HomeMy WebLinkAboutDRC-2020-004545 - 0901a06880c12be4Energy Fuels Resources (USA) Inc.
225 Union Blvd. Suite 600
Lakewood, CO, US, 80228
303 974 2140
www.energyfuels.com
NERO Y FUELS
February 27, 2020 RC-2020-00 45Li-5 Div of Waste Management
and Radiation Control
Sent VIA E-MAIL AND EXPRESS DELIVERY
Ty L. Howard,
Director of Waste Management and Radiation Control
State of Utah Department of Environmental Quality
195 North 1950 West
P.O. Box 144880
Salt Lake City, UT 84114-4880
MAR - 2 2020
Re: Transmittal of Plan and Time Schedule under Utah Ground Water Discharge Permit
UGW370004 Part I.G.4 (c) White Mesa Mill (the "Mill")
Dear Mr. Anderson:
This letter transmits Energy Fuels Resources (USA) Inc.' s ("EFRI' s") Plan and Time Schedule pursuant to
State of Utah Groundwater Discharge Permit UGW370004 (the "Permit") Part I.G.4(c) for MW-31 for the
fourth quarter of 2019. Part I.G.2 of the Permit provides that out-of-compliance ("00C") status exists when the
concentration of a pollutant in two consecutive samples from a compliance monitoring point exceeds a
groundwater compliance limit ("GWCL"). While consecutive exceedance have been noted in MW-31 and other
wells at the site, a plan and time schedule have not been required or appropriate in light of other actions
currently being undertaken by EFRI or in light of other reports submitted by EFRI.
This Plan covers Total Dissolved Solids ("TDS") in MW-31 that was identified as being in violation of Part
I.G.2 of the Permit, in the Fourth Quarter 2019 Exceedance Notice, dated January 31, 2020. In addition, this
Plan and the associated SAR will address the additional constituent of sulfate, which exceeded the GWCL in
both the fourth quarter 2019 and the first quarter 2020. While this dual exceedance has not been reported yet,
EFRI has reviewed the data for first quarter 2020 and a Plan will be required. In anticipation of the required
Plan, sulfate will be included in this Plan.
Please contact me if you have any questions or require any further information.
Yours very truly,
ENERGY FUELS RESOURCES (USA) INC.
Kathy Weinel
Quality Assurance Manager
cc: Paul Goranson
Terry Slade Logan Shumway
Scott Bakken
David Frydenlund
WHITE MESA MILL
State of Utah Ground Water Discharge Permit UGW370004
Plan and Time Schedule
Under Part I.G.4 (c)
For
Exceedances in MW-31 in the Fourth Quarter of 2019
Energy Fuels Resources (USA) Inc.
225 Union Boulevard, Suite 600
Lakewood, CO 80228
February 27, 2020
1. INTRODUCTION
Energy Fuels Resources (USA) Inc. ("EFRI") operates the White Mesa Uranium Mill (the
"Mill"), located near Blanding Utah, under State of Utah Ground Water Discharge Permit
UGW370004 (the "Permit").
This is the plan and time schedule (the "Plan") required under Part I.G.4(c) of the Permit relating
to violations of Part I.G.2 of the Permit for the MW-31 for the fourth quarter of 2019. Part I.G.2
of the Permit provides that out-of-compliance status exists when the concentration of a pollutant
in two consecutive samples from a compliance monitoring point exceeds a groundwater
compliance limit ("GWCL") in Table 2 of the Permit. While consecutive exceedance have been
noted in MW-31 and other wells at the site, a plan and time schedule and Source Assessment
Report ("SAR") have not been required or appropriate in light of other actions currently being
undertaken by EFRI or in light of other reports submitted by EFRI, and as determined by
Division of Waste Management and Radiation Control ("DWMRC") Staff. Specifically,
consecutive exceedances, which occurred in previous reporting periods are discussed in previous
SARs submitted to DWMRC. Additionally, pH was addressed in reports dated November 9,
2012 and December 7, 2012. A description of the other actions and reports which have affected
the requirement to submit a plan and time schedule are as follows:
1. Nitrate + nitrite and chloride in monitoring wells at the site have been the subject of
ongoing investigations at the Mill. Based on the results of the previous investigations,
EFRI and the Director acknowledge that it has not been possible to date to determine the
source(s), cause(s), attribution, magnitudes of contribution, and proportion(s) of the local
nitrate + nitrite and chloride in groundwater. EFRI submitted a Corrective Action Plan
("CAP") in February 2012 for nitrate + nitrite and chloride in groundwater. The CAP
was approved on December 12, 2012 and the activities associated with the CAP are on-
going. Based on information provided by DWMRC in teleconferences on April 27, and
May 2, 2011, due to the ongoing activities and actions, the 30-day plan and schedule for
assessment is not required for nitrate + nitrite and chloride exceedances at this time.
