Loading...
HomeMy WebLinkAboutDRC-2018-004101 - 0901a068808021b5 DRC-2018-004101 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T.D.D. (801) 536-4284 www.deq.utah.gov Printed on 100% recycled paper State of Utah GARY R. HERBERT Governor SPENCER J. COX Lieutenant Governor Department of Environmental Quality Alan Matheson Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Scott T. Anderson Director May 3, 2018 Kathy Weinel Quality Assurance Manager Energy Fuels Resources (USA) Inc. 225 Union Blvd., Suite 600 Lakewood, CO 80228 RE: Health Physics Inspection RADMOD-AFIL Radioactive Material License Number UT1900479 Dear Ms. Weinel: Representatives of the Division of Waste Management and Radiation Control inspected the White Mesa Mill April 16 through April 18, 2018. The inspection was an examination of the activities conducted at the Mill as they relate to compliance with Utah’s Radiation Control Rules, the conditions of RML No. UT1900479 and federal regulations. The inspection consisted of an examination of representative records, interviews of personnel and observations by the inspector. Observations from the inspection were discussed at the closeout meeting with Mill staff. Enclosed is the inspection report. The Division considers this inspection closed. The Division would also like to thank the Mill staff for their cooperation during this inspection. If you have any questions, please call Ryan Johnson at (801) 536-4255. Sincerely, Scott T. Anderson, Director Division of Waste Management and Radiation Control (Over) STA/ RMJ/ka Enclosure: RADMOD-AFIL Health Physics Inspection Report (DRC-2018-004161) c: Kirk Benge, Health Officer, San Juan Public Health Department Rick Meyer, Environmental Health Director, San Juan Public Health Department Scott Hacking, P.E., DEQ District Engineer Inspection Module: Inspection Location: Inspection Items: Inspection Dates: Inspectors: Personnel Contacted: Governing Documents: INSPECTION REPORT RADMOD-AFIL: Alternate Feed and lnsitu Leach Energy Fuels Resources Inc. (EFRI) -White Mesa Uranium Mill, Blanding Utah. Alternate Feed Material storage and processing, 11 e(2) disposal, and Equivalent Feed and Yellowcake Slurry storage and processing; ALARA Audit April 16, 2018 through April 18, 2018 Ryan Johnson, Utah Division Waste Management and Radiation Control (DWMRC) Tim Butler, DWMRC David Turk, Energy Fuels Resources, Radiation Safety Officer (RSO) Terry Slade, Energy Fuels Resources, Chemist/Assistant RSO Justin Perkins, Energy Fuels Resources, Radiation Safety Technician (RST) Kathy Weinel, Energy Fuels Resources, Quality Assurance Manager Julia Yeckes, Energy Fuels Resources, Staff Attorney Peter Luthiger, Energy Fuels Resources, Mestef\a ISL facility • U AC R3 13-1 5 • Radioactive Materials License (RML) UT 19004 79 • Applicable Mill procedures and manuals Opening Meeting Energy Fuels Resources: David Turk, RSO Utah DWMRC: Ryan Johnson (Health Physics Inspector) Tim Butler (Health Physics Inspector) During the opening meeting, the inspector discussed the inspection items and documentation to be reviewed during the inspection. The main portion of the Mill was not in operation during this inspection except for the grizzly and pulp storage which is being used for the Sequoyah Fuels alternate feed. The Mill staff reminded the inspectors of the safety requirements for the Mill. DRC Meters Used Model Serial Number Calibration Due Date Dose Rate Ludlum 19 101673 7/12/2018 Inspection Summary The inspection consisted of an RSO interview, reviewing applicable documentation and a mill tour. The following discussion provides more detail of the specific items reviewed. 1 of Page 4 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT 1900479 Energy Fuels Res -White Mesa UM ill\HP Inspection modules\2018\lnspection Reports\lnspection Report RADMOD-AF!L 04-18-18.docx Item 1. Documentation Review: The Inspector reviewed applicable documentation. Observations: The DWMRC inspector reviewed the following documents: • I I e.(2) Shipment paperwork; • Alternate Feed receipts; • Equivalent Feed paperwork; and • Tailing Capacity Form. The l le.(2) shipment paperwork documented: • Where and how the l le.(2) material was disposed of in Tailing Cell #3; • Where the l le.