HomeMy WebLinkAboutDRC-2019-001184 - 0901a068809a5901Energy Fuels Resources (USA) Inc.
225 Union Blvd. Suite 600
Lakewood, CO, US, 80228
303 974 2140
www.energyfuels.com
January 24, 2019
VIA PDF AND FEDERAL EXPRESS
Mr. Phil Goble
Utah Division of Radiation Control
State of Utah Department of Environmental Quality
Uranium Mills and Radioactive Materials Section Manager
195 North 1950 West
P.O. Box 144850
Salt Lake City, UT 84116-4850
Div of Waste Management
and Radiation Control
JAN 302019
DIK-201 9 - COHN-
Re: State of Utah Ground Water Discharge Permit No. UGW370004
White Mesa Uranium Mill — Removal of Certain Groundwater Monitoring Parameters
from Accelerated Monitoring Status
Dear Mr. Goble:
A number of groundwater monitoring constituents have been placed on accelerated monitoring status
under Part I.G.1 of the Energy Fuels Resources (USA) Inc. ("EFRr') Ground Water Discharge Permit No.
UGW370004 ("GWDP"). Part I.G.1 provides that such accelerated monitoring shall continue until
compliance status of the facility can be determined by the Director.
Based on the accelerated monitoring results to date, EFRI requests the Division of Waste Management
and Radiation Control ("DWMRC"). make a determination that accelerated monitoring cease at this time
for field pH in MW-26 and MW-30 and sulfate in MW-32 for the reasons stated below:
• MW-26 field pH results have been within the Groundwater Compliance Limit ("GWCL")
specified in the GWDP for eight consecutive sampling events since Q2 2018. Per the UDEQ,
eight consecutive sample results below the GWCL are needed for the discontinuance of
accelerated monitoring.
• MW-30 field pH results have been within the GWCL range specified in the GWDP for eight
consecutive sampling events since the Q2 2018 sampling event. Per the UDEQ, eight
consecutive sample results below the GWCL are needed for the discontinuance of accelerated
monitoring.
• MW-32 sulfate results have been below the GWCL specified in the GWDP for eight consecutive
sampling events since Q4 2016. Per the UDEQ, eight consecutive sample results below the
GWCL are needed for the discontinuance of accelerated monitoring.
Once removed from accelerated monitoring status, these constituents, like all other constituents, would be
subject to future accelerated monitoring under Part I.G.1 of the GWDP, should circumstances warrant.
Field pH measurements will continue to be recorded for all samples collected, including any accelerated
monitoring completed for other constituents as required. Upon 1)VA 4RC approval of this request, field
Letter to Rusty Lundberg
Removal of Parameters from Accelerated Monitoring
May 7, 2015
Page 2
pH measurements will no longer be tracked and reported as part of the quarterly Exceedance Notice, but
will return to the routine reporting in the Quarterly Groundwater Monitoring Reports.
To assist in your evaluation of the foregoing, we have included a summary of the accelerated sampling
results since the initial sample result that triggered accelerated monitoring in Table 1.
The analytical laboratory reports for the foregoing results up to and including December 2018 are
included in the Quarterly Groundwater Monitoring Reports, all of which have been provided to DWMRC.
Copies of the analytical laboratory reports and the field sheets for the results for October 2018 through
December 2018 will be provided in the upcoming 4th Quarter 2018 Groundwater Monitoring Report and
are also included with this letter for your convenience. It is important to note that the 4th Quarter 2018
monitoring results included with this letter have been evaluated per the DWMRC approved QAP and the
GWDP and all field and laboratory quality control parameters are acceptable. The evaluations of the 4th
Quarter data will be included in the 4th Quarter 2018 Groundwater Monitoring Report, due March 1,
2019.
If you have any questions or require any further information, please contact the undersigned.
