Loading...
HomeMy WebLinkAboutDRC-2013-001177 - 0901a06880346697State of Utah GARY R HERBERT Governor GREG BELL Lieutenant Governor January 8, 2013 Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director DRC-P0l3-00tl77 Mr David C Frydenlund Senior Vice President, Regulatory Affairs and General Counsel Energy Fuels Resources (USA) Inc (EFR) 225 Union Blvd , Suite 600 Lakewood, CO 80228 Subject Compliance: Engineenng Module 75D , 3"^ Quarter, 2012 EFR DMT Performance Standards Momtonng Report and Cell 4A and Cell 4B Performance Standards Momtonng Report (Dated November 29, 2012) Ground Water Quality Discharge Permit UGW370004 DRC Findings and Closeout Dear Mr Frydenlund On November 30, 2012, the Utah Division of Radiation Control (DRC) received the 3'"'' Quarter, 2012 DMT Performance Standards Monitonng Report and Cell 4A and Cell 4B Performance Standards Monitonng Report (dated November 29, 2012) for the EFR White Mesa Mill near Blanding, Utah This letter summanzes the outcome of our staff review of the Report The DRC findings were as follows 1 On July 5, 2012, workers removing sediment fi-om Roberts Pond snagged and tore a portion of the Imer The pond contained no fluid at the time, and crews repaired the tear on July 12, 2012 2 On July 23, 2012, while performing the daily inspection regimen, EFR plant personnel discovered that the Cell 4A LDS system displayed data, but the data logger had ceased recording Plant personnel recorded on the inspection forms the readings required under the DMT Plan Plant personnel reset the recording equipment, after which proper recording resumed Having recorded the required data on the inspection form, no violation of the data acquisition portions of the DMT Plan occurred EFR retumed the system to proper operation within 24 hours of discovery of the malfiinction, as required 3 In all other respects it appears EFR complied with applicable standards as detailed in the DMT and BAT Plans 195 North 1950 West • Salt Uke City, UT Mailing Address P O Box 144850 • Sah Uke City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 'TDD (801) 5364414 www deq utah gov Printed on 100% recycled paper David C Frydenlund Page 2 January 8, 2013 Inasmuch as no open issues remain, the DRC considers the review of the 3*^^^ Quarter, 2012 EFR DMT Performance Standards Monitonng Report and the Cell 4A and Cell 4B Performance Standards Monitonng Report closed If you have any questions please contact at Russ Topham at (801) 536-4256 Sincerely, Rusty Lundberg Director RL/RJT r)t