Loading...
HomeMy WebLinkAboutDRC-2015-009906 - 0901a0688061cd7fLLRW/U-Mill Document Scanning Form Document Type _____Incomingl ^ Outgoing! ”"’“*1 Internall DRC Program”"™ _____ LLRWl ~| GSAr"1 U-Mil! Facility/License # Zb-Z7-/rDocument Date Document Title _ PlejiSe i O&Mn A#/*, <y\ Authors) Check Applicable Folder Selection ^Application!! Correspondence|__^2S Compliance|_j^_j License! 1 Check Applicable Document ClassAnalytical! j Fi Emailj [inspection Report GW Permi Other Letter Monitoring Report D R C - Z O 15 - 0 0 3 * 1 o k 505gim W/ State of Utah GARY R. HERBERT Governor SPENCER J. COX Lieutenant Governor Department of Environmental Quality Alan Matheson Executive Director DIVISION OF WASTE MANAGEMENT AND RADIATION CONTROL Scott T. Anderson Director PBC-20(=>- OO^^Ofo MEMORANDUM TO:Phil Goble Pl&!l/* FROM:Dean Henderson DATE: October 27,2015 SUBJECT: Review of the 1st and 2nd Quarter 2015 Nitrate Monitoring Reports for the Nitrate Contamination Investigation, Energy Fuels Resources (USA) Inc. (“EFR“) White Mesa Uranium Mill, near Blanding, Utah The Utah Division of Waste Management and Radiation Control (“Division”) has reviewed the May 20, 2015, White Mesa Uranium Mill 1st Quarter 2015 Nitrate Monitoring Report and the August 25,2015 White Mesa Uranium Mill 2nd Quarter 2015 Nitrate Monitoring Report (“Reports”) for the Nitrate Contamination Investigation. For the review of these Reports the following regulatory enforcement documents were used: • Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah, May 7, 2012, (“CAP’’) approved December 12, 0212. • The EFR Quality Assurance Plan, June 7,2012, Revision. 7.2 (“QAP”) REVIEW Monitor Well Sampling for the 1st and 2nd Quarter 2015 In each quarter the following monitor wells were sampled and analyzed for inorganic chloride and nitrate + nitrite (as N) as required in the CAP: Monitor wells TWN-1, TWN-2, TWN-3, TWN-4, TWN-7, TWN-18, TW4-22, TWN-24, and TWN-25, and Piezometer 1, Piezometer 2, and Piezometer 3. In each quarter the monitoring wells were purged using the three approved QAP well purging strategies and meet QAP requirements for each strategy: 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144880 • Salt Lake City, UT 84114-4880 Telephone (801) 536-0200 • Fax (801) 536-0222 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper Page 2 1. Purging two casing volumes with stable field parameters for specific conductivity, turbidity, pH, redox potential, and water temperature (within 10% RPD): Wells: TWN-1, TWN-4, and TWN-18. 2. Purging a well to dryness and stability of field parameters for pH, specific conductivity, and water temperature only after recovery: Wells: TWN-3 and TWN-7 3. Continuously Pumped Wells that are considered sufficiently evacuated to immediately collect a sample: Wells: TWN-2, TW4-22, TW4-24, and TW4-25 Chloride and nitrate + nitrite (as N) were analyzed for methods consistent with the requirements of the QAP. QAQC Holding Times The method holding times for each quarter and parameter for samples collected at each monitor well were received and analyzed within the required holding times in the QAP. Receipt Temperature In each quarter all samples were received within the required QAP temperature limit of 6° C. Detection Limits In each quarter all sample sets for each were measured and reported to the required QAP reporting limits. Sample Duplicates One duplicate sample was collected for each quarter. All duplicate samples analytical results for the sample/duplicate pairs were within the 20% acceptance limits as required in the QAP (see Table 2 below). Groundwater Head Monitoring for 1st and 2nd Quarter 2015 Depth to groundwater was measured in the following wells and/or piezometers as required in Part I.E.3 of the Permit : • The quarterly groundwater compliance monitoring wells. • Existing monitoring well MW-4 and all of the temporary chloroform investigation wells. • Piezometers P-1, P-2, P-3, P-4 and P-5. • MW-20, MW-22 and MW-34 Page 3 • Nitrate monitoring wells. • The DR piezometers which were installed during the Southwest Hydrologic Investigation. In addition to the above, depth to water measurements are routinely observed in conjunction with sampling events for all wells sampled during quarterly and accelerated efforts, regardless of the sampling purpose. All well levels used for groundwater contour mapping were measured and recorded within 5 calendar days of each other. Estimation of Pumped Nitrate Mass Removal The 1st quarter 2015 report reported an estimate of 82 lbs. of nitrate was removed from the chloroform pumping wells (MW-4, MW-26, TW4-1, TW4-2, TW4-4, TW4-11, TW4-19, and TW4-20) and the nitrate pumping wells (TWN-2, TW4-22, TW4-24, and TW4-25). Of the 82 lbs. removed approximately 67 lbs. or 81%, was removed by the