Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2020-015183 - 0901a06880d24276
Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www.energyfuels.com ENERGY FUELS Div of Waste Management August 27, 2020 and Radiation Control Sent VIA E-MAIL AND EXPEDITED DELIVERY AUG 3 1 2020 Mr. Ty L. Howard W -2020-01503 Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West Salt Lake City, UT 84116 Re: Background Report for Monitoring Wells MW-38, MW-39, and MW-40 Groundwater Quality Discharge Permit UGW370004 White Mesa Uranium Mill Dear Mr. Howard: Section I.H.2 of the Groundwater Discharge Permit ("GWDP") required the installation of three new monitoring wells (MW-38, MW-39, and MW-40). As required by the GWDP, the wells were installed in February 2018. Section I.H.3 requires that within 30 days of the Director approval of the As-Built Report, Energy Fuels Resources (USA) Inc. ("EFRI") shall commence quarterly sampling. The As- Built report was approved by letter dated October 2018. Section I.H.3.c) of the GWDP requires the submission of a Background Report for MW-38, MW-39, and MW-40 after the completion of eight consecutive quarters of sampling and analysis. The wells were sampled consecutively beginning the fourth quarter 2018. The eighth consecutive quarter of data was collected in the third quarter 2020. Please note that an additional non-consecutive quarter of data were collected prior to submission and approval of the As-Built Report. Those data will be included in the Background Report for these wells and have been included in the assessment of the number of statistically valid data points discussed below. As noted above, these wells have been sampled quarterly since fourth quarter 2018. The GWDP requires the completion of a Background Report after the collection of eight quarters of data. Analysis of the data, after eight consecutive quarters, and a total of nine data points, indicate that additional data are required to meet the statistical requirements of the flowsheet. Specifically, eight statistically valid points (as required by the flowsheet) are not available for Gross Alpha (minus Rn and U) ("Gross Alpha") and manganese in MW-39 and chloride in MW-40. ' LedEr to Ty L. Howard August 27, 2020 Page 2 of 2 EFRI would like to request an extension of 90 days on the due date for the Background Report to accommodate the collection of an additional quarterly sample for MW-38, MW-39 and MW-40 during the fourth quarter 2020. The revised due date would be January 8, 2021. If you should have any questions regarding this letter, please contact me. Yours very truly, ENERGY FUELS RESOURCES (USA) INC. Kathy Weinel Quality Assurance Manager cc: David Frydenlund Scott Bakken Logan Shumway Terry Slade Garrin Palmer Tanner Holliday 2 8/27/2020 State of Utah Mail - Fwd: Background Report for MW-38, MW-39 and MW-40 Alyssa Stringham <astringham©utah.gov> Fwd: Background Report for MW-38, MW-39 and MW-40 1 message Phillip Goble <pgoble@utah.gov> To: Alyssa Stringham <astringham@utah.gov> Alyssa, Please print out the attached and give it to the front desk for scanning. Thanks, Phil Thu, Aug 27, 2020 at 3:01 PM Div of Waste Menagairon' and Radiation Control AUG 2 7 2020 Forwarded message From: Kathy Weinel <KWeinel@energyfuels.com> Date: Thu, Aug 27, 2020 at 2:58 PM Subject: Background Report for MW-38, MW-39 and MW-40 To: tyhoward@utah.gov <tyhoward@utah.gov> Cc: Phillip Goble <pgoble@utah.gov>, Thomas Rushing <trushing@utah.gov>, David Frydenlund <DFrydenlund@energyfuels.com>, Scott Bakken <SBakken@energyfuels.com>, Logan Shumway <LoShumway@energyfuels.com>, Terry Slade <TSlade@energyfuels.com>, Garrin Palmer <GPalmer@energyfuels.com>, N. Tanner Holliday <tholliday@energyfuels.com>, Angela Persico (APersico@intera.com) <APersico@intera.com> Mr. Howard, As noted in the attached letter, MW-38, MW-39, and MW-40 have been sampled quarterly since fourth quarter 2018. The GWDP requires the completion of a Background Report after the collection of eight quarters of data. Analysis of the data, after eight consecutive quarters, and a total of nine data points, indicate that additional data are required to meet the statistical requirements of the flowsheet. EFRI would like to request an extension of 90 days on the due date for the Background Report to accommodate the collection of an additional quarterly sample for MW-38, MW-39 and MW-40 during the fourth quarter 2020. The revised due date would be January 8, 2021. If you should have any questions regarding this transmittal please contact me at 303-389-4134. Regards, Kathy Weinel https://mail.google.com/mail/u/O?ik=66c2522f41&view=pt&search=all&permthid=thread-f%3A1676213831236575931&simpl=msg-f%3A16762138312... 1/2 8/27/2020 State of Utah Mail - Fwd: Background Report for MW-38, MW-39 and MW-40 KAt Energy Fuels Resources (USA) lnc. Kathy Weinel Quality Assurance Manager t: 303.389.4134 l f: 303.389.4125 225 Union Blvd., Suite 600 Lakewood, CO 80228 http://www.energyfuels.com This e-mail is intended for the exclusive use of person(s) mentioned as the recipient(s). This message and any attached files with it are confidential and may contain privileged or proprietary information. lf you are not the intended recipient(s) please delete this message and notify the sender. You may not use, distribute print or copy this message if you are not the intended recipient(s). Background Report Extension request.pdf " 86K https://mail.google.com/mail/u/0?ik=66c2522f41&view=pt&search=all&permthid=thread-f%3A1676213831236575931&simpl=msg-f%3A16762138312... 2/2