Loading...
HomeMy WebLinkAboutDRC-2012-001894 - 0901a06880307c31RC-2012-001894 Page 1 of 1 Thomas Rushmg u - Storm water Inspection White Mesa Mill - request for extension of due date for Confirmatory Action #4 From: Jo Ann Tischler <JTischler(genergyfuels com> To: "Rusty Lundberg (RLUNDBERG@utah gov)" <RLUNDBERG@utah gov> Date: 8/29/2012 1 35 PM Subject: Storm water Inspection White Mesa Mill - request for extension of due date for Confirmatory Action #4 CC: "Thomas Rushing ii (trushing@utah gov)" <trushing(gutah gov>, "PhillipGoble (Pgoble@utah gov)" <Pgoble(^utah gov>, Harold Roberts <HRoberts(^energyfuels com>, David Frydenlund <DFrydenlund@energyfuels com>, David Turk <DTurk@energyfuels com>, Dan Hillsten <DHillsten@energyfuels com>, Steve Snyder <SSnyder(genergyfuels com> Mr Lundberg, Energy Fuels Resources (USA) Corp Inc ("EFR") is in the process of responding to the Utah Division of Radiation Control's ("DRC's") August 8, 2012 letter regarding the June 21, 2012 storm water inspection at White Mesa Mill EFR received the letter on August 10, 2012 As required by DRC's letter, we will be submitting our response on or before September 9, 2012 (within 30 days of receipt of DRC's letter) In a telephone call on August 28, 2012 between EFR and Mr Tom Rushing ofthe DRC, EFR requested an extension ofthe time to complete Confirmatory Action Number 4 of that letter, specifically, preparation of a report including • estimation of additional soil volume associated with the Clancone spill, to be excavated and disposed at Mill reclamation, • justification of the soil volume, • surface mapping and cross sections of the excavation, and • surety estimate with line items for each work element of excavation, removal and disposal of the proposed soil volume Per the letter, this report was to be submitted to DRC within 45 days of receipt of DRC's letter, or by September 24, 2012 In order to complete all the requested items to the satisfaction of the Director, EFR asked Mr Rushing for an extension to permit us to submit the report 60 days from the date of our August 27, 2012 phone call, or October 27, 2012 Mr Rushing instructed us to provide this request in writing today, to allow adequate time to receive a written confirmation from your office for the requested extension We appreciate your consideration of our request Jo Ann Tischler Director, Compliance Energy Fuels Resources (USA) Inc Jo Ann Tischler Director, Compliance and Permitting Energy Fuels Resources (USA) Inc t 303-389^132 | f 303-389-4125 225 Union Blvd , Suite 600 Lakewood, CO, US 80228 http //www energyfueis com This e-mail is intended for the exclusive use the of person(s) mentioned as the recipient(s) This message and any attached files with it are confidential and may contain pnvileged or propnetary information If you are not the intended recipient(s) please delete this message and notify the sender You may not use distnbute pnnt or copy this message if you are not the intended recipient(s) file //C \Documents and Settings\tiiishmg\Local Settings\Temp\XPgrpwise\503ElABDEQDOMAINEQRADl 8/29/2012