Loading...
HomeMy WebLinkAboutDRC-2017-007176 - 0901a06880758e2dState of Utah GARY R. HERBERT Governor SPENCER J. COX Lieutenant Governor Department of Environmental Quality Alan Matheson Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Scott T. Anderson Director DRC-ZOIE-007176 TO: Phil Goble FROM: Dean Henderson DATE: August 18, 2017 SUBJECT: Review of the 1st Quarter 2017 Nitrate Monitoring Report for the Nitrate Contamination Investigation, Energy Fuels Resources (USA) Inc. (“EFR“) White Mesa Uranium Mill, near Blanding, Utah The Utah Division of Waste Management and Radiation Control (“Division”) has reviewed the EFR May 22, 2017, White Mesa Uranium Mill Nitrate Monitoring Report (“Report”) for the Nitrate - Contamination Investigation. For the review of this Report the following regulatory enforcement documents were used: • Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah, May 7, 2012, (“CAP”) approved December 12, 2012. • The EFR Quality Assurance Plan, August 15, 2072, Revision. 7.3 (“QAP”) MEMORANDUM T/h/rl Oft r/»h REVIEW Monitor Well Sampling The following monitor wells were sampled and analyzed for inorganic chloride and nitrate + nitrite (as N) as required in the CAP: TWN-1, TWN-2, TWN-3, TWN-4, TWN-7, TWN-18, TW4-22 (pumping well), TW4-24 (pumping well), and TW4-25 (pumping well), and Piezometer 1, Piezometer 2, and Piezometer 3A. The monitoring wells were purged using the three approved QAP well purging strategies and meet QAP requirements for each strategy: 195 North 1950 West • Salt Lake City, UT Mailing Address: P.0 Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T D.D. (801) 536-4414 immu.deq.utnh.gov Printed on 100% recycled paper Page 2 \ 1. Purging two casing volumes with stable field parameters for specific conductivity, turbidity, pH, redox potential, and water temperature (within 10% RPD): Wells: TWN-1, TWN-4, and TWN-18. 2. Purging a well to dryness and stability of field parameters for pH, specific conductivity, and water temperature only after recovery: Wells: TWN-3 and TWN-7 3. Continuously Pumped Wells that are considered sufficiently evacuated to immediately collect a sample: Wells: TWN-2, TW4-22, TW4-24, and TW4-25 Chloride and nitrate + nitrite (as N) were analyzed for methods consistent with the requirements of the QAP. QAQC Holding Times The method holding times for each parameter for samples collected at each monitor well were received and analyzed within the required holding times in the QAP. Receipt Temperature All samples were received within the required QAP temperature limit of 6° C. Detection Limits All sample sets were measured and reported to the required QAP reporting limits. Sample Duplicates One duplicate sample was collected at TWN-1 and identified as TWN-65. The duplicate sample analytical results for this sample/duplicate pair were within the 20% acceptance limits as required in the QAP (see Table 2 below). Groundwater Head Monitoring For the 1st Quarter, 2017 depth to groundwater was measured in the following wells and/or piezometers as required in Part I.E.3 of the Permit: • The quarterly groundwater compliance monitoring wells. • Existing monitoring well MW-4 and all of the temporary chloroform investigation wells. • Piezometers P-1, P-2, P-3 A, P-4 and P-5. • MW-20, MW-22 and MW-34 • Nitrate monitoring wells. Page 3 • The DR piezometers which were installed during the Southwest Hydrologic Investigation. In