HomeMy WebLinkAboutDRC-2014-006423 - 0901a068804aed93State of Utah
GARY R. HERBERT
Governor
Spencer J. Cox
Lieutenant Governor
Department of
Environmental Quality
Amanda Smith
Executive Director
DIVISION OF RADIATION CONTROL
Rusty Lundberg
Director
MEMORANDUM DRC-2014-006423
TO: File C-20 14-72
THROUGH: Phil Goble, Section Manager
FROM:
DATE:
SUBJECT:
Russell J. Topham, P.E.
October 15,2014
Engineering Module 73. Inspection of Disposal of Bulk Byproduct Material September 23,
2014. Radioactive Materials License UT 19004 79 (License) -Energy Fuels Resources
(USA) Inc. (EFR) White Mesa Mill, Blanding, Utah
On September 23, 2014, I performed an inspection of in-situ leach (ISL) waste disposal operations at the
White Mesa uranium mill on behalf of the Utah Division of Radiation Control (DRC). This inspection
responds to a II e.(2) Byproduct Receipt Notification from EFR, dated September 12, 2014. EFR is
allowed to dispose this byproduct material in Tailings Cell 3 only, which is allowed by License Condition
I 0.5 of the EFR Radioactive Materials License.
On September 12,2014 the DRC received notice that EFR would receive one load of lle.(2) byproduct
material, and intended to dispose of that waste in Cell 3 on September 23, 2014. Three. loads were
ultimately received prior to the commencement of the burial activity, including two that pertained to
previous notices provided to the DRC.
I checked in at the White Mesa mill at 7:55a.m. on September 23, 2014 and coordinated with mill
personnel. Soon thereafter I met with Mr. Garrin Palmer and Mr. David Turk, and planned the inspection
activities. Mr. Turk and I proceeded directly to the field to commence reconnaissance activities relative to
the Roberts Pond remediation while crews gathered the necessary equipment to the disposal site. At about
8:3 0a.m. we commenced the disposal operation.
Material disposed consisted of:
• Miscellaneous debris, primarily wood, metal and plastics, from Cameco Resources' Smith Ranch,
Wyoming property, shipped by Greenfield Logistics, bearing Shipper Numbers 9/14-58 and 9/14-
64 (two loads);
• Miscellaneous debris, primarily wood, metal and plastics, from Texas Mining Venture's Palangana
facility in Benavides, Texas, shipped by Cosby Trucking, bearing Shipper Numbers LP-21 (one
load).
168 North 1950 West • Salt Lake City, UT
Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414
www.deq. utah.gov
Printed on I 00% recycled paper
Page 2
The bill of lading for each of these loads appears in the attachments to this report.
The work crew executed the waste disposal in two excavations that extended into the tailings sands. I
witnessed opening of the excavation, and saw the tailings sand brought to the surface. Solution was
exposed at approximately 24 inches below the rim of the excavations. Given the elevation of the solution, I
could not directly observe the bottom of the excavation.
Mr. Palmer and Mr. Tanner Holliday surveyed the level at the bottom of the excavation prior to waste
placement. Using a front-end loader and a small dozer, crews placed the waste in the excavations and
tamped it down to approximately one foot below the top of the excavation. Mr. Palmer then surveyed the
elevation of the top of the waste, and the crews filled the excavation to the top with soil. The crew track-
walked the capping fill to a point where it exhibited no yielding.
EFR appears compliant with Part I 0.5 .E.(2) of the RML with respect to the elevation of burial. It appeared
that all provisions of the approved disposal SOP were followed during placement and burial of the bulk
waste.
Finding: EFR appears to have followed applicable provisions of the RML and of the SOP for the burial
operation I observed.
Recommendation: I recommend closing out the inspection of September 23, 20 I 4.
Attachments: Photo log, Receipt Notification September 12, 2014, Bill of Lading and Disposal
Documentation for each load disposed on September 23,2014
Photo 1: ISL material awaiting disposal. Photo taken September 23, 2014.
Photo 3: Excavating an interment site for ISL waste. Photo taken September
23,2014.
Photo 2: ISL material awaiting disposal. Photo taken September 23,2014.
Photo 4: Open excavation awaiting placement of ISL waste. Photo taken
September 23,2014.
