Loading...
HomeMy WebLinkAboutDRC-2017-003684 - 0901a068806fff25State of Utah GARYR. HERBERT Governor SPENCERJ. COX Lieutenant Governor Department of Environmental Quality Alan Matheson Exzcutive Director DTVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Scott T. Anderson Director May 23,2017 Kathy Weinel Quality Assurance Manager Energy Fuels Resources (USA) Inc. 225 Union Blvd., Suite 600 Lakewood, CO 80228 RE: Health Physics Inspection RADMOD-IM Radioactive Material License Number UT 1900479 Dear Ms. Weinel: On May 10 and 11,2017, an inspection was conducted at yoru facility by a representative of the Division of Waste Management and Radiation Control. Observations from the inspection were discussed at the closeout meeting with White Mesa Uranium Mill staff. The inspection was an examination of the activities conducted at your facility as they relate to compliance with the Utah Radiation Control Rules, the license conditions of the RML No. UT1900479 and Federal Regulations. The inspection consisted of an examination of representative records, interviews of personnel and observations by the inspector. Enclosed is the inspection report regarding this inspection for your review. The Division considers this inspection closed. We appreciate the Mill staffand their cooperation during this inspection. If you have any questions, please call Ryan Johnson at (801) 536-4255. Sincerely, Scott T. Anderson, Director Division of Waste Management and Radiation Control 195 North 1950 West. Salr Lake City, UT Mailing Address: P.O. Box 144880 . Salt Lake Ciry, UT 84114-4880 Telephone (801) 536-0200. Fax (801) 5364222. T.D.D. (801) 5364284 uruw.fuq.utah.gw Printed on l00o/o recycled paper DRC-2017-003684 (Over) STA/ RMJlka Enclosure: HealthPhysicsInspectionRADMOD-IM c: Kirk Benge, Health Officer/Environmental Health Director, San Juan County Health Department Rick Meyer, Environmental Health Director, San Juan County Health Department Scott Hacking, P.E., DEQ District Engineer INSPECTION REPORT InspectionModule: RADMOD-PEM: Surveys/Posting/ExitMonitoring Inspection Location: Enerry Fuels - White Mesa Uranium Mill, Blanding Utah. Inspection ltems: Radiological Postings, Routine Surveys and Employee Exit Monitoring Inspection Date: May 11,2017 Inspectors: Ryan Johnson, Utah Division of Waste Management and Radiation Control (DWMRC) Personnel Contacted: David Turk, Energy Fuels Resources Radiation Safety Officer (RSO) Justin Perkins, Radiation Safety Technician (RST) Governing Documents:o UAC R3l3-15o Radioactive Materials License (RML) UTl900479. Applicable Mill procedures and manuals Onenins Meetins Energy Fuels Resources: David Turk (RSO) Utah DWMRC: Ryan Johnson (Health Physics Inspector) During the opening meeting, the inspectors discussed the inspection items for the inspection. The inspectors also discussed an incident involving a roll-off container that was released from the Mill and an upcoming site tour for an NRC training course. The Mill was not in operation during the inspection except for the alternate feed circuit. The Mill staff reminded the inspector of the safety requirements for the Mill. DWMRC Meters Used Model SerialNumber Calibration Due Date Dose Rate Ludlum l9 101673 7t21n7 Insoection Summarv The inspection consisted ofi r Observing radiological postings around the Milhr Observing Mill personnel perform exit surveys: r Reviewing documentation ofi o Weekly Alpha surveys; o Daily Efficiency meter checks; and o Taking dose rate measurements around the Mill. The following discussion provides more detail of each inspection items. I ofPage 4 \\Cbwfp2\shw\Shared\RAD\COMMOlrl\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modulesV0l7\lnspection Reports\lnspection Report RADMOD-PEM 5- l l - I 7-pg.docx Postinp Locations Observed Postinss Observed Dose Rates Yellowcake Storase Area Caution Radiation Area 75 urem/hr South Yellowcake Drver Airborne Area 350 urem/hr Resoirator Protection Reouired Radiation Area North Yellowcake Dryer Airborne Area 450 prem/hr Resoirator Protection Reo uired Radiation Area Packaging Area Caution Radiation Area 200 prem/hr Airborne Area Alternate Feed Circuit Radiation Area 75 urem/hr Laboratory Radioactive Materials 20 prem/hr Any Area Within this Mill May Contain Radioactive Material Ore Pad No Postine 300 urem/hr Sample Preparation Room Airborne Area 230 urem/hr Item 1. Radiological Postings: Observations: During the Mill Tour the inspector observed the following posted areas: The lnspector also observed that the postings were placed in visible areas and they were legible. Deficiencies: None Item 2. Exit Surveys: The Inspector observed employees survey themselves