Loading...
HomeMy WebLinkAboutDRC-2013-001173 - 0901a06880346322i' State of Utah GARY R HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director January 14,2013 Mr David C Frydenlund Senior Vice President, Regulatory Affairs and General Counsel Energy Fuels Resources (USA) Inc (EFR) 225 Union Blvd , Suite 600 L.kewood,COS0a2S D R C - 2 013" 0 U 117 3 Subject Compliance: Engmeenng Module 73, Inspection of Disposal of Bulk Byproduct Matenal Radioactive Matenals License UTl 900479 (RML) DRC Findings, Closeout of Engineering Module 73, and Request for Information Relative to Standard Operating Procedure PBL-10 Dear Mr Frydenlund Dunng the year 2012, the Utah Division of Radiation Control (DRC) conducted four inspections of disposal operations for 1 le (2) byproduct matenal These inspections occurred on Apnl 13, June 8, September 20 and December 20, 2012. The DRC findings were as follows 1 EFR has an approved Standard Operating Procedure, No PBL-10, Revision No R-3 (SOP), dated November 10, 2011 which sets forth an orderly methodology for achieving compliance with the conditions of the RML governing receipt and disposal of 1 le (2) byproduct matenal 2. The inspections performed on the above referenced dates did not reveal incidents of noncompliance with either the RML or the SOP, with one exception, as noted below 3 Dunng the December 20, 2012 inspection, EFR received two loads of byproduct matenal Paragraph 5 6 on Page 3 of the SOP requires inspection of the load for conformance with the descnption of the shipping papers pnor to the load leaving the vicinity of the scale house and entenng the secured area The load beanng Shipping Number 12/12-16 on the Bill of Lading was not inspected until it reached the disposal site in Cell 3, withm the secure area The DRC was provided an explanation that the containers often amve with doors frozen shut dunng the winter, and forcing the doors open is better done just pnor to offloading the matenal The inspection at the point of receipt is designed to facilitate rejection of loads without needing to address decontamination of the transport vehicle when the matenal does not match the descnption on the shipping papers The DRC does 195 North 1950 West • Salt Uke City, UT Maihng Address P O Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 -TDD (801) 5364414 / www deq Utah gov Printed on 100% recycled paper David C Frydenlund Page 2 January 14,2013 not take exception to the practice observed, but does have concern that a nonconforming load may create a compliance dilemma upon rejecting the load 4 The SOP contains a form, identified as Attachment 2, and appeanng on Pages 10 through 12 of the SOP Field crews use the form to track and document compliance with the SOP, and thus with the RML, when each load of byproduct matenal amves and receives disposal EFR can improve this form by including on the form a place to identify the load to which the form pertains Should the Bill of Lading and other documents be separated from the form, returning the form to the conect paperwork packet would prove problematic Inasmuch as EFR has complied with the provisions of the RML, no violations have been detected, and no open issues remain therefore, the DRC considers the 2012 Engineering Module 73 closed Request for Information As noted in Bullet Item 3 above, the field practice of transporting incoming loads to the secure area dunng extreme cold weather pnor to visual inspection against the descnption on the load manifest introduces complications should EFR need to reject a load If EFR intends to continue this practice, please amend Standard Operating Procedure PBL-10 to include the vanation currently employed under extreme cold conditions Include in the amendment decontamination and survey procedures for the exiting load and its transport Please provide these revisions, or a statement that EFR will abandon the practice, by February 28, 2013 If you have any questions on these matters, please contact at Russ Topham at (801) 536-4256 Sincerely, Rusty Lundberg Director RL/RJT ijt