Loading...
HomeMy WebLinkAboutDRC-2020-002232 - 0901a06880bd54e8ENERGY FUELS January 23, 2020 VIA EXPRESS DELIVERY Mr. Ty L. Howard Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, UT 84114-4880 Div of Waste Managort and Radiation Control JAN 2 9 2020 Re: Transmittal of DMT Performance Standards Monitoring Report and Cell 4A BAT Performance Standards Monitoring Report for the 4th Quarter of 2019 Dear Mr. Howard: Enclosed please find two copies of the DMT Performance Standards Monitoring Report and Cell 4A BAT Performance Standards Monitoring Report for the 4th Quarter of 2019, as required under Parts I.F.2 and I.F.3 of the White Mesa Mill's State of Utah Groundwater Discharge Permit No. UGW370004. Also enclosed are two CDs, each with an electronic word-searchable copy of the enclosed Report. If you have any questions regarding this Report, please contact the undersigned at (303) 389-4134 or Mr. Terry Slade at (435) 678-4128. Yours very truly, teettted(cP44 ENERGY FUELS RESOURCES (USA) INC. Kathy Weinel Quality Assurance Manager cc David Frydenlund Paul Goranson Terry Slade Logan Shumway Scott Bakken Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 DRC-Z20-- 002232. www.enCratileki0111 January 23, 2020 VIA EXPRESS DELIVERY Mr. Ty L. Howard Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West P.O. Box 144880 Salt Lake City, UT 84114-4880 Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www.energyfuels.com Re: Transmittal of DMT Performance Standards Monitoring Report and Cell 4A BAT Performance Standards Monitoring Report for the 4th Quarter of 2019 Dear Mr. Howard: Enclosed please find two copies of the DMT Performance Standards Monitoring Report and Cell 4A BAT Performance Standards Monitoring Report for the 4th Quarter of 2019, as required under Parts I.F.2 and I.F.3 of the White Mesa Mill's State of Utah Groundwater Discharge Permit No. UGW370004. Also enclosed are two CDs, each with an electronic word-searchable copy of the enclosed Report. If you have any questions regarding this Report, please contact the undersigned at (303) 389-4134 or Mr. Terry Slade at (435) 678-4128. Yours very truly, ~~Jr-~ ENERGY FUELS RESOURCES (USA) INC. Kathy Weinel Quality Assurance Manager cc David Frydenlund Paul Goranson Terry Slade Logan Shumway Scott Bakken WHITE MESA URANIUM MILL DMT PERFORMANCE STANDARDS MONITORING REPORT AND CELL 4A AND CELL 4B BAT PERFORMANCE STANDARDS MONITORING REPORT 4th Quarter October through December 2019 State of Utah Groundwater Discharge Permit No. UGW370004 Prepared By: Energy Fuels Resources (USA) Inc. 225 Union Boulevard, Suite 600 Lakewood, CO. 80228 January 23, 2020 TABLE OF CONTENTS 1.0 INTRODUCTION ......................................................................................................................................... 1 2.0 MEASUREMENTS TAKEN AND MONITORING PERFORMED ....................................................... ! 3.0 WEEKLY TAILINGS WASTEWATER POOL ELEVATION MONITORING ................................... 2 4.0 QUARTERLY SLIMES DRAIN WATER LEVEL MONITORING ....................................................... 3 4 .1 GENERAL ...................................................................................................................................................... 3 4.2 RESULTS FOR THE QUARTER ........................................................................................................................ .4 4 .3 QUALITY ASSURANCE EVALUATION AND DATA VALIDATION ..................................................................... .4 4.4 GRAPHIC C OMPARISON TO PREVIOUS YEAR ................................................................................................. 5 5.0 WEEKLY FEEDSTOCK STORAGE AREA INSPECTIONS AND INSPECTIONS OF FEEDSTOCK MATERIAL STORED OUTSIDE THE FEEDSTOCK STORAGE AREA .................. 5 6.0 TAILINGS CELLS AND POND LINER SYSTEM REPAIRS ................................................................ 5 7.0 DECONTAMINATION PADS .................................................................................................................... 6 7 .1 SUMMARY OF W EEKLY INSPECTIONS ............................................................................................................ 6 7 .2 ANNUAL INSPECTION OF EXISTING DECONTAMINATION PAD ....................................................................... 6 7 .3 ANNUAL INSPECTION OF N EW DECONTAMINATION PAD .............................................................................. 7 7.4ANNUALINSPECTION OFUSED 0ILANDFUEL TANKS ......................................................................................... 7 8.0 AMMONIUM SULFATE PAD .................................................................................................................... 7 9.0 CELL 4A AND CELL 4B BAT PERFORMANCE STANDARDS REPORT ......................................... 7 9 .1 LDS MONITORING ........................................................................................................................................ 7 9.1.1 Operational Status of LDS Pumping and Monitoring Equipment ........................................................... 7 9.1.2 Measurement of Weekly Fluid Head at the Lowest Point in the Secondary FML ................................... 8 9.1.3 Measurement of the Volume of Fluids Pumped from the LDS ................................................................. 8 9 .2 MEASUREMENT OF W EEKLY WASTEWATER FLUIDS IN CELLS 4A AND 4 B ................................................... 9 9.3 SLIMES DRAIN RECOVERY HEAD MONITORING ............................................................................................ 9 10.0 CELL 1, CELL 2, AND CELL 3 LOS MONITORING ............................................................................ 9 10.1 OPERATIONAL STATUS OF LDS PUMPING AND MONITORING EQUIPMENT .................................................. l 0 10.2 MEASUREMENT OF THE VOLUME OF FLUIDS PUMPED FROM THE LDS ....................................................... 10 10.3 MEASUREMENTOFWEEKLYWASTEWATERFLUIDS IN CELLS 1, 2, AND 3 .................................................. 10 10.4 SLIMES DRAIN RECOVERY HEAD MONITORING .......................................................................................... 10 11.0 ANNUAL SLIMES DRAIN RECOVERY HEAD REPORT FOR THE CALENDAR YEAR 2019 ... 10 11.1 INDIVIDUAL SLIMES DRAIN RECOVERY H EAD FOR 2019 ............................................................................ 11 11 .2 ANNUAL ASSESSMENT ..................................................................................................................................... 11 11.2.1 Quality Assurance Evaluation and Data Validation ......................................................................... 12 11.3 CONCLUSION .................................................................................................................................................... 13 12.0 QUARTERLY PRECIPITATION DATA ................................................................................................ 13 13.0 SIGNATURE AND CERTIFICATION .................................................................................................... 14 LIST OF TABLES Table 1 -Summary of Waste Water Pool Elevations (In the Text) Table 2 -New Decontamination Pad Inspection Portal Level (In the Text) Table 3 -Cell 2 Slimes Drain Recovery Head and SDRE Values for 2019 (Tab C) Table 4-Cell 2 Slimes Drain Monthly Volumes of Fluids Pumped (Tab C) ATTACHMENTS A Tailings Cell Wastewater Elevations B Notices Pursuant to Part I.G.3 of the GWDP C Quarterly Cell 2 Slimes Drain Monitoring Data D Graph of Cell 2 Slimes Drain Water Levels Over Time E Cell Liner Repair Reports and Notices F Cell 4A and Cell 4B Leak Detection System Data for the Quarter and BAT O&M Plan Tables lA and lB, Cell 4A and 4B Calculations G Annual Inspection Forms for Existing and New Decontamination Pads and Quarterly Inspection Forms for the Ammonium Sulfate Area H Weekly Feedstock Inspection Form -Feedstock Maps I Quarterly Precipitation Data 11 WHITE MESA URANIUM MILL DMT PERFORMANCE STANDARDS MONITORING REPORT AND CELL 4A AND CELL 4B BAT PERFORMANCE STANDARDS MONITORING REPORTS FOR THE 4TH QUARTER OF 2019 1.0 INTRODUCTION This is the routine Discharge Minimization Technology ("DMT") Performance Standards Monitoring Report for the fourth quarter of 2019 (the "quarter") prepared by Energy Fuels Resources (USA) Inc. ("EFRI"), as required under Part I.F.2 of the White Mesa Mill's (the "Mill's") State of Utah Groundwater Discharge Permit No. UGW370004 (the "GWDP"), and the Routine Cell 4A and Cell 4B Best Available Technology ("BAT") Performance Standards Monitoring Reports for the quarter, as required under Part I.F.3 of the GWDP. 2.0 MEASUREMENTS TAKEN AND MONITORING PERFORMED During the quarter, the following DMT monitoring was performed or addressed, as required under Part I.D.3, I.E.7, and I.F.11 of the GWDP: • Weekly tailings wastewater pool elevations for tailings Cells 1 and 3 (Part I.E.7(a)); • Quarterly slimes drain water levels in Cell 2 (Part I.D.3(b)(2)); • Annual Slimes Drain Compliance (Part I.D.3 (b) (3) and I.F.11); • Weekly feedstock storage area inspections and inspections of feedstock materials stored outside of the feedstock storage area (Part I.D.3(f) and Parts I.E.7(d); and (e)); • Any tailings cell and pond liner system repairs (Part I.E.7 (f) and Part I.E.(8)(c)); • Weekly New Decontamination Pad Inspection (Part I.E.7 (g)) and • Annual Decontamination Pad Concrete Inspection (Part I.F.11) (not required this reporting period) Also, during the quarter, the following Cell 4A and 4B BAT performance standards monitoring was performed, or addressed, as applicable and as required by Paits I.E.8 and I.E.12 of the GWDP: • Leak detection system ("LDS") monitoring for Cell 4A (Part I.E.8.(a)), and Cell 4B (Part I.E.12); and • Weekly tailings wastewater pool elevations for tailings Cell 4A (Part I.E.8 (a)) and Cell 4B (Part I.E.12). During the quarter, the following inspections were also completed: • LDS monitoring for Cells 1, 2 and 3 pursuant to the Mill's State of Utah Radioactive Materials License No. UT 1900479 (the "License") (Part 11.3). 1 3.0 WEEKLY TAILINGS WASTEWATER POOL ELEVATION MONITORING Mill personnel monitored and recorded weekly the elevation of wastewater in the Mill's tailings cells during this quarter, to ensure compliance with the maximum wastewater elevation criteria mandated by Parts I.E.7(a)2 and I.E.12(a) of the GWDP. The results of such monitoring, reported as feet above mean sea level ("fmsl"), are included in Attachment A. Part I.D.2 of the GWDP provides that under no circumstances shall the freeboard of any tailings cell be less than three feet, as measured from the top of the flexible membrane liner ("FML"). The top of the FML in Cell 1 is at 5,618.5 fmsl, and the top of the FML in Cell 4B is 5600.4 fmsl. This means that the maximum wastewater pool elevations in Cells 1 and 4B permitted under Part I.D.2 of the GWDP are 5,615.50, and 5,597.40 fmsl, respectively. The maximum wastewater pool elevations in Cells 1 and 4B, as measured during the quarter, are summarized in the following Table 1. The requirements to meet freeboard elevation limits in Cell 3 and Cell 4A were eliminated. The solution elevation measurements in Cell 4A are not required for compliance with freeboard limits but are required for the calculation of the daily allowable volume of fluids pumped from Cell 4A LDS and are collected for this purpose. The freeboard limits established by the GWDP and the "License are slightly different; accordingly, the stricter of the two limits represents the regulatory standard for each cell. As indicated in Table 1, the applicable freeboard limits were not exceeded during the Quaiter for any cell. Table 1 -Summary of Waste Water Pool Elevations Tailings Maximum Maximum Maximum Cell Wastewater Elevation Wastewater Elevation Wastewater Measured During the Permitted Under Elevation Permitted Quarter (fmsl) License Condition Under Part I.D.2 of 10.3 (fmsl) the GWDP (fmsl) Cell I 5615.01 5,615.40 5,615.50 Cell 3 Not Measured-No Limit No Limit freeboard limit was (5,602.50*) (5,605.50*) removed in Q 1 2011 Cell 4A 5590.69 -freeboard No Limit No Limit limit was removed in (5,593.74**) (5,595.50**) Qt 2011. Cell 4B 5570.72 5594.60 5597.40 * The Director approved the removal of the Cell 3 freeboard limit and authorized the use of Cell 4B on January 27, 2011 . Cell 3 is nearly full of solids. ** The Director granted a variance from the Cell 4A freeboard limit on January 13, 2011, and approved the removal of the Cell 4A limit and authorized the use of Cell 4B on January 27, 2011. The previous freeboard limit noted above for Cell 4A was not set out in the License. The freeboard limit of 5,593.74 for Cell 4A was set out in a letter from the Director dated November 20, 2008. The approved DMT Plan, Revision 11.1 dated January 2011, included the removal of the freeboard limit for Cell 4A to be replaced by a freeboard limit for Cell 4B that will accommodate the freeboard requirements of Cells 1, 4A, and 4B. 2 4.0 QUARTERLY SLIMES DRAIN WATER LEVEL MONITORING 4.1 General Part I.D.3(b)(l) of the GWDP provides that the Permittee shall at all times maintain the average wastewater recovery head in the slimes drain access pipes of each of Cells 2 and 3 to be as low as is reasonably achievable, in accordance with the DMT Plan. Part I.E.7(b)(5) of the GWDP provides that for Cell 3, this requirement shall apply after initiation of dewatering operations. Part I.D.6(c) of the GWDP provides that, after the Permittee initiates pumping conditions in the slimes drain layer in Cell 4A, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer, in a manner equivalent to the requirements found in Part I.D.3(b ), and 2) a maximum head of 1.0 feet in the tailings (as measured from the lowest point of the upper FML) in 6.4 years or less. Similarly, Part I.D.13(c) of the GWDP provides that, after the Permittee initiates pumping conditions in the slimes drain layer in Cell 4B, the Permittee will provide: 1) continuous declining fluid heads in the slimes drain layer in a manner equivalent to the requirements found in Part I.D.3(b), and 2) a maximum head of 1.0 feet in the tailings (as measured from the lowest point of the upper FML) in 5.5 years or less. The GWDP, Part I.D.3(b)(l) states the "Permitee shall at all times maintain the average wastewater recovery head in the slimes drain access pipe to be as low as reasonably achievable ... " Part I.D.3(b)(2) states the "effective July 11, 2011, the Permittee shall conduct a quarterly slimes drain recovery test...". Monthly testing was conducted through the second quarter of 2011. The frequency change dictated by the GWDP was implemented in the third quarter 2011. The test ensures that each tailings cell meets the following minimum requirements: 1) includes a duration of at least 90-hours, as measured from the time that pumping ceases, and 2) achieves a stable water level at the end of the test, as measured by three consecutive hourly water level depth measurements with no change in water level, as measured to the nearest 0.01 foot. The GWDP, Part I.E.7(b) requires quarterly monitoring of all slimes drain access pipes in accordance with I.D.3 as noted above. In addition, for the purposes of monitoring the slimes drain access pipes, the GWDP Part 1.E.7(b) requires: 1) that 1 separate slimes drain recovery test be performed in each slimes drain for each cell quarterly (upon commencement of dewatering operations), 2) designate, operate, maintain and preserve one water level measuring point of each slimes drain access pipe that has been surveyed by a Utah licensed engineer or land surveyor (upon commencement of dewatering operations), 3) make all slimes drain recovery head test (depth to fluid) measurements from the same designated measuring point, and 4) record all fluid depth measurements to the nearest 0.01 foot. At this time, dewatering operations have not commenced in Cell 3, Cell 4A, or Cell 4B. As a result, the requirements in Part I.E.7(b) to monitor and record monthly the depth to wastewater in the slimes drain access pipes as described in Part I.D.3 of the GWDP apply only to Cell 2 at this time. Accordingly, this Report is limited to slimes drain recovery head information relating to Cell 2 only. 3 Pursuant to Parts the I.F.2 of the GWDP, Section 7.1 of the DMT Plan and correspondence from the Division of Waste Management and Radiation Control ("DWMRC"), dated February 7, 2008, the results of quarterly recovery monitoring of the slimes drain for Cell 2 are to be recorded and included with the results of quarterly monitoring in the quarterly White Mesa Mill DMT Performance Standards Monitoring Report and Cell 4A and Cell 4B BAT Performance Standards Monitoring Reports (the "DMT Reports"). Further, beginning in 2008, quarterly DMT Reports must include both the current year values and a graphic comparison to the previous year. The annual slimes drain recovery head report for 2019 is included in Section 11 of this report. 4.2 Results for the Quarter In accordance with the requirements described above, the quarterly slimes drain recovery head monitoring data for the quarter, which includes the date and time for the start and end of the recovery test, the initial water level, and the final depth to stable water level for the quarter, are included as Attachment C to this Report. All measurements were made from the designated fluid measuring point. The fluid level measuring point was surveyed by a licensed Utah land surveyor in Q3 2017 after the extension of the slimes drain access pipe. The extension of the slimes drain access pipe was required due to the Cell 2 cover activities. Cell 2 Phase 1 cover placement/construction commenced in April 2016. The Phase 1 cover activities include the placement and compaction of approximately 4.5 feet of soil materials. These cover placement activities have caused an increase in the measured elevations of the Cell 2 slimes drain fluids. The increased elevations are due to excess pressure from surcharge as a result of cover activities. The increase in elevations was expected and is unavoidable during cover construction activities. Cover construction activities included the installation of a series of piezometers across Cell 2. Fluid levels are monitored and recorded in the piezometers. Initially, fluid measurements in the piezometers were conducted weekly. After the completion of the Phase 1 activities, the fluid measurements were conducted monthly. The data as well as monthly contours of the fluid levels are included in Tab C. The data indicate that the increase in fluid levels in Cell 2 is directly related to the placement of fill and cover construction activities. The slimes drain pump in Cell 2 is activated and deactivated by a float mechanism and water level probe system. When the water level reaches the level of the float mechanism the pump is activated. Pumping then occurs until the solution level reaches the lower probe which turns the pump off. It is important to note that as a result of the added cover materials and the increase in solution elevations, additional volumes of solutions have been pumped since the commencement of cover activities began. 4.3 Quality Assurance Evaluation and Data Validation EFRI management has evaluated all slimes drain data collected, data collection methods, and all related calculations required by the GWDP, and have verified the accuracy and reliability of both the data and calculations reported. 4 As a result of its quality assurance evaluation and data validation review, EFRI has concluded that the 2009, and 2010 monthly slimes drain tailings fluid elevation measurements, the 2011 monthly (through June) and quarterly (July forward), and the quarterly 2012, 2013, 2014, 2015, 2016, 2017, 2018, and 2019 slimes drain tailings fluid elevation measurements to date meet the test performance standards found in Part I.D.3(b)(2) and I.E.7(b) of the GWDP and can be used for purposes of determining compliance with the requirements of Part I.D.3(b) of the GWDP. 4.4 Graphic Comparison to Previous Year A graph showing the final depth to stable water level readings for 2009 through the current 2019 period is included as Attachment D. 5.0 WEEKLY FEEDSTOCK STORAGE AREA INSPECTIONS AND INSPECTIONS OF FEEDSTOCK MATERIAL STORED OUTSIDE THE FEEDSTOCK STORAGE AREA Weekly feedstock storage area inspections were performed by the Mill's Radiation Safety Department, to confirm that the bulk feedstock materials are stored and maintained within the defined area described in the GWDP and that all alternate feedstock located outside the defined feedstock area is maintained in compliance with the requirements of Part I.D.11 of the GWDP. The results of these inspections are recorded on the Weekly Mill Inspection forms, which are available at the Mill for inspection. In the closeout letter for the first quarter 2013 DMT Report, dated July 23, 2013, DWMRC wrote "EFRI noted standing water in one of the feedstock storage areas. Language in the report referred to the standing water as a "small amount." The DWMRC requests that in future quarterly reports, EFRI be more complete in quantifying and describing the location of standing water discovered in feedstock storage areas." To comply with this request, EFRI has attached the Feedstock Storage Area Maps ("Feedstock Maps") completed during the weekly Feedstock Storage Area inspections as Attachment H. When present, the Feedstock Maps will include the areal extent (in feet) and depth (in inches) of any standing water noted during the weekly inspections. During the quarter, standing water was noted during the weekly inspections of December 13 and December 19, 2019. Standing water (or ice on December 19, 2019) noted was the result of precipitation which had fallen and accumulated on the ore stock piles. 6.0 TAILINGS CELLS AND POND LINER SYSTEM REPAIRS The liner systems at Cells 1, 2, 3, 4A, and 4B were inspected on a daily basis. The results of those inspections are recorded on the Mill's Daily Inspection Data sheets, which are available at the Mill for review. 5 7.0 DECONTAMINATION PADS 7.1 Summary of Weekly Inspections Part I.F. 7 (g) of the GWDP and Section 3.1 of the DMT Plan require that a weekly inspection of the New Decontamination Pad be performed, and that the vertical inspection portals on the New Decontamination Pad, which are located between the primary and secondary containments, be visually observed on a weekly basis as a means of detecting any leakage from the primary containment into the void between the primary and secondary containments. The BAT performance standards for the New Decontamination Pad are set out in Part I.D.14 of the GWDP. Table 2 below indicates the water level measurements in each portal measured during the quarter. Table 2 -New Decontamination Pad Inspection Portal Level for the Quarter Date Portal 1 Portal 2 Portal 3 Liquid Level (ft.) Liquid Level (ft.) Liquid Level (ft.) 10/4/2019 0.00 0.00 0.00 10/11/2019 0.00 0.00 0.00 10/18/2019 0.00 0.00 0.00 10/25/2019 0.00 0.00 0.00 11/1/2019 0.00 0.00 0.00 11/8/2019 0.00 0.00 0.00 11/15/2019 0.00 0.00 0.00 11/22/2019 0.00 0.00 0.00 11/27/2019 0.00 0.00 0.00 12/6/2019 0.00 0.00 0.00 12/12/2019 0.00 0.00 0.00 12/18/2019 0.00 0.00 0.00 12/27/2019 0.00 0.00 0.00 As can be seen from the foregoing table, no fluids were observed to be present in any of the portals during the quarter. Any soil and debris identified during the weekly inspections was removed from the wash pad of the New Decontamination Pad, in accordance with part I.D.14 (b) of the GWDP and Section 3.1 (e)(i)(F) of the DMT Plan. No cracks greater than 1/8" were observed during any weekly inspections. 7 .2 Annual Inspection of Existing Decontamination Pad As required by Part I.F .12 of the Permit, annual inspections of the existing decontamination pad must be conducted during the second quarter of each year. The documentation for the 2019 annual inspection was reported in the Second Quarter DMT report submitted on July 25, 2019. The annual inspection for 2020 will be conducted during the second quarter and reported in the DMT Report due on or before September 1, 2020. 