Photo 5: Placing ISL waste into an excavation for burial. Photo taken
September 23,2014.
'~~~;.;
Photo 7: Placing random fill cover material over the emplaced waste. Photo
taken September 23, 2014.
Photo 6: Arranging and tamping emplaced waste. Photo taken September 23,
2014.
Photo 8: Leveling and wheel-walking the cover material. Photo taken
September 23 , 2014.
DRC-2014-005321
September 12, 2014
VIA Electronic Mail (PDF) and UPS
Mr. Rusty Lundberg
Division Director of Radiation Control
State of Utah Department of Environmental Quality
195 North 1950 West
PO Box 144830
Salt Lake City, UT 84114-4820
Dear Mr. Lundberg,
Re: 11 e.(2) Byproduct Receipt Notification
Energy Fuels Resources (USA) Inc.
6425 South Highway 191, PO Box 809
Blanding, UT. US, 84511
435 678 2221, fax 435 678 2224
www.energyfuels.com
Pursuant to Radioactive Materials License (RML) UT1900479 condition 10.5.F, Energy Fuels Resources
(USA) Inc. is hereby notifying the Division of Radiation Control that the White Mesa Uranium Mill will be
receiving and disposing of one load of 11e.(2) byproduct materials on September 23 ; 2014.
If there are any questions regarding these shipments or the scheduling of the disposal activities feel free to
contact me at the White Mesa Mill at 435.678.2221.
David Turk
Environmental Health & Safety Manager
Energy Fuels Resources (USA) Inc.
cc: Denver Central Files
No.: PBL-10 DENISON MINES (USA) CORP.
4 ''I ' o '.
Rev. No.: R-3.1 STANDARD.OPERATING PROCEDURES Page 10 of 12
Date: June 4, 2012 Title·: l.le.(2) Byproduct Dispos~ . · .
ATTACHMENT 2
lle.(2) BYPRODUCT MATERIAL DIS~OSAL 'DO~UMENTATION FORM
Date: 9/1 ~d I :i
Name of employee receiving the load: _ _...,Q""'-"'p...c.>"""'-';'""'Ac...o.....-'TI-X:v'-'-.-.......r.::~::...,_--
Generator of the Byproduct Material: .S"""'-1± lA )2.,. ...... c.. b (c.~_.. c.'")
Was the State of Utah given notice to the receipt/disposal activities associated with this load?@
No
Who gave and when was the notification given?
DD-.v ,r,)., Tvrl'-1 7/ts=/J '1
Description of byproduct material disposal area/activities:
Trc.->k.1 fu..NLfS 1 .SG< f4-4-o fA~ fl,.f.te
Has each drum been inspected to identify the presence of any void spaces? ALA-
Have all drums with void spaces been filled with tailings sands or soil? NIt
Which tailings cell was the material placed in? __ Cx=..._ll=--=3'----------
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
M.:...te.r iq,.t lo..)n.J pl~c.H~ "' "> ~l'c.oe-c \..... tk. ... f-Wb.J kw...-.. ±a H .... , $4\ ..... c:.tr,
Was the material segregated from any Mill material or equipment disposed of in the cell?
Was the material segregated from byproduct material from other ISL sources disposed of in the cell?
'f
(
No.: PBL-lO DENISON Ml'ffiS (USA) CORP.
Rev. No.: R-3.1 STANaA~· OPERA T~G PROCEDURES Page 11 of 12
Date: June 4, 2012 Title: lle.(2) Byproduct Disposal
') Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
-~
Was the material placed in a cell approved by the executive Secretary
for ISL waste disposal? --'-'~:...L...--------
Documentation of
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
Ar-c...e-tue..J co.Mo"'de.J. t...>j\-k tJ.-le-·~;..u-o..+ k.:...S t Povr ttM.C5 f?-C
-~ t
Were void spaces filled with tailings?
Was the shipment properly covered?
'-l e k> vc. _
Are additional settlement monitors required to be placed for this generator?
A
) .. ·
If required, where were settlement markers were placed?
No.: PBL-10 DENISON MINES (USA) CORP.
