G- 2010-007671
MEMORANDUM
TO:
FROM:
DATE:
SUBJECT:
File
David Rupp, Geotechnical Services Section
October 20, 2010
Site Inspection July, 29, 2010 on
DUSA Cell 4B Construction Project and
Miscellaneous White Mesa Mill Observations
I visited the site at the White Mesa Mill on the subject date. Photos were taken during the inspection work.
They will be attached to the electronic Documentum file on this subject.
There were no major discoveries at the Cell 4B construction site. The project seemed to be well in hand.
Our discussion was primarily about issues to do with the VPL tank area storm water drainage problem, the
New Decontamination Pad, and Ore Storage containment. I met with mill management personnel, Messrs.
R. Bartlett, D. Turk, R. Palmer and S. Snyder and discussed these items.
Other miscellaneous observations are noted on the pictures. Please refer to them for additional
information.
END
F:\DUSA\Cell 4B\Constr\MEMO for 7-2010
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 ' Fax (801) 533-4097 • T.D.D. (801) 536-4414
www.deq. Utah, i^ov
Printed on 100% recycled paper
195 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414
www.deq.utah.gov
Printed on 100% recycled paper
State of Utah
GARY R. HERBERT
Governor
GREG BELL
Lieutenant Governor
Department of
Environmental Quality
Amanda Smith
Executive Director
DIVISION OF RADIATION CONTROL
Rusty Lundberg
Director
M E M O R A N D U M
TO: File
FROM: David Rupp, Geotechnical Services Section
DATE: October 20, 2010
SUBJECT: Site Inspection July 29, 2010 on
DUSA Cell 4B Construction Project and
Miscellaneous White Mesa Mill Observations
I visited the site at the White Mesa Mill on the subject date. Photos were taken during the inspection work.
They will be attached to the electronic Documentum file on this subject.
There were no major discoveries at the Cell 4B construction site. The project seemed to be well in hand.
Our discussion was primarily about issues to do with the VPL tank area storm water drainage problem, the
New Decontamination Pad, and Ore Storage containment. I met with mill management personnel, Messrs.
R. Bartlett, D. Turk, R. Palmer and S. Snyder and discussed these items.
Other miscellaneous observations are noted on the pictures. Please refer to them for additional
information.
- END -
F:\DUSA\Cell 4B\Constr\MEMO for 7-2010
DUSA Photographs by D. Rupp 7-29-2010
C1 LDS port with cap.
Former C1 LDS port caps. Note flat tops.
C1 Graduated blow tube being drawn through cap noted above.
Spraying contents for evaporation in C1.
Preliminary earthwork and gravel around tanks.
Same as above. Different view.
NDP. Note slight amount of water in compartments.
South dike of C4B. Step–up construction.
Some additional cutting remaining.
Some rainwater in SE corner of C4B.