addition to the above, depth to water measurements are routinely observed in conjunction with sampling events for all wells sampled during quarterly and accelerated efforts, regardless of the sampling purpose. All well levels used for groundwater contour mapping were measured and recorded within 5 calendar days of each other. Estimation of Pumped Nitrate Mass Removal The Report estimated 116 lbs. of nitrate was removed from the chloroform pumping wells (MW-4, MW- 26, TW4-1, TW4-2, TW4-4, TW4-11, TW4-19, TW4-20, TW4-37, and TW4-39) and the nitrate pumping wells (TWN-2, TW4-22, TW4-24, and TW4-25). Of the 116 lbs. removed approximately 110 lbs. or 95%, was removed by the pumping wells inside the nitrate plume. In the attached Table 3, the DWMRC shows calculations that verify these reported estimates. Reporting The Report included the following information as required in the CAP: a) Introduction b) Sampling and Monitoring Plan: i. Description of monitor wells sampled; ii. Description of sampling methodology, equipment and decontamination procedures; iii. Identification of all quality assurance samples, e.g. equipment blanks duplicate samples, etc. c) Data Interpretation: i. Interpretation of groundwater levels, gradients, and flow directions. The interpretation will include a discussion on: 1) current site groundwater contour map, 2) hydrographs to show groundwater elevation in each monitor well over time, 3) depth to groundwater measured and groundwater elevation from each monitor well summarized in data table that includes historic groundwater level data for each well, 4) calculations documenting quarterly nitrate mass removed by pumping; ii. Interpretation of all analytical results for each well including a discussion on: 1) a current nitrate isoconcentration map, 2) graphs showing nitrate concentration trends in each well through time and, analytical results for each well summarized in data table that includes historic analytical results for each well; and iii. An electronic copy of all laboratory results for groundwater quality monitoring conducted during the quarter will be provided to the Executive Secretary. d) Conclusions and Recommendations Page 4 e) Copies of EFR field reports, laboratory reports, and chain of custody forms. The nitrate plume is defined to include any monitoring well that has concentration of nitrate in excess of 10 mg/L. Evaluation of the Nitrate Contaminate Plume and Its Associated Contaminants Bounding And Hydraulic Control of the Chloroform Plume The groundwater monitoring data appeared to show that the nitrate contaminate plume (“Plume”) is bound by up gradient, cross gradient, and down gradient wells that have a nitrate concentrations of <10 mg/L (GWQS = 10 mg/L). In addition, based on water level data, groundwater contour, and capture zone maps in the Report it appears that upgradient of pumping wells TW4-19, TW4-20, TW4-22, TW4- 24, TW4-37, and TW4-39 the Nitrate Plume is being captured. Conclusions on Compliance with the CAP. OAP Per the Division review it appears that the 1st Quarter 2017 Nitrate Monitoring Report for the Nitrate Contamination Investigation, Energy Fuels Resources (USA) Inc. complies with the CAP and QAP. Therefore, a letter will be drafted for the Director Signature, notifying EFR of the review and closing- out of this report. References Energy Fuels Resources (USA) Inc., White Mesa Uranium Mill 1st Quarter, 2017 Nitrate