Loading...
HomeMy WebLinkAboutDRC-2016-007014 - 0901a06880630fb8State of Utah GARYR. }IERBERT Govemor SPENCERJ. COX Lieutetant Govemor Department of Environmental Quality Alan Matheson Execttire Director DIVISION OF WASTE MANAGEMENT AND RADI,ATION CONTROL Scott T. Andersorr Director May 17,2016 Kathy Weinel, Quality Assurance Manager Energy Fuels Resources (USA) Inc. 225 Unron Blvd., Suite 600 Lakewood, CO 80228 RE:Health Physics Inspection RADMOD-RPP Radioactive Material License Number UT 1900479 Dear Ms. Weinel: On April 27,2016, an inspection was conducted at the White Mesa Uranium Mill by a representative of the Division of Waste Management and Radiation Control. Observations from the inspection were discussed at the closeout meeting with the Mill staff. The inspection was an examination of the activities conducted at the Mill as they relate to compliance with the Utah Radiation Control Rules, the license conditions of the Radioactive Material License No. UT 1900479 and Federal Regulations. The inspection consisted of an examination of representative records, interviews of personnel and observations by the inspector. Enclosed is the inspection report. The Division considers this inspection closed. The Division would like to thank the Mill stafffor their cooperation r during this inspection. If you have any questions, please call Ryan Johnson at (801) 536-4255. Sincerely, Scott T. Anderson, Director Division of Waste Management and Radiation Control 195 North 1950 West. Salt Lake City, UT Mailing Address: P.O. Box 1,f4880 . Salt Lake City, UT 841144880 Telephone (801) 536-0200. Fax (801) 5364222. T.D.D. (801) 903-3978 tuwwdeq.utah.gn Printed on l00o/o recycled paper DRC-2016-007014 (Over) STA/ RMJ/ka Enclosure: InspectionReport c: Worthy Glover, Jr., MMHRM, CPM, Health Offrcer, San Juan Public Health Department Rick Meyer, Environmental Health Director, San Juan Public Health Department David Ariotti, P.8., DEQ District Engineer Ixsppcrrox Rnponr InspectionModule: RADMOD-RPP:RespiratoryProtectionProgram Inspection Location: Energy Fuels - White Mesa Uranium Mill, Blanding Utah. Inspection Items: Respirator Protection InspectionDates: April27,2016 Inspectors: Ryan Johnson, Utah Division Waste Management and Radiation Control (DWMRC) Personnel Contacted: David Turk, Energy Fuels Resources Radiation Safety Officer (RSO) Governing Documents:. UAC R3l3-15. Radioactive Materials License (RML) UT1900479. Applicable Mill procedures and manualso NRC Regulatory Guide 8.15 Openins Meetins Energy Fuels Resources: David Turk, RSO Tanner Holliday Utah DWMRC: Ryan Johnson (Health Physics Inspector) Phil Goble (U-MilyRAM Supervisor) Russ Topham (Engineer Inspector) During the opening meeting, the inspector discussed the inspection items and documentation to be reviewed during the inspection. The main portion of the Mill was not in operation during this inspection. The Mill staff reminded the inspectors of the safety requirements for the Mill. Inspection Summarv The inspection consisted of a RSO interview, reviewing applicable documentation and a mill tour. The following discussion provides more detail of the specific items reviewed. 1 ofPage 3 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modules90l6\Inspection Reports\lnspection Report RADMOD-RPP 04-27-16-pg.docx DRC Meters Used Model SerialNumber Calibration Due Date Contamination Ludlum 2360 245764 8t6^6 Dose Rate Ludlum l9 101673 7il1n6 Item l. Documentation Review: The Inspector reviewed applicable documentation. Observations: The DWMRC inspector reviewed the following documents:o The current Respiratory Protection Manual and confirmed all required respirator protection procedures are covered in the manual; o The respirator issuance log;o Medical clearance, fit testing and respirator training documentation; ando Respirator survey forms. Deficiencies: None Item 2. Mill Tour: The Inspector walked through the restricted area on a general site tour. The tour included the ore pad, the mill, the alternate feed circuit and the respirator room. Observations: The DWMRC inspector also observed:. Ore (both alternate feed and conventional ore) being stockpiled on the ore pad;o OSL badges were appropriately being used by all observed employees at the Mill; o Continued equipment maintenance and replacement activities throughout the Mill;o Yellowcake being put into drums in the new yellowcake packaging room;r Respirator room was clean and well organized;r Respirators were clean and in good repair;o Fit testing of respirators was performed appropriately; ando Respirator issuance to Mill personnel is performed appropriately. Radiolosical readinss observed durine Mill Deficiencies: None Item 3. Other: Follow-up on Leaking f le.(2) Shipment Observations: The DWMRC inspector followed up on a leaking I le.(2) shipment that was reported to the DWMRC on March 29,2016. The inspector was able to inspect the decontaminated shipping container and observe that the container had built in vent ports inside the container. The DWMRC passed all information regarding this leaking shipment to the Nuclear Regulatory Commission (NRC). The company that sent the leaking shipment to the White Mesa Mill is regulated by the NRC. Deficiencies: None Closeout Meetins Energy Fuels: Logan Shumway (Mill Manager) David Turk (RSO) Tanner Halliday Garrin Palmer 2 ofPage 3 \\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMilI\FIP lnspection modulesU0l6\lnspection Reports\lnspection Report RADMOD-RPP 04-27-l 6-pg.docx I ng lvllil lou Location Dose Rate (uR/hr) Ore Pad 300 to 1.100 Mill 250 to 300 Utah DWMRC: Ryan Johnson (Health Physics Inspector) Phil Goble (U-MilyRAM Supervisor) Russ Topham (Engineer lnspector) Findinss None Recommendations None Recommendation for Next Inspectionl. Spills (yellowcake and other materials) being cleaned up in the mill immediately;2. Personnel Exit Monitoring; Prepared By: Ryan Johnson */6-/C Reviewed Bv: (Print Name) Phil Goble (Print Name) 3 ofPage 3 \\Cbwfp2\shw\Shared\RAD\COMMOMUranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modulesV0l6\lnspection Reports\lnspection Report RADMOD-RPP 04-27-l 6-pg.docx (Signature)