6 7.3 Annual Inspection of New Decontamination Pad Annual inspections of the new decontamination pad are conducted during the second quarter of each year. The documentation for the 2019 annual inspection was reported in the Second Quarter DMT report submitted on July 25, 2019. The annual inspection for 2020 will be conducted during the second quarter and reported in the DMT Report due on or before September 1, 2020. 7.4 Annual Inspection of Used Oil and Fuel Tanks The used oil tank and storage area and the fuel tanks and storage areas were inspected during the second quarter 2019 as required by the Spill Prevention, Control and Countermeasures Plan and the DMT Plan. The annual inspection for 2020 will be conducted during the second quarter and reported in the DMT Report due on or before September 1, 2020. 8.0 AMMONIUM SULFATE PAD EFRI implemented Phase I of the approved May 7, 2012 Mill Nitrate Corrective Action Plan ("CAP") through the installation of the ammonium sulfate concrete pad. The ammonium sulfate cover area is required to be inspected quarterly for eight (8) quarters and annually thereafter. The eighth quarter! y inspection was completed in August 2017. The ammonium sulfate pad annual inspections were completed in June 2019 as required by the CAP and DMT plan. Repairs and maintenance, including caulking and sealing of cracks, were completed following the inspection to prevent additional deterioration. 9.0 CELL 4A AND CELL 4B BAT PERFORMANCE STANDARDS REPORT This Section constitutes the routine Cell 4A and Cell 4B BAT Performance Standards Monitoring Report for the quarter, as required under Part I.F.3 of the GWDP. 9.1 LDS Monitoring 9.1.1 Operational Status of LDS Pumping and Monitoring Equipment The LDS pumping and monitoring equipment for both of Cell 4A and Cell 4B, including, but not limited to, the submersible pump, pump controller, head monitoring, and flow meter equipment, operated continuously during the quarter except as noted below. Cell 4A During the quarter, there were no failures of any pumping or monitoring equipment that were not repaired and made fully operational within 24-hours of discovery, as contemplated by Part I.E.8(a)(l) of the GWDP. 7 Cell 4B During the quarter, there were no failures of any pumping or monitoring equipment that were not repaired and made fully operational within 24-hours of discovery, as contemplated by Part I.E.12(a)(l) of the GWDP. 9.1.2 Measurement of Weekly Fluid Head at the Lowest Point in the Secondary FML The measurements of the fluid head above the lowest point in the secondary FML for Cells 4A and 4B are provided in Attachment F. As can be seen from a review of Attachment F, at no point in the quarter did the fluid head in the Cell 4A LDS sump exceed a I-foot level above the lowest point in the lower FML on the Cell floor (where for purposes of compliance monitoring, this I-foot distance equates to 2.28 feet [27.36 inches] above the LDS system transducer), as stipulated by Part I.E.8(a)(2) of the GWDP. During the quarter, the fluid head in the Cell 4A LDS sump did not exceed 7.4 inches above the LDS transducer. As can be seen from a review of Attachment F, at no point in the quarter did the fluid head in the Cell 4B LDS sump exceed a I-foot level above the lowest point in the lower FML on the Cell floor, as stipulated by Part I.E.12(2) of the GWDP. For the purposes of compliance monitoring, this I-foot distance equates to 2.25 feet (27 inches) above the LDS system. During the quarter, the fluid head in the Cell 4B LDS sump did not exceed 4.72 inches above the LDS transducer. 9.1.3 Measurement of the Volume of Fluids Pumped from the LDS The measurements of the volume of fluids pumped are provided in Attachment F. Cell 4A As can be seen from a review of Attachment F, 1,224 gallons of fluid were pumped from the Cell 4A LDS for the quarter. Accordingly, the average daily LDS flow volume in Cell 4A did not exceed 24,160 gallons/day, as stipulated by Part I.E.8(a)(3) of the GWDP. The daily allowable volume of fluids pumped from the Cell 4A LDS have also been calculated based on weekly tailings cell fluid measurements using the calculations provided in the Cell 4A BAT Operations and Maintenance Plan. A letter from the Director dated January 27, 2011 that approved the use of Cell 4B, and a subsequent letter dated March 15, 2011, stated approval of the DMT and Cell 4A O&M Plans, which effectively eliminated the former freeboard elevation requirements for tailings Cell 4A. Pursuant to the receipt of the March 15, 2011 letter, freeboard limits in Cell 4A were no longer required. However, the weekly wastewater elevations are documented in order to calculate the maximum daily allowable flow volume, in accordance with the Cell 4A BAT Operations and Maintenance Plan. Based on the wastewater pool elevation surveys conducted during the quarter, and the maximum head recorded on the FML during the quarter of 35.14 feet, the allowable flow rate would be approximately 587.46 gallons/acre/day (23,099 gallons/day for the cell), as determined by Table IA of the Mill's Cell 4A and 4B BAT Operations and Maintenance Plan, and assuming a liner elevation of 5555.55 feet and 8 approximately 39.32 acres of liquid area. The average daily flow volume in Cell 4A did not exceed the calculated flow volume of 23,099 gallons/day. As mentioned above, a total of 1,224 gallons of fluid were pumped from the Cell 4A LDS during the quarter and did not exceed the calculated maximum allowable daily flow volume. The allowable flow rate calculation for the quarter for Cell 4A along with Table lA is included in Attachment F of this report. Cell 4B As can be seen from a review of Attachment F, 2,942 gallons of fluid were pumped from the Cell 4B LDS for the quarter. The average daily LDS flow volume in Cell 4B did not exceed the 26,145 gallons/day limit, as stipulated by Pait I.E.12(3) of the GWDP. Based on the wastewater pool elevation surveys conducted during the quarter, the maximum head recorded on the FML during the quarter was 13.22 feet. The allowable flow rate would therefore be approximately 369.90 gallons/acre/day (12,199 gallons/day for the cell), as determined by Table lB of the Mill's Cell 4A and 4B BAT Operations and Maintenance Plan, and assuming a liner elevation of 5557.5 feet and approximately 32.98 acres of liquid area. The average daily flow volume in Cell 4B did not exceed the calculated flow volume of 12,199 gallons/day. As mentioned above, a total of 2,942 gallons of fluid were pumped from the Cell 4B LDS during the quarter and did not exceed the calculated maximum allowable daily flow volume. The allowable flow rate and average daily flow rate calculations for the quarter for Cell 4B are included along with Table lB in Attachment F of this report. 9.2 Measurement of Weekly Wastewater Fluids in Cells 4A and 4B Weekly fluid elevations for Cells 4A and 4B for the quarter are provided in Attachment A along with elevations for Cell 1. 9.3 Slimes Drain Recovery Head Monitoring As the Mill has not initiated pumping of the Cell 4A or Cell 4B slimes drain systems at this time, monthly recovery head tests and fluid level measurements are not required at this time pursuant to Part I.E.8(b) of the GWDP. 10.0 CELL 1, CELL 2, AND CELL 3 LDS MONITORING The requirement in Section 3.l(a) of the DMT Plan to monitor the LDS for Cells 1, 2, and 3 is a requirement of the License, and not a DMT performance monitoring standard required by Parts I.D.3 or I.E.7 of the GWDP. However, DWMRC has requested that the LDS monitoring for Cells 1, 2, and 3 be included on the DMT inspection forms and that the results of the monitoring be reported in the quarterly DMT reports. The Cells 1, 2, and 3 LDS monitoring data are included in Attachment F. 9 10.1 Operational Status of LDS Pumping and Monitoring Equipment The LDS pumping and monitoring equipment for each of Cell 1, Cell 2, and Cell 3, including, but not limited to, the submersible pump, pump controller, head monitoring, and flow meter equipment, operated continuously during the quarter except as noted below. For Cell 1, during the quarter, there were no failures of any pumping or monitoring equipment not repaired and made fully operational within 24 hours of discovery. For Cell 2, during the quarter, there were no failures of any pumping or monitoring equipment not repaired and made fully operational within 24 hours of discovery. For Cell 3, during the quarter, there were no failures of any pumping or monitoring equipment not repaired and made fully operational within 24-hours of discovery. 10.2 Measurement of the Volume of Fluids Pumped from the LDS No fluids were pumped from the Cells 1, 2 or 3 LDSs during the quarter because no fluids were detected in the Cells 1, 2 or Cell 3 LDSs. 10.3 Measurement of Weekly Wastewater Fluids in Cells 1, 2, and 3 A summary of the fluid elevations for the Cells 1, 2 and 3 LDSs for the quarter are provided in Attachment F. The LDS for Cells 1, 2, and 3 were dry during the quarter. 10.4 Slimes Drain Recovery Head Monitoring As the Mill has not initiated pumping in the Cell 3 slimes drain system at this time, monthly recovery head tests and fluid level measurements are not required at this time. 11.0 ANNUAL SLIMES DRAIN RECOVERY HEAD REPORT FOR THE CALENDAR YEAR 2019 As previously noted, Cell 2 Phase 1 cover placement/construction commenced in April 2016. The Phase 1 cover activities include the placement and compaction of approximately 4.5 feet of soil materials. These cover placement activities have caused an increase in the measured elevations of the Cell 2 slimes drain fluids. The increased elevations are due to excess pressure from surcharge as a result of cover activities. The increase in elevations was expected and is unavoidable during cover construction activities. The increase in fluid levels in Cell 2 is directly related to the placement of 4.5 feet of fill and cover construction activities. 10 The GWDP dated March 19, 2019 requires an annual slimes drain assessment be included with the 4th quarter DMT Rep01t. 11.1 Individual Slimes Drain Recovery Head for 2019 The individual slimes drain recovery head monitoring data for calendar year 2019, which includes the date and time for the start and end of the recovery test, the initial water level, and the final depth to stable water level, is included as Attachment C to this Report. These results were used for the assessments completed pursuant to the GWDP. The equivalent recovery water level elevation is determined by subtracting the final depth to stable water measurement (as recorded on the sheets in Attachment C) from the elevation of the measuring point. The water level measurements are referred to as the slimes drain recovery elevations ("SDRE") in the Table 3 in Attachment C. 11.2 Annual Assessment Parts I.D.3, I.F.11, and ILG of the GWDP requires an annual assessment of the slimes drain compliance. The remainder of this section discusses the 2019 Cell 2 slimes drain data and assesses the compliance against the GWDP. Part I.D.3 requires an annual report be submitted that includes: 1) Monthly volumes of fluid pumped from the slimes drain for each applicable tailings disposal cell; 2) The results of all quarterly slimes drain recovery tests; 3) A calculation of average annual wastewater recovery elevation in the slimes drain access pipe, and; 4) The annual report shall include an assessment and verification that the maximum fluid volume which could practicably be extracted from the slimes drain in accordance with the systems in place was removed. In addition, the GWDP requires the submission of a Slimes Drain Compliance Plan on or before January 19, 2020. The Slimes Drain Compliance Plan was submitted to DWMRC as required by the GWDP under separate cover on January 16, 2020. Monthly volumes of fluid pumped are included in Table 4 in Attachment C. The results of the four quarterly slimes drain recovery tests are included in Attachment C. The amount of fluid pumped from the Cell 2 slimes was maximized in 2019. As