Monitoring Report, May 22, 2017. Energy Fuels Resources (USA) Inc., August 15, 2017, White Mesa Uranium Mill, Ground Water Monitoring Quality Assurance Plan (Revision 7.3). HYDRO GEO CHEM, INC, May 7, 2012, Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah Table 1 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-1 Monitoring Event TWN-2 (Pumping well starting in January 2013) Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 0.5 17 1st Qtr 3/24/2010 .62.1 85 2nd Qtr 5/26/2010 0.6 20 2nd Qtr 6/2/2010 "" ' ■ "69 97 3rd Qtr 9/27/2010 0.6 19 3rd Qtr 9/29/2010 69 104 4th Qtr 12/7/2010 0.6 14 4th Qtr 12/9/2010 48 93 1st Qtr 1/26/2011 0.5 17 1st Qtr 2/1/2011 43 93 2nd Qtr 4/20/2011 0.5 19 2nd Qtr4/28/2011 40 85 3rd Qtr 7/26/2011 0.5 14 3rd Qtr 7/28/2011 33 74 4th Qtr 10/17/2011 0.5 10 4th Qtr10/20/2011 33 76 1st Qtr 1/9/2012 0.6 15 1st Qtr 1/12/2012 31 86 2nd Qtr 4/18/2012 0.6 17 2nd Qtr 4/20/2012 48 103 3rd Qtr 7/24/2012 0.6 17 3rd Qtr 7/31/2012 54 93 4th Qtr10/17/2012 0.43 17.5 4th Qtr 7/17/2012 22.10 79 Nitrate Pumping System Started in January 2013 1st Qtr 2/18/2013 0.68 17.6 1st Qtr 2/19/2013 57.3 80.5 2nd Qtr4/23/2013 0.84 17.4 2nd Qtr4/24/2013 57.7 82.1 3rd Qtr 8/27/2013 1.24 24.1 3rd Qtr 8/27/2013 80.0 75.9 4th Qtr10/16/2013 1.61 26.8 4th Qtr7/16/2013 111 70.4 1st Qtr 1/14/2014 1.47 29.2 1st Qtr 1/13/2014 42.6 72.4 2nd Qtr S/6/2014 1.63 31.1 2nd Qtr 5/7/2014 44.7 84.9 3rd Qtr 8/5/2014 1.7 28 3rd Qtr 8/6/2014 42.0 8o| 4th Qtr 10/8/2014 1.46 27.6 4th Qtr 10/8/2014 71 81 1st Qtr 2/18/2015 1.37 27.8 1st Qtr 2/18/2015 48.6 87.8 TWN-65 dup of TWN-1 1.41 29.0 2nd Qtr 5/13/2015 0.65 29.2 2nd Qtr 5/12/2015 52.8 83.6 3rd Qtr 8/25/2015 0.624 33.2 3rd Qtr 8/25/2015 49.7 87.8 4th Qtr10/13/2015 1.35 27.7 4th Qtr10/14/2015 45 74.9 1st Qtr 2/23/2016 1.51 30.3 1st Qtr 2/23/2016 86.3 73.9 2nd Qtr5/17/2016 1.73 32.1 2nd Qtr 5/17/2016 45.4 74.5 3rd Qtr 7/20/2016 1.76 29.6 3rd Qtr 7/20/2016 35.3 68.8 4th Qtr10/6/2016 1.98 33 4th Qtr 10/11/2016 32.6 69.8 1st Qtr 2/15/2017 2.06 31.2 1st Qtr2/15/2017 27.4 65.8 TWN-65 dup of TWN-1 1.98 31.5 Monitoring Event TWN-3 Monitoring Event TWN-4 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/25/2010 25.3 . 111 1st Qtr 3/16/2010 0.9 22 2nd Qtr 6/3/2010 118 2nd Qtr5/27/2010 1.0 22 3rd Qtr 7/16/2010 27 106 3rd Qtr 9/27/2010 0.9 19 4th Qtr 12/10/2010 24 117 4th Qtr 12/8/2010 1.0 21 1st Qtr 2/1/2011 24 138 1st Qtr 1/25/2011 0.9 21 2nd Qtr 4/28/2011 26 128 2nd Qtr 4/20/2011 0.9 21 3rd Qtr 7/29/2011 25 .............................134 3rd Qtr 7/26/2011 1.1 35 4th Qtr10/20/2011 25 129 4th Qtr 10/18/2011 0.9 20 1st Qtr 1/12/2012 25 143 1st Qtr 1/9/2012 0.9 20 2nd Qtr4/20/2012 : 24 152 2nd Qtr4/18/2012 1.1 24 3rd Qtr 7/31/2012 27 158 3rd Qtr 7/25/2012 ...........................1.4 .............................25 4th Qtr10/17/2012 '"'m 149 4th Qtr 7/15/2012 1.45 26.4 Nitrate Pumping System1 Started in January 2013 1st Qtr 2/19/2013 m 157 1st Qtr 2/18/2013 1.5 .....25.3 2nd Qtr 4/24/2013 27.2 158 2nd Qtr 4/23/2013 1.63 24.4 3rd Qtr 8/28/2013 ’ 20.9 171 3rd Qtr8/27/2013 1.6 27.2 4th Qtr10/17/2013 .. „.163 4th Qtr 7/16/2013 1.69 29.4 1st Qtr 1/15/2014 19.6 160 1st Qtr 1/14/2014 1.4 28.4 2nd Qtr5/7/2014 .y ' , 23.6 168 2nd Qtr 5/6/2014 ..........1.6 29.6 3rd Qtr 8/6/2014 _. 