Rev. No.: R-3.1 STANDARD OPERATING PROCEDURES
Date: June 4, 2012 Title: lle.(2) Byproduct Disposal
Radiological receipt survey measurements:
'QD-0 • Z.o ....... R/ L..c-
Breathing Zone:
1. Was a Breathing Zone Sample collected? Yes~
2. If yes, what were the results of the sampling?
Was a photograph taken during the unloading activities?e No
Page 12 of 12
c
__ ,
Generator of Byproduct material:
Controled Elevation used (Cell 3)
Area
Initial shot for trench
Top of trench
Bottom of trench
Initial shot used for material
Smith Ranch
5612.27
Elevation Transit Shot
4.32
5606.41 10.18
5597.69 18.9
4.32
Top of material in trench 5603.89 112
Top of cell 3 liner 5608.5
Feet below liner 4.61 ======
STRAIGHT BILL OF LADING
ORIGINAL-NOT NEGOTIABLE
Note-(1) VVhera the rate il dependlint on nlue, sNpper& ere r.qulred lo state spedfic11fty on
writhg the ~reed or declared value of 1M propeny, a foiOW'I The agreed or dec:lllrld Yllue
of Ule property Is hereby apec::ifially .U.tld by the 5hipper to~ not
~c=r;: the apptic:llble tariff pr;..,~ . .,.-.. -opodfy-..,.,.-•=•rma&ion of the camel's Ubillty abient a
rl!leau or 1 wlue declaration by tht s.hlpper and lhe shipper does not release the carrier's
Ill billy or declare a wlue, the car'Mr'1lillbilily 15hall be lmlted to the menl provided by auch
pt<Wiliona. See NMFL ilem 1n.
{3) Commodihe r.quiring sped~ I Of adcfitk)nal ctre or atle"*>n'" 1\endllng or stowing mutt
be 10 mertl;ed and pt~c:k.lged u to IMUfl Nfa W.nspolta~n SH s.ction 2(t) of Item 360,
Bill of Udlng, Freight BiUs, and Statements of Charges and Sedon 1 (a) of tht Contract
terms and conditions for a lilt of such arldes.
Shipper No. 3j !Lj-{ptf
Carrier No. ____ _
RECEIVED, aubtact 10 the c:I...W.C.tiona and Wriffa In etfect on the data of luue of d'lit Bill of Llding, tho property dneribed above in appa,..nl good order, aweepln noted (contents and condition of ccnfenla of pec:klgn unknown), marked, consigned, and
dedntd n lndic:eted above whCh uld earlier (the word ~rritr being under.tood throughout ttllil co..U.ct H mNnlng any ~n or corporaMn k1 ~n of thil property IInder the contract) egrHI to cany to b ~ p&ac:e of deiYery •C -'d dni6Mtion, if
on Its route, oUlerwise Ia deliver to .,other carrier on the route to ..td destinlflion II is mlltu8lly agreed nto 11ch carrier af etl or eny Df, uid property owr aH or eny pofton oiN~ route to dntin.lion end ulo ••ch p11rty •t•ny time 11tat.a.d In IN or eny uld
property, lh.t ewry aeMc:e to be performed hefeunder Wtl bt tubfKt lO all the bill of lading terms end concHtionlln the govemktg diSiificlllon on the date of the ·~•nt
Shipper hereby certif*s that he is femilllr with .U the llldklg terms and condllloM In lhe governing daalficalion and the uld lerrm •nd ~:ondil6onlare he,.by egrHd to by U.lhipper end accepted fof himHif and hil:llllgns
~@
Cameco
WYOMING OPERATIONS
BYPRODUCT MATERIAL SHIPMENT TRUCK
SURVEY
METER MODEL .J ~:Z~i~~ION DATE ..... ~~7.~---~fi-~-+~....:J_~'-----
Yes
Swipe Survey @
u.of
mR/hr Driver's Seat
"1-$·3<. ldpm/100 cm2
Surface
mR/hr {/,C) 7 (J ~(_;
6.6' (2 meters) Surface
;>Q/d'\~ dpm/100cm2
Quality Control Checklist (49CFR 173.475)
As Per SHEQ Management System Volume tV-Transportation
The container is in good condition? ~
The container has been closed properly? ~
The container has been filled properly? ~
Exterior contamination! Radiation levels below
the limits? V
SHIPMENT NO.
