Loading...
HomeMy WebLinkAboutDRC-2019-002122 - 0901a068809dbb99 DRC-2019-002122 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah GARY R. HERBERT Governor SPENCER J. COX Lieutenant Governor Department of Environmental Quality Alan Matheson Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Rusty Lundberg Acting Director March 8, 2019 Kathy Weinel Quality Assurance Manager Energy Fuels Resources (USA) Inc. 225 Union Blvd., Suite 600 Lakewood, CO 80228 RE: Health Physics Inspection RADMOD-RPP: Radioactive Material License Number UT 1900479 Dear Ms. Weinel: On February 25 and 26, 2019, an inspection was conducted at your facility by representatives of the Division of Waste Management and Radiation Control. Observations from the inspection were discussed at the closeout meeting with White Mesa Uranium Mill staff. The inspection was an examination of the activities conducted at your facility as they relate to compliance with the Utah Radiation Control Rules, the license conditions of the RML No. UT1900479 and Federal Regulations. The inspection consisted of an examination of representative records, interviews of personnel, and observations by the inspector. Enclosed is the inspection report regarding this inspection for your review. The DWMRC considers this inspection closed. The DWMRC would like to thank the Mill staff for their cooperation regarding this inspection. If you have any questions, please contact Ryan Johnson by email at rmjohnson@utah.gov or by phone at (801) 536-4255. Sincerely, Rusty Lundberg, Acting Director Division of Waste Management and Radiation Control (Over) RL/RMJ/kb Enclosure: RADMOD-RPP Health Physics Inspection Report Radioactive Material License Number UT 1900479 c: Kirk Benge, Health Officer, San Juan Public Health Department Rick Meyer, Environmental Health Director, San Juan Public Health Department Scott Hacking, P.E., DEQ District Engineer INSPECTION REPORT Inspection Module: RADMOD-RPP: Respiratory Protection Program Inspection Location: Energy Fuels -White Mesa Uranium Mill, Blanding Utah. Inspection Items: Respirator Protection Inspection Dates: February 25 & 26, 2019 Inspectors: Ryan Johnson, Utah Division Waste Management and Radiation Control (DWMRC) Tim Butler, DWMRC Spencer Wickham, DWMRC Personnel Contacted: Justin Perkins, Radiation Safety Technician Abel (Junior) Mendoza, Safety Technician Kenny Roberts, Radiation Safety Technician Governing Documents: • UAC R313-15 • Radioactive Materials License (RML) UT 19004 79 • Applicable Mill procedures and manuals • NRC Regulatory Guide 8.15 Opening Meeting Energy Fuels Resources: Justin Perkins, Radiation Safety Technician Utah DWMRC: Ryan Johnson (Health Physics Inspector) Tim Butler (Health Physics Inspector) Spencer Wickham (Health Physics Inspector) During the opening meeting, the inspector discussed the inspection items and documentation to be reviewed during the inspection. The Mill staff reminded the inspectors of the safety requirements for the Mill. DRC Meters Used Model Serial Number Calibration Due Date Dose Rate Ludlum 19 101673 6/15/2019 Inspection Summary The inspection consisted of a RSO interview, reviewing applicable documentation and a mill tour. The following discussion provides more detail of the specific items reviewed. 1 of Page 3 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UTI 900479 Energy Fuels Res -White Mesa UMill\HP Inspection modules\20191201 9 Inspection Reportsllnspection Report RADMOD-RPP 2-25 -2019.docx Item 1. Documentation Review: The Inspector reviewed applicable documentation. Observations: The DWMRC inspector reviewed the following documents: • The current Respiratory Protection Manual and confirmed all required respirator protection procedures from RJ 13-15-703 and NRC Reg. Guide 8.15 are covered in the manual; • The respirator issuance log; • Respirator Damage Sheet; • Fit testing and respirator training documentation; and • Respirator survey forms. Deficiencies: The Medical Clearance documentation was not available. The Mill had not received the paperwork from the medical provider at the time of the inspection. The Inspector will follow-up on a future inspection Item 2. Mill Tour: The Inspector walked through the restricted area on a general site tour. The tour included the mill, solvent extraction building, the alternate feed circuit and the respirator room. Observations: The DWMRC inspector also observed: • OSL badges were appropriately being used by all observed employees at the Mill; • Respirator room was clean and well organized; • Respirators were clean and in good repair; • Fit testing of respirators was performed appropriately. During the inspection the inspector was able to observe a DWMRC inspector (Spencer Wickham) being fit tested; and • Meters used to survey respirators were calibrated and in good repair. Rd. I a 10 og1ca rea mgs o serve d. b urmg I dd . M "II tour Location Dose Rate (µR/hr) Mill Product Storage Yard Solvent Extraction Building Respirator Room Deficiencies: None Closeout Meeting Energy Fuels: Justin Perkins, Radiation Safety Technician Abel (Junior) Mendoza, Safety Technician Kathy Weinel, Quality Assurance Manager (via phone on February 28, 2019) Utah DWMRC: Ryan Johnson (Health Physics Inspector) Tim Butler (Health Physics Inspector) Spencer Wickham (Health Physics Inspector) Phil Goble (U-Mill/RAM Supervisor) part of phone call on February 28, 2019 Findings None 2 of Page 3 125 100 40 15 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT 19004 79 EnergyFuels Res -White Mesa UMill\HP Inspection modules\2019\2019 Inspection Reports\lnspection Report RADMOD-RPP 2-25 -20 I 9.docx Recommendations • Refresher Training for all Radiation Safety Staff; and • Document Medical Clearance without using a person's medical file Recommendation for Next Inspection I. Follow-up on Medical Clearance Docum Prepared By: Reviewed By: Ryan Johnson (Print Name) Phil Goble (Print Name) (Signature) 3 of Page 3 -:; --S--26/'f ~/r,/4011 (Date) \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UTI 900479 EnergyFuels Res -White Mesa UMill\HP Inspection module,1201912019 Inspection Reportsllnspection Report RADMOD-RPP 2-25-2019.docx