19.5 174 3rd Qtr8/5/2014 2.0 28 4th Qtr 10/9/2014 19.1 153 4th Qtr 10/8/2014 1.44 30.7 1st Qtr 2/19/2015 19.4 164 1st Qtr 2/18/2015 1.48 31.5 2nd Qtr 5/14/2015 17.2 141 2nd Qtr 5/13/2015 0.733 31.9 3rd Qtr 8/26/2015 16.2 156 3rd Qtr8/25/2015 0.974 35.2 TWN-65 dupofTWN-4 1.160 35.2 4th Qtr10/14/2015 .163 129 4th Qtr 10/13/20115 1.58 28.4 1st Qtr 2/24/2016 16.8 128 1st Qtr 2/23/2016 2.02 30.7 2nd Qtr5/18/2016 13.5 116 2nd Qtr 5/17/2016 2.97 31.7 3rd Qtr 7/20/2016 16.8 110 3rd Qtr 7/20/2016 3.14 28.0 4th Qtr10/7/2016 15.8 113 4th Qtr 10/6/2016 3.09 31.3list Qtr 2/16/2017 17.4 113 1st Qtr 2/15/2017 2.63 31.2 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I Table 2 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-5 Monitoring Event TWN-6 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/16/2010 0.3 43 1st Qtr 3/23/2010 !.5 19 2nd Qtr5/26/2010 0.3 44 2nd Qtr6/1/2010 1A 22 3rd Qtr 7/12/2010 0.3 43 3rd Qtr 7/13/2010 ’ i.4 73 4th Qtr 12/7/2010 0.3 45 4th Qtr 12/7/2010 1.2 21 1st Qtr 1/25/2011 0.4 47 1st Qtr l/26/20il '...... " ...... 1.1 18 2nd Qtr 4/20/2011 0.3 44 2nd Qtr 4/20/2011 1.5 22 3rd Qtr 7/26/2011 0.3 44 3rd Qtr7/27/2011 1.1 17 4th Qtr 10/17/2011 0.3 45 4th Qtr 10/18/2011 1.4 21 1st Qtr 1/9/2012 0.2 45 1st Qtr 1/10/2012 1.2 20 2nd Qtr 4/18/2012 0.3 39 2nd Qtr4/18/2012 1.1 22 3rd Qtr 7/24/2012 0.3 48 3rd Qtr7/25/2012 !.4 22 4th Qtr10/15/2012 <0.1 43.5 4th Qtr 7/15/2012'0.78 20.4 1st Qtr 2013 MA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-5 abandoned on July 31, 2013 3rd Qtr 2013 NA 4th Qtr 2013 NA 1st Qtr 2014 NA 2nd Qtr 2014 NA 3rd Qtr 2014 NA 4th Qtr 2014 NA 1st Qtr 2015 NA 2nd Qtr 2015 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA 1st Qtr 2016 NA 2nd Qtr 2016 NA i 3rd Qtr 2016 NA 4th Qtr 2016 NA 1st Qtr 2017 NA ' "I Monitoring Event TWN-7 Monitoring Event TWN-8 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 0.8 6 1st Qtr 3/16/2010 <0.1 11 2nd Qtr 5/28/2010 12 6 2nd Qtr 5/26/2010 <0.i n 3rd Qtr 7/14/2010 1.8 7 3rd Qtr 7/12/2010 <01 11 4th Qtr 12/10/2010 1 4 4th Qtr 12/7/2010 <0.1 .......................9 1st Qtr 1/27/2011 .................1.3 6 1st Qtr 1/25/2011 <0.1 .................13 2nd Qtr4/21/2011 1.7 6 2nd Qtr 4/19/2011 10 3rd Qtr 7/29/2011 0.7 5 3rd Qtr7/26/2011 <0.1 18 4th Qtr 10/19/2011 ^ 7.2 ......... ' 6 4th Qtr 10/17/2011 <0.1 10 1st Qtr 1/11/2012 2.3 5 1st Qtr 1/9/2012 <0.1 11 2nd Qtr 4/20/2012 1.2 6 2ndQtr 4/18/2012 <0.1 15 3rd Qtr 7/26/2012 0.9 6 3rd Qtr 7/24/2012 <0.1 11 4th Qtr 10/:(>/2qi2 0.64 5.67 4th Qtr7/15/2012 <0.1 11 4 Nitrate Pumping System Started in January 2013 1st Qtr 2/19/2013"'""0.59 5.68 1st Qtr 2013 NA 2nd Qtr 4/24/2013 1.16 5.88 2nd Qtr 2013 NA 3rd Qtr 8/28/2013 0.835 6.96 TWN-8 abandoned on July 31, 2013 4th Qtr 10/16/2013 0.986 5.7 1st Qtr 1/15/2014.....0.887 '5.75 2nd Qtr 5/7/2014 0.564 5.26 3rd Qtr 8/6/2014 ' ' 0.9 6 4th Qtr 10/9/2014 0.968 5.93 1st Qtr 2/19/2015............................1.04 .........................5.58 2nd Qtr 5/14/2015 0.779 6.18 3rd Qtr 8/6/2015 6.348 6.12 4th Qtr 10/14/2015 0.672 5.84 1st Qtr 2/24/2016 0.24 6 06 2nd Qtr 5/18/2016 '0.732 6.26 3rd Qtr 7/21/2016 0.81 5.97 4th Qtr 10/7/2016 0.698 6 17 ist Qtr 2/16/2017 1.63 .........14.0 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 Table 3 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-9 Monitoring Event TWN-10 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/23/2010 7.6 183 1st Qtr 3/23/2010 1.5 54 2nd Qtr6/1/2010 7.7 175 2nd Qtr 6/2/2010 1.0 30 3rd Qtr 7/15/2010 l|- 10.7 210 3rd Qtr 7/14/2010 ............................0.2 ..........................21 4th Qtr 12/9/2010 8.0 172 