2. As discussed in previous quarterly groundwater sampling reports, the background levels
and GWCLs for pH were established based on eight or more quarters of laboratory data,
which are historically higher than field data. EFRI' s letter to the Director dated January
31, 2011 proposed the recalculation of the GWCLs for field pH. Following the statistical
evaluation of pH data by EFRI's geochemical consultant, lNTERA, Inc., EFRI compared
the Mill's groundwater pH data from Q2 2011 and noted that all of the June 2011
groundwater results, and many of the other results from Q2 2011, were already outside
the revised GWCLs that were to be proposed in the June 30, 2011 letter. Pursuant to
teleconferences with DWMRC on December 5, and December 19, 2011, EFRI submitted
a Work Plan and Schedule on January 20, 2012 and a revised plan based on DWMRC
comments on April 13, 2012. Based on the approved Work Plan and Time Schedule,
EFRI and DWMRC entered into a Stipulated Consent Agreement ("SCA") dated July 12,
2012. The SCA required the completion of the pH Report and the Pyrite Investigation
and associated report. The pH Report and Pyrite Investigation Report were submitted
November 9, 2012 and December 7, 2012 respectively. By letter dated April 25, 2013,
DWMRC accepted the conclusions that the out-of-compliance results for pH are due to
background effects within the aquifer matrix and are not caused by Mill activities.
DWMRC also approved the recalculation of the GWCLs. As a result, the 30-day plan and
schedule for assessment is not required for field pH exceedances.
3. A Plan and Time Schedule will not be prepared for monitoring wells with two successive
exceedances, if those successive exceedances were reported in a previous quarter and /or
were included in a previous SAR, because the conclusions and actions delineated in those
reports were accepted by DWMRC.
Chloroform and methylene chloride are the subject of the ongoing chloroform pumping program
and are covered by State of Utah Notice of Violation ("NOV") and Groundwater Corrective
Action Order ("CAO") State of Utah Department of Environmental Quality ("UDEQ") Docket
No. UGW-20-01. As a result, the 30-day plan and schedule for assessment of chloroform and
methylene chloride exceedances is not required.
The Permit was originally issued in March 2005, at which time GWCLs were set on an interim
basis, based on fractions of State Ground Water Quality Standards or the equivalent, without
reference to natural background at the Mill site. The Permit also required that EFRI prepare a
background groundwater quality report to evaluate all historic data for the purposes of
establishing background groundwater quality at the site and developing GWCLs under the
Permit.
As required by then Part I.H.3 of the Permit, EFRI submitted the following to the Director of the
State of Utah Division of Radiation Control (the "Director"):
• A Revised Background Groundwater Quality Report: Existing Wells For Denison Mines
(USA) Corp.'s Mill Site, San Juan County, Utah, October 2007, prepared by INTERA,
Inc. (the "Existing Wells Background Report");
• A Revised Addendum: -- Evaluation of Available Pre-Operational and Regional
Background Data, Background Groundwater Quality Report: Existing Wells For
Denison Mines (USA) Corp.'s Mill Site, San Juan County, Utah, November 16, 2007,
prepared by INTERA, Inc. (the "Regional Background Report"); and
• A Revised Addendum: -- Background Groundwater Quality Report: New Wells For
Denison Mines (USA) Corp.'s Mill Site, San Juan County, Utah, April 30, 2008, prepared
by 1NTERA, Inc. (the "New Wells Background Report, and together with the Existing
Wells Background Report and the Regional Background Report, the "Background
Reports").
Based on a review of the Background Reports and other information and analyses the Director
re-opened the Permit and modified the GWCLs to be equal to the mean concentration plus two
standard deviations or the equivalent of background for each constituent on an intrawell basis.
The modified GWCLs became effective on January 20, 2010. A new GWDP was issued on
January 19, 2018. The January 19, 2018 GWDP incorporated the revised GWCLs that resulted
from previous SARs. A revised GWDP was issued on March 19, 2019. The revised GWDP
incorporated the revised GWCLs that resulted from previous SARs among other changes.
Part I.G.4 c) of the GWDP states, with respect to exceedances of GWCLs, "that the Permittee
shall prepare and submit within 30 calendar days to the Executive Secretary a plan and a time
schedule for assessment of the sources, extent and potential dispersion of the contamination, and
an evaluation of potential remedial action to restore and maintain groundwater quality to insure
that Permit limits will not be exceeded at the compliance monitoring point and that DMT or BAT
will be reestablished." Pursuant to this requirement, EFRI has previously submitted Plans and
Time Schedules and SARs to address previous dual exceedances (as required in light of other
actions currently being undertaken by EFRI and as determined by DWMRC Staff and stated in
teleconferences with EFRI on April 27 and May 2, 2011).
