Loading...
HomeMy WebLinkAboutDRC-2021-024001 - 0901a068810471dcDepartment of Environmental Quality L Scott Baird Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Ty L Howard Director DP\ C- 202 - 0240 I y.;\ State of Utah GARY R. HERBERT Governor SPENCER J. COX Lieutenant Governor MEMORANDUM TO: Project File C-2021-48 THROUGH: Phil Goble, Uranium Mill Section Manager 122. 6 V/ FROM: Russell J. Topham, PE 1/ DATE: November 22, 2021 SUBJECT: Inspection of Secondary Containment for Hydrochloric Acid Storage Tanks Ground Water Discharge Permit (GWDP) UGW370004 On October 15, 2021, the Division extended conditional approval to construct secondary containment for hydrochloric acid tanks that Energy Fuels intends to construct on the former Roberts Pond site. The hydrochloric acid would not be part of the licensed uranium milling operation but would support a broadening of the mill's mission to include extraction of rare earth minerals. Therefore, Energy Fuels' radioactive materials license is not impacted by this construction. However, protection of ground water is necessary. Therefore, the plans for the construction underwent plan approval. The conditions upon which the approval was extended are contained in the letter dated October 15, 2021, from the Division to Energy Fuels (file number DRC-2021-015342). The waste stream from the rare earth mineral extraction process would become feed for uranium extraction, qualifying the tailings for disposal as 11e.(2) byproduct material in the mill's tailings disposal system. The conditional approval called for the Division to have opportunity to inspect the construction from the Division to Energy Fuels. The Division availed itself of that opportunity on Nov ember 9, 2021. At the time, the pedestals for the hydrochloric acid tanks had been poured, and the construction crew had commenced excavating footing trenches for the containment structure. The construction techniques employed by the construction crew were appropriate. Day-to-day quality control oversight was done by the facility engineer, Steve Snyder. During inspection, I saw nothing to which to object. DRC-20 195 North 1950 West • Salt Lake City, UT Mailing Address: P.0 Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T D D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper HC1 Tank Secondary Containment Construction Inspection November 9, 2021 Page 2 Conclusions and Recommendations The Licensee appears fully compliant with the plans as approved and with good construction practice. The inspection should be closed out. Photo 1. Looking south-southwest across tank foundation pedestals. Photo taken November 9, 2021