LOCATION:
DATE:
RSO/RST
BACKGROuND 0 .0 U
BACKGROUND )(;/\ Lfl
mR/hr
dmp/100 cm2
&ooa.C~d
CARRIER NAME
T4
TRACTOR NO.
012 -
mR/hr (). uc
Surface 6.6' (2 Meters)
mR/hr 0)5 Q.08
Surface 6.6' (2 Meters)
"'2 c) ,Q9~dpmll 00 cm2
Limits
Gamma • 200 mRihr at surface
Gamma= 10 mR/hr at 2 meters
Gamma • 2 mR/hr in cab
Alpha • 1000 dpm/100cm2 for swipe survey
Alpha-2200 dpm/100 cm2 for instrument survey
mR!hr 6~7 o.uOJ
6.6' (2 eters) Surface
Rev 2-August 14,2014
Page I of I
J:\4) Radiation Protection Program\WYO-RPP-01 (Volume tV-Health Physics)\WYO-RPP-01 (Forms)\WYO-RPP-OL048 Byproduct Material Shipment Truck
Survey.doc
No.: PBL-10 DENISON.MINES (USA) CORP.
• • ' 'I', l ! '
Rev. No.: R-3.1 ST ANDARD.OPERA TING PROCEDURES Page 10 of 12
Date: June 4, 2012 Title: l.le.(z) Byp~odu~t Dispos~l . · .
.. ATTACHMENT2
lle.(2) BYPRODUCT.MATER,IALDlSPOSAL OOCUMENTATION FORM
Date: '1/ ('d I 4
Name of employee receiving the load: 64-cr=i,A.. Pe--l~
Generator of the Byproduct Material: S""'l Ho. ~b. (L&...~oJ
Was the State of Utah given notice to the receipt/disposal activities associated with this load? Yes or
No
Who gave and when was the notification given?
'{')& ..... ~c)..Tc..-ct.l q/n .. /1'"(
Description of byproduct material disposal area/activities:
"VnfS 1 ... ~.rc.., TrNb-.Sc..c ph<,+o.S a.J fbf-fe_
Has each drum been inspected to identify the presence of any void spaces? ;t/A:
Have all drums with void spaces been filled with tailings sands or soil? A/A
Which tailings cell was the material placed in? _-....:C.::-e;..;:=:::..:....l \!-.!=3::...__ ______ _
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
M.ett.r-:"'\ w, .. J f IM.c:-A :"' " 4-r-., ..... d.._ +\....,. t w c.J el,r.J ...... tu the... J'e."J..s
Was the material segregated from any Mill material or equipment disposed of in the cell?
Was the material segregated from byproduct material from other ISL sources disposed of in the cell?
c
No.: PBL-10 DENISON MINES (USA) CORP.
Rev. No.: R-3 .1 STANDARD OPERATING PROCEDURES Page 11 of 12
Date: June 4, 2012 Title: lle.(2) Byproduct Disposal
-) Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
)
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
Ar-e."'-'w"=~ Lp.,-Ap?L-dc.) w;·H"" .. "'= lpc...W a+ le,.:-J t t'v....r b""'-<!J fw--
I• ~+.
Were void spaces filled with tailings?
c
Was the shipment properly covered?
YeS, s u v-.boue.
Are additional settlement monitors required to be placed for this generator?
NA
)
If required, where were settlement markers were placed?
No.: PBL-10
Rev. No.: R-3.1
Date: June 4, 2012
DENISON MINES (USA) CORP.
STANDARD OPERATING PROCEDURES Page 12 of 12
Title: lle.(2) B
Radiological receipt survey measurements:
f>I.D-o I -tc= t .. o'----'"""~[2_-.........lbc~---------·----r .
Breathing Zone:
1. Was a Breathing Zone Sample collected? Yes eb
2. If yes, what were the results of the sampling?
Was a photograph taken during tlte.unloading activities~ or No
c
__ ,
Generator of Byproduct material: Smith Ranch
Controled Elevation used (Cell 3)
Area Elevation
Initial shot for trench
Top of trench 5606.41
Bottom of trench 5597.69
Initial shot used for material
Top of material in trench 5603.89
Top of cell 3 Liner 5608.5
Feet below liner 4.61
5612.27
Transit Shot
4.32
10.18
18.9
4.32
12.7
STRAIGHT BILL OF LADING
ORIGINAL-NOT NEGOTIABLE
Shipper No.<tl y-s'"'£
Carrier No. ____ _
Page_1_of_1_ Gt ........... L ....• : Date l -' (Name of Carrier) (S~C)
on Coiled on DeliYe<y ahipmenta, the 1111111B COD must appear !Mfore consignee' a """"' or a From: Shipper CAMECO RESOURCES. INC. olherwlae provided In llem 430, Sec. I.