This Plan covers Total Dissolved Solids ("TDS") in MW-31 that was identified as being in
violation of Part I.G.2 of the Permit, in the Fourth Quarter 2019 Exceedance Notice, dated
January 31, 2020. In addition, this Plan and the associated SAR will address the additional
constituent of sulfate, which exceeded the GWCL in both the fourth quarter 2019 and the first
quarter 2020. While this dual exceedance has not been reported yet, EFRI has reviewed the data
for first quarter 2020 and a Plan will be required. In anticipation of the required Plan, sulfate
will be included herein.
2. CONSTITUENTS AND WELLS SUBJECT TO THIS PLAN
The following constituents are covered by this Plan:
Table 1
Constituent and Well Subject to this Plan
Constituent POC Well GWCL Q4 2019 and
Q1 2020
Results
TDS (mg/L) MW-31 2132 2280, 2650,
2030, 2220
Sulfate
(mg/L) MW-31 993 1010, 990,
1020, 1120
It should be noted that the fourth Quarter 2019 Exceedance Notice identifies a number of wells,
with consecutive exceedances of other constituents. None of those constituents are included in
this Plan, for the reasons stated in Section 1 above and in the Q4 2109 Exceedance Notice. This
Plan and the associated SAR are being submitted to DWMRC by EFRI to address exceedances
in MW-31 for TDS and sulfate which have exceeded the GWCLs due to statistically significant
trends noted in previous studies.
Nitrate + Nitrite and Chloride concentrations in MW-31 are associated with the Nitrate/Chloride
plume, and are currently covered by the December 12, 2012 Stipulation and Consent Order.
With respect to pH, EFRI and DWMRC entered into a Stipulated Consent Agreement ("SCA")
dated July 12, 2012. The SCA required the completion of the pH Report and the Pyrite
-Investigation and associated report. The pH Report and Pyrite Investigation Report were
submitted November 9, 2012 and December 7, 2012 respectively. By letter dated April 25,
2013, DWMRC accepted the conclusions that the out-of-compliance results and site-wide
decrease in pH are due to background effects within the aquifer matrix and are not caused by
Mill activities. The site-wide decrease in pH due to background effects within the aquifer matrix
has continued.
3. CATEGORIES FOR ANALYSIS
Previously EFRI has categorized wells and constituents in several categories as follows:
• Constituents Potentially Impacted by Decreasing pH Trends Across the Site
• Newly Installed Wells with Interim GWCLs
• Constituents in Wells with Previously Identified Rising Trends
• Pumping Wells
• Other Constituents
TDS and sulfate fall within the fifth category: Other Constituents. It is important to note that
TDS and sulfate also fall within the first and third categories: Constituents Potentially Impacted
by Decreasing pH Trends Across the Site and Constituents in Wells with Previously Identified
Rising Trends, respectively. Assessment of these constituents in MW-31 will follow the process
noted below with additional considerations to address the previously identified rising trend.
3.1. Other Constituents
As previously noted TDS and sulfate fall within the third category and the fifth category.
Assessment of sulfate and TDS in MW-31 will follow the process previously used for
constituents classified under the "other" category.
The location of MW-31 is important when determining potential sources of contamination.
MW-31 was included in previous SARs for exceedances in sulfate and TDS. The previous SARs
concluded that the increasing concentrations of various analytes were due to the sitewide
oxidation of pyrite which releases sulfate and other dissolved constituents and the proximity of
that well to the nitrate/chloride plume. The nitrate/chloride plume has been the subject of many
studies that are described in detail in the following reports:
• Nitrate Contamination Investigation Report
• Quarterly Nitrate Reports 2009-2015
The nitrate/chloride plume is currently being addressed by the ongoing activities under the
DWMRC-approved CAP.
4. PLAN
4.1 . General
This Plan is a plan and time schedule for assessment of the sources, extent and potential
dispersion of the contamination, and an evaluation of potential remedial action to restore and
maintain groundwater quality to ensure that Permit limits will not be exceeded at the compliance
monitoring point and that, to the extent applicable, discharge minimization technology and best
available technology will be reestablished.
Given the recent analyses in the Background Reports, SARs, pH Report, and Pyrite Report and
other recent information relating to the Chloroform and Nitrate/Chloride investigations at the
site, EFRI believes that all of the exceedances are likely due to background influences (including
a natural decreasing trend in pH across the site, changing water levels in some wells and other
factors), disruption of the aquifer by pumping, and/or the geochemical influences of the existing
chloroform and nitrate/chloride plumes.
Therefore, the first step in the analysis will be to perform an assessment of the potential sources
for each exceedance to determine whether the exceedance is due to background influences or
Mill activities. If an exceedance is determined to be due to background influences then it will
not be necessary to perform any further evaluations on the extent and potential dispersion of the
contamination or to perform an evaluation of potential remedial actions. Monitoring will
continue, and where appropriate revised GWCLs will be proposed to reflect changes in
background conditions at the site.
