Loading...
HomeMy WebLinkAboutDRC-2021-004048 - 0901a06880e45e0bMarch 24, 2021 Sent VIA EXPEDITED DELIVERY Mr. Ty L. Howard Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West Salt Lake City, UT 84116 Div of Waste Management and Radtation Control MAR 2 6 2021 Re: Energy Fuels Resources (USA) Inc. ("EFRI") Response to Confirmatory Action Letter — Installation of Additional Nitrate Wells, White Mesa Uranium Mill Dear Mr. Howard: Pursuant to the February 5, 2021 Division of Waste Management and Radiation Control ("DWMRC") letter, EFRI is providing proposed locations for DWMRC review and approval for two new Nitrate monitoring wells to be installed at the White Mesa Mill. The two proposed new nitrate wells are located to 1) provide a well (eastern well) immediately downgradient of the 'spur' of the nitrate plume extending to TWN-7; and 2) provide water level data between Cell 1 and the mesa rim to the west of the plume (western well). Because of the very slow rate of migration of the plume to the location of TWN-7 it is anticipated that the eastern proposed well will be unimpacted by the plume and will function as a new bounding well. The water level data provided by both wells, especially the western well, will provide water level data in an area currently lacking any measurement points. The proposed locations are shown on the attached figure. EFRI has tentatively scheduled a drilling contractor for mid-April 2021. A definitive schedule will be provided to DWMRC upon approval of the proposed locations. If you should have any questions regarding this report please contact me. Yours very truly, 71retif Jf._d ENERGY FUELS RESOURCES (USA) INC. Kathy Weinel Quality Assurance Manager CC: David Frydenlund Logan Shumway Scott Bakken Terry Slade Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 DRC- 2o2( - 00 ii-o 4-0 www.energyfuels.com FIGURE ------ 5470 ,;4,$3 TWN-20 \ ‘ 0 14 4 \ a71!1.•an5ga oned W-01 7W4-10 \ ., labantoned 54.1 "—flii,' TWN-09 a on rialw-18 TWI0-06 AllF, 1WN- 5590 .. / 15EZ-01 TWN-15 17 \ 5 5 0 TWN-05 TWN-08 t / 5543 / MZ-18„, • 4-+ TWIT-18 • MW-12 405502 5530 5525 5520 DR-10 DR-11 DR-12 DR-13 P1EZ-05 EXPLANATION proposed new nitrate well RVIN SPOING TW4-42 4)5526 MW-38 -(}-5463 TW4-40 +5523 MW-5 • 5504 4Q 2020 nitrate plume boundary estimated dry area temporary perched monitoring well installed April, 2019 showing elevation in feet amsl perched monitoring well installed February, 2018 showing elevation in feet amsl temporary perched monitoring well installed February, 2018 showing elevation in feet amsl perched monitoring well showing elevation in feet amsl DRAFT TW4-12 05569 temporary perched monitoring well showing elevation in feet amsl temporary perched nitrate monitoring well showing elevation in feet amsl perched piezometer showing c' 5588 elevation in feet amsl RUIN SPRING 6 5380 seep or spring showing elevation in feet amsl NOTES: MW-4, MW-26, TW4-1, TW4-2, TW4-4, TW4-11, TW4-19, TW4-21, TW4-37, TW4-39, TW4-40 and TW4-41 are chloroform pumping wells; TW4-22, TW4-24, TW4-25 and TWN-2 are nitrate pumping wells; TW4-11 water level is below the base of the Burro Canyon Formation PROPOSED LOCATIONS OF NEW NITRATE WELLS SHOWING KRIGED 4th QUARTER, 2020 WATER LEVELS AND NITRATE PLUME BOUNDARY APPROVED 1-11718000/TINN_2021/propNwell_2021.srf TWN-7 * )568 PIEZ-1 HYDRO GEO CHEM, INC. DATE REFERENCE FIGURE