To: Consignee Energy Fuels Street: 762 ROSS ROAD
Street 6425 South HWY 191 City DOUGLAS State WY Zip Code 82833
City Blanding State !.!T Zip Code .M§ll. 24 hr. Emergency Contact Tel. No: 905·885-874~
Route : [ Vehicle:
Number
HM Basic Description Total Quantity Weight RATE Charges
Proper Shipping Name, Hazard Class, (Weight, Volume, (Subject to (For Carrier
Identification Number (UN or NA), PaCking Group, per 172.101 o 172.202, 172.203 Gallons, etc.) Correction) Use Only)
1 Roll off XX RQ,UN2912, RADIOACTIVE MATERIAL, SURFACE CONTAMINATED
OBJECT (SCO), HAZARD CLASS 7 l l~ ·' l'tl (k1·lo(/ RADIONUCUDE: Ds:~:ttnltA NATURAL URANIUM & u~:tnl"t .. TED
DAUGHTER PDnnt
PHYSICAL FORM: SOLID
CHEMICAL FORM: NATURAL URANIUM OXIDE U04·2H,O
TOTALACTWITY: \-~~~q
•·~o-->~INDEX: NIA AS'lER 49cfr17~
PLACARDS: RADIOACTIVE 7
THIS VEHICLE IS ASSIGNED FOR EXCLUSWE USE OF Cameco
RESOURCES, INC. UNDER PROVISIONS OF 49 CFR 173.425 (B)
DO NOT LOAD OTHER FREIGHT IN THIS VEHICLE, TRANSFER EN
ROUTE
PLACARDS TENDERED: YES: X NO D REMIT C.O.D. TO:
ADDRESS
N-<1)""""" lie oaloild.,_-oo-. olipporo 0111 ,..ndlo-..-,on • ....,_.,._.,._f>*lhil COD lolri:.S C.O.D. FEE. ...wno ... ..-.,d-rodnluo<*tho.._..,, .. _Tholll-or-od-~ ... ...,._....,_ PREI'A.DS ollllo_lo_,.-,_,tho....,.lobonot
_, ... _oHpplog_onol_
COLI.ECT' S -.___ -.podulgod.-ond
(2) -. ... opp~o:o~~~o _,_......,.-ollllo c:onlol'lloe., ·-· ......,._I'll, oodOIWin ol._.aln ...... a-tJ .............................. -......... --..., ... olllppor .............. _ ... _ ... _.. --""~-*'~~"' .............. -... ....................... TOTAL ~ .. -........ .,._.......,_bo_lo ... _nl,._,...., ""**"---...... __
~-~ ..... 172.
_ ,,.._ ,..._,...,.. ....... ....,, ............. ,.,._., CHARGES • (3)~ ... --.. -nol..,oor-ln~or-..r..-...........................
boso -ondpodlagodoolo..,.._lnl __ . --2(o)f>*llom310. ON BEHALF OF SHPI'ER
-of lAding, Frwlglll-. w --"*Ciw;•ond -1(a) of.,.~ #l.j_~A!-FREIGHT CHARGES -ond-Joooiotofoudlo.-. ,......,.........., CNci-·~ I iiPOOft•......., ............. (, ...... ~·--RECENED,oubjodlolw_ond_ln_on ... _ol_of111i1Uaf,._.,.,..._.., __ lo_.,good_, ____ ond_of-oii**OIIIw..,.._),-'od.-.tgnod.ond -_____ ..,.,(tho __ ...,. _ _....,. .. _oo...WOV""'JIO....,.,....,...-In__.,ofiNopnlpollyoonolorlw~-loAtrylolo_,.._ ofdoliworyolooid-1
onlo-.--lo-.lo...,.,conlorontho.-toooid-. lil..........,..,-alo-conlorofoloronrfll.ooid..--olor...,pootonolooid_lo_Widalo-l*ll'olony...,._lnllllor..,ooil _,, _ _,_tobo'*"""'""lllnllnclor-booulljodlool111ollllofioofo1g-•nd-ln.,.u--.-onlw-oltho...,._. ~hoooby-llolhoil __ ...... -.v ___ lntllo_.q __ ... _______ .. , ... """!!'"'_'
0 7 .......