However, if any of the exceedances are determined to be caused by Mill activities, then EFRI
will proceed to the next step and will consider the extent and potential dispersion of the
contamination, and will perform an evaluation of potential remedial actions to restore and
maintain groundwater quality to ensure that Permit limits will not be exceeded at the compliance
monitoring point.
This two-step approach is necessary, because, in light of the varied background conditions at the
site and previously identified background trends, it can't be assumed that consecutive
exceedances of a constituent in a well represents contamination that has been introduced to the
groundwater. It is first necessary to establish whether or not the exceedances represent
background influences.
4.2. Other Constituents
The primary focus of the source assessment for these constituents will again be to determine
whether or not there is any new information that would suggest that the previous analysis
conducted in the New Wells Background Report, SARs, pH Report and Pyrite Report has
changed since the date of those Reports. This analysis will include the following for each
constituent listed in Table 4:
(i) A geochemical analysis that will evaluate the behavior of all of the constituents in the
well in question to determine if there are any changes in the behavior of indicator
constituents, such as chloride, sulfate, fluoride and uranium since the date of the New
Wells Background Report and the SARs that may suggest a change in the behavior of
that well since the date of those Reports;
(ii) A mass balance analysis that will evaluate the observed concentrations in light of the
concentrations in Mill tailings and the presence or absence of any mounding at the
location of the well in question;
(iii) An analysis of the extent, if any, to which the constituents may be influenced by
geochemical changes caused by migrating nitrate and/or chloride or chloroform from
the existing plumes; and
(iv) An analysis of the extent, if any, to which the constituents may be influenced by
changes in other constituents in ground water that have resulted from changes in pH or
any other natural phenomenon.
The foregoing analysis will be included in the SAR.
If no significant changes are identified that would suggest that the previous analyses conducted
in the Background Reports for the constituents in question has changed, then EFRI will propose
changes to the GWCLs for those wells to better reflect background concentrations at the site.
If significant changes are identified that are attributable to geochemical changes caused by either
the nitrate/chloride plume or the chloroform plume, then the constituents should be considered in
connection with the applicable plume, and the associated CAP.
If significant changes are identified that cannot be attributed to one of the existing plumes, or
other background influences, then EFRI will propose to the Executive Secretary further analysis
that may be required in order to identify the source and the extent and potential dispersion of the
contamination, as well as potential remedial actions.
4.3. Expert Reports to be Prepared
The results of the statistical analysis and, if appropriate, recalculation of the GWCLs will be
compiled as a SAR that will be submitted to DWMRC within 90 days of the approval of this
plan. The SAR will detail the results of all of the analyses performed and the conclusions drawn
from such analyses, including any proposed revisions to existing GWCLs. Specifically, the SAR
will follow the format of the previously submitted SARs and will include discussions, results and
conclusions of the analyses and appendices containing the following:
A geochemical analysis of MW-31
Comparison of calculated and measured TDS for samples with complete major ions
Charge balance calculations
Descriptive statistics
Box plots to identify extreme outliers
Histograms and Shapiro Wilk test for normality
Regression or Mann Kendall trend analysis
Proposed Revised GWCLs for MW-31
A geochemical analysis of Indicator Parameters in MW-31
Descriptive Statistics
Box plots to identify extreme outliers
Histograms and Shapiro Wilk test for normality
Regression and/or Mann Kendall trend analysis
A pH analysis in MW-31
Descriptive Statistics
Box plots to identify extreme outliers
Histograms and Shapiro Wilk test for normality
Regression and/or Mann Kendall trend analysis
5. TIME SCHEDULE
The SAR will be submitted to the Director within 90 days after approval of this Plan. The SAR
contemplated by this submission may be combined with any subsequent SARs resulting from
other Plans and Schedules for other out of compliance constituents, as necessary.
6. CONCLUSION
Given the varied background groundwater quality at the site it cannot be assumed that
consecutive exceedances of a constituent in a monitoring well means that contamination has
been introduced to groundwater in that well.
The location of MW-31 is important when determining potential sources of contamination.
MW-31 was included in the October 2012 SAR for exceedances in TDS and sulfate and the
December 2015 SAR for exceedances in sulfate, selenium, field pH, and TDS and the August 21,
2017 SAR for sulfate, selenium, TDS, and uranium. The previous SARs concluded that the
concentrations of many constituents in MW-31 were due to or affected by the sitewide oxidation
of pyrite and the proximity of that well to the nitrate/chloride plume. MW-31 is located at the
margin of the nitrate/chloride plume. The nitrate/chloride plume has been the subject of many
studies that are described in detail in separate reports.