previously stated the added cover materials and the increase in solution elevations, has increased the volumes of solutions that have been pumped since the commencement of cover activities began. The slimes drain pump was lowered to the lowest point practicable to maximize the length of time the pump operates. In addition, the slimes drain pump in Cell 2 is activated and deactivated by a float mechanism and water level probe system. When the water level reaches the level of the float mechanism the pump is activated. Pumping then occurs until the solution level reaches the lower probe which turns the pump off. This system, rather than a timed system, assures that the pump operates the maximum time practicable thus maximizing the amount of fluid pumped. No unscheduled downtimes of the pump in the Cell 2 slimes were noted during 2019, and the maximum fluid volume which could practicably be extracted from the slimes drain in accordance 11 with the systems in place was removed. No additional optimization of the system is possible and EFRI has maximized the system components. Part I.F.11, in addition to the requirements of I.D.3 items listed above, requires the inclusion of: c) a time series chart to show trends of the recovery water level elevations at each slimes drain. d) the results of a quality assurance evaluation and data validation. The validation shall provide written descriptions and findings that evaluate all data collected, data collection methods, and all related calculations and verification of the accuracy and reliability of both the data and calculations reported required by this Permit, and e) a demonstration of compliance with Part I.D.3(b) and I.E.7(b) of the Permit. A time series plot showing trends of the recovery fluid level elevations is included in Attachment C. It is important to note that a downward trend was observed prior to the cover construction activities in 2016. The surcharge resulting from the cover construction is clearly visible in the 2016 measurements. It is important to note that due to the maximization of pumping, the trend since 2016 has been overall downward indicating that the maximized pumping is effectively removing the surcharged fluids and fluid levels are or will be decreasing. 11.2.1 Quality Assurance Evaluation and Data Validation Per the requirements of Part I.F.11, EFRI has evaluated all data collected, data collection methods, and all related calculations required by the Permit, and has verified the accuracy and reliability of both the data and calculations reported. The 2019 Cell 2 slimes drain data are usable for the intended purpose of determining compliance with the GWDP requirements. The data and data collection methods met the following GWDP criteria: • The average wastewater recovery head in the slimes drain access pipe was maintained as low as reasonable achievable because EFRI maximized the pumping; • Quarterly head tests were performed. The head tests met the duration requirements (includes a duration of at least 90-hours, as measured from the time that pumping ceases); • Quarterly head tests achieve a stable water level at the end of the test, as measured by three consecutive hourly water level depth measurements with no change in water level, as measured to the nearest 0.01 foot; and • Water level depth measurements were collected from a designated measuring point that has been surveyed by a Utah Licensed Land Surveyor. The calculations contained in this annual assessment are based on validated data and have been performed as required in the GWDP. All calculations and data were verified by the EFRI Quality Assurance Manager for accuracy and completeness. The calculations are considered accurate and reliable. While the historic data are not used for the calendar year 2019 assessment under the GWDP, the quality assurance evaluation and data validation are included here for completeness. As a result of the quality assurance evaluation and data validation review, EFRI has concluded that the 12 2009, 2010, 2011, 2012, 2013, 2014, 2015, 2016, 2017, 2018 and 2019 slimes drain tailings fluid elevation measurements meet the test performance standards found in Part I.D.3(b) and are also usable for the intended purpose. Part 11.G of the GWDP specifies records contents for data collected under the GWDP. The data collected during the quarterly slimes drain head tests meet the requirements of Part 11.G and includes date, time, place the measurements were made and personnel making the measurements. Since no laboratory analyses were performed no date and time for the analyses or certified laboratory are necessary. Measurement techniques and results are discussed above. 11.3 Conclusion Based on the discussions above and the data in Attachment C, the annual slimes drain compliance has been achieved for Cell 2 in 2019. Cell 2 slimes drain pumping and monitoring were completed in accordance with Part I.D.3(b) and 1.E.7(b)of the Permit for the reasons stated above. Additional detail regarding the Cell 2 slimes drain pumping system are included in the Slimes Drain Compliance Plan, which was submitted to DWMRC under separate cover on January 16, 2020. 12.0 QUARTERLY PRECIPITATION DATA Pursuant to a verbal request from DWMRC personnel, EFRI is providing the quarterly precipitation data in the quarterly DMT reports. The data are collected at the Mill, by the EFRI Field Staff, using an on-site rain gauge. The data are included as Attachment I to this report. 13 13.0 SIGNATURE AND CERTIFICATION This document was prepared by Energy Fuels Resources (USA) Inc. Energy Fuels Resources (USA) Inc. By: Scott A. Bakken Senior Director Regulatory Affairs 14 CERTIFICATION: I certify, under penalty of law, that this document and all attachments were prepared under my direction or supervision in accordance with a system designed to assure that qualified personnel properly gather and evaluate the information submitted. Based on my inquiry of the person or persons who manage the system, or those persons directly responsible for gathering the information, the information submitted is, to the best of my knowledge and belief, true, accurate and complete. I am aware that there are significant penalties for submitting false information, including the possibility of fine and imprisonment for knowing violations. Scott A. Bakken Senior Director Regulatory Affairs Energy Fuels Resources (USA) Inc. 15 Attachment A Date Cell 1 Cell 3 1 Cell 4A 2 Cell 4B 3 Free board 5615.40 -RML 5594.60 -RML Limit 5615.50-GWDP No Limit 5597.40 -GWDP 10/4/2019 5614.71 No Longer Required 5590.30 5570.18 10/11/2019 5614.80 No Longer Required 5590.22 5569.83 10/18/2019 5614.89 No Longer Required 5590.19 5569.53 10/25/2019 5614.83 No Longer Required 5590.03 5569.40 11/1/2019 5614.89 No Longer Required 5589.99 5568.92 11/8/2019 5614.90 No Longer Required 5590.02 5568.88 11/15/2019 5614.82 No Longer Required 5590.09 5569.65 11/22/2019 5614.76 No Longer Required 5590.11 5569.72 11/27/2019 5615.01 No Longer Required 5590.24 5570.05 12/6/2019 5614.87 No Longer Required 5590.38 5570.08 12/12/2019 5614.85 No Longer Required 5590.41 5570.43 12/18/2019 5614.71 No Longer Required 5590.42 5570.72 12/27/2019 5614.79 No Longer Required 5590.69 5570.70 1Cell 3 is nearly full of solids. The freeboard limit is no longer required and the weekly measurements are no longer required per the January 27 and March 14, 2011 letters from DWMRC. 2 The previous freeboard limit of 5,593.74 for Cell 4A is set out in a letter from the Director dated November 20, 2008. EFRI proposed in the DMT Plan revision dated November 12, 2010 the removal of the freeboard limit for Cell 4A to be replaced by a freeboard limit for new Cell 4B that will accommodate the freeboard requirements of Cells 3, 4A, and 4B. The Director granted a variance from the Cell 4A freeboard limit on January 13, 2011 and approved the removal of the Cell 4A limit and the use of Cell 4B on January 27, 2011. The weekly measurements are no longer required for compliance with freeboard limts, but are required for the calculation of the daily allowable volume of fluids pumped from the Cell 4A LOS. 3 The freeboard limit listed is the value specified in the DMT plan when the pool surface area is 40 acres. A pool surface area of 40 acres is used because there are no beaches present in Cell 4B at this time. Attachment B This attachment has been deliberately left blank. Attachment C Table 3 Cell 2 Slimes Drain Recovery Head and SDRE Values for 2019 2019 Test Elevation of Reported Level SDRE Values Closing Date Measurement (feet) (Reported as fmsl) Point (fmsl) 3/4/2019 5024..1 7" 28.30 5S96.87, - 5/13/2019 5624.17 28.57 $595.60 9/16/2019 5624.17 28.40 1,. 5595.77 11/25/2019 .5624.17 28.00 §596.17 I IE2019 22is3.4t N2019 4 2019 Average $595.8.$ Recovery Table 4 Cell 2 Slimes Drain Monthly Volumes of Fluids Pumped a Total Pumped by Month Date (gal) January-19 94713 February-19* 80084 March-19* 97921 April-19 92178 May-19* 84677 June-19 87619 July-19 90063 August-19 90647 September-19* 79259 October-20 92165 November-19* 80057 December-19 100221 2019 Total 1069604 *Pursuant to Part I.D.3(b) of the January 19, 2018 GWDP, slimes darin recovery tests were performed quarterly. The recovery tests (and GWDP) require the pump to be turned off for 90 hours. No pumping of slimes drain fluid occurs during the recovery test. Less volumes are reported during the months in which the recovery tests are conducted. QUARTERLY HEAD MEASUREMENT TEST Location:White Mesa Mill Slimes Cell # 2 2/26/19 700 41.03 800 40.72 900 40.07 1000 39.55 1100 38.91 1200 38.41 1300 37.82 1400 37.55 1500 37.34 1600 Comments: Date: 2/26/2019-3/4/2019 Sampler: Deen Lyman 2/27/19 2/28/19 3/1/19 3/2/19 33.94 31.46 30.29 29.46 33.83 31.43 30.25 33.72 31.37 30.21 33.58 31.29 30.17 33.47 31.23 30.15 33.31 31.19 30.12 33.18 31.10 30.09 33.09 31.01 30.05 32.95 30.96 29.99 Final reading for the quarter was 28.30 3/3/19 3/4/19 28.56 28.30 28.30 28.30 QUARTERLY HEAD MEASUREMENT TEST Locatio White Mesa Mill Slimes Cell# 2 5/7/19 700 40.55 800 39.50 900 39.02 1000 38.61 1100 38.14 1200 37.86 1300 37.33 1400 36.98 1500 36.64 1600 36.32 Date: Sampler: 5/8/19 5/9/19 33.69 31.40 33.54 31.37 33.41 31.29 33.27 31.22 33.15 31.19 33.01 31.13 32.91 31.09 32.80 31.04 32.71 30.99 32.56 30.94 Comment! Final reading for the quarter was 28.57 5/7/2019-5/13/2019 Deen Lyman 5/10/19 5/11/19 30.41 30.35 30.30 30.26 30.22 30.18 31.14 30.10 30.08 29.86 5/12/19 5/13/19 28.57 28.57 28.57 29.44 QUARTERLY HEAD MEASUREMENT TEST Location: White Mesa Mill Slimes Cell # 2 9/10/19 700 39.90 800 39.25 900 38.80 1000 38.26 1100 37.79 1200 37.39 1300 37.01 1400 36.68 1500 36.41 1600 Date: Sampler: 9/11/19 9/12/19 33.55 31.48 33.42 31.43 33.30 31.38 33.17 31.34 33.04 31.26 32.95 31.20 32.85 31.14 32.75 31.07 32.65 31.00 Comments: Final reading for the quarter was 28.40 9/10/2019-9/16/2019 D. Lyman, T. Holliday, G. Palmer 9/13/19 9/14/19 9/15/19 30.39 28.96 30.37 30.34 30.31 30.28 30.25 30.22 30.18 30.14 29.20 9/16/19 28.40 28.40 28.40 QUARTERLY HEAD MEASUREMENT TEST Location: White Mesa Mill Slimes Cell# 2 Date: 11/19/2019-11/25/2019 Sampler: Deen Lyman, Tanner Holliday, Garrin Palmer 11/19/19 11/20/19 11/21/19 11/22/19 11/23/19 700 40.05 33.25 31.05 30.05 800 39.53 33.18 31.00 30.03 900 39.04 33.01 30.94 30.01 1000 39.00 32.84 30.87 29.99 1100 38.07 32.77 30.81 29.96 29.36 1200 38.03 32.66 30.75 29.91 1300 37.09 32.54 30.67 29.86 1400 36.87 32.42 30.61 29.82 1500 36.65 32.30 30.56 29.78 Comments: Final reading for the quarter was 28.40. Meter was having problems on 11/19/2019, was having innacurate readings. Replaced the battery and meter was properly functioning. Stabalized at 28.00 11/24/19 28.43 11/25/19 28.00 28.00 28.00 .. - ' -L':'""" .r\;:-~ 1•"" _;.i. -. ,-~ ._'. '~-: .. : Piezometer 6/16/2016 6/22/2016 6/30/2016 1n12016 7/14/2016 7/22/2016 7/28/2016 8/5/2016 8/11/2016 C2-P01 11.46 11.34 11.22 11.17 11.22 11.13 11.01 10.94 11.00 C2-P02 8.98 8.94 13.96 13.79 13.73 13.54 13.44 13.36 13.43 C2-P03 13.23 13.01 12.91 12.66 12.71 12.72 12.55 12.25 12.22 C2-P04 10.91 10.82 15.78 15.66 15.70 15.62 15.24 15.14 15.16 C2-P05 14.04 13.95 18.89 18.80 18.73 18.73 18.64 18.37 18.31 C2-P06 17.52 17.45 17.32 17.29 17.26 17.12 16.96 16.87 16.91 C2-P07 15.21 15.07 15.09 15.02 15.03 15.00 14.30 14.23 14.30 C2-P08 18.69 18.56 18.54 18.48 18.46 18.45 18.30 18.19 23.26 C2-P09 25.25 23.76 23.86 23.82 23.91 23.71 23.60 23.50 23.52 C2-P10 22.49 21.93 22.62 22.80 22.96 23.08 22.78 22.74 27.87 C2-P11 20.71 20.45 20.78 20.79 20.91 20.92 20.35 20.31 25.35 C2-P12 21.12 19.72 25.61 25.77 25.97 26.06 25.89 25.48 25.61 C2-P13 16.85 16.83 21.72 21.55 21.48 21.47 21.30 21.14 21.10 C2-P14 22.85 22.56 22.60 22.65 22.75 22.60 22.40 22.38 22.46 C2-P15 21.37 21 .17 21.20 21.16 21.21 21.08 20.80 20.75 20.51 C2-P16 20.24 20.01 20.06 20.02 20.10 20.02 19.80 19.71 19.78 C2-P17 23.01 22.87 22.90 22.75 22.77 22.75 22.60 22.47 22.55 C2-P18 18.70 18.65 18.62 18.52 18.57 18.58 18.38 18.26 18.31 C2-P19 10.31 10.28 10.31 10.35 10.50 10.57 10.50 10.50 10.65 C2-P20 17.15 17.10 17.02 16.97 16.98 16.97 16.82 16.72 16.75 C2-P21 14.96 14.88 14.87 14.76 14.82 14.85 14.68 14.58 14.65 C2-P22 12.42 12.34 12.42 12.30 12.40 12.48 12.32 12.23 12.34 C2-P23 9.93 9.76 9.74 9.65 9.73 9.85 9.78 9.72 9.76 Notes: 1. Piezometers 9 and 15 were found broken at a joint due to construction work in the area between July 28, 2016 and August 5, 2016. DTW readings on August 5, 2016 were taken before these piezometers were repaired. 