SHIPPER: CAMECO RESOURCES, INC. CARRIER· t::~ /""1Elo L~ • 7'""/'7 11\.0~
PER //h. / Uf..:KZ-PER ~~ ......-::::: ~~-A.
DATE / '9/J///t/ DATE!' 4/1;/J'-1 ---u
._ 'I I I
WYOMING OPERATIONS
BYPRODUCT MATERIAL SHIPMENT TRUCK
SURVEY
Cumccu Rc!'!ourcc-.
METER MODEL
METERSN
CALIBRATION DATE
Yes
Swipe Survey <N)
0.6:2
mR!hr Driver's Seat
?.Q;i~pm/1 00 cm2
Surface
o.o ·z
6o6' (2 m'eters)
mR/hr 01
Surface
2(' hu-, dpm/100 cm2
I
Quality Control Checklist (49CFR 173.475)
As Per SHEQ Management System Volume IV-Transportation
The container is in good condition? ~
The container has been closed properly? ~
The container has been filled properly? --lo::::.....
Exterior contamination/ Radiation levels below
the limits? V"'
~~~r,;~~:NOo -#~~~:.,.;-=~"'-"L-..,_---
RSO/RST ltP /) . 0 ~ ~~
BACKGROUND Q o Q L} mR!hr
I
BACKGROUND J/7 3 dmp/100 cm2
a_.udt~~tA
CARRIER J\ME ---z-cJ mR!hr
Q, I(
TRACTOR NO. Surface
(1 C;6
6o6' (2 Meters)
mR/hr Q.2 5
D.Lt
Surface
mR!hr
Q 0() 4
6o6' (2 Meters)
~~.l~?> dpm/100 cm2
Limits
Gamma • 200 mR/hr at surface
Gamma= 10 mRihr at 2 meters
Gamma = 2 mRihr in cab
Alpha • 1000 dpm/1 00cm2 for swipe survey
Alpha= 2200 dpm/1 00 cm1 for instrument survey
6.6' (2 Meters) Surface
Rev 2-August 14, 2014
Page I of I
)5 .6ao dpm/100 cm2
Surface
J:\4) Radiation Protection Program\WYO-RPP-01 (Volume IV-Health Physics)\WYO-RPP-01 (Forms)\WYO-RPP-01.048 Byproduct Material Shipment Truck
Survey.doc
No.: PBL-10 DENISQN.MINES (USA) CORP: • ., .·' I . . ...
Page 10 of 12 Rev. No.: R-3.1
Date: June 4, 2012
STANDARD.OPERATING PROCEDURES
Title:. l.le.(2) Bwrodu~t Dis os;u . .
----~----------~--------~
ATTACHMENT 2
lle.(2) BYPRODUCT MATE~L DlSPOSAL DOCUMENTATION FORM
Date: q I to It=\
Name of employee receiving the load: D.,..v, c&. _1~..-~.~.LJ..._r...I:~=-------
Generator of the Byproduct Material: l ) E L '-c.. f""\ "'"'!!:P~"' "'-.
Was the State of Utah given notice to the receipt/disposal activities associated with this load?~
No · ·
Who gave and when was the notification given?
be-q.\cA \v r ~ 1 9 I~ /1 Y
Description of byproduct material disposal area/activities:
f'i '+c-r f. rc:-r 1 e .... llc.±<· 1 +t-£>Sb . s "'' f"'-ot a ,.,.A...e. ....... tA~~ff"-l'L"""" ..... t+....._..e;__ ____________________ _
Has each drum been inspected to identify the presence of any void spaces? ---+~J:it'i~'---------
Have all drums with void spaces been filled with tailings sands or soil? Dru ... M ........ r'-?=ru.sL...col
Which tailings cell was the material placed in? _..-L:...o.c........_\ l,.__-=3~-------------
Was the material placed on a tailings beach area of the cell or on an area of the cell that was underlain
by tailings sands?