4th Qtr 12/8/2010 1.3 28 1st Qtr 2/1/2011 ....9.5 217 1st Qtr1/26/2011 °-3 ..40 2nd Qtr 4/28/2011 10.0 192 2nd Qtr 4/21/2011 .............................1.2 28 3rd Qtr 7/29/2011 11.0 208 3rd Qtr7/27/2011 0.!28 4th Qtr 10/20/2011 10.9 134 4th Qtr 10/18/2011 0.2 33 1st Qtr 1/12/2012 v, 12.2 202 1st Qtr 1/10/2012 0.8 44 2nd Qtr 4/20/2012 10.6 209 2nd Qtr 4/19/2012 0.9 28 3rd Qtr 7/31/2012 12.3 215 3rd Qtr 7/25/2012 0.6 33 4th Qtr 10/17/2012 12.5 194 4th Qtr 7/16/2012 0.12 30.8 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-9 abandoned on July 31, 2013 TWN-10 abandoned on July 31, 2013 Monitoring Event TWN-11 Monitoring Event TWN-12 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 1.4 73 1st Qtr 3/17/2010 0.7 113 2nd Qtr 6/1/2010 72 2nd Qtr5/26/2010 0.8 106 3rd Qtr 9/27/2010 1.4 76 3rd Qtr 7/12/2010 0.7 112 4th Qtr 12/8/2010 1.4 72 4th Qtr 12/7/2010 0.7 103 1st Qtr 1/27/2011 14 84 1st Qtr 1/26/2011 4.2 87 2nd Qtr4/26/2011 1.4 76 2nd Qtr4/26/2011 .............................1.0 109 3rd Qtr7/27/2011 .........................0.1 ................................76 3rd Qtr 7/26/2011 0.6 102 4th Qtr 10/17/2011 1.6 76 4th Qtr 10/17/2011 ............................1.2 87 1st Qtr 1/10/2011 1.6 69 1st Qtr 1/10/2012............. oJ 104 2nd Qtr4/19/2012 1.6 71 2nd Qtr 4/18/2012 1.2 106 3rd Qtr 7/25/2012 1.8 77 3rd Qtr 7/25/2012 1.4 102 4th Qtr 10/16/2012 1.84 76.4 4th Qtr7/16/2012 1.41 101 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-11 abandoned on July 31, 2013 TWN-12 abandoned on July 31, 2013 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Sround Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 Table 4 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-13 Monitoring Event TWN-14 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 sO.l 47 1st Qtr 3/24/2010 2.9 24 2nd Qtr 5/26/2010 0.1 49 2nd Qtr 6/2/2010 2.9 30 3rd Qtr 9/27/2010 0.2 53 3rd Qtr 7/15/2010 3.5 26 4th Qtr 12/7/2010 _______ 0.4 57 4th Qjtr 12/10/2010 4.2 28 1st Qtr1/25/2011 1.6 103 1st Qtr 1/28/2011 3.7 24 2nd Qtr 4/26/2011 0.1 49 2nd Qtr 4/27/2011 3.5 30 3rd Qtr 7/26/2011 0.1 49 3rd Qtr 7/29/2011 3.5 25 4th Qtr 10/17/2011 cO.l 48 4th Qtr 10/19/2011 3.9 271st Qtr 1/9/2012......cb'l......................46 1st Qtr 1/11/2012...........3.5 ..........................26 2nd Qtr 4/18/2012 0.1 53 2nd Qtr 4/20/2012 3.4 27 3rd Qtr 7/24/2012 01 48 3rd Qtr 7/27/2012 3.7 27 4th Qtr 10/15/2012 0.1 47.3 4th Qtr7/17/2012 403 27.4 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-13 abandoned on July 31, 2013 3rd Qtr 2013 4th Qtr 2013 1st Qtr 2014 2nd Qtr 2014 3rd Qtr 2014 4th Qtr 2014 1st Qtr 2015 2nd Qtr 2015 3rd Qtr 2015 4th Qtr 2015 1st Qtr 2016 2nd Qtr2016 NA NA NA NA NA NA NA NA NA NA NA NA 3rd Qtr 2016 NA 4th Qtr 2016 1st Qtr 2017 NA NA Monitoring Event TWN-15 Monitoring Event TWN-16 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/18/2010 0.7 43 1st Qtr 3/17/2010 1.2 35 2nd Qtr 5/28/2010 1.0 39 2nd Qtr5/27/2010 1.3 _____ 35 3rd Qtr 7/13/2010 1.0 36 3rd Qtr 9/27/2010 2.6 - ^ 4th Qtr 12/9/2610 l-2 38 4th Qtr 12/9/2010 2 ............................30 1st Qtr'1/27/2011 1.4 ' 43 1st Qtr 1/27/2011...................4.6 ............................34 2nd Qtr 4/27/2011 !.6 49 2nd Qtr 4/27/2011 1.6 39 3rd Qtr 7/28/2011 1.6 47 3rd Qtr 7/27/2011 2.4 31 4th Qtr 10/19/2011 1.3 38 4th Qtr 10/18/2011 2.6 34 1st Qtr 1/11/2012 1.5 38 1st Qtr 1/10/2012 2.8 33 2nd Qtr4/20/2012 1.6 46 2nd Qtr 4/19/2012 2.0 