2. Piezometer 3 was hit by a vehicle on July 11, 2018. It was a clean break and the water levels were able to be read for this date. The piezometer was repaired and a new elevation measured on September 11, 2018. --i .. ' . E F R (USA) w·. . .. C s ~-~~~ ~~~i_'! I .. r.~' \. ~~· -·~ •"·,"7-I~---;-'.i. 'J,--.•, ~:.i.~, .'i-,.~."'." .. · ... Piezometer 8/19/2016 8/26/2016 9/2/2016 9/9/2016 9/16/2016 9/23/2016 9/30/2016 10n12016 10/13/2016 10/21/2016 10/28/2016 C2-P01 10.86 10.81 13.14 13.12 13.08 12.70 12.64 12.66 12.53 12.71 12.59 C2-P02 13.02 12.80 12.42 12.45 12.30 12.08 11.69 11.67 11 .58 11.79 11.71 C2-P03 11.75 11.73 16.62 16.62 16.18 15.86 15.89 15.97 15.85 16.00 15.87 C2-P04 15.02 14.71 14.42 13.97 13.88 13.57 13.55 13.10 12.84 12.91 12.78 C2-P05 17.95 17.90 17.83 17.83 17.50 17.44 17.25 17.35 17.20 17.30 17.15 C2-P06 16.34 16.30 16.05 15.99 15.70 18.82 18.72 18.70 18.48 18.56 18.37 C2-P07 14.16 13.74 13.61 12.91 12.90 15.70 15.76 15.16 14.87 14.91 14.84 C2-P08 22.90 22.96 22.81 22.81 22.61 22.43 22.50 22.57 22.37 22.50 22.30 C2-P09 23.24 23.05 22.92 22.89 22.75 22.50 22.25 22.30 22.10 22.29 22.13 C2-P10 27.80 27.40 27.16 26.90 26.89 26.04 26.05 25.26 25.13 25.82 25.47 C2-P11 25.28 25.10 24.73 24.29 24.25 23.76 23.78 23.13 22.84 23.21 23.22 C2-P12 25.58 25.65 25.29 24.81 24.57 27.13 27.02 26.56 26.00 26.77 26.80 C2-P13 20.69 20.66 20.52 20.52 20.30 20.05 20.14 20.13 19.98 20.13 19.97 C2-P14 22.21 21.96 21.79 21.79 21.70 23.75 23.60 23.49 23.31 23.58 23.46 C2-P15 20.54 20.10 20.10 19.99 20.00 22.00 22.06 21.90 21.58 21.79 21.72 C2-P16 19.59 19.50 19.31 19.26 19.24 18.86 19.01 18.96 18.69 18.78 18.75 C2-P17 22.31 22.34 22.21 22.22 22.10 21.92 22.08 22.12 21.95 22.11 21.96 C2-P18 18.10 18.11 18.01 17.95 17.86 17.70 17.90 17.88 17.82 17.97 17.77 C2-P19 10.55 10.70 10.71 10.82 10.84 10.80 11.08 11.25 11 .15 11.20 11.18 C2-P20 16.59 16.61 16.53 16.51 16.40 16.32 16.45 16.49 16.33 16.46 16.35 C2-P21 14.46 14.60 14.33 14.46 14.34 14.08 14.43 14.46 14.33 14.51 14.28 C2-P22 12.18 12.29 12.15 12.25 12.22 12.06 12.46 12.32 12.31 12.44 12.35 C2-P23 9.77 9.86 9.79 9.84 9.85 9.72 10.04 10.14 10.07 9.93 9.98 Energy Fuels Resources (USA) Inc. White Mesa Mill Cell 2 Standpipe Piezometers (ft. ·-]."' ~, -"" :::. .. ',?~ ..... --i._ -.. ' ~ --, Piezometer 11/4/2016 11/11/2016 11/18/2016 11/25/2016 12/2/2016 12/8/2016 12/13/2016 12/20/2016 12/30/2016 1/6/2017 1/11/2017 C2-P01 12.81 12.77 12.91 13.02 12.75 13.10 13.00 13.32 13.23 13.32 13.05 C2-P02 t 1.92 11.90 12.00 12.09 11.88 12.21 12.08 12.49 12.36 12.41 12.15 C2-P03 16.06 16.02 16.16 16.22 15.95 16.27 16.15 16.46 16.32 16.41 16.12 C2-P04 12.95 12.91 12.96 13.08 12.88 13.14 13.01 13.35 13.25 13.10 12.98 C2-P05 17.30 17.22 17.42 17.40 17.20 17.43 17.30 17.48 17.33 17.51 17.19 C2-P06 18.54 18.44 18.57 18.57 18.32 18.58 18.39 18.65 18.44 18.50 18.17 C2-P07 14.96 14.95 15.01 15.05 14.90 15.10 14.97 15.20 15.09 15.03 15.04 C2-P08 22.49 22.38 22.52 22.56 22.28 22.61 22.33 22.64 22.40 22.47 22.12 C2-P09 22.30 22.19 22.40 22.28 21.87 21.90 21.80 22.18 21.95 22.09 21.75 C2-P10 25.66 25.62 25.78 25.44 24.70 25.10 25.10 24.95 24.79 24.78 24.53 C2-P11 23.40 23.41 23.36 23.45 23.08 23.18 23.27 23.71 23.71 23.56 23.65 C2-P12 27.05 27.05 27.06 26.83 25.94 26.24 26.61 27.39 27.47 27.32 27.30 C2-P13 20.14 20.08 20.16 20.23 19.91 20.20 20.02 20.17 20.19 20.16 19.87 C2-P14 23.64 23.50 23.48 23.28 22.78 22.93 22.82 23.01 22.76 22.89 22.54 C2-P15 21.93 21 .75 21.85 21.79 21.50 21.78 21 .70 22.02 21.74 21.84 21.57 C2-P16 18.96 18.14 18.53 18.57 18.31 18.56 18.48 18.59 18.35 18.42 18.19 C2-P17 22.07 22.00 22.13 22.10 21.71 22.07 21 .88 22.21 21.94 22.05 21.65 C2-P18 17.90 17.75 17.55 17.78 17.44 17.74 17.55 17.78 17.61 17.58 17.27 C2-P19 14.31 14.16 14.06 14.15 13.93 14.23 14.08 14.08 13.89 13.99 13.68 C2-P20 19.20 19.19 19.27 19.30 19.00 19.22 19.10 19.31 19.10 19.15 18.85 C2-P21 14.31 14.29 14.36 14.48 13.98 19.69 19.47 19.73 18.54 19.11 18.73 C2-P22 12.31 12.28 12.38 12.44 12.02 18.38 18.06 18.32 18.15 17.66 17.14 C2-P23 10.25 9.79 9.35 9.33 9.20 9.44 9.37 13.89 14.40 14.29 14.20 -. . " i' -f'l.1--. ... : 'I . . Piezometer 1/20/2017 1/27/2017 2/3/2017 2/17/2017 2/22/2017 3/3/2017 3/10/2017 3/17/2017 3/24/2017 3/31/2017 4n12011 4/14/2017 C2-P01 13.06 13.72 13.48 13.34 13.42 13.80 13.73 13.75 13.66 13.33 13.68 13.55 C2-P02 12.13 12.85 12.63 12.51 12.64 13.05 12.97 12.99 12.86 12.58 12.99 12.86 C2-P03 16.13 16.80 16.53 16.35 16.40 16.79 16.70 16.75 16.66 16.35 16.70 16.61 C2-P04 12.95 13.50 13.31 13.22 13.37 13.68 13.63 13.61 13.46 13.28 13.69 13.58 C2-P05 17.18 17.72 17.51 17.40 17.41 17.74 17.67 17.73 17.71 17.44 17.73 17.66 C2-P06 18.12 18.76 18.47 18.31 18.43 18.78 18.70 18.70 18.62 18.34 18.72 18.62 C2-P07 14.85 15.27 15.10 15.01 15.13 15.39 15.34 15.34 15.24 15.08 15.40 15.31 C2-P08 22.08 22.82 22.51 22.36 22.50 22.88 22.74 22.77 22.65 22.29 22.74 22.57 C2-P09 21.70 22.29 21.99 21.81 21 .85 22.20 22.10 22.13 22.10 21.55 22.00 21.90 C2-P10 24.49 25.01 24.75 24.60 25.12 25.74 25.55 25.08 24.86 24.34 24.88 24.82 C2-P11 23.61 23.64 23.86 23.93 23.95 23.98 24.24 24.25 24.00 23.66 24.20 24.16 C2-P12 27.30 27.79 27.60 27.56 27.72 28.01 27.93 27.91 27.46 26.81 27.83 27.86 C2-P13 19.84 20.55 20.26 20.12 20.24 20.64 20.57 20.58 20.44 20.15 20.88 20.45 C2-P14 22.50 23.09 22.81 22.71 22.80 23.17 23.10 23.15 23.07 22.73 23.10 23.01 C2-P15 21.56 22.10 21.89 21.80 21.93 22.15 22.20 22.22 22.05 21.79 22.24 22.15 C2-P16 18.19 18.69 18.49 18.42 18.55 18.85 18.80 18.84 18.69 18.43 18.81 18.70 C2-P17 21.58 22.20 21.92 21.77 21.82 22.19 22.09 22.14 22.09 21.76 22.09 22.00 C2-P18 17.08 17.76 17.51 17.36 17.46 17.90 17.80 17.85 17.69 17.40 17.83 17.65 C2-P19 13.63 14.21 13.92 13.76 13.80 14.13 14.00 14.02 13.95 13.61 13.91 13.79 C2-P20 18.80 19.35 19.10 18.97 18.94 19.35 19.25 19.32 19.28 19.00 19.25 19.60 C2-P21 18.64 19.37 19.06 18.98 19.03 19.52 19.45 19.51 19.43 19.13 19.56 19.45 C2-P22 17.00 17.65 17.40 17.33 17.42 17.88 17.83 17.89 17.80 17.55 17.96 17.87 C2-P23 13.35 13.75 13.63 13.63 13.80 14.07 14.04 14.00 13.86 13.82 14.15 13.96 Energy Fuels Resources (USA) Inc. White Mesa MIii Cell 2 stand pipe 1-'1ezometers (tt.) -~ --5(r- i] ~ .J 10::,J..lL..:. l, ~-. ' -·~ Piezometer 4/20/2017 4/27/2017 5/2/2017 5/12/2017 5/19/2017 5/25/2017 5/31/2017 6/8/2017 6/16/2017 6/23/2017 6/30/2017 7/6/2017 C2-P01 13.62 13.37 13.57 13.59 13.60 13.61 13.50 13.48 13.48 13.41 13.35 13.43 C2-P02 12.96 12.71 12.95 12.98 13.02 13.04 12.95 12.95 12.96 12.90 12.88 12.97 C2-P03 16.68 16.46 16.69 16.74 16.78 16.79 16.71 16.73 16.78 16.74 16.70 16.82 C2-P04 13.73 13.50 13.74 13.76 13.79 13.81 13.81 13.81 13.82 13.76 13.77 13.86 C2-P05 17.70 17.55 17.72 17.81 17.85 17.91 17.76 17.80 17.88 17.89 17.88 18.00 C2-P06 18.70 18.50 18.73 18.85 18.83 18.85 18.77 18.80 18.90 18.83 18.83 18.94 C2-P07 15.42 15.27 15.46 15.50 15.52 15.55 15.56 15.58 15.60 15.56 15.59 15.66 C2-P08 22.67 22.47 22.70 22.80 22.82 22.80 22.72 22.77 22.84 22.83 22.80 22.95 C2-P09 22.05 21.85 22.05 22.10 22.19 22.20 22.10 22.11 22.20 22.22 22.03 22.20 C2-P10 24.93 24.76 24.96 25.00 25.02 25.03 25.00 25.03 25.07 24.96 24.72 25.01 C2-P11 24.25 24.10 24.30 24.99 24.31 24.32 24.38 24.37 24.41 24.24 24.00 24.26 C2-P12 28.03 27.90 28.15 28.17 28.24 28.24 28.31 28.32 28.40 28.03 27.60 28.18 C2-P13 20.57 20.35 20.59 20.63 20.67 20.73 20.63 20.65 20.66 20.67 20.62 20.72 C2-P14 22.91 22.75 22.96 23.00 23.09 23.15 23.04 23.07 23.15 23.11 23.01 23.18 C2-P15 21.86 21.78 21.98 22.01 22.11 22.13 22.10 22.12 22.19 22.07 22.05 22.21 C2-P16 21.21 21.28 21.49 21.56 21.65 21.74 21.65 21.69 21.75 21.66 21.65 21 .79 C2-P17 22.03 21.93 22.05 22.08 22.12 22.14 22.02 22.03 22.11 22.08 22.05 22.17 C2-P18 17.74 17.47 17.75 17.77 17.80 17.86 17.77 17.77 17.82 17.78 17.84 17.90 C2-P19 15.62 15.40 15.53 15.53 15.50 15.58 15.37 15.34 15.40 15.35 15.32 15.40 C2-P20 19.20 19.00 19.20 19.44 22.00 21.96 21.94 21.93 22.01 21.99 21.94 22.07 C2-P21 19.54 19.30 19.61 19.64 19.70 19.72 19.70 19.71 19.82 19.79 19.86 19.95 C2-P22 17.98 17.75 18.03 18.10 18.14 18.18 18.12 18.15 18.23 18.20 18.20 18.34 C2-P23 13.86 13.65 13.82 14.02 14.81 14.83 13.92 13.92 13.95 13.91 13.92 14.03 -.. . -' ~~~·,1·J ; J .. , - Piezometer 7/14/2017 7/28/2017 8/4/2017 9/1/2017 10/13/2017 11/10/2017 12/6/2017 1/10/2018 2/1/2018 3/16/2018 4/5/2018 5/11/2018 C2-P01 13.32 13.12 13.07 12.96 13.00 13.08 13.49 13.45 13.96 14.10 14.28 13.92 C2-P02 12.90 12.74 12.70 12.59 12.58 12.58 12.92 12.77 13.30 13.45 13.70 13.45 C2-P03 16.75 16.60 16.57 16.27 16.34 16.36 16.73 16.60 17.13 17.34 17.56 17.35 C2-P04 13.85 13.75 13.74 13.65 13.69 13.70 14.05 13.89 14.29 14.44 14.76 14.56 C2-P05 17.95 17.87 17.85 17.71 17.67 17.61 17.87 17.75 18.14 18.33 18.51 18.41 C2-P06 18.90 18.81 18.79 18.77 18.75 18.66 18.93 18.62 19.06 19.22 19.49 19.36 C2-P07 15.66 15.60 15.60 15.60 15.67 15.73 15.97 15.78 16.12 16.26 16.53 16.42 C2-P08 22.89 22.80 22.79 22.72 22.56 22.42 22.66 23.50 22.82 22.97 23.21 23.05 C2-P09 22.21 22.19 22.17 22.17 22.10 22.00 22.15 21.83 22.29 22.17 22.41 22.39 C2-P10 25.07 25.06 25.04 25.05 25.00 24.90 25.09 24.77 25.10 25.19 25.30 25.30 C2-P11 24.30 24.32 24.33 24.32 24.25 24.20 24.34 24.24 24.46 24.54 24.63 24.75 C2-P12 28.37 28.45 28.49 28.51 28.55 28.33 28.70 28.52 28.76 28.85 28.79 29.06 C2-P13 20.68 20.64 20.56 20.48 20.38 20.26 20.48 20.51 20.62 20.75 21.02 20.86 C2-P14 23.17 23.12 23.10 23.11 23.04 22.90 23.15 22.92 23.32 23.52 23.63 23.55 C2-P15 22.12 22.16 22.15 22.16 22.13 21.95 22.27 22.02 22.41 22.56 22.72 22.67 C2-P16 21.79 21.76 21.75 21.76 21.73 21 .63 21.89 21.71 22.05 22.22 22.37 22.34 C2-P17 22.09 21.94 21.90 21.78 21.63 21.42 21 .62 21.32 21.79 21.95 22.17 22.05 C2-P18 17.83 17.70 17.68 17.55 17.40 17.20 17.38 17.06 17.52 17.71 18.03 17.93 C2-P19 15.31 15.18 15.14 15.10 15.10 15.08 15.37 15.14 15.61 15.80 16.00 15.79 C2-P20 22.00 21.85 21.84 21.69 21.55 21.33 21.49 21.23 21.61 21.79 21.98 21.91 C2-P21 19.90 19.76 19.75 19.65 19.52 19.33 19.56 19.21 19.70 19.88 20.18 20.07 C2-P22 18.30 18.19 18.18 18.14 18.10 17.99 18.25 17.56 18.43 18.61 18.88 18.78 C2-P23 13.98 13.97 13.99 13.93 13.91 13.98 14.14 14.21 14.47 14.70 14.92 15.09 --.. . . ' ,_ -. ";..i:.