HomeMy WebLinkAboutDRC-2016-011808 - 0901a0688068ea89mgfM ENERGY FUELS
Energy Fuels Resources (USA) Inc.
225 Union Blvd. Suite 600
Lakewood, CO, US, 80228
303 974 2140
www.cncrgvluals.com
December 5, 2016 Div of Waste Management
and Radiation Control
SENT VIA E-MAIL AND EXPRESS DELIVERY DEC - 6 2016
Mr. Scott Anderson DR.C-2016- 011808
Director of Waste Management and Radiation Control
Utah Department of Environmental Quality
195 North 1950 West
P.O. Box 144880
Salt Lake City, UT 84114-4880
Re: Transmittal White Mesa Uranium Mill Reclamation Plan, Revision 5.1
Dear Mr. Anderson:
Pursuant to discussions with the Division for Waste Management and Radiation Control
(“DWMRC”) regarding the draft Stipulation and Consent Agreement (“SCA”, dated July 1,
2016) for the Cell 2 cover placement activities, Energy Fuels Resources (USA) Inc. (“EFRI”)
provided the DWMRC with the White Mesa Uranium Mill Reclamation Plan, Revision 5.1
(“Reclamation Plan”) on August 10, 2016. DWMRC provided written review comments to
EFRI on both documents, including draft redlines on the SCA on September 28, 2016. EFRI
revised the SCA and select sections of the Reclamation Plan to address DWMRC’s review
comments and also incorporate comments resulting from discussions with the DWMRC during a
meeting on October 5, 2016 and during follow up conference calls. Select sections of the
Reclamation Plan and SCA were submitted on November 11, 2016 to incorporate the above
referenced comments. DWMRC provided verbal comments to the November 11, 2016 revisions
in a conference call on November 16, 2016. The attached redlines address the verbal comments
provided by DWMRC in the November 16, 2016 conference call. This letter transmits the
revised documents and includes:
• Two CDs each containing:
o An electronic file of the revised draft SCA (with redlines since last draft provided
to DWMRC)
o a word searchable electronic copy of the White Mesa Uranium Mill Reclamation
Plan, Revision 5.1 dated December 2016 (includes revised sections of the
Reclamation Plan since the August 2016 version)
o electronic file copies of redlined report sections changed since the November 11,
2016 submittal of the Reclamation Plan
• Two sets of hard copies of the revised draft SCA
• Two sets of hard copies of replacement sections to the August 2016 version of the
Reclamation Plan. Hard copies include:
o Binder covers
Letter to Scott Anderson
December 5, 2016
Page 2 of 2
o Reclamation Plan main text
o Drawings
o Updated Cover Design Report main text (Appendix A to Reclamation Plan)
o Appendix G to Updated Cover Design Report (main text only)
o Appendix L to Updated Cover Design Report (main text only)
If you should have any questions regarding this transmittal please contact me at 303-389-4160
Kathy Weinel at 303-389-4134.
Energy Fuels Resources (USA) Inc.
Harold R. Roberts
Executive Vice President Conventional Operations
cc: David C. Frydenlund
Kathy Weinel
Logan Shumway
Scott Bakken