Loading...
HomeMy WebLinkAboutDRC-2012-001718 - 0901a068802f9783State of Utah GARYR HERBERT Governor GREG BELL Lieutenant Governor August 1,2012 001718 Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADL^TION CONTROL Rusty Lundberg Director CERTIFIED MAIL (Return Receipt Requested) Jo Ann Tischler, Director, Compliance and Permitting Denison Mines (USA) Corp 1050 17'^ Street Suite 950 Denver, CO 80265 IT JQ a LO •- • • O CD U.S. PosjW Service - j CERTIFIED MAtLTiTflBCEIPT (Domestic Mail Only; No Insurance Coverage Provided) For delivery information visit our website at www.usps.come 0 c 1 A L USE Postage Certified Fee $ Postmark RE 8/1/12, approval for well mw-31 / TR Jo Ann Tischler Denison Mines (USA) Corp 1050 Seventeenth ST, STE 950 Denver, CO 80?^^5 PS Form 3100, August 2006 See Reverse (or Instructions Subject Demson Mines (USA) Corp 4^^ Quarter, 2011, and 1'^ Quarter, 2012 Groundwater Momtonng Reports for the White Mesa Uranium Mill, Blanding, UT, Utah Ground Water Discharge Permit No UGW370004 DRC Conditional Approval for Well lVrW-31 and Review Close-out Dear Ms Tischler The Division of Radiation Control (DRC) has reviewed the following Denison Mines (USA) Corp documents Denison Mines (USA) Corp , February 28, 2012, Quarter 2011 Groundwater Monitormg Report Groundwater Discharge Permit UGW370004, White Mesa Uranium Mill, February 15, 2012, DUSA Notice Pursuant to Part IG 1(a) fourth quarter ("Q4") 2011 groundwater momtonng, Denison Mmes (USA) Corp , May 29, 2012, F^ Quarter 2012 Groundwater Monitoring Report Groundwater Discharge Permit UGW370004, White Mesa Uranium Mill, and, - May 11, 2012, DUSA Notice Pursuant to Part IG 1(a) first quarter ("Ql") 2012 groundwater momtonng The review was conducted with consideration of the following related actions 1 Stipulated Consent Agreement Docket Number UGW12-03 (SCA) which was duly executed by the DRC Director and DUSA Counsel on July 12, 2012 The SCA provides approval for three DUSA Plan and Time Schedule documents dated June 13, 2011, September 7, 2011 and Apnl 13, 2012 The SCA and attached documents specify follow- up actions and timelmes to investigate and resolve multiple parameters in 195 North 1950 West • Salt Lake City, UT Maihng Address P O Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 •TDD (801) 536^14 www deq Utah gov Pnnted on 100% recycled paper Jo Ann Tischler Page 2 out-of-comphance status for several ground monitonng wells at the White Mesa Uranium Mill (Mill), as well as an investigation of the potential source of decreasing pH trends noted in several of the Mill monitonng wells The SCA also specifies stipulated penalties in the event that DUSA fails to comply with study objectives, timelines and/or agreements therein 2 • DRC notified DUSA by letter (dated Apnl 16, 2012) that in order to formalize an Apnl 5, 2010 discussion between DRC and DUSA representatives regarding agreed upon Permit -Si.- alterations to required schedules for out-of-comphance reporting and initiation of accelerated momtonng, a wntten request for a groundwater permit modification was required for Director review and approval Subsequently, DUSA submitted a May 25, 2012 wntten request for a Permit modification, including redline copies of pertinent pages of the Permit to reflect the agreements made dunng the Apnl 5, 2010 conference call The Permit modification request is cunently under DRC review and Permit modification is pending Conditional Approval for TDS OOC Plan and Time Schedule, Monitoring Well MW-31 Per the May 11,20X2, DUSA Notice Pursuant to Part IG 1(a) first quarter ("Ql") 2012 groundwater momtonng {DUSA May 11, 2012 Notice), it was documented that one new exceedence of groundwater monitonng parameter was found (TDS in Momtonng Well MW-31) and that this monitonng well and parameter is therefore added to the Out-of-Compliance reporting requirement Per the DUSA May 11, 2012 Notice Part 1.1 DUSA recommends that ''The successive TDS exceedances reported in Ql 2012 will be added to, and addressed in conjunction with the sulfate exceedances as described in the June 13, 2011 Plan and Time Schedule The rationale for addressing the TDS and sulfate together is based on the connection of sulfate to TDS, that is, sulfate is a component of TDS The time schedule for the assessment of TDS will be the same as that for sulfate " The June 13, 2011 Plan and Time Schedule Study was duly executed by the Du-ector and DUSA via dual execution of Stipulated Consent Agreement, Docket No UGW 12-03 on July 12, 2012 Per Part 2 1 of the DUSA May 11, 2012 Notice, ''Demson respectfully requests UDEQ's concurrence with the addition of the TDS assessment in MW-31 to the previously submitted Plan and Time Schedule submitted June 13, 2011 as amended April 13, 2012 " The inclusion of TDS for Momtonng Well MW-31 with the June 13, 2011 Plan and Time Schedule Study is approved with the following conditions Condition 1 - TDS for Monitonng Well MW-31 is required to comply with all study objectives and timelines as outlined for Sulfate m the DUSA Plan and Time Schedule dated June 13, 2011, and. Jo Ann Tischler Page 3 Condition 2 - TDS for Momtonng Well MW-31 is subject to all agreements, stipulated penalties and notices listed in the Utah Department of Environmental Quality Stipulated Consent Agreement, Docket No UGW12-03 executed on July 12, 2012 Close-out Based on DRC review ofthe DUSA 4th Quarter 2011, and 1'^ Quarter 2012 Ground Water Monitonng Reports, the Reports appear to comply with the requirements of Utah Ground Water Discharge Permit No UGW370004 and the review is closed-out If you have any questions regarding this letter or the review findings please contact Tom Rushing at (801) 536-0080 Sincerely, Rusty Limdberg Director RLTRtr F \DUSA\Groundwater Reports\2011 Groundwater Reports\2011 4th Qtr ReviewNDUSA 4th 2011 and 1st 2012 DRC Conditional Approval and Close-out Ltr docx