·.J - I ~ , Piezometer 6/14/2018 7/11/2018 8/2/2018 9/6/2018 10/1/2018 11/5/2018 12/4/2018 1/8/2019 2/1/2019 3/20/2019 4/4/2019 5/6/2019 6/5/2019 C2-P01 13.89 13.63 13.42 13.43 13.29 13.32 13.99 14.45 14.40 16.78 13.53 12.78 12.50 C2-P02 13.54 13.39 13.11 13.19 12.99 12.88 13.44 13.83 13.79 13.97 13.57 12.71 12.33 C2-P03 17.45 17.33 16.53 16.56 16.41 16.26 16.82 17.22 17.08 16.51 16.06 15.65 15.64 C2-P04 14.70 14.62 14.48 14.53 14.41 14.33 14.83 15.10 15.10 14.85 14.06 13.36 13.31 C2-P05 18.60 18.55 18.54 18.68 18.57 18.45 18.83 19.02 18.95 18.93 18.61 18.24 18.29 C2-P06 19.61 19.58 19.58 19.72 19.59 19.45 19.89 20.05 19.94 20.17 19.95 19.59 19.52 C2-P07 16.75 16.60 16.53 16.61 16.51 16.46 16.85 17.01 16.94 16.77 16.55 16.41 16.44 C2-P08 23.32 23.27 23.28 23.49 23.29 23.09 23.54 23.71 23.57 23.82 23.70 23.33 23.33 C2-P09 22.62 22.45 22.56 22.74 22.52 22.39 22.71 22.91 22.78 22.95 23.00 22.90 22.91 C2-P10 25.59 25.44 25.53 25.69 25.44 25.37 25.78 25.50 25.72 25.89 25.92 25.90 26.00 C2-P11 24.98 24.82 24.89 25.00 25.18 24.78 25.01 25.12 25.15 25.31 25.30 25.39 25.47 C2-P12 29.39 28.99 29.12 29.35 29.40 28.98 29.29 29.43 29.36 29.54 29.53 29.59 29.67 C2-P13 21.12 21.08 21.00 21.08 20.85 20.62 21.05 21.27 21.15 21.47 21.31 20.98 21.09 C2-P14 23.81 23.67 23.75 23.90 24.09 23.49 23.94 24.12 23.99 25.15 24.14 24.01 24.03 C2-P15 22.92 22.80 22.81 22.97 23.18 22.55 22.99 23.15 23.01 23.43 23.22 23.12 23.19 C2-P16 22.57 22.45 22.43 22.62 22.38 22.19 22.64 22.78 22.62 22.78 22.76 22.68 22.76 C2-P17 22.25 22.19 22.20 22.21 21.98 21.73 22.1 22.39 23.25 22.71 22.64 22.51 22.56 C2-P18 18.22 18.22 18.14 18.19 17.92 17.63 17.99 18.28 18.18 18.71 18.72 18.72 18.95 C2-P19 15.82 15.83 15.82 15.92 15.81 15.77 16.34 16.60 16.50 16.10 15.96 15.90 16.01 C2-P20 22.10 22.08 22.07 22.09 21.85 21.6 21.93 22.19 22.13 22.55 22.60 22.57 22.71 C2-P21 20.31 20.32 20.32 20.37 20.11 19.84 20.24 20.53 20.38 20.88 20.83 20.84 21.01 C2-P22 19.06 19.07 18.94 19.16 18.92 18.71 19.12 19.41 19.31 19.72 19.65 19.65 19.79 C2-P23 15.19 15.29 15.18 15.18 15.11 15.04 15.18 15.45 15.57 15.91 15.84 15.82 15.89 -ell 2 Standpipe Piezometers (ft.) f I • I Piezometer 7/3/2019 Bn/2019 9/5/2019 10/2/2019 11n12019 12/4/2019 C2-P01 12.02 11.78 12.01 11.96 12.52 12.77 C2-P02 11.88 11.61 11 .68 11.53 11.92 12.07 C2-P03 15.37 15.19 15.16 15.16 15.42 15.47 C2-P04 13.04 13.00 13.07 13.01 13.39 13.60 C2-P05 18.21 18.17 18.20 18.15 18.16 18.05 C2-P06 19.25 19.13 19.13 18.97 18.97 18.93 C2-P07 16.21 16.11 16.06 15.89 16.02 16.13 C2-P08 23.17 23.15 23.19 23.09 23.06 22.93 C2-P09 22.78 22.72 22.74 22.61 22.64 22.24 C2-P10 25.87 25.89 25.89 25.69 25.70 25.54 C2-P11 25.35 25.35 25.29 24.96 25.10 25.05 C2-P12 29.55 29.57 29.56 29.16 29.32 29.06 C2-P13 21.10 21.09 21.05 20.68 20.70 20.58 C2-P14 23.94 23.91 23.92 23.76 23.75 23.53 C2-P15 23.06 23.05 23.07 22.89 22.88 22.73 C2-P16 22.61 22.61 22.62 22.44 22.45 22.30 C2-P17 22.50 22.40 22.36 22.17 22.12 21.91 C2-P18 18.91 18.88 18.85 18.61 18.59 18.42 C2-P19 15.92 15.87 15.96 15.94 16.14 16.11 C2-P20 22.70 22.63 22.59 22.38 22.31 22.06 C2-P21 20.97 20.92 20.90 20.65 20.61 20.36 C2-P22 19.68 19.63 19.59 19.36 19.38 19.25 C2-P23 15.85 15.76 15.67 15.39 15.58 15.64 -· ' .. ~ ~ I ' ~ . I I ' Piezometer 6/16/2016 6/22/2016 6/30/2016 7ll/2016 7/14/2016 7/22/2016 7/28/2016 8/5/2016 8/11/2016 C2-P01 5611.05 5611.17 5611.29 5611.34 5611.29 5611.38 5611.50 5611.57 5611.51 C2-P02 5610.90 5610.94 5610.92 5611.09 5611.15 5611.34 5611.44 5611.52 5611 .45 C2-P03 5610.04 5610.26 5610.36 5610.61 5610.56 5610.55 5610.72 5611.02 5611.05 C2-P04 5610.84 5610.93 5610.97 5611.09 5611.05 5611.13 5611.51 5611.61 5611.59 C2-P05 5606.50 5606.59 5606.65 5606.74 5606.81 5606.81 5606.90 5607.17 5607.23 C2-P06 5606.51 5606.58 5606.71 5606.74 5606.77 5606.91 5607.07 5607.16 5607.12 C2-P07 5606.53 5606.67 5606.65 5606.72 5606.71 5606.74 5607.44 5607.51 5607.44 C2-P08 5603.71 5603.84 5603.86 5603.92 5603.94 5603.95 5604.10 5604.21 5604.07 C2-P09 5599.31 5600.80 5600.70 5600.74 5600.65 5600.85 5600.96 5601.06 5600.97 C2-P10 5598.44 5599.00 5598.31 5598.13 5597.97 5597.85 5598.15 5598.19 5598.01 C2-P11 5599.55 5599.81 5599.48 5599.47 5599.35 5599.34 5599.91 5599.95 5599.87 C2-P12 5595.99 5597.39 5596.50 5596.34 5596.14 5596.05 5596.22 5596.63 5596.50 C2-P13 5603.71 5603.73 5603.84 5604.01 5604.08 5604.09 5604.26 5604.42 5604.46 C2-P14 5601.28 5601.57 5601.53 5601.48 5601.38 5601.53 5601.73 5601.75 5601 .67 C2-P15 5601.80 5602.00 5601.97 5602.01 5601.96 5602.09 5602.37 5602.42 5602.65 C2-P16 5602.27 5602.50 5602.45 5602.49 5602.41 5602.49 5602.71 5602.80 5602.73 C2-P17 5606.06 5606.20 5606.17 5606.32 5606.30 5606.32 5606.47 5606.60 5606.52 C2-P18 5606.20 5606.25 5606.28 5606.38 5606.33 5606.32 5606.52 5606.64 5606.59 C2-P19 5609.06 5609.09 5609.06 5609.02 5608.87 5608.80 5608.87 5608.87 5608.72 C2-P20 5609.43 5609.48 5609.56 5609.61 5609.60 5609.61 5609.76 5609.86 5609.83 C2-P21 5610.72 5610.80 5610.81 5610.92 5610.86 5610.83 5611.00 5611.10 5611 .03 C2-P22 5611.77 5611.85 5611.77 5611.89 5611.79 5611.71 5611.87 5611.96 5611 .85 C2-P23 5612.29 5612.46 5612.48 5612.57 5612.49 5612.37 5612.44 5612.50 5612.46 --, -''j .• ~ , .. . -.. ~, I ·· ...... ~ Piezometer 8/19/2016 8/26/2016 9/2/2016 9/9/2016 9/16/2016 9/23/2016 9/30/2016 10n12016 10/13/2016 10/21/2016 10/28/2016 C2-P01 5611.65 5611.70 5611.94 5611.96 5612.00 5612.38 5612.44 5612.42 5612.55 5612.37 5612.49 C2-P02 5611.86 5612.08 5612.46 5612.43 5612.58 5612.80 5613.19 5613.21 5613.30 5613.09 5613.17 C2-P03 5611.52 5611 .54 5611.54 5611.54 5611.98 5612.30 5612.27 5612.19 5612.31 5612.16 5612.29 C2-P04 5611.73 5612.04 5612.33 5612.78 5612.87 5613.18 5613.20 5613.65 5613.91 5613.84 5613.97 C2-P05 5607.59 5607.64 5607.71 5607.71 5608.04 5608.10 5608.29 5608.19 5608.34 5608.24 5608.39 C2-P06 5607.69 5607.73 5607.98 5608.04 5608.33 5608.51 5608.61 5608.63 5608.85 5608.77 5608.96 C2-P07 5607.58 5608.00 5608.13 5608.83 5608.84 5609.22 5609.16 5609.76 5610.05 5610.01 5610.08 C2-P08 5604.43 5604.37 5604.52 5604.52 5604.72 5604.90 5604.83 5604.76 5604.96 5604.83 5605.03 C2-P09 5601.25 5601.44 5601.57 5601.60 5601.74 5601.99 5602.24 5602.19 5602.39 5602.20 5602.36 C2-P10 5598.08 5598.48 5598.72 5598.98 5598.99 5599.84 5599.83 5600.62 5600.75 5600.06 5600.41 C2-P11 5599.94 5600.12 5600.49 5600.93 5600.97 5601.46 5601.44 5602.09 5602.38 5602.01 5602.00 C2-P12 5596.53 5596.46 5596.82 5597.30 5597.54 5598.26 5598.37 5598.83 5599.39 5598.62 5598.59 C2-P13 5604.87 5604.90 5605.04 5605.04 5605.26 5605.51 5605.42 5605.43 5605.58 5605.43 5605.59 C2-P14 5601.92 5602.17 5602.34 5602.34 5602.43 5602.74 5602.89 5603.00 5603.18 5602.91 5603.03 C2-P15 5602.62 5603.06 5603.06 5603.17 5603.16 5603.51 5603.45 5603.61 5603.93 5603.72 5603.79 C2-P16 5602.92 5603.01 5603.20 5603.25 5603.27 5603.65 5603.50 5603.55 5603.82 5603.73 5603.76 C2-P17 5606.76 5606.73 5606.86 5606.85 5606.97 5607.15 5606.99 5606.95 5607.12 5606.96 5607.11 C2-P18 5606.80 5606.79 5606.89 5606.95 5607.04 5607.20 5607.00 5607.02 5607.08 5606.93 5607.13 C2-P19 5608.82 5608.67 5608.66 5608.55 5608.53 5608.57 5608.29 5608.12 5608.22 5608.17 5608.19 C2-P20 5609.99 5609.97 5610.05 5610.07 5610.18 5610.26 5610.13 5610.09 5610.25 5610.12 5610.23 C2-P21 5611.22 5611.08 5611.35 5611.22 5611.34 5611.60 5611.25 5611.22 5611.35 5611.17 5611.40 C2-P22 5612.01 5611.90 5612.04 5611.94 5611.97 5612.13 5611.73 5611.87 5611.88 5611.75 5611.84 C2-P23 5612.45 5612.36 5612.43 5612.38 5612.37 5612.50 5612.18 5612.08 5612.15 5612.29 5612.24 Ener 1v Fuels Resources (USA ) Inc. White Mesa Mill Cell 2 Standpipe Piezometers Water Surface Elevation (ft amsl) I ' ( ' Piezometer 11/4/2016 11/11/2016 11/18/2016 11/25/2016 12/2/2016 12/8/2016 12/13/2016 12/20/2016 12/30/2016 1/6/2017 , 1/11/2017 C2-P01 5612.27 5612.31 5612.17 5612.06 5612.33 5611.98 5612.08 5611.76 5611.85 5611.76 5612.03 C2-P02 5612.96 5612.98 5612.88 5612.79 5613.00 5612.67 5612.80 5612.39 5612.52 5612.47 5612.73 C2-P03 5612.10 5612.14 5612.00 5611.94 5612.21 5611.89 5612.01 5611.70 5611.84 5611.75 5612.04 C2-P04 5613.80 5613.84 5613.79 5613.67 5613.87 5613.61 5613.74 5613.40 5613.50 5613.65 5613.77 C2-P05 5608.24 5608.32 5608.12 5608.14 5608.34 5608.11 5608.24 5608.06 5608.21 5608.03 5608.35 C2-P06 5608.79 5608.89 5608.76 5608.76 5609.01 5608.75 5608.94 5608.68 5608.89 5608.83 5609.16 C2-P07 5609.96 5609.97 5609.91 5609.87 5610.02 5609.82 5609.95 5609.72 5609.83 5609.89 5609.88 C2-P08 5604.84 5604.95 5604.81 5604.77 5605.05 5604.72 5605.00 5604.69 5604.93 5604.86 5605.21 C2-P09 5602.19 5602.30 5602.09 5602.21 5602.62 5602.59 5602.69 5602.31 5602.54 5602.40 5602.74 C2-P10 5600.22 5600.26 5600.10 5600.44 5601.18 5600.78 5600.78 5600.93 5601.09 5601.10 5601.35 C2-P11 5601.82 5601.81 5601.86 5601.77 5602.14 5602.04 5601.95 5601.51 5601.51 5601.66 5601.57 C2-P12 5598.34 5598.34 5598.33 5598.56 5599.45 5599.15 5598.78 5598.00 5597.92 5598.07 5598.09 C2-P13 5605.42 5605.48 5605.40 5605.33 5605.65 5605.36 5605.54 5605.39 5605.37 5605.40 5605.69 C2-P14 5602.85 5602.99 5603.01 5603.21 5603.71 5603.56 5603.67 5603.48 5603.73 5603.60 5603.95 C2-P15 5603.58 5603.76 5603.66 5603.72 5604.01 5603.73 5603.81 5603.49 5603.77 5603.67 5603.94 C2-P16 5603.55 5604.37 5603.98 5603.94 5604.20 5603.95 5604.03 5603.92 5604.16 5604.09 5604.32 C2-P17 5607.00 5607.07 5606.94 5606.97 5607.36 5607.00 5607.19 5606.86 5607.13 5607.02 5607.42 C2-P18 5607.00 5607.15 5607.35 5607.12 5607.46 5607.16 5607.35 5607.12 5607.29 5607.32 5607.63 C2-P19 5607.92 5608.07 5608.17 5608.08 5608.30 5608.00 5608.15 5608.15 5608.34 5608.24 5608.55 C2-P20 5610.23 5610.24 5610.16 5610.13 5610.43 5610.21 5610.33 5610.12 5610.33 5610.28 5610.58 C2-P21 5611.37 5611.39 5611.32 5611.20 5611.70 5611.25 5611.47 5611.21 5612.40 5611.83 5612.21 C2-P22 5611.88 5611.91 5611.81 5611.75 5612.17 5612.01 5612.33 5612.07 5612.24 5612.73 5613.25 C2-P23 5611.97 5612.43 5612.87 5612.89 5613.02 5612.78 5612.85 5613.70 5613.19 5613.30 5613.39 . , E Fuels R (USA} Inc. White M Mill Cell 2 Standpipe p· w Surface El (ft I) . ' ' ' I I ~ •:_~~ ... f~ ' I I '. I . ~ ..... ,...,_ "'""r.._.,_,,, Piezometer 1/20/2017 1/27/2017 2/3/2017 2/17/2017 2/22/2017 3/3/2017 3/10/2017 3/17/2017 3/24/2017 3/31/2017 4n12011 4/14/2017 C2-P01 5612.02 5611.36 5611 .60 5611.74 5611.66 5611.28 5611.35 5611.33 5611.42 5611.75 5611.40 5611.53 C2-P02 5612.75 5612.03 5612.25 5612.37 5612.24 5611.83 5611.91 5611.89 5612.02 5612.30 5611.89 5612.02 C2-P03 5612.03 5611.36 5611.63 5611.81 5611.76 5611.37 5611.46 5611.41 5611.50 5611.81 5611.46 5611.55 C2-P04 5613.80 5613.25 5613.44 5613.53 5613.38 5613.07 5613.12 5613.14 5613.29 5613.47 5613.06 5613.17 C2-P05 5608.36 5607.82 5608.03 5608.14 5608.13 5607.80 5607.87 5607.81 5607.83 5608.10 5607.81 5607.88 C2-P06 5609.21 5608.57 5608.86 5609.02 5608.90 5608.55 5608.63 5608.63 5608.71 5608.99 5608.61 5608.71 C2-P07 5610.07 5609.65 5609.82 5609.91 5609.79 5609.53 5609.58 5609.58 5609.68 5609.84 5609.52 5609.61 C2-P08 5605.25 5604.51 5604.82 5604.97 5604.83 5604.45 5604.59 5604.56 5604.68 5605.04 5604.59 5604.76 C2-P09 5602.79 5602.20 5602.50 5602.68 5602.64 5602.29 5602.39 5602.36 5602.39 5602.94 5602.49 5602.59 C2-P10 5601.39 5600.87 5601.13 5601.28 5600.76 5600.14 5600.33 5600.80 5601.02 5601.54 5601.00 5601.06 C2-P11 5601.61 5601.58 5601.36 5601.29 5601.27 5601.24 5600.98 5600.97 5601.22 5601.56 5601.02 5601.06 C2-P12 5598.09 5597.60 5597.79 5597.83 5597.67 5597.38 5597.46 5597.48 5597.93 5598.58 5597.56 5597.53 C2-P13 5605.72 5605.01 5605.30 5605.44 5605.32 5604.92 5604.99 5604.98 5605.12 5605.41 5604.68 5605.11 C2-P14 5603.99 5603.40 5603.68 5603.78 5603.69 5603.32 5603.39 5603.34 5603.42 5603.76 5603.39 5603.48 C2-P15 5603.95 5603.41 5603.62 5603.71 5603.58 5603.36 5603.31 5603.29 5603.46 5603.72 5603.27 5603.36 C2·P16 5604.32 5603.82 5604.02 5604.09 5603.96 5603.66 5603.71 5603.67 5603.82 5604.08 5603.70 5603.81 C2-P17 5607.49 5606.87 5607.15 5607.30 5607.25 5606.88 5606.98 5606.93 5606.98 5607.31 5606.98 5607.07 C2-P18 5607.82 5607.14 5607.39 5607.54 5607.44 5607.00 5607.10 5607.05 5607.21 5607.50 5607.07 5607.25 C2-P19 5608.60 5608.02 5608.31 5608.47 5608.43 5608.10 5608.23 5608.21 5608.28 5608.62 5608.32 5608.44 C2-P20 5610.63 5610.08 5610.33 5610.46 5610.49 5610.08 5610.18 5610.11 5610.15 5610.43 5610.18 5609.83 C2-P21 5612.30 5611.57 5611.88 5611.96 5611.91 5611.42 5611.49 5611.43 5611.51 5611.81 5611.38 5611.49 C2-P22 5613.39 5612.74 5612.99 5613.06 5612.97 5612.51 5612.56 5612.50 5612.59 5612.84 5612.43 5612.52 C2-P23 5614.24 5613.84 5613.96 5613.96 5613.79 5613.52 5613.55 5613.59 5613.73 5613.77 5613.44 5613.63 I I ---.. Piezometer C2-P01 C2-P02 C2-P03 C2-P04 C2-P05 C2-P06 C2-P07 C2-P08 C2-P09 C2-P10 C2-P11 C2-P12 C2-P13 C2-P14 C2-P15 C2-P16 C2-P17 C2-P18 C2-P19 C2-P20 C2-P21 C2-P22 C2-P23 I I I I 4/20/2017 4/27/2017 5/2/2017 5/12/2017 5/19/2017 5/25/2017 5/31/2017 6/8/2017 5611.46 5611.71 5611.51 5611.49 5611.48 5611.47 5611.58 5611.60 5611.92 5612.17 5611.93 5611.90 5611.86 5611.84 5611.93 5611.93 5611.48 5611.70 5611.47 5611.42 5611.38 5611.37 5611.45 5611.43 5613.02 5613.25 5613.01 5612.99 5612.96 5612.94 5612.94 5612.94 5607.84 5607.99 5607.82 5607.73 5607.69 5607.63 5607.78 5607.74 5608.63 5608.83 5608.60 5608.48 5608.50 5608.48 5608.56 5608.53 5609.50 5609.65 5609.46 5609.42 5609.40 5609.37 5609.36 5609.34 5604.66 5604.86 5604.63 5604.53 5604.51 5604.53 5604.61 5604.56 5602.44 5602.64 5602.44 5602.39 5602.30 5602.29 5602.39 5602.38 5600.95 5601.12 5600.92 5600.88 5600.86 5600.85 5600.88 5600.85 5600.97 5601.12 5600.92 5600.23 5600.91 5600.90 5600.84 5600.85 5597.36 5597.49 5597.24 5597.22 5597.15 5597.15 5597.08 5597.07 5604.99 5605.21 5604.97 5604.93 5604.89 5604.83 5604.93 5604.91 5603.58 5603.74 5603.53 5603.49 5603.40 5603.34 5603.45 5603.42 5603.65 5603.73 5603.53 5603.50 5603.40 5603.38 5603.41 5603.39 5604.33 5604.26 5604.05 5603.98 5603.89 5603.80 5603.89 5603.85 5607.04 5607.14 5607.02 5606.99 5606.95 5606.93 5607.05 5607.04 5607.16 5607.43 5607.15 5607.13 5607.10 5607.04 5607.13 5607.13 5608.80 5609.02 5608.89 5608.89 5608.92 5608.84 5609.05 5609.08 5610.23 5610.43 5610.23 5609.99 5610.04 5610.08 5610.10 5610.11 5611.40 5611.64 5611.33 5611.30 5611.24 5611.22 5611.24 5611.23 5612.41 5612.64 5612.36 5612.29 5612.25 5612.21 5612.27 5612.24 5613.73 5613.94 5613.77 5613.57 5612.78 5612.76 5613.67 5613.67 * Week of 4/20/17 Piezometer 19 was hit by equipment and then raised and piezometer 16 was raised to keep above cover. ,· I I ~ --~.