Loading...
HomeMy WebLinkAboutDRC-2020-013504 - 0901a06880cf79de-712-C--ZOW -0 0504- INSPECTION REPORT Inspection Module: RADMOD-RPP: Respiratory Protection Program (RPP) Inspection Location: Energy Fuels - White Mesa Uranium Mill, Blanding Utah. Inspection Items: Respiratory Protection Inspection Dates: July 13 & 14, 2020 Inspectors: Ryan Johnson, Utah Division Waste Management and Radiation Control (DWMRC) Personnel Contacted: Terry Slade, Radiation Safety Officer (RSO) Garrin Palmer, Radiation Safety Technician (RST) Governing Documents: • UAC R313-15 • Radioactive Materials License (RML) UT1900479 • Applicable Mill procedures and manuals • NRC Regulatory Guide 8.15 Opening Meeting Energy Fuels Resources: Terry Slade, RSO Garrin Palmer, RST Utah DWMRC: Ryan Johnson (Health Physics Inspector) During the opening meeting, the inspector discussed the inspection items and documentation to be reviewed during the inspection. The Mill staff reminded the inspectors of the safety requirements for the Mill. DRC Meters Used Model Serial Number Calibration Due Date Dose Rate Ludlum 19 101673 4/27/2021 Inspection Summary The inspection consisted of a RSO interview, reviewing applicable documentation and a mill tour. The following discussion provides more detail of the specific items reviewed. 1 of Page 3 \\Cbwfp2 \shw\Shared\RAD\COMMON\Uranium mills\U11900479 EnergyFuels Res White Mesa UMi11\HP Inspection modules\2020\2020 Inspection Reports\Inspection Report RADMOD-RPP 7-14-2020.docx Item 1. Documentation Review: The Inspector reviewed applicable documentation. Observations: The DWMRC inspector reviewed the following documents: • The current Respiratory Protection Manual and confirmed all required respirator protection procedures from R313-15-703 and NRC Reg. Guide 8.15 are covered in the manual; • The respirator issuance log; • Respirator Damage Sheet; • Fit testing and respirator training documentation; • Respirator survey forms; and • The new Medical Clearance form. The Inspector followed up on the documentation of Medical Clearance requirement from 2019s inspection on the RPP. The Mill has developed a new form in which a medical doctor declares if an employee is: • Cleared to wear a respirator without medical restrictions; • Cleared to wear a respirator with minor medical restrictions; or • Cannot wear a respirator. The doctor then signs the form at the bottom of the page. If the employee has minor restrictions or cannot wear a respirator a brief explanation is recorded. The Inspector determined that this form properly documents the Medical Clearance requirement and no further follow up is required. In addition, the Mill is now allowing employees to use half-face respirators when appropriate. The Mill has updated their respiratory protection procedures for the use of half-face respirators and how the radiation safety staff will determine when the use of half-face respirators is appropriate. Deficiencies: None Item 2. Mill Tour: The Inspector walked through the restricted area on a general site tour. The tour included ore pad, the mill, the solvent extraction building, the alternate feed circuit, the tailing impoundments and the respirator room. Observations: The DWMRC inspector also observed: • OSL badges were appropriately being used by all observed employees at the Mill; • Respirator room was clean and well organized; • Respirators were clean and in good repair; and • Meters used to survey respirators were calibrated and in good repair. 2 of Page 3 \\Cbwfp2 \shw\Shared\RAD\COMMON\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMi11\HP Inspection modules \2020 \2020 Inspection Reports \Inspection Report RADMOD-RPP 7-14-2020.docx 9-27- 2o2c7 (Date) Radiolo ical readin s observed durin Mill tour Location Dose Rate (i.tIt/hr) Mill 100 Product Storage Yard 70 Solvent Extraction Building 70 Ore Pad 250-1,000 Alternate Feed Ciruit 60 Deficiencies: None Closeout Meeting Energy Fuels: Terry Slade, RSO Garrin Palmer, RST Utah DWMRC: Ryan Johnson (Health Physics Inspector) Findino None Recommendations None Recommendation for Next Inspection None Prepared By: Reviewed By: Phil Goble (Print Name) (Signature) 3 of Page 3 \\Cbwfp2 \shw\Shared\RAD\COMMON\Uranium mills \UT1900479 EnergyFuels Res - White Mesa UMiii\HP Inspection modules\2020 \2020 Inspection Reports\Inspection Report RADMOD-RPP 7-14-2020.docx