(2) material came from and how much material has been sent to the White Mesa Uranium mill for disposal; and • The radiological surveys of the truck and I le.(2) material that was received by the mill. The alternate feed receipts documented: • Which alternate feed material is currently being accepted and stored on the Mill's ore pad; and • How much alternate feed material is currently onsite. The equivalent feed paperwork documented how much equivalent feed material has been accepted and processed at the mill. The Tailing Capacity Form documents that there is space in the tailing cells for the amount of feed material (both alternate feed and conventional ore) that is currently stored on the ore pad. Defi ciencies: None Item 2. Mill Tour: The Inspector walked through the restricted area on a general site tour. The tour included the ore pad, the mill, and the alternate feed circuit. Currently KOH alternate feed material is being processed at the alternate feed circuit, Sequoyah Fuels alternate feed is being placed into the grizzly and being stored in the pulp tanks. Observations: The DWMRC inspector also observed: • Alternate feed being stored on the ore pad; • Two Sequoyah Fuels alternate feed shipments being accepted, unloaded and staged next to the Mill's grizzly in bags. Due to high winds and a clogged pipe inside the Mill on Monday and Tuesday the Sequoyah Fuels material was not put into Grizzly during the inspection; • Proper PPE was being worn by Mill employees within all observed areas of the Mill; • Proper Radiological Posting were being used within all observed areas of the Mill; • Proper Radiological Monitoring was being done at the Alternate Feed Circuit; and • OSL badges were appropriately being used by all observed employees at the Mill; R ct· I . I ct· b a 10 og1ca rea mgs o serve dd . M.11 unng I tour Location Dose Rate (µR/hr) Product Storage Yard 450 Alternate Feed Pad 250 Sequoyah Fuels Bags 2,100 Solvent Extraction 180 Alternate Feed Circuit 50 2 of Page 4 \\Cbwfp2\shw1Shared\RADICOMMON\Uranium mills\UTl900479 EnergyFuels Res -White Mesa UMill\HP Inspection modules\2018\Inspection Reports\lnspection Report RADMOD-AFIL 04-18-1 8.docx Deficiencies: None Item 3. ALARA Audit: During this in spection EFRI was performing an internal ALARA Audit. The inspectors observed part of that audit. Observations: During the inspection the In spectors observed: • That the ALARA Audit was being conducted by three qualified EFRI Personnel o Kathy Weinel, Quality Assurance Manager; o Julia Yeckes, Staff Attorney; and o Peter Luthiger, from the EFRJ Mestena ISL facility; • A checklist was prepared prior to the ALARA Audit to aid in the Audit process. The list is made up of: o A LARA Audit requirements found in NRC Reg. Guide 8.3 I; o Follow-up items from the previous year; o Recommendations from the DWMRC; and o MSHA requirements; and • The Audit was an examination of records and on site observations. The records that were being reviewed by the Audit team at the time of the inspection included (but not limited to): o Training Records; o Standard Operating Procedures; and o Radiation Work Permits. A member of the Audit Team also observed the receiving and unloading of two Sequoyah Fuels alternate feed shipments. Deficiencies: None Closeout Meeting Energy Fuels: David Turk (RSO) Kathy Weinel, Energy Fuels Resources, Quality Assurance Manager Julia Yeckes, Energy Fuels Resources, Staff Attorney Peter Luthiger, Energy Fuels Resources, Mestena ISL facility UtahDWMRC: Ryan Johnson (Health Physics Inspector) Tim Butler (Health Physics Inspector) Findings None Recommendations None 3 of Page 4 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT!900479 EnergyFuels Res - White Mesa UMill\HP Inspection modules\2018\lnspection Reportsllnspection Report RADMOD-AF IL 04-18-18 .docx Recommendation for Next AFIL Inspection I. Confirm procedures are being followed if Alternate Feeds are stored off the ore pad; 2. Verify appropriate postings and radiolo · al mo 'toring for processing alternate feeds; Prepared By: Reviewed By: Ryan Johnson (Print Name) Phil Goble (Print Name) (Signature) 4 of Page 4 \\Cbwfp2\shw\Shared\RADICOMMON\Uranium mills\UTI 900479 Energy Fuels Res -White Mesa UMill\HP Inspection modules\20 18\lnspection Reports\lnspection Report RADMOD-AFIL 04-1 8-18.docx