out of the restricted area and checked the alpha meter used. Observations: The Mill uses Alpha scintillators for exit surveys. The lnspector checked the settings of one of the survey instruments and found that it was set properly. Meters are calibrated every 6 months. The inspector also reviewed the Daily Efficiency check form and found no deficiencies. The Mill personnel that were observed performing exit surveys, did the surveys appropriately. Deficiencies: Serial number not legible on alpha probe. RSO committed to check all probes and etch the serial numbers onto the probes. The Inspector will check during the next inspection. Item 3. Radiological Surveys and Monitoring: The Inspector reviewed the weekly surveys done around the Mill. The Mill was in a production period from August to November 2016. During production periods routine survey are done more frequently than in non-production periods. Observations: The inspector reviewed the radiological monitoring documentation performed at the Mill site. The documentation indicated that:. All areas of the Mill are being survey for radiological conditions;e Surveys indicate that the Mill is being maintained within regulatory radiological parameterso Documentation is legible, complete and using appropriate units; ando "Clean" areas are beine maintained. 2 ofPage 4 \\Cbwfp2\shw\Shared\RAD\COMMOMUranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\FIP lnspection modulesU0lT\lnspection Reports\lnspection Report RADMOD-PEM 5-l l -17-pg.docx Meter Location Model Meter Serial #Probe Serial #Cal. Due Alarm Settine West Admin. Door Ludlum 177 185t72 Not lesible 6t22t17 80 The inspector also looked at dosimeter usage. The inspector observed:o Mill personnel were properly wearing their dosimeters on the torso of the their bodies;o Dosimetery was being properly stored in the locker room and administration building; ando Each employee is assigned a dosimeter. Deficiencies: None Item 4. EPA Offsite Rule Visit: On May 10,2016, three EPA Representatives visited the Mill for an Offsite Rule Inspection for the Dawn Mining alternate feed material. Observations: The EPA opened the inspection with a discussion on what their visit was to verifo that the Dawn Mining alternate feed was being properly processed for its uranium content (Note: The Dawn Mining uranium Mill and mine site is being cleaned up under CERCLA). Therefore, the EPA is authorized to inspect of any facility where material is being sent offsite for reprocessing or disposal. During the opening meeting the Mill management discussed:o Ore receiving (Dawn Mining material is considered an ore because it is being processed for its uranium content);o The Mill's daily, weekly and monthly inspection;o A Mill process overview;o Groundwater and air monitoring locations; ando Tailing cell design and leak detection. After the opening meeting the EPA toured select locations of the Mill site. The areas of the Mill toured by the EPA included:o The ore receiving weigh station;o The ore pad;o The alternate feed circuit; o The tailing cells; ando Monitor Well MW-22 After the tour of the Mill the EPA reviewed documentation associated with the Dawn Mining material. The documentation reviewed was:. Paper work related to the receipt of the Dawn Mining material o Billof Ladings o Tare receipts; . Daily, weekly and Monthly reports; ando Documentation related to processing Dawn Mining material (i.e. amount received and amount processed) After the inspection the EPA personnel had a short closeout meeting in which they thanked the Mill Management for their time and providing the requested information and they found the Mill satisfactory for the continued receipt of the Dawn Mining material. EPA Personnel EFRI Personnel State ofUtah Personnel Linda Jacobson David Frydenlund Ryan Johnson David Duster Logan Shumway Treasure Bailey David Turk Deliciencies: None 3 ofPage 4 \\Cbwfp2\shw\Shared\RAD\COMMOMUranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modulesU0l T\lnspection Reports\lnspection Reporl RADMOD-PEM 5-l I-I7-pg.docx Closeout Meetine Energy tr'uels: David Turk (RSO) Utah DWMRC: Ryan Johnson (Health Physics lnspector) During the closeout meeting the inspector discussed with the RSO that no findings were observed in this inspection. Recommendations None Recommendation for Next Inspection l. Spills (yellowcake and other materials) being cleaned up in the mill immediately; Prepared By: Reviewed By: Ryan Johnson (Print Name) PhilGoble f-z>-so /7 "o l7 (Print Name) 4 ofPage 4 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modules\2017\lnspection Reports\lnspection Report RADMOD-PEM 5-l l - I 7-pg.docx (Date){4. (Date)