M·~·.±c.r ...... t WA.i f\"'"·A ;...., a-. p•'r ot~ ezv± to bhc.. \'A~·
Was the material segregated from any Mill material or equipment disposed of in the cell?
Yc'i
Was the material segregated from byproduct material from other ISL sources disposed of in the cell?
'fe-r
LP-2l
c
c
c
No.: PBL-10
Rev. No.: R-3.1
Date: June 4, 2012
DENISON M~S (USA) CORP.
STAND A~ .• OPERATING PROCEDU~ES Page 11 of 12
) Have the thickness and placement measurements been verified and documented for the disposal area
by the engineer, specifically:
How was the area compacted? Was each lift compacted by heavy equipment (such as a Cat D-6) at
least 4 times prior to placement of subsequent lifts?
A r c.e-wev Lo,......_f'c-c.~t.e'-. •·>I l-l.;. Q., laMkr o..f. lc..c..>t 4 b.I'Ae-.f f<'r \:£i
Were void spaces filled with tailings?
Yc.S
Was the shipment properly covered?
Y c.] C:. <.. o-..bo vC:.. ~
Are additional settlement monitors required to be placed for this generator?
)
If required, where were settlement markers were placed?
No .: PBL-10 DENISON MINES (USA) CORP.
Rev. No.: R-3.1 STANDARD OPERATING PROCEDURES Page 12 of 12
Date: June 4, 2012 Title: lle.(2) Byproduct Disposal
A c
Radiological receipt survey measurements:
P:k c-c) (). s-~e I be
Breathing Zone:
1. Was a Breathing Zone Sample collected? Yes~
2. If yes, what were the results of the sampling?
Was a photograph taken during the unloading activities@ No
c
--·
Controled Elevation used (Cell 3) 5613.04
Area Elevation Transit Shot
4.90 Initial shot for trench
Top of trench
Bottom of trench
5608.05 9.89
5601.26 16.68
Initial shot used for material 4.32
Top of material in trench 5606.16 11.20 ------------~-----====
Top ofcell3 Liner ______ 5_6_0...;..8._5
Feet below liner 2.34 ========
Shipment Number LP~\
BILL OF LADING-BYPRODUCT MATERIAL
24-HOUR EMERGENCY CONTACT NUMBER/PROVIDER & CONTRACT NAME OR No.
(830) 583-4222 Kevin Dziuk (Radiation Safety Officer)
UN
UN 2912
TRAILER
This is to certify that the above-named articles are properly classified, described, packaged, marked, and labeled, and are in proper condition
~lo "'" lotloM oftho Doportmoot ofT" "::::1•~ hf 9'
DRIVER'S SIGNATURE~ 4
DESTINATION SIGNATURE OF _a-+4.1--,~/!1,_ _ _,_<"~--------
DATE Z-5-/fr'
INDICATION OF LEAKAGE (;.) YES, EXPLAIN
South Texas Mining Venture, LLP
La Palangana VEHICLE RADIATION SURVEY
Surve Technician: Kevin Dziuk
Date: 9/9/14
South Texas Mining Venture
Calculation of total Radium Activity
Type 1 Material
Radioactive Materials license No. R06062
Shipment No. oiiiilo..P--·-~..;.,;;.\.._ _____________ _
Date 9/9/2014
Model No. Serial No.
Meter
Survey Technician
Location
Front of Trailer
Right Side of Trailer
Back of Trailer
Left Side of Trailer
Top of Trailer
Bottom of Trailer
Average Gamma level
Volume of Material
Kevin Dziuk
Gamma Readings
micro-R/hr
'd-b~ teo a-()(:)
f('")~ 3~~ 9.~~
L{ ~){') q-0~ ;l~~
t()O 3.~~ /.{D~
l-16(:, L( () ~ ( 06
f(t){5 )'~~ l-f oo
__ Y..-.o ..... () ____ micro-Rihr
Shipment Volume
__ ....;.17;.._ ___ cubic yards
TOTAL RADIUM Ra-226 ACTIVITY Q .-\~ Ci -----....-.---
(Avg uRJhr)x(1.25)x(1.453e-6)x(volln cy) = Cl of Ra·226
Cal Date. --l