Loading...
HomeMy WebLinkAboutDRC-2010-007671 - 0901a0688025cd73State of Utah GARY R. HERBERT Governor GREG BELL Lieutenant Governor Departmentof Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director G- 2010-007671 MEMORANDUM TO: FROM: DATE: SUBJECT: File David Rupp, Geotechnical Services Section October 20, 2010 Site Inspection July, 29, 2010 on DUSA Cell 4B Construction Project and Miscellaneous White Mesa Mill Observations I visited the site at the White Mesa Mill on the subject date. Photos were taken during the inspection work. They will be attached to the electronic Documentum file on this subject. There were no major discoveries at the Cell 4B construction site. The project seemed to be well in hand. Our discussion was primarily about issues to do with the VPL tank area storm water drainage problem, the New Decontamination Pad, and Ore Storage containment. I met with mill management personnel, Messrs. R. Bartlett, D. Turk, R. Palmer and S. Snyder and discussed these items. Other miscellaneous observations are noted on the pictures. Please refer to them for additional information. END F:\DUSA\Cell 4B\Constr\MEMO for 7-2010 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 ' Fax (801) 533-4097 • T.D.D. (801) 536-4414 www.deq. Utah, i^ov Printed on 100% recycled paper 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper State of Utah GARY R. HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director M E M O R A N D U M TO: File FROM: David Rupp, Geotechnical Services Section DATE: October 20, 2010 SUBJECT: Site Inspection July 29, 2010 on DUSA Cell 4B Construction Project and Miscellaneous White Mesa Mill Observations I visited the site at the White Mesa Mill on the subject date. Photos were taken during the inspection work. They will be attached to the electronic Documentum file on this subject. There were no major discoveries at the Cell 4B construction site. The project seemed to be well in hand. Our discussion was primarily about issues to do with the VPL tank area storm water drainage problem, the New Decontamination Pad, and Ore Storage containment. I met with mill management personnel, Messrs. R. Bartlett, D. Turk, R. Palmer and S. Snyder and discussed these items. Other miscellaneous observations are noted on the pictures. Please refer to them for additional information. - END - F:\DUSA\Cell 4B\Constr\MEMO for 7-2010 DUSA Photographs by D. Rupp 7-29-2010 C1 LDS port with cap. Former C1 LDS port caps. Note flat tops. C1 Graduated blow tube being drawn through cap noted above. Spraying contents for evaporation in C1. Preliminary earthwork and gravel around tanks. Same as above. Different view. NDP. Note slight amount of water in compartments. South dike of C4B. Step–up construction. Some additional cutting remaining. Some rainwater in SE corner of C4B.