Yours truly,.
eend e
Kathy Weinel
Quality Assurance Manager
cc: David C. Frydenlund
Paul Goranson
Logan Shumway
Terry Slade
Tanner Holliday
Scott Bakken
Analytical Results and Field Sampling Sheets for the Wells that are the Subject of
this Request
Table 1
Summary of Accelerated Sam le Results with Ei ht or More Results in Com liance
• Well II) Constituent GWCL Sample Date Sample Resu It
MW-26 Field pH (S.U.) 5.61 - 8.5 Q2 2018* 5.50
May 2018 6.81
June 2018 7.00
July 2018 7.18
August 2018 6.64
Q3 2018 6.57
Q4 2018 6.38
November 2018 6.57
December 2018 6.87
MW-30 Field pH (S.U.) 6.47 — 8.5 Q2 2018* 6.33
May 2018 6.74
June 2018 6.84
July 2018 7.39
August 2018 6.91
Q3 2018 6.94
Q4 2018 6.56
November 2018 6.94
December 2018 7.11
MW-32 Sulfate (mg/L) 2556.7 Q4 2016* 2590
Q1 2017 2090
Q2 2017 2100
Q3 2017 2140
Q4 2017 2050
Q1 2018 2160
Q2 2018 2000
Q3 2018 2060
Q4 2018 1800
*Last sample result outside of GWCL limits.
Groundwater Discharge Permit
Groundwater Monitoring Quality Assurance Plan
White Mesa Mill
Field Data Worksheet For Groundwater
Sampler TH/DL
93.45 [Final Depth to Water (feet)
Matrix
WATER
WATER
WATER
WATER
WATER
WATER
Sample
Collected?
Analytical Samples Information
Type of Sample/Analysis
Total Dissolved Solids
Heavy Metals 7 Full Suite
VOCs - Full Suite for GW
• Nutrients
General Inorganics
Gross Alpha
Flow Rate (Q = S/60) (gal/min) 10.50
Time to evacuate 2 Casing Volumes ()
Number of casing Volumes
Volume, if well evacuated to dryness () 0
Container
Sample Filtered?
Preservative
Number Type Type Added?
1 250-mL HDPE 4 Deg C
1 250-mL HDPE HNO3 (pH<2)
3 40m1V0A HCI (pH<2), 4 Deg C
1 250-mL HDPE H2SO4 (pH<2), 4 Deg C
250-ml HDPE 4 Deg C
1 250-mL HDPE HNO3
Comments:
[Arrived on site at 0940. Samples collected at 0950. Water started clear but as purge went on water had some orange coloration with some particles floating.
Signature of Field Technician
y 1
Redox
570
Turbidity
0
pH Temp (Deg C)
6.38
15.00
PumDinq Rate Calculations
T Location ID ., MW-26
Field Sample ID MW-26_10252018
10/25/2018 9:40 purge Date & Time 4 Sample Date & Time • 10/25/2018 9:50
purging Equipment Pump
pump Type Continuous
PurOng Method
Casing Volume 0
palculated Casing Volumes Purge Duration 0
pH Buffer 7.0 •• 7.0
pH Buffer 4.0 4.0
Specific Conductance (micromhoa) 1000
1.
Date/Time
10/25/2018 9:49
Gallons Purged • Conductivity • 3452
Weather Conditions Cloudy
External Ambient Temperature (C) j 13
previous Well Sampled • MW-14
Well Depth (ft) • 121.33
yiell Casing Diameter (in) 4
Depth to Water Before Purging (ft) 76.34
Sampling Event 2018 Q4 GW Quarterly
Sampling Program
Volume of water purged
-Name of Certified Analytical Laboratory_
1 AWSL
_ TH/DL Sampler
79.25 Final Depth to Water (feet)
Sample
Collected?
Analytical Samples Information
Type of Sample/Analysis
Chloride
Nitrate/nitrite as N
VOCs - ChCI3 and Mea2
Comments:
Arrivpd on site at 1256. Samples collected at 1300.
Signature of Field Technician
Location ID -4 MW-26
Field Sample ID , MW-26 11142018 _ , Purge Date & Time 11/14/2018 12:59
Sample Date & Time 11/14/2018 13:00
Purging Equipment Pump
Type ,Pump Continuous
Purging Method 2 Casings fr Casing Volume 0
:Calculated Casing Volumes Purge Duration 0
pH Buffer 7.0 7.0
pH Buffer 4.0 -4- 4.0
Specific Conductance (micromhos) . 1000
Groundwater Discharge Permit
Groundwater Monitoring Quality Assurance Plan
Sampling Program
Sampling Event November 2018
Weather Conditions . Sunmy
External Ambient Temperature (C) 7
Previous Well Sampled MW-11
Well Depth (ft) 121.33
'Well Casingpiameter (in) 4
Depth to Water Before Purging (ft) 67.88
White Mesa Mill
Field Data Worksheet For Groundwater
PumDincl Rate Calculations
Flow Rate (0 = S/60) (gal/min) 10.50
Time to evacuate 2 Casing Volumes ()
Number of casing Volumes
Volume, if well evacuated to dryness () 0
Container Preservative
Matrix Number Type Sample Filtered? Type Added?
