments and also incorporate comments resulting from discussions with the DWMRC during a meeting on October 5, 2016 and during follow up conference calls. Select sections of the Reclamation Plan and SCA were submitted on November 11, 2016 to incorporate the above referenced comments. DWMRC provided verbal comments to the November 11, 2016 revisions in a conference call on November 16, 2016. The attached redlines address the verbal comments provided by DWMRC in the November 16, 2016 conference call. This letter transmits the revised documents and includes: • Two CDs each containing: o An electronic file of the revised draft SCA (with redlines since last draft provided to DWMRC) o a word searchable electronic copy of the White Mesa Uranium Mill Reclamation Plan, Revision 5.1 dated December 2016 (includes revised sections of the Reclamation Plan since the August 2016 version) o electronic file copies of redlined report sections changed since the November 11, 2016 submittal of the Reclamation Plan • Two sets of hard copies of the revised draft SCA • Two sets of hard copies of replacement sections to the August 2016 version of the Reclamation Plan. Hard copies include: o Binder covers Letter to Scott Anderson December 5, 2016 Page 2 of 2 o Reclamation Plan main text o Drawings o Updated Cover Design Report main text (Appendix A to Reclamation Plan) o Appendix G to Updated Cover Design Report (main text only) o Appendix L to Updated Cover Design Report (main text only) If you should have any questions regarding this transmittal please contact me at 303-389-4160 Kathy Weinel at 303-389-4134. Energy Fuels Resources (USA) Inc. Harold R. Roberts Executive Vice President Conventional Operations cc: David C. Frydenlund Kathy Weinel Logan Shumway Scott Bakken