HomeMy WebLinkAboutDRC-2016-007014 - 0901a06880630fb8State of Utah
GARYR. }IERBERT
Govemor
SPENCERJ. COX
Lieutetant Govemor
Department of
Environmental Quality
Alan Matheson
Execttire Director
DIVISION OF WASTE MANAGEMENT
AND RADI,ATION CONTROL
Scott T. Andersorr
Director
May 17,2016
Kathy Weinel, Quality Assurance Manager
Energy Fuels Resources (USA) Inc.
225 Unron Blvd., Suite 600
Lakewood, CO 80228
RE:Health Physics Inspection RADMOD-RPP
Radioactive Material License Number UT 1900479
Dear Ms. Weinel:
On April 27,2016, an inspection was conducted at the White Mesa Uranium Mill by a representative of
the Division of Waste Management and Radiation Control. Observations from the inspection were
discussed at the closeout meeting with the Mill staff. The inspection was an examination of the
activities conducted at the Mill as they relate to compliance with the Utah Radiation Control Rules, the
license conditions of the Radioactive Material License No. UT 1900479 and Federal Regulations. The
inspection consisted of an examination of representative records, interviews of personnel and
observations by the inspector.
Enclosed is the inspection report. The Division considers this inspection closed. The Division would
like to thank the Mill stafffor their cooperation r during this inspection.
If you have any questions, please call Ryan Johnson at (801) 536-4255.
Sincerely,
Scott T. Anderson, Director
Division of Waste Management and Radiation Control
195 North 1950 West. Salt Lake City, UT
Mailing Address: P.O. Box 1,f4880 . Salt Lake City, UT 841144880
Telephone (801) 536-0200. Fax (801) 5364222. T.D.D. (801) 903-3978
tuwwdeq.utah.gn
Printed on l00o/o recycled paper
DRC-2016-007014
(Over)
STA/ RMJ/ka
Enclosure: InspectionReport
c: Worthy Glover, Jr., MMHRM, CPM, Health Offrcer, San Juan Public Health Department
Rick Meyer, Environmental Health Director, San Juan Public Health Department
David Ariotti, P.8., DEQ District Engineer
Ixsppcrrox Rnponr
InspectionModule: RADMOD-RPP:RespiratoryProtectionProgram
Inspection Location: Energy Fuels - White Mesa Uranium Mill, Blanding Utah.
Inspection Items: Respirator Protection
InspectionDates: April27,2016
Inspectors: Ryan Johnson, Utah Division Waste Management and Radiation Control
(DWMRC)
Personnel Contacted:
David Turk, Energy Fuels Resources Radiation Safety Officer (RSO)
Governing Documents:. UAC R3l3-15. Radioactive Materials License (RML) UT1900479. Applicable Mill procedures and manualso NRC Regulatory Guide 8.15
Openins Meetins
Energy Fuels Resources:
David Turk, RSO
Tanner Holliday
Utah DWMRC:
Ryan Johnson (Health Physics Inspector)
Phil Goble (U-MilyRAM Supervisor)
Russ Topham (Engineer Inspector)
During the opening meeting, the inspector discussed the inspection items and documentation to be reviewed
during the inspection. The main portion of the Mill was not in operation during this inspection. The Mill
staff reminded the inspectors of the safety requirements for the Mill.
Inspection Summarv
The inspection consisted of a RSO interview, reviewing applicable documentation and a mill tour. The
following discussion provides more detail of the specific items reviewed.
1 ofPage 3
\\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modules90l6\Inspection
Reports\lnspection Report RADMOD-RPP 04-27-16-pg.docx
DRC Meters Used Model SerialNumber Calibration Due Date
Contamination Ludlum 2360 245764 8t6^6
Dose Rate Ludlum l9 101673 7il1n6
Item l. Documentation Review: The Inspector reviewed applicable documentation.
Observations: The DWMRC inspector reviewed the following documents:o The current Respiratory Protection Manual and confirmed all required respirator protection
procedures are covered in the manual;
o The respirator issuance log;o Medical clearance, fit testing and respirator training documentation; ando Respirator survey forms.
Deficiencies: None
Item 2. Mill Tour: The Inspector walked through the restricted area on a general site tour. The tour
included the ore pad, the mill, the alternate feed circuit and the respirator room.
Observations: The DWMRC inspector also observed:. Ore (both alternate feed and conventional ore) being stockpiled on the ore pad;o OSL badges were appropriately being used by all observed employees at the Mill;
o Continued equipment maintenance and replacement activities throughout the Mill;o Yellowcake being put into drums in the new yellowcake packaging room;r Respirator room was clean and well organized;r Respirators were clean and in good repair;o Fit testing of respirators was performed appropriately; ando Respirator issuance to Mill personnel is performed appropriately.
Radiolosical readinss observed durine Mill
Deficiencies: None
Item 3. Other: Follow-up on Leaking f le.(2) Shipment
Observations: The DWMRC inspector followed up on a leaking I le.(2) shipment that was reported to the
DWMRC on March 29,2016. The inspector was able to inspect the decontaminated shipping container and
observe that the container had built in vent ports inside the container. The DWMRC passed all information
regarding this leaking shipment to the Nuclear Regulatory Commission (NRC). The company that sent the
leaking shipment to the White Mesa Mill is regulated by the NRC.
Deficiencies: None
Closeout Meetins
Energy Fuels:
Logan Shumway (Mill Manager)
David Turk (RSO)
Tanner Halliday
Garrin Palmer
2 ofPage 3
\\Cbwfp2\shw\Shared\RAD\COMMON\Uranium mills\UT1900479 EnergyFuels Res - White Mesa UMilI\FIP lnspection modulesU0l6\lnspection
Reports\lnspection Report RADMOD-RPP 04-27-l 6-pg.docx
I ng lvllil lou
Location Dose Rate (uR/hr)
Ore Pad 300 to 1.100
Mill 250 to 300
Utah DWMRC:
Ryan Johnson (Health Physics Inspector)
Phil Goble (U-MilyRAM Supervisor)
Russ Topham (Engineer lnspector)
Findinss
None
Recommendations
None
Recommendation for Next Inspectionl. Spills (yellowcake and other materials) being cleaned up in the mill immediately;2. Personnel Exit Monitoring;
Prepared By: Ryan Johnson */6-/C
Reviewed Bv:
(Print Name)
Phil Goble
(Print Name)
3 ofPage 3
\\Cbwfp2\shw\Shared\RAD\COMMOMUranium mills\UT1900479 EnergyFuels Res - White Mesa UMill\HP lnspection modulesV0l6\lnspection
Reports\lnspection Report RADMOD-RPP 04-27-l 6-pg.docx
(Signature)