50 3rd Qtr 7/26/2012 2.1 50 3rd Qtr 7/25/2012 24 33 4th Qtr10/17/2012 1.79 47 4th'Qtr 7/16/2012 2.50 .........................32.11st Qtr 2013"“NA 1st Qtr 2013................NA............................. 2nd Qtr 2013 NA 2nd Qtr2013 NA TWN-15 abandoned on July 31, 2013 3rd Qtr 2013 NA 4th Qtr 2013 NA 1st Qtr 2014............NA 2nd Qtr 2014 NA 3rd Qtr 2014 NA 4th Qtr 2014 NA 1st Qtr 2015 NA 2nd Qtr 2015 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA 1st Qtr 2016'' ............NA 2nd Qtr 2016 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA............................. 1st Qtr 2017..............NA............................. Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 Table 5 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-17 Monitoring Event TWN-18 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 11 1st Qtr 3/24/2010 10.4 78 1st Qtr 3/17/2010 1.6 42 2nd Qtr 6/3/2010 11 87 2nd Qtr 6/1/2010 1.8 63 3rd Qtr 7/15/2010 8.9 66 3rd Qtr 9/27/2010 1.8 64 4th Qtr 12/10/2010 8 65 4th Qtr 12/9/2010 1.6 59 1st Qtr 2/1/2011 8.6 90 1st Qtr 1/27/2011 1.4 61 2nd Qtr 4/28/2011 9 8!2nd Qtr4/26/2011 1.8 67 3rd Qtr 7/29/2011 8.5 74 3rd Qtr 7/28/2011 1.8 65 4th Qtr 10/20/2011 8.1 71 4th Qtr10/18/2011 1.9 60 1st Qtr 1/12/2012 8.7 79 1st Qtr 1/10/2012 1.9 64 2nd Qtr 4/20/2012 9.1 80 2nd Qtr 4/19/2012 2.1 64 3rd Qtr 7/27/2012 9.5 85 3rd Qtr 7/26/2012 2.3 67 4th Qtr 10/17/2012 9.65 84.8 4th Qtr 7/16/2012 1.95 67.5 Nitrate Pumping System Started in January 2013 1st Qtr 2013 NA 1st Qtr 2/18/2013 2.27 68.7 2nd Qtr 2013 NA 2nd Qtr 4/23/2013 2.32 64.3 3rd Qtr 2013 NA 3rd Qtr 8/27/2013 2.04 70.4 TWN-17 abandoned on July 31, 2013 4th Qtr 10/16/2013 2.15 67.3 1st Qtr 2/14/2014 2.33 68.4 2nd Qtr 5/6/2014 2.18 76.5 3rd Qtr 8/5/2014 1.8 70 4th Qtr 10/8/2014 1.47 74.8 1st Qtr 2/18/2015 1 73.3 2nd Qtr 5/13/2015 1.35 76.6 TW4-65 dupof TWN-18 <0.10 76.9 3rd Qtr 8/25/2015 0.35 81.3 4th Qtr 10/13/2015 0.668 69 TW4 65 dupof TWN-18 0.645 68.6 1st Qtr 2/23/2016 0.648 .............67.6 2nd Qtr 5/17/2016 0.497 69.9 3rd Qtr 7/21/2016 <0.100 52.7 4th Qtr 10/6/2016 0.501 67.4 1st Qtr 2/15/2017 0.47 62.1 Monitoring Event TWN-19 Monitoring Event Upper Wildlife Pond (UMLP) Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/23/2010 7.2 118 1st Qtr 3/18/2010 <0.1 <1.0 2nd Qtr 6/1/2010 6.2 113 2nd Qtr 6/2/2010 <0.1 <:L-0 3rd Qtr 9/27/2010 7.2 3rd Qtr 7/19/2010 <0.1 d.O 4th Qtr 12/9/2010 7.0 107 4th Qtr 12/10/2010 <0.1 1 ..........................7.0 ......114 1st Qtr l731/2011...........................o’i .......................i 2nd Qtr 4/28/2011 .................... 6.9 120 2nd Qtr4/25/2011 <0.1 <i:o;:;;;;:;.. 3rd Qtr 7/28/2011 .........................7.1 ..........113 3rd Qtr 7/25/2011 <0.1.......................<1.0 4th Qtr 10/18/2011 6.5 108 4th Qtr 10/19/2011 <0.1 <1.0 1st Qtr 1/10/2012 7.0 114 1st Qtr 1/31/2012 0.1 1 2nd Qtr4/19/2012 ...........................117 Pond no longer in service 3rd Qtr 7/26/2012 7.5 117 4th Qtr10/16/2012 7.7 118 1st Qtr 2013 NA 2nd Qtr 2013 NA 3rd Qtr 2013 NA 4th Qtr 2012 NA 1st Qtr 2014 NA 2nd Qtr 2014 NA 3rd Qtr 2014 na":’ 4th Qtr 2014 NA 1st Qtr 2015 NA 2nd Qtr 2015 NA 3rd Qtr 2015 NA 4th Qtr 2015 NA 1st Qtr 2016 NA 2nd Qtr 2016 na:::::::::: 3rd Qtr 2016 NA 4th Qtr 2016 NA 1st Qtr 2017.....NA...... Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 NS = Not sampled Table 6 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event PIEZ-1 Monitoring Event PIEZ-2 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 2010 NS NS 1st Qtr 2010 NS NS 2nd Qtr 6/2/2010 7.2 52 2nd Qtr6/2/2010 0.6 8 3rd Qtr 7/19/2010 6.8 52 3rd Qtr7/19/2010'' ' 0.6 8 4th Qtr 12/10/2010 6.5 60 4th Qtr12/10/10 0.2 6 1st Qtr 1/31/2011 7 60 1st Qtr 1/31/2011 ...........................0.3 ..............................9 2nd Qtr 4/25/2011 6.8 58 2nd Qtr4/25/2011 0.3 8 3rd Qtr7/2S/2011 7 53 3rd Qtr 7/25/2011 Oil 9 4th Qtr 10/19/2011 6.6 55 4th Qtr10/19/2°11 0.1 8 1st Qtr1/11/2012 7.1 78 1st Qtr 1/11/2012 0.1 9 1st Qtr 1/10/2012 7.0 114 1st Qtr 1/31/2012 0.1 1 2nd Qtr 4/20/2012 6.6 58 2nd Qtr4/20/2012 •’ 0.2 . 83rd Qtr 7/27/2012 7.2 56 3rd Qtr 7/27/2012 0.2 9 4th Qtr 10/17/2012 7.66 55 4th Qtr 7/17/2012 0.19 9.5 Nitrate Pumping System Started in January 2013 1st Qtr 2/19/2013 8.11 56.7 1st Qtr 2/19/2013 0.22 9.67 2nd Qtr 4/24/2013 8.88 53.3 2nd Qtr 4/24/2013 0.172 10.3 3rd Qtr 8/28/2013 7.83 55.1 3rd Qtr 8/28/2013 0.198 9.66 4th Qtr10/16/2013 6.68 54 1 4th Qtr 10/16/2013 0.36 9.22 1st Qtr 1/13/2014 ......... 6.79 .................56.2 1st Qtr 1/13/2014 0 169 11.4 2nd Qtr 5/7/2014 7.57 52.1 2nd Qtr 5/7/2014 '0.736 11.4 3rd Qtr 8/6/2014 5.1 55 3rd Qtr 8/6/2014 08 124th Qtr 10/8/2014 5.75 .................57.6 4th Qtr10/8/2014’0.755 1.2.2 1st Qtr 2/18/2015 6.41 ..................55.9 1st Qtr 2/18/2015 0.749 .......... 12.5 2nd Qtr 5/12/2015’5.95 57.5 2nd Qtr 5/12/2015 0 646 13.1 3rd Qtr 8/26/2015 4.96 64.2 3rd Qtr8/6/2015 0.7 15.5 4th Qtr 10/14/2015 6.17 54.4 4th Qtr 10/14/2015 0.692 13.3 1st Qtr 2/23/2016 8.31 56.5 1st Qtr 2/23/2016 0.615 13.4 2nd Qtr 5/12/2016 6.33 59.1 2nd Qtr 5/12/2016 0 665 14 3rd Qtr 7/19/2016 6.78 53.9 3rd Qtr 7/19/2016 0.669 12.4 4th Qtr 10/11/2016 6.42 58.1 4th Qtr 10/11/2016 0.732 1.3.4 1st Qtr 2/15/2017..........................'6 7511 54.5 1st Qtr 2/15/2017 0 69611......................12.4 Monitoring Event PIEZ-3 (abandonded May 2016 ) Monitoring Event PIEZ-3A Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/24/2010 \J 116 2nd Qtr 6/2/2010 1.6 36 3rd Qtr 7/19/2010 1.8 35 4th Qtr 12/9/2010 18 25 1st Qtr 1/31/2011.........1.8 ......40 2nd Qtr 4/25/2011 1.7 35 3rd Qtr 7/25/2011 1.8 61 4th Qtr 10/19/2011 1.7 12 1st Qtr 1/11/2012 ' 1.8 ” .....................20 2nd Qtr 4/20/2012 1.7 53 3rd Qtr 7/27/2012 1.8 21 4th Qtr 10/17/2012 2.75 .......................20.1 Nitrate Pumping System Started in January 2013 1st Qtr 2/24/2013 1.85 21 2nd Qtr 4/24/2013 1.83 21.2 3rd Qtr 8/28/2013 1.83.22.4 4th Qtr 10/16/2013 .......................18 23.5 1st Qtr 1/13/2014 . . 17 26 2nd Qtr 5/7/2014 1.79 ' 23.9 3rd Qtr 8/6/2014 ’1.7 ’ 26 4th Qtr 10/8/2014 '... 1.74 28.3 1st Qtr 2/18/2015........................182 ...............27.3 2nd Qtr 5/12/2015 1.75 30.2 3rd Qtr 8/26/2015 1.87 54.8 4th Qtr 10/14/2015 2.24 39.5 1st Qtr 2/23/2016 1.82 27.3 PIEZ-3 abandonded May 2016 ‘^nd Qtr 5/12/2016 8.33 109 3rd Qtr 7/19/2016 8.83 93.8 4th Qtr 10/11/2016 8 44 100 1st Qtr 2/15/2017' 'Wm, mi- io:o in 1. New piezometer to replace PIEZ-3 drilled and installed in May 2016 First monitoring event NS = Not sampled NA = Per the CAP and SCO, these wells not sampled 2015 Table 7 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TW4-22(Pumping welt starting in January 2013) Monitoring Event TW4-24 (Pumping well stating in January 2013) Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr2/11/2013 58 635 1st Qtr 2/11/2013 > 35.9 596 2nd Qtr 6/5/2013 50.2 586 2nd Qtr 