WATER 1 500-mL Poly None
WATER 1 250-mL HDPE H2SO4 (pH<2), if Deg C
WATER 3 40z glass jar HCI (pH<2), 4 Deg C
Date/Tirne
1 11/14/2018 13:00 1
I_ Conductivity
3633
pH Temp (Deg C)
6.57 16.95
Before/After I Gallons Purged Redox Turbidity
Volume of water purged
,Name of Certified Analytical Laboratory
AWSL
Purging Equipment Pump
Pump Type Continuous
Purging Method 2 Casings
Casing Volume 0
Casing Volumes Purge Duration ,Calculated ()
pH Buffer 7.0 7.0
pH Buffer 4.0 4.0
S ecific Conductance (eicromhos) . _ wpo
1
Date/Time
12/10/2018 13:44
Gallons Purged Conductivity
3489
Weather Conditions Sunny
Ambient Temperature (C) ,External 6
Previous Well Sampled MW-25
Well Depth (ft) 121.33
Well Casing Diameter (in) 4
Depth to Water Before Purging (ft) 67.45
pH • Temp (Deg C)
6.87 15.80
Redox
567
Turbidity
0 I
Before/After
Volume of water purged 0
Final Depth to Water (feet) 79.32
„Name of Certified Analytical Laboratory
AWSL
Analytical Samples Information
Type of Sample/Analysis
Chloride
Nitrate/nitrite as N
VOCs - ChCI3 and MeCl2
Sample
Collected?
Groundwater Discharge Permit
Groundwater Monitoring Quality Assurance Plan
White Mesa Mill
Field Data Worksheet For Groundwater
Location ID MW-26
Field Sample ID MW-26 _12102018
Purge Date & Time 12/10/2018 13:44
Sample Date & Time 12/10/2018 13:45
Sampling Program ,
Sampling Event _ December 2018
Sampler T11
Pumøinu Rate Calculations
Flow Rate (0 = S/60) (gal/min) 10.00
,Time to evacuate 2 Casing Volumes 0
fiumber of casing Volumes
Volume, if well evacuated to dryness 0 _ „ 0
Container Preservative
Matrix Number Type Sample Filtered? Type Added?
WATER 1 500-mL Poly None
WATER 1 250-ml HDPE 11 H2SO4 (pH<2), 4 Deg C
WATER 3 4oz glass jar HCI (pH<2), 4 Deg C
. Comments:
[ Arrived on site at 1340. Samples collected at 1345. Water was clear. Left site at 1350.
Signature of Field Technician
77.60 Final Depth to Water feet)
Groundwater Discharge Permit
Groundwater Monitoring Quality Assurance Plan
White Mesa Mill
Field Data Worksheet For Groundwater
PumDin1 Rate Calculations lyolume of water purged (gals)
Analytical Samples Information
Type of Sample/Analysis
Total Dissolved Solids
Heavy Metals - Full Suite
VOCs - Full Suite for GW
Nutrients
General Inorganics
Gross Alpha
Flow Rate (Q = S/60) (gal/min) .217
Time to evacuate 2 Casing Volumes (min) 215.00
Number of casing Volumes 2.00 , Volume, if well evacuated to dryness () _ 0
Container Preservative
Matrix Number Type Sample Filtered? Type Added?
WATER 1 250-mL HDPE 4 Deg C
WATER 1 250-mL HDPE HNO3 (pH<2)
WATER 3 40m1V0A HCI (pH<2), 4 Deg C
WATER 1 250-ml HDPE H2SO4 (pH<2), 4 Deg C
WATER 1 250-mL HDPE 4 Deg C
WATER 1 250-mL HDPE HNO3
46.65
Comments:
!
Arrived on site at 0636. Purge began at 0640. Purged well for a total of 215 minutes. Purge ended and samples collected at 1015. Water was mostly clear. Left site at 1035.
Dean Henderson with the DEQ split sampled well.