=-.l. . .:; .,~ L,,.]( 1! " I J ,, . .;· .... , .... i;.. ·--;-=:~ ~-~~' I l1...-r::1I~ .._ •r 6/16/2017 6/23/2017 6/30/2017 7/6/2017 5611.60 5611.67 5611.73 5611.65 5611.92 5611.98 5612.00 5611.91 5611.38 5611.42 5611.46 5611.34 5612.93 5612.99 5612.98 5612.89 5607.66 5607.65 5607.66 5607.54 5608.43 5608.50 5608.50 5608.39 5609.32 5609.36 5609.33 5609.26 5604.49 5604.50 5604.53 5604.38 5602.29 5602.27 5602.46 5602.29 5600.81 5600.92 5601.16 5600.87 5600.81 5600.98 5601.22 5600.96 5596.99 5597.36 5597.79 5597.21 5604.90 5604.89 5604.94 5604.84 5603.34 5603.38 5603.48 5603.31 5603.32 5603.44 5603.46 5603.30 5603.79 5603.88 5603.89 5603.75 5606.96 5606.99 5607.02 5606.90 5607.08 5607.12 5607.06 5607.00 5609.02 5609.07 5609.10 5609.02 5610.03 5610.05 5610.10 5609.97 5611.12 5611.15 5611.08 5610.99 5612.16 5612.19 5612.19 5612.05 5613.64 5613.68 5613.67 5613.56 ---. E Fuels R {US~} Inc. White Mesa Mill Cell 2 Standpipe p· ters Water Surface El {ft I) - ! -' I -ar' .. -.,. ~ I -! ; .,_ ; I -· j" ":...: .;.~:-"!~-..,.~. :}; I Piezometer 7/14/2017 7/28/2017 8/4/2017 9/1/2017 10/13/2017 11/10/2017 12/6/2017 1/10/2018 2/1/2018 3/16/2018 4/5/2018 5/11/2018 C2-P01 5611.76 5611.96 5612.01 5612.12 5612.08 5612.00 5611.59 5611.63 5611.12 5610.98 5610.80 5611.16 C2-P02 5611.98 5612.14 5612.18 5612.29 5612.30 5612.30 5611.96 5612.11 5611.58 5611.43 5611.18 5611.43 C2-P03 5611.41 5611.56 5611.59 5611.89 5611.82 5611.80 5611.43 5611.56 5611.03 5610.82 5610.60 5610.81 C2-P04 5612.90 5613.00 5613.01 5613.10 5613.06 5613.05 5612.70 5612.86 5612.46 5612.31 5611.99 5612.19 C2-P05 5607.59 5607.67 5607.69 5607.83 5607.87 5607.93 5607.67 5607.79 5607.40 5607.21 5607.03 5607.13 C2-P06 5608.43 5608.52 5608.54 5608.56 5608.58 5608.67 5608.40 5608.71 5608.27 5608.11 5607.84 5607.97 C2-P07 5609.26 5609.32 5609.32 5609.32 5609.25 5609.19 5608.95 5609.14 5608.80 5608.66 5608.39 5608.50 C2-P08 5604.44 5604.53 5604.54 5604.61 5604.77 5604.91 5604.67 5603.83 5604.51 5604.36 5604.12 5604.28 C2-P09 5602.28 5602.30 5602.32 5602.32 5602.39 5602.49 5602.34 5602.66 5602.20 5602.32 5602.08 5602.10 C2-P10 5600.81 5600.82 5600.84 5600.83 5600.88 5600.98 5600.79 5601.11 5600.78 5600.69 5600.58 5600.58 C2-P11 5600.92 5600.90 5600.89 5600.90 5600.97 5601.02 5600.88 5600.98 5600.76 5600.68 5600.59 5600.47 C2-P12 5597.02 5596.94 5596.90 5596.88 5596.84 5597.06 5596.69 5596.87 5596.63 5596.54 5596.60 5596.33 C2-P13 5604.88 5604.92 5605.00 5605.08 5605.18 5605.30 5605.08 5605.05 5604.94 5604.81 5604.54 5604.70 C2-P14 5603.32 5603.37 5603.39 5603.38 5603.45 5603.59 5603.34 5603.57 5603.17 5602.97 5602.86 5602.94 C2-P15 5603.39 5603.35 5603.36 5603.35 5603.38 5603.56 5603.24 5603.49 5603.10 5602.95 5602.79 5602.84 C2-P16 5603.75 5603.78 5603.79 5603.78 5603.81 5603.91 5603.65 5603.83 5603.49 5603.32 5603.17 5603.20 C2-P17 5606.98 5607.13 5607.17 5607.29 5607.44 5607.65 5607.45 5607.75 5607.28 5607.12 5606.90 5607.02 C2-P18 5607.07 5607.20 5607.22 5607.35 5607.50 5607.70 5607.52 5607.84 5607.38 5607.19 5606.87 5606.97 C2-P19 5609.11 5609.24 5609.28 5609.32 5609.32 5609.34 5609.05 5609.28 5608.81 5608.62 5608.42 5608.63 C2-P20 5610.04 5610.19 5610.20 5610.35 5610.49 5610.71 5610.55 5610.81 5610.43 5610.25 5610.06 5610.13 C2-P21 5611.04 5611.18 5611.19 5611.29 5611.42 5611.61 5611.38 5611.73 5611.24 5611.06 5610.76 5610.87 C2-P22 5612.09 5612.20 5612.21 5612.25 5612.29 5612.40 5612.14 5612.83 5611.96 5611.78 5611.51 5611.61 C2-P23 5613.61 5613.62 5613.60 5613.66 5613.68 5613.61 5613.45 5613.38 5613.12 5612.89 5612.67 5612.50 ner Y I .. E Fuels R (USA) Inc. White M Mill Cell 2 Standpipe p· ters Water Surface Elevation {ft I} '' I . '' J." . -~ : . r-ar -.--' ..._ I ; '..J. ,. _-":~1 r~ J~ .;·; ., ~. ~--' ,, ~ • J, :"_....1;1 : 1-: ·5 1.•:.-1 , -I .. -....." ~,:.::.. ,~ -~ -,: . ..;...., ~~~ I I ~ ~ ""i ' I I -.-:-:::i Piezometer 6/14/2018 7/11/2018 8/2/2018 9/6/2018 10/1/2018 11/5/2018 12/4/2018 1/8/2019 2/1/2019 3/20/2019 4/4/2019 5/6/2019 6/5/2019 C2-P01 5611.19 5611.45 5611.66 5611.65 5611.79 5611.76 5611.09 5610.63 5610.68 5608.30 5611.55 5612.30 5612.58 C2-P02 5611.34 5611.49 5611.77 5611.69 5611.89 5612.00 5611.44 5611.05 5611.09 5610.91 5611.31 5612.17 5612.55 C2-P03 5610.71 5610.83 5610.87 5610.84 5610.99 5611.14 5610.58 5610.18 5610.32 5610.89 5611.34 5611.75 5611.76 C2-P04 5612.05 5612.13 5612.27 5612.22 5612.34 5612.42 5611.92 5611.65 5611.65 5611.90 5612.69 5613.39 5613.44 C2-P05 5606.94 5606.99 5607.00 5606.86 5606.97 5607.09 5606.71 5606.52 5606.59 5606.61 5606.93 5607.30 5607.25 C2-P06 5607.72 5607.75 5607.75 5607.61 5607.74 5607.88 5607.44 5607.28 5607.39 5607.16 5607.38 5607.74 5607.81 C2-P07 5608.17 5608.32 5608.39 5608.31 5608.41 5608.46 5608.07 5607.91 5607.98 5608.15 5608.37 5608.51 5608.48 C2-P08 5604.01 5604.06 5604.05 5603.84 5604.04 5604.24 5603.79 5603.62 5603.76 5603.51 5603.63 5604.00 5604.00 C2-P09 5601.87 5602.04 5601.93 5601.75 5601.97 5602.10 5601.78 5601.58 5601.71 5601.54 5601.49 5601.59 5601.58 C2-P10 5600.29 5600.44 5600.35 5600.19 5600.44 5600.51 5600.10 5600.38 5600.16 5599.99 5599.96 5599.98 5599.88 C2-P11 5600.24 5600.40 5600.33 5600.22 5600.04 5600.44 5600.21 5600.10 5600.07 5599.91 5599.92 5599.83 5599.75 C2-P12 5596.00 5596.40 5596.27 5596.04 5595.99 5596.41 5596.10 5595.96 5596.03 5595.85 5595.86 5595.80 5595.72 C2-P13 5604.44 5604.48 5604.56 5604.48 5604.71 5604.94 5604.51 5604.29 5604.41 5604.09 5604.25 5604.58 5604.47 C2-P14 5602.68 5602.82 5602.74 5602.59 5602.40 5603.00 5602.55 5602.37 5602.50 5601.34 5602.35 5602.48 5602.46 C2-P15 5602.59 5602.71 5602.70 5602.54 5602.33 5602.96 5602.52 5602.36 5602.50 5602.08 5602.29 5602.39 5602.32 C2-P16 5602.97 5603.09 5603.11 5602.92 5603.16 5603.35 5602.90 5602.76 5602.92 5602.76 5602.78 5602.86 5602.78 C2-P17 5606.82 5606.88 5606.87 5606.86 5607.09 5607.34 5606.97 5606.68 5605.82 5606.36 5606.43 5606.56 5606.51 C2-P18 5606.68 5606.68 5606.76 5606.71 5606.98 5607.27 5606.91 5606.62 5606.72 5606.19 5606.18 5606.18 5605.95 C2-P19 5608.60 5608.59 5608.60 5608.50 5608.61 5608.65 5608.08 5607.82 5607.92 5608.32 5608.46 5608.52 5608.41 C2-P20 5609.94 5609.96 5609.97 5609.95 5610.19 5610.44 5610.11 5609.85 5609.91 5609.49 5609.44 5609.47 5609.33 C2-P21 5610.63 5610.62 5610.62 5610.57 5610.83 5611.10 5610.70 5610.41 5610.56 5610.06 5610.11 5610.10 5609.93 C2-P22 5611.33 5611.32 5611.45 5611.23 5611.47 5611.68 5611.27 5610.98 5611.08 5610.67 5610.74 5610.74 5610.60 C2-P23 5612.40 5612.30 5612.41 5612.41 5612.48 5612.55 5612.41 5612.14 5612.02 5611.68 5611.75 5611.77 5611.70 E (USA) Inc. White M Mill Cell 2 Standpipe Piezometers Water Surface Elevation (ft amsl) Fuels R - - Piezometer 7/3/2019 8"/2019 9/5/2019 10/2/2019 11n12019 12/4/2019 C2-P01 5613.06 5613.30 5613.07 5613.12 5612.56 5612.31 C2-P02 5613.00 5613.27 5613.20 5613.35 5612.96 5612.81 C2-P03 5612.03 5612.21 5612.24 5612.24 5611.98 5611.93 C2-P04 5613.71 5613.75 5613.68 5613.74 5613.36 5613.15 C2-P05 5607.33 5607.37 5607.34 5607.39 5607.38 5607.49 C2-P06 5608.08 5608.20 5608.20 5608.36 5608.36 5608.40 C2-P07 5608.71 5608.81 5608.86 5609.03 5608.90 5608.79 C2-P08 5604.16 5604.18 5604.14 5604.24 5604.27 5604.40 C2-P09 5601.71 5601.77 5601 .75 5601.88 5601.85 5602.25 C2-P10 5600.01 5599.99 5599.99 5600.19 5600.18 5600.34 C2-P11 5599.87 5599.87 5599.93 5600.26 5600.12 5600.17 C2-P12 5595.84 5595.82 5595.83 5596.23 5596.07 5596.33 C2-P13 5604.46 5604.47 5604.51 5604.88 5604.86 5604.98 C2-P14 5602.55 5602.58 5602.57 5602.73 5602.74 5602.96 C2-P15 5602.45 5602.46 5602.44 5602.62 5602.63 5602.78 C2-P16 5602.93 5602.93 5602.92 5603.10 5603.09 5603.24 C2-P17 5606.57 5606.67 5606.71 5606.90 5606.95 5607.16 C2-P18 5605.99 5606.02 5606.05 5606.29 5606.31 5606.48 C2-P19 5608.50 5608.55 5608.46 5608.48 5608.28 5608.31 C2-P20 5609.34 5609.41 5609.45 5609.66 5609.73 5609.98 C2-P21 5609.97 5610.02 5610.04 5610.29 5610.33 5610.58 C2-P22 5610.71 5610.76 5610.80 5611.03 5611.01 5611.14 C2-P23 5611.74 5611.83 5611.92 5612.20 5612.01 5611.95 -~ -C 0 'Zi (U > CLl LU a; > CLl ...I '-CLl .... (U ~ 5,615 5,610 5,605 5,600 5,595 5,590 Jun-16 -C2-P01 _._C2-P02 -C2-P07 -+-C2-P08 ~C2-P13 -..C2-P14 -C2-P19 -C2-P20 Dec-16 ~C2-P03 -&-C2-P09 -C2-P15 ~C2-P21 Figure 2 -Cell 2 Standpipe Piezometers Water Level Elevations -+-C2-P04 ~C2-POS -C2-P06 ~C2-P10 -+-C2-P11 ~C2-P12 -+-C2-P16 -+-C2-P17 ~C2-P18 -+-C2-P22 ~C2-P23 Jun-17 Dec-17 Jun-18 Date -, Note (1): Pieozometer C2-P01 reading for Mar 20, 2019 was erroneous due to an issue with the water level meter Dec-18 Jun-19 Dec-19 2216500 2217000 2217500 2218000 2218500 2219000 2219500 1~~~~~~~~~~~~~~~,~/~/~~~/~/~---~~.-~~~~~~~~~\~~~~~/~----.--L~~~i 1 €2-PO C2$17 ~ ~2.1: -------C2-P01 C2-P02 + + I + \ C2-P16 ( I I I § ~-;-------t----------t---------+---------1----------1----------+----------+---------+-~ ~ ~ 2216500 2217000 2217500 2218000 2218500 2219000 2219500 ENERGY FUELS INC. 0 200 400 800 N 225 Union Blvd, Suite 600 Feet A Lakewood, Colorado 80228 0 50 100 200 Cell 2 October 2019 Piezometer Contours ENERGY FUELS Meters Date: 1/6/2020 DK 2216500 C2-P01 + 2217000 2217500 2218000 2218500 2219000 2219500 --i------1-------1----------+-------------+------1-------------t-i § 2216500 2217000 2217500 2218000 2218500 2219000 2219500 ENERGY FUELS INC. 0 200 400 800 N 225 Union Blvd, Suite 600 Feet A Lakewood, Colorado 80228 0 50 100 200 Cell 2 November 2019 Piezometer Contours ENERGY FUELS Meters Date: 1/6/2020 DK 2216500 2217000 2 C2-P01 C2-P02 + + ~----t/ / 2217500 ;2 18 I I , 2218000 /.,,,.------ / /C2-P08 + g\ 0 .;. I C2-P16 + 2218500 2219000 { I C7-P22 /~ I I ' J 2219500 0 0 0 -+---------+------------------+----------t------------------t-----------+--------t-~ S! 2216500 2217000 2217500 2218000 2218500 2219000 2219500 ENERGY FUELS 1NC. 0 200 400 800 N 225 Union Blvd, Suite 600 Feet A Lakewood, Colorado 80228 0 50 100 200 Cell 2 December 2019 Piezometer Contours ENERGY FUELS Meters Date: I /6/2020 DK Attachment D n t'D --N V, --· 3 t'D u, C al -· ::s I N 0 0 \0 I N 0 ~ \0 + V, (D .... iii" "' N c:: ::::, (D QI .... V) (D .... iii" "' ~ w 0 0 0 N I.D 0 0 N 00 0 0 Feet Below Top of Standpipe N -.J 0 0 N en 0 0 N l.n 0 0 N N +> w 0 0 0 0 N N N N .... 