Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2021-014801 - 0901a06880f6ab75
September 30, 2021 ENERGYFUELS Energy Fueis Resources (USA) Inc. 225 Union Blvd. Suite 600 LAewood, CO, US, 80228 303 974 2140 P C 202 1 Ike o www.energyfuels.com 111" j, and Radon Cdrtrol OCT 0 4 2021 Sent VIA E-MAIL AND OVERNIGHT DELIVERY Mr. Doug Hansen Director Division of Waste Management and Radiation Control Utah Department of Environmental Quality 195 North 1950 West Salt Lake City, UT 84116 Re: Transmittal of the Design Drawings for EFRI White Mesa Mill Firoposed Secondary Containment for Hydrochloric Acid Tanks Dear Mr. Hansen: Attached as Appendix 1, please find the design drawings for Energy Fuels Reources (USA) Inc.'s ("EFRI' s") proposed design for a secondary containment structure for addition41 tanks at the White Mesa Mill (the"Mill"). EFRI submitted a Request to Amend and Notice of Intent ("NOI") to the Utah Division of Air Quality ("DAQ") for the Mill's Air Approval Order ("AO") Number DAQE-AN0112050018-11 for the addition of hydrochloric acid storage at the Mill. EFRI operates the Mill under the above-named AO as a minor source as defined under the 1990 Clean Air Act. EFRI proposes to install two hydrochloric acid storage tanks to provide operational flexibility and to improve opportunities for waste reduction via recycling of tailings constituents and off-spec product. By letter dated September 24, 2021, DAQ issued an Intent to Approve ("ITA") for the request and NOI, subject to public reN4ew. Please note that while the NOI was for three additional tanks, only two are beirtg constructed at this time. EFRI will submit design drawings, under separate cover, prior to the conStruction of the third tank. The reclamation procedures for the additional tanks and concrete are already ad4ressed in the current DWMRC-approved Reclamation Plan and no additional changes are required at Otis time. Due to the de minimis nature of the additional costs for removal of the'Oe structures during reclamation, the surety estimate will be updated during the next scheduled submisSion in March 2022. The tailings capacity evaluation has been revised to account for the reclamation d is available at the Mill for review. Letter to Doug Hansen September 30, 2021 Page 2 We are submitting these drawing in advance of construction for approval by the Director. Please contact me if you have any questions or comments on these drawings. j?( Yours very ly, itt i /€2144-e ENERGY FUELS RESOURCES (USA) INC. Kathy Weinel Quality Assurance Manager cc: Scott Bakken David Frydenlund Garrin Palmer Logan Shumway Steve Snyder Appendix 1 1'-6" SCRUBBER PAD 6" CONCRETE SLAB W/ #4 BARS © 12" O.C. T.B. EA. WAY 3' 2' 3' 3' 3' - 30'-10" 29'-6" - 2' - 39' 40' 4" SUMP 2'X2'X2' ARRANGEMENT Ir.-- Energy Fuels Resources (USA) Inc. REVISIONS Project RARE EARTH PROCESSING Date By County SAH ,UAN State J TAH Location. AMITE META MIL_ HYDROCHLORIC ACID TANK TANK CONTAINMENT & FOUNDATION SHEET 1 OF 2 - -- --. 11 MEE • • • • • • UNDISTURBED OR RECOMPACTED NATIVE SOIL SECTION UNDISTURBED OR RECOMPACTED NATIVE SOIL SECTION 6" 15-0" WATER STOP STRIP .=11=11=11=11=11=11= .=11-=11=-11=11=11=11=11' .-=11-=11=11=11=11=11=11= .=11=11=11=-11=11--11=11=11: =11=11=11-=11=11-=11=11=11= •=11=11=11=11=11=11=11=11=-1' .=-11=11==11=11=11=11=-11=11=11 =11=11=11=11=11=11=11=11=11-11=11=11=11=11=11=11=11=11= =11=11=11=11=11=11=11=11= 11=11=11=11=-11=11=11=11=1' =11=11=11=11=11=11=11=11" 11=11=11=11=11=11=11=11= =11=11=11=11=11-=11=11=' 11-11-11-11-11-11-11-11 11=11=11=11=11=11=11=11 =11=11=11=11=11=11=11= 11=11=11=11=11=11=11=1' -11=11=11=11=11=11=1' 11=11=11=11=11=11=1' =11=11=11=11=11=11' 11=11=11=11=11=11= .1=11-11-11--1111=11=11=11=11=11=r =11=1=1=11=11=11=11=11=11=11=" .-A1-=11=11=11=11-=11=11--111="- =1=1=1=11=11=11=1 - -ii=i1=1111=1.- 1 ,-0" 2CID =114=-11=11=11=11=11=11 1=11=11=11=11=-11=11= =11=11=11=11=11=11= 1=11=11=11=11=11=11 =11-=11=11=11=11=11= 1=11=11=11=11=11=11 =11=11=11=11=11=11= 1=11=11=11=11=''.=11 =11=11=11=11=11=11= 1=11=-11=11=11=11= =11=11=11=11=11=1 1=11=-11=11=11=11 =11=11=11=11=11r 1=11=11=11=11= =11=-11=11=11=P 1=-11=11=11=11 =11=11=11r 11=11=11= =11=11=1P 11=11=11r =11=11= I 11=11 =11=11=11=11=11=11- u=11=1111=" SECTION MUM SECTION (C TOC FOR ALL TANK PADS TO BE SAME ELEVATION ger Energy Fuels Resources (USA) Inc. REVISIONS Project RARE EARTH PROCESSING Date By County SAN jur, State JTH Location AMIE MESA MEI HYDROCHLORIC ACID TANK TANK CONTAINMENT & FOUNDATION SHEET 2 OF 2 4 @ 12" O.C. HORIZ. #4 @ 12" O.C. VERTS WATER STOP STRIP ro gi 4 • "'• 4".• '. • • • • t • •