Sstiature of Filp Techr3,olan
TH [Sampler
Partly cloudy
8
MW-35
Weather Conditions
External Ambient Temperature (C)
Previous Well Sampled
PH
6.47
6.51
6.54
Temp (Deg C)
14.82
14.79
14.69
Location ID MW-30
Sample ID ,Field MW-30_10222018
Purge Date & Time 10/22/2018 6:40
Sample Date & Time .., 10/22/2018 10:15
Purging Equipment Pump
Pump Type i QED
Purging Method 2 Casings
Casing Volume (gal) 22.88 , Calculated Casing Volumes Purge Duration (min) , 210.88 , pH Buffer 7.0 7.0 . pH Buffer 4.0 4.0
Specific Conductance (micromhos) 1000
Date/Time
• 10/22/2018 10:12
10/22/2018 10:13
10/22/2018 10:14
10/22/2018 10:15
Gallons Purged
46.00
46.22
46.43
46.65
Conductivity
2118
2119 ' 2119
2115
Depth to Water Before Purging (ft)
110.00
4
74.96
6.56 14.65
Redox
505
501
498
496
Turbidity
0
0
0
0
Before/After
Well Depth (ft)
Viell Casing Diameter (in)
2018 04 GW Quarterly Sampling Event
Sampling Program
Sample
Collected?
Name of Certified Analrical Laboratory
AWSL
Groundwater Discharge Permit
Groundwater Monitoring Quality Assurance Plan
White Mesa Mill
Field Data Worksheet For Groundwater
45.57 yolume of water purged (gals)
77.84 Final Depth to Water (feet)
,Location ID MW-30
Field Sample ID MW-30_11142018
Purge Date & Time 11/14/2018 7:30
Sample Date & Time 11/14/2018 11:00
Purging Equipment Pump
Pump Type QED , Purging Method 2 Casings
Casing Volume (gal) i 22.65 .
, Calculated Casing Volumes Purge Duration (min) 208.83
1pH Buffer 7.0 7.0
pH Buffer 4.0 4.0
,Specific Conductance (micromhos) 1000
Date/Time
/1/1.4/2018 10:57
11/14/2018 10:58
11/14/2018 10:59
11/14/2018 11:00
Gallons Purged
44.91
45.13
45.35
45.57
Conductivity
2131
2126
21.29
2129
Weather Conditions Sunny
External Ambient Temperature (C) -3
Previous Well Sampled MW-14
Well Depth (ft) 110.00
Well Casing Diameter (in) 4
Depth to Water Before PurOng (ft) 75.30
pH Temp (Deg C) Redox Turbidity Before/After
6.98 14.51 550
6.97 14.55 550 o
6.95 14.50 551 0
6.94 14.50 551 0
Pumpinc Rate Calculations
Analytical Samples Information
Type of Sample/Analysis
Chloride
Nitrat,/nitrite as N
Heavy Metals - U only
Comments:
I Arrived on site at 0728. Purge began at 0730. Purged well for a total of 210 minutes. Purge ended and samples collected at 1100. Water was clear. Left site at 1110.
Signature of Field T 'cian e7
hotafilltPZ-
Flow Rate (Q = S/60) (gal/min) .217
Time to evacuate 2 Casing Volumes (min) 210.00
Number of casing Volumes 2.00
Volume, if well evacuated to dryness 0 0
Sample
Collected? Matrix
WATER
WATER
WATER
Sample Filtered?
Preservative
Type
None
H2SO4 (pH<2), 4 Deg C
HNO3 (pH<2)
Added?
Sampling Event
Sampling Program
November 2018
Sampler TH/DL
if4ame of Certified Analytical Laboratory
AWSL
Container
Number
1
1
1
Type
500-mL Poly
250-mL HDPE
250-mL HDPE
Sampler GP
Nolume of water purged (gals) r 47.74
78.40 Final Depth to Water (feet)
Groundwater Discharge Permit
Groundwater Monitoring Quality Assurance Plan
White Mesa Mill
Field Data Worksheet For Groundwater
ID ,Location MW-30
Field Sample ID MW-30 12112018 _
Rurge Date & Time 12/11/2018 7:50
Sample Date & Time 12/11/2018 11:30
purging Equipment Pump
Pump Type QED , 'purging Method 2 Casings
Casing Volume (gal) 22.83 ,- Calculated Casing Volumes Purge Duration (min) , 210.46
pH Buffer 7.0 7.0
pH Buffer 4.0 4.0 • Specific Conductance (rnicromhos) 1000
Sampling Event
ISampling Program
December 2018
Well Depth (ft) 110.00
Well Casing Diameter (in) 4
Depth to Water Before Purging (ft) 75.03
Date/Time Gallons Purged Conductivity pH Temp (Deg C) Redox Turbidity Before/After
12/11/2018 11:27 47.08 2118 7.14 14.41 473 0
12/11/201.8 11:28 47.30 2119 7.13 1.4.46 474 0
12/11/2018 11:29 47.52 2120 7.12 14.57 475 0
12/11/2018 11:30 47.74 2123 7.11 14.60 476 0
PumpinQ Rate Calculations
Analytical Samples Information
Sample
Type of Sample/Analysis Collected?