0 0 0 0 0 0 0 1/30/2009 5/30/2009 9/30/2009 1/31/2010 5/31/2010 9/30/2010 1/31/2011 5/31/2011 9/30/2011 1/31/2012 5/31/2012 9/30/2012 1/31/2013 5/31/2013 9/30/2013 1/31/2014 5/31/2014 9/30/2014 1/31/2015 5/31/2015 9/30/2015 1/31/2016 5/31/2016 9/30/2016 1/31/2017 5/31/2017 9/30/2017 1/31/2018 5/31/2018 9/30/2018 1/31/2019 5/31/2019 9/30/2019 Attachment E This attachment has been deliberately left blank. Attachment F Cell 4A LDS Monitoring Information October 2019 November 2019 December 2019 Weekly measurements in inches from transducer at Weekly measurements in Weekly measurements in the bottom of the LDS Flow Meter inches from transducer at the Flow Meter inches from transducer at the Flow Meter Date sump. in Gallons Date bottom of the LDS sump. in Gallons Date bottom of the LDS sump. in Gallons 10/01/19 2.4 564805 11/01/19 2.9 565388 12/01/19 5.0 565715 10/02/19 3.2 564805 11/02/19 1.9 565388 12/02/19 4.8 565715 10/03/19 2.2 564805 11/03/19 3.0 565388 12/03/19 3.9 565715 10/04/19 3.0 564805 11/04/19 3.0 565388 12/04/19 3.0 565715 10/05/19 3.3 564805 11/05/19 4.3 565388 12/05/19 4.1 565715 10/06/19 3.1 564805 11/06/19 2.1 565388 12/06/19 4.9 565715 10/07/19 3.2 564805 11/07/19 2.9 565388 12/07/19 5.1 565715 10/08/19 4.2 564805 11/08/19 3.6 565388 12/08/19 4.0 565715 10/09/19 3.2 564805 11/09/19 3.0 565388 12/09/19 5.4 565715 10/10/19 4.5 564805 11/10/19 3.5 565388 12/10/19 4.4 565715 10/11/19 2.9 564805 11/11/19 2.9 565388 12/11/19 3.8 565715 10/12/19 1.2 565388 11/12/19 2.7 565388 12/12/19 4.0 565715 10/13/19 1.1 565388 11/13/19 2.7 565388 12/13/19 4.8 565715 10/14/19 1.7 565388 11/14/19 3.6 565388 12/14/19 4.2 565715 10/15/19 1.8 565388 11/15/19 3.7 565388 12/15/19 4.4 565715 10/16/19 2.1 565388 11/16/19 3.6 565388 12/16/19 6.1 565715 10/17/19 2.4 565388 11/17/19 3.6 565388 12/17/19 5.0 565715 10/18/19 2.7 565388 11/18/19 4.4 565388 12/18/19 3.2 565715 10/19/19 2.5 565388 11/19/19 2.4 565715 12/19/19 5.0 565715 10/20/19 2.8 565388 11/20/19 4.0 565715 12/20/19 4.8 565715 10/21/19 2.0 565388 11/21/19 3.4 565715 12/21/19 5.0 565715 10/22/19 2.0 565388 11/22/19 4.0 565715 12/22/19 4.5 565715 10/23/19 1.9 565388 11/23/19 3.0 565715 12/23/19 5.2 565715 10/24/19 2.5 565388 11/24/19 3.4 565715 12/24/19 5.4 565715 10/25/19 2.9 565388 11/25/19 3.0 565715 12/25/19 5.1 565715 10/26/19 3.1 565388 11/26/19 3.7 565715 12/26/19 6.3 565715 10/27/19 2.9 565388 11/27/19 3.3 565715 12/27/19 5.6 565715 10/28/19 3.2 565388 11/28/19 3.4 565715 12/28/19 7.4 565715 10/29/19 2.0 565388 11/29/19 4.0 565715 12/29/19 6.4 565715 10/30/19 2.0 565388 11/30/19 3.5 565715 12/30/19 5.7 565715 10/31/19 2.7 565388 12/31/19 1.9 566029 Total Gallons Pumped per Month 583 327 314 Total Gallons pumped for Q4 1,224 Cell 4B LOS Monitoring Information October 2019 November 2019 December 2019 Weekly measurements in Weekly measurements in Weekly measurements in inches from transducer at inches from transducer at the Flow Meter inches from transducer at the Flow Meter the bottom of the LDS Flow Meter Date bottom of the LDS sump. in Gallons Date bottom of the LDS sump. in Gallons Date sump. in Gallons 10/01/19 3.90 407630 11/01/19 3.90 407783 12/01/19 3.90 407784 10/02/19 3.90 407630 11/02/19 3.90 407783 12/02/19 3.90 407784 10/03/19 3.90 407630 11/03/19 3.90 407783 12/03/19 3.90 407784 10/04/19 3.90 407630 11/04/19 3.90 407783 12/04/19 3.90 407784 10/05/19 3.90 407630 11/05/19 3.90 407783 12/05/19 3.90 407784 10/06/19 3.90 407630 11/06/19 3.90 407783 12/06/19 3.90 407784 10/07/19 3.90 407630 11/07/19 3.90 407783 12/07/19 3.90 407784 10/08/19 3.90 407630 11/08/19 3.90 407783 12/08/19 3.90 407784 10/09/19 3.90 407630 11/09/19 3.90 407783 12/09/19 3.90 407784 10/10/19 3.90 407630 11/10/19 3.90 407783 12/10/19 3.90 407784 10/11/19 3.90 407630 11/11/19 3.90 407783 12/11/19 3.90 407784 10/12/19 3.90 407782 11/12/19 3.90 407783 12/12/19 3.90 407784 10/13/19 3.90 407782 11/13/19 3.90 407783 12/13/19 3.90 407784 10/14/19 3.90 407782 11/14/19 3.90 407783 12/14/19 3.90 407784 10/15/19 3.90 407782 11/15/19 3.90 407783 12/15/19 3.90 407784 10/16/19 3.90 407782 11/16/19 3.90 407783 12/16/19 3.90 407784 10/17/19 3.90 407782 11/17/19 3.90 407783 12/17/19 3.90 407784 10/18/19 3.90 407782 11/18/19 3.90 407783 12/18/19 3.90 407784 10/19/19 3.90 407782 11/19/19 3.90 407784 12/19/19 3.90 407784 10/20/19 3.90 407782 11/20/19 3.90 407784 12/20/19 3.90 407784 10/21/19 3.90 407782 11/21/19 3.90 407784 12/21/19 3.90 407784 10/22/19 3.90 407782 11/22/19 3.90 407784 12/22/19 3.90 407784 10/23/19 3.90 407782 11/23/19 3.90 407784 12/23/19 3.90 407784 10/24/19 3.90 407782 11/24/19 3.90 407784 12/24/19 3.90 407784 10/25/19 4.72 407782 11/25/19 3.90 407784 12/25/19 3.90 407784 10/26/19 3.90 407782 11/26/19 3.90 407784 12/26/19 3.90 407784 10/27/19 4.72 407782 11/27/19 3.90 407784 12/27/19 3.90 407784 10/28/19 4.72 407782 11/28/19 3.90 407784 12/28/19 3.90 407784 10/29/19 4.72 407782 11/29/19 3.90 407784 12/29/19 3.90 407784 10/30/19 3.90 407783 11/30/19 3.90 407784 12/30/19 3.90 407784 10/31/19 3.90 407783 12/31/19 3.90 410572 Total Gallons Pumped per Month 153 I 2,788 Total Gallons pumped for Q4 2,942 White Mesa Mill -Discharge Minimization Technology Monitoring Plan 12/16 Revision: EFRI 12.4 Page 25 of25 ATTACHMENT C TABLES Table lA Calculated Action leakage Rates for Various head Conditions Cell 4A White Mesa Mill Blanding, Utah Head above Liner System (feet) Calculated Action leakage Rate 5 10 15 20 25 30 35 37 ( gallons / acre / day ) Table lB Calculated Action leakage Rates for Various head Conditions Cell 4B White Mesa Mill Blanding, Utah 222.04 314.01 384.58 444.08 496.50 543.88 587.46 604.01 Head above Liner System (feet) Calculated Action leakage Rate ( gallons / acre / day ) 5 211.40 10 317.00 15 369.90 20 422.70 25 475.60 30 528.40 35 570.00 37 581.20 Calculation of Maximum Daily Allowable LDS Flow Volume for Varying Head Conditions in Cells 4A and 4B The equation for the calculation of maximum daily allowable flow volume in Cells 4A and 4B is as follows: Step 1) Where: Step 2) Step 3) Step 4) Elevation 1-Elevation 2 = Head (ft.) Elevation 1 is the maximum elevation in feet measured during the reporting period. Elevation 2 is the FML elevation in feet. Determine Calculated Action Leakage Rate from Table lA (for Cell 4A) or Table lB (for Cell 4B) using the head calculated in Step 1 above. If the head calculated in step 1 above falls between two values in the Head Above Liner System (feet) column, then the closer of these two values will be used to determine the Calculated Action Leakage Rate. Calculate the acres of tailings cell fluids based on the area of the base of the cell, the head, and the angle of the sideslopes of the cell. Action Leakage Rate (from Table lA or lB) X Acres of Tailings Cell Fluids = Maximum Daily Allowable Flow Volume Max head on Cell 4A FML Max elevation (ft.) FML elevation (ft.) Head (ft.) From BAT O&M Table lA (gallon/acre/day) Acres of fluid based on maximum level (acres) Max allowable flow rate (gal/day) 4A-Q4 2019 5590.69 5555.55 35.14 587.46 39.32 23,099 Max head on Cell 4B FML Max elevation (ft.) FML elevation (ft.) Head (ft.) From BAT O&M Table lB (gallon/acre/day) Acres of fluid based on maximum level (acres) Max allowable flow rate (gal/day) 4B-Q4 2019 5570.72 5557.50 13.22 369.90 32.98 12,199 Cell 1, Cell 2, and Cell 3 LDS Monitoring Information -Fourth Quarter 2019 Cell 1 Cell 2 Cell 3 Measurement in inches Measurement in inches Measurement in inches Date from transducer at the Date from transducer at the Date from transducer at the bottom of the LDS sump. bottom of the LDS sump. bottom of the LDS sump. 10/4/2019 Dry 10/4/2019 Dry 10/4/2019 Dry 10/11/2019 Dry 10/11/2019 Dry 10/11/2019 Dry 10/18/2019 Dry 10/18/2019 Dry 10/18/2019 Dry 10/25/2019 Dry 10/25/2019 Dry 10/25/2019 Dry Cell 1 Cell 2 Cell 3 Measurement in inches Measurement in inches Measurement in inches Date from transducer at the Date from transducer at the Date from transducer at the bottom of the LDS sump. bottom of the LDS sump. bottom of the LDS sump. 11/1/2019 Dry 11/1/2019 Dry 11/1/2019 Dry 11/8/2019 Dry 11/8/2019 Dry 11/8/2019 Dry 11/15/2019 Dry 11/15/2019 Dry 11/15/2019 Dry 11/22/2019 Dry 11/22/2019 Dry 11/22/2019 Dry 11/27/2019 Dry 11/27/2019 Dry 11/27/2019 Dry Cell 1 Cell 2 Cell 3 Measurement in inches Measurement in inches Measurement in inches Date from transducer at the Date from transducer at the Date from transducer at the bottom of the LDS sump. bottom of the LDS sump. bottom of the LDS sump. 12/6/2019 Dry 12/6/2019 Dry 12/6/2019 Dry 12/12/2019 Dry 12/12/2019 Dry 12/12/2019 Dry 12/18/2019 Dry 12/18/2019 Dry 12/18/2019 Dry 12/27/2019 Dry 12/27/2019 Dry 12/27/2019 Dry Attachment G This attachment has been deliberately left blank. Attachment H White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA DATE: i<J-'(-lf 12/16 Revision: EFRI 12.4 Page 24 of25 ......_...-,.1•~~ ... •• ,t •• ,~--·,.·---·-_....--··-.. ,,.,.__...... -.. -----,-._..,._ ..... --•--&.: 1 - White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENTB FEEDSTOCK STORAGE AREA DATE: /4/;;//f 12/16 Revision: EFRI 12.4 Page 24 of25 • _ __,,,.,~w\ w__.,._., -•, ,_ .. ,.., _ .. ~---· _ _.... .... _,..,, .. .,-. -.,.._.._..,... 0 T • ..-.----·----"'-. ·-- L_ N t ___ . ....,.._ ____ _ White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA DATE: /0 .. /l -l j 12/16 Revision: EFRl 12.4 Page 24 of25 --.--.~ ............ --,--,--... --,.-...... -. ,·-· __ .,_, ____ -·-.,.; .. ,,_ I • .....-.-'--·-·---~·•,.',... ... _ ... l ·------~-_,.,......,~.:1,1''-----~ White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA 12/16 Revision: EFRI 12.4 Page 24 of25 DATE: I o/1y /1 ~ ~-..-,i.--·~-·.,.·--~··--------~--~#"~' ~____,... ... _. ____ .... _. .. ,,-...-- N t White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA 12/16 Revision: EFRI 12.4 Page 24 of25 DATE: .~4111( ~,. ... ....----.... .--,.....--.. --............ ----·-.... ,-· .. -----·----\.,...,....,, .. ·-- N 1 -~--~' __ ___,,....__.,__.., White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA DATE: t/-J-19 12/16 Revision: EFRI 12.4 Page 24 of25 -,., ... ,~...,....,._.-----· ---··-----·-· ..J .... -. ~------"-·--... ,'),.,.., ..... _ .. N l White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA DATE: \\-\S--\°\ ----··'~-~---~-... --....... .--...---.... -....... , ..... -. N t C 'llllo 12/16 Revision: EFRI 12.4 Page 24 of25 White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENTB FEEDSTOCK STORAGE AREA DATE: {,-21-If 12/16 Revision: EFRI 12.4 Page 24 of25 _ .. .,.-~..,. .. ----·-J•r•-~_.,...,._.,_..._'\.,.'r"W.,''- White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA DATE: /(-n-19 • N l 12/16 Revision: EFRI 12.4 Page 24 of25 White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA 12/16 Revision: EFRI 12.4 Page 24 of25 DATE: ¥/ft ~-----··--.,. ·-......::. ·.,, ··----~------_ _.,,...-. N 1 ------... ----....-~·. ,,.,,._,.,_ White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATTACHMENT B FEEDSTOCK STORAGE AREA 12/16 Revision: EFRI 12.4 Page 24 of25 DATE: /l.f/1,U, .-,1,.1.&~-·----,.._--._,. __ ....._ ___ ._. _,r_........., ~~---f"'V••----, 1 White Mesa Mill -Discharge Minimization Technology Monitoring Plan l __ ATTACHMENT B FEEDSTOCK STORAGE AREA DATE: li,/lf//t ,_. -~ .... -~ .... .,..,.--...-----.. ...... -- N 1 12/16 Revision: EFRI 12.4 Page 24 of25 Jv\~S.v'f ~""<~ ~\i..t.\,,. W&t.. o ~ XC.t, ,J~ s~\v-. W~ .. A·U-~ ~ r White Mesa Mill -Discharge Minimization Technology Monitoring Plan ATIACHMENTB FEEDSTOCK STORAGE AREA DATE: /r,,/J.f,~f 12/16 Revision: EFRI 12.4 Page 24 of25 -, .. ~~--·---_..-..-,..--~ ... ~--..u-,i..-.... ....... -.. , .. , .. .-...--. .., ____ ... _ ...... _.-.-,-,. .... _...., i_ N Attachment I Energy Fuels Resources (USA) Inc. White Mesa Mill Precipitation Chart Rain or Snow Recorded in Inches of Moisture Received YEAR 2019 Month October Rain Snow Rain Snow 1 17 2 18 3 19 4 20 5 21 6 22 7 23 8 24 9 25 10 26 11 27 12 28 0,10 13 29 14 30 15 31 16 Combined Total: • iO Energy Fuels Resources (USA) Inc. White Mesa Mill Precipitation Chart Rain or Snow Recorded in Inches of Moisture Received YEAR 2019 Month November Rain Snow Rain Snow 1 17 2 18 3 19 4 20 ~so 5 21 " 0 i::, 6 22 7 23 8 24 9 25 10 26 11 27 12 28 0.06 13 29 0,3$? 14 30 15 31 16 Combined Total: • Cfq Energy Fuels Resources (USA) Inc. White Mesa Mill Precipitation Chart Rain or Snow Recorded in Inches of Moisture Received YEAR 2019 Month December Rain Snow Rain Snow 1 17 2 18 3 19 4 20 5 21 01)() 6 22 7 23 ~ 8 24 o. \~ . Of# 9 25 O.(Jo . Z.& 10 26 ',~ 11 27 . Ir, 12 28 13 29 14 30 15 31 . ~:l. 16 Combined Total: I. 7()