6/5/2013 23.7 916 3rd Qtr 9/3/2013 29.7 487 3rd Qtr 9/3/2013 ' ' 32.6 998 4th Qtr 10/29/2013 45.2 501 4th Qtr 10/3/2013 34.6 1,030 1st Qtr 1/27/2014 54.6 598 1st Qtr 1/27/2014 31.6 809 2nd Qtr5/19/2014 47.2 614 2nd Qtr5/19/2014 35 1,020 3rd Qtr 8/11/2014 41.5 540 3rd Qtr 8/11/2014 31.5 1,150 4th Qtr10/21/2014 54.9 596 4th Qtr 10/21/2014 35.7 1,050 1st Qtr 3/9/2015 69.2 675 1st Qtr 3/9/2015 34.6 944 2nd Qtr 6/8/2015 47.1 390 2nd Qtr 6/8/2015 31.8 1290 3rd Qtr 8/31/2015 64.7 557 3rd Qtr 8/11/2015 25.3 788 4th Qtr 10/19/2015 56.1 567 4th Qtr 10/19/2015 29.6 909 1st Qtr 3/9/2016 31.1 583 1st Qtr 3/9/2016 29.1 989 2nd Qtr5/23/2016 58.4 598 2nd Qtr 5/23/2016 24.2 771 3rd Qtr 7/25/2016 61.3 619 3rd Qtr 7/25/2016 34.4 1180 4th Qtr 10/12/2016 61.5 588 4th Qtr10/12/2016 31.9 1010 1st Qtr 3/8/2017 69.8 566 1st Qtr 3/8/2017 41.3 1090 TW4-25 (Pumping well starting In January 2013)Pond D Monitoring Event Nitrate, Nitrate +Chloride (mg/I)Monitoring Event Nitrate, Nitrate +Chloride (mg/I) Nitrite (mg/I)Nitrite (mg/I) 1st Qtr 2/11/2013 9 190 (1>lst Qtr 1/31/2011 0.1 3 2nd Qtr 6/5/2013 5.24 136 3rd Qtr9/3/2013 5.69 119 4th Qtr 10/29/2013 6.1 88.6 1st Qtr 1/27/2014 2.16 85.7 2nd Qtr5/19/2014 1.21 51.1 3rd Qtr8/11/2014 .........................1.6 67 4th Qtr 10/21/2014 1.03 58.1 1st Qtr 3/9/2015 14.4 310 2nd Qtr 6/8/2015 1.14 58.3 3rd Qtr 8/31/2015 1.63 69.2 4th Qtr 10/21/2015 1.78 93.7 1stQtr 3/9/2015 0.837 62.7 2nd Qtr 5/23/2016 0.959 75.5 3rd Qtr 7/25/2016 1.78 74.1 4th Qtr 10/12/2016 1.24 59.8 1st Qtr 3/8/2017 17 285 1. Only sample collected. Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I Table 2 Summary of QA/QC Duplicate Sample 1st Quarter 2017 Parameter GWQS Duplicate of TWN-1 TWN-1 TWN-65 RPD Nitrate + Nitrite (as N)10 mg/L 2.06 1.98 4.0 Chloride none 31.2 31.5 -1.0 label 3 DRC Nitrate Mass Removal Calculations Energy Fuels Resorses Inc. White Mesa Mill, Bland, Utah 1st Quarter 2017 Data Discriptions Chloroform Pumping Wells Nitrate Pumping Wells MW4 MW-26 TW4-1 TW4-2 TW4-4 TW4-11 TW4-19 TW4-20 TW4-21 TW4-37 TW4-39 TWN-2 TW4-22 TW4-24 TW4-25 Nitrate (mg/L)5.0 0 768 4 44 4.74 6.87 8.12 11.10 12.0 17.7 32.3 6.4 27.4 69 8 41 3 1.150 Nitrate (g/L)4.99E-03 7 68E-04 4 44E-03 4.74E-03 6.87E-03 8.12E-03 1 11E-02 1.20E-02 1.77E-02 3.23E-02 6.40E-03 2 74E-02 6 98E-02 4 13E-02 1 15E-03 Nitrate (Ibs/L)1.10E-05 1.70E-06 9.81 E-06 1.05E-05 1 52E-05 1.79E-05 2.45E-05 2.65E-05 3.91 E-05 7.14E-05 1.41 E-05 6 05E-05 1.54E-04 9.13E-05 2 54E-06 Nitrate (Ibs/gal)4.17E-05 6 42E-06 3 71E-05 3 96E-05 5.75E-05 6.79E-05 9.28E-05 1 00E-04 1 48E-04 2.70E-04 5.35E-05 2.29E-04 5.84E-04 3.45E-04 9 62E-06 Total gallons pumped 76,642 26,107 16,944 19,870 23,527 2,984 110,417 13,553 54,334 97,072 103,118 45,283 24,066 99,117 161 lbs of nitrate removed 3.20 0.17 0.63 0.79 1.35 0 20 10 25 1.36 8.04 26.22 5 52 10 38 14 05 34 23 0.002 Gallons of nitrate removed 0.26 0 01 0.05 0.06 0.11 0 02 0 83 0.11 0 65 2 13 0.45 0.84 1 14 2.79 0.00 Total lbs of nitrate removed from pumping wells inside nitrate plume___110.05 Total gallons of nitrate removed from pumping wells inside nitrate plume8.95 Total lbs of nitrate removed from pumping wells outside nitrate plume 6.34 Total gallons of nitrate removed from pumping wells outside nitrate plume0.50 Total lbs nitrate removed from all pumping wells 116.39 Total gallons of nitrate removed from all pumping wells 9.45 % lbs of nitrate removed by pumping wells inside nitrate plume94,55