Chloride Y
Nitrate/nitrite as N Y
Heavy Metals - U only Y
Comments:
Container
Matrix Number Type Sample Filtered?
WATER 1. 500-mL Poly U
WATER 1 250-mL HDPE U
WATER 1 250-mL HDPE Y
Preservative
Type
None
H2SO4 (pH<2), 4 Deg C
HNO3 (pH<2)
1 Arrived on site at 0745. Purge began at 0750. Purged well for a total of 220 minutes. Purge ended and samples collected at 1130. Water was clear. Left site at 1140.
Signature of Field Technician
Flow Rate (Q = S/60) (gal/min) .217
Time to evacuate 2 Casing Volumes (min) 220.00 , of casing Volumes ,Number 2.00
Volume, if well evacuated to dryness () ,_ 0
MW-14 Previous Well Sampled
Weather Conditions
External Ambient Temperature (C)
Partly cloudy
3
IA
Name of Certified Analytical Laboratory
WSL
American Wes ANALYTIC•L LABORATORIES
INORGANIC ANALYTICAL REPORT
Contact: Garrin Palmer Client:
Project:
Lab Sample ID:
Client Sample ID:
Collection Date:
Received Date:
Energy Fuels Resources, Inc.
4th Quarter Groundwater 2018
1811040-010
MW-32_10292018
10/29/2018 1300h
11/2/2018 1019h
3440 South 700 West
;alt Lake City, UT 84119
Analytical Results
Date Date Method Reporting Analytical
Compound Units Prepared Analyzed Used Limit Result Qual
Ammonia (as N) mg/L 11/6/2018 800h 11/6/2018 1641h E350.1 0.0500 0.770
Bicarbonate (as mg/L 11/5/2018 800h SM2320B 1.00 376
CaCO3)
Carbonate (as CaCO3) mg/L 11/5/2018 800h SM2320B 1.00 < 1.00
Chloride mg/L 11/8/2018 2316h E300.0 1.00 33.7
Fluoride mg/L 11/9/2018 312h E300.0 0.100 0.190
Ion Balance % 11/6/2018 1008h Calc. -100 11.7
Nitrate/Nitrite (as N) mg/L 11/2/2018 1445h E353.2 0.100 < 0.100
Sulfate mg/L 11/8/2018 1920h E300.0 150 1,800
Total Anions, Measured meq/L 11/6/2018 1008h Calc. 46.0
Total Cations, meq/L 11/6/2018 1008h Calc. 58.2
Measured
Total Dissolved Solids mg/L 11/2/2018 1300h SM2540C 20.0 3,170
Total Dissolved Solids 11/6/2018 1008h Calc. 1.02
Ratio,
Measured/Calculated
Total Dissolved Solids, mg/L 11/6/2018 1008h Calc. 3,120
Calculated
Phone: (801) 263-8686
Coll Free: (888) 263-8686
Fax: (801) 263-8687
awal@awal-labs.com
Neb: www.awal-labs.com
Kyle F. Gross
Laboratory Director
Jose Rocha
QA Officer
Report Date: 11/21/2018 Page 30 of 68
All analyses applIcable to the CWA. SDWA. and RCRA are performed in accordance to NELAC protocols Pertinent sampling information is located on the attached CDC, Confidential Business informatiott This report is provided for the exclusive use of the it.ddressee Pnsilers of subsequent use of the ii.!1.ne of this company or am member of its staff, or reproduction of this report in connechon with the advertisement promotion or sale of any product or process. 05 hi connection with the republication or this report