nitrate pumping wells. In the attached Table 3, the DRC shows calculations that verify these reported estimates. The 2nd quarter 2015 report reported an estimate of 69 lbs. of nitrate was removed from the chloroform pumping wells (MW-4, MW-26, TW4-1, TW4-2,TW4-4, TW4-11, TW4-19, TW4-20, TW4-21 and TW4-37) and the nitrate pumping wells (TWN-2, TW4-22, TW4-24, and TW4-25). Of the 69 lbs. removed approximately 48 lbs. or 69%, was removed by the nitrate pumping wells. In the Attached Table 3, the DRC shows calculations that verify these reported estimates. Reporting Each Report included the following information as required in the CAP: a) Introduction b) Sampling and Monitoring Plan: i. Description of monitor wells sampled; ii. Description of sampling methodology, equipment and decontamination procedures; iii. Identification of all quality assurance samples, e.g. equipment blanks duplicate samples, etc. c) Data Interpretation: i. Interpretation of groundwater levels, gradients, and flow directions. The interpretation will include a discussion on: 1) current site groundwater contour map, 2) hydrographs to show groundwater elevation in each monitor well over time, 3) depth to groundwater measured and groundwater elevation from each monitor well summarized in data table that includes historic groundwater level data for each well, 4) calculations documenting quarterly nitrate mass removed by pumping; ii. Interpretation of all analytical results for each well including a discussion on: 1) a current nitrate isoconcentration map, 2) graphs showing nitrate concentration trends in each well Page 4 through time and, analytical results for each well summarized in data table that includes historic analytical results for each well; and iii. An electronic copy of all laboratory results for groundwater quality monitoring conducted during the quarter will be provided to the Executive Secretary. d) Conclusions and Recommendations e) Copies of EFR field reports, laboratory reports, and chain of custody forms. The nitrate plume is defined to include any monitoring well that has concentration of nitrate in excess of 10 mg/L. Evaluation of the Chloroform Contaminate Plume and Its Associated Contaminants Bounding Chloroform Plume Groundwater monitoring data up to the 2nd quarter 2015 monitoring event appeared to show that the nitrate contaminate plume (“Plume”) is bound by up gradient, cross gradient, and down gradient wells that have a nitrate concentrations of <10 mg/L (GWQS = 10 mg/L). Pumping Wells Three new pumping wells TW4-1, TW4-2, and TW4-11 started in the 1st quarter 2015 and two new pumping wells TW4-21 and TW4-37 in the 2nd quarter 2015. Pumping wells TW4-21 and TW4-37 were installed to control and capture chloroform for the chloroform corrective action plan and because their within in the nitrate plume these wells will also serve to control and capture nitrate. Conclusions on Compliance with the CAP. OAP Per the Division review it appears that the 1st and 2nd Quarter 2015 Nitrate Monitoring Reports for the Nitrate Contamination Investigation, Energy Fuels Resources (USA) Inc. complies with the CAP and QAP. Therefore, a letter will be drafted for the Director Signature, notifying EFR of the review and closing-out of these reports. Page 5 References Energy Fuels Resources (USA) Inc., June 7,2012, White Mesa Uranium Mill, Ground Water Monitoring Quality Assurance Plan (Revision 7.2). HYDRO GEO CHEM, INC, May 7,2012, Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah Table 1 of 1 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-1 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Monitoring Event TWN-2 (Pumping well starting in January 2013) Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 2nd Qtr 5/26/2010 3rd Qtr9/27/2010 0.5 17 1st Qtr 3/24/2010 0.6 20 2nd Qtr 6/2/2010 0.6 19 4th Qtr12/7/2010 0.6 14 3rd Qtr 9/29/2010 4th Qtr 12/9/2010 62.1 ...69 69 48 85 97 1st Qtr 1/26/2011 2nd Qtr 4/20/2011 0.5 17 1st Qtr 2/1/2011 0.5 19 2nd Qtr4/28/2011 3rd Qtr 7/26/2011 4th Qtr10/17/2011 0.5 14 3rd Qtr 7/28/2011 0.5 10 4th Qtr 10/20/2011 43 40 33 33 104 93 ..93 85 74 76 1st Qtr 1/9/2012 0.6 15 1st Qtr 1/12/2012 2nd Qtr 4/18/2012 3rd Qtr 7/24/2012 4th Qtr 10/17/2012 0.6 17 2nd Qtr4/20/2012 0.6 17 3rd Qtr 7/31/2012 0.43 Nitrate 1st Qtr 2/18/2013 2nd Qtr4/23/2013 3rd Qtr 8/27/2013 4th Qtr 10/16/2013 0.68 0.84 1.24 1.61 17.5 Pumping System 4th Qtr 7/17/2012 Started in January 2013 31 48 54 22.10 86 103 93 79 17.6 17.4 24.1 26.8 1st Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/27/2013 4th Qtr 7/16/2013 57.3 57.7 80.0 111 80.5 82.1 75.9 70.4 1st Qtr 1/14/2014 1.47 2nd Qtr 5/6/2014 3rd Qtr 8/5/2014 1.63 1.7 29.2 31.1 4th Qtr 10/8/2014 1.46 ....28 27.6 1st Qtr 1/13/2014 2nd Qtr 5/7/2014 3rd Qtr 8/6/2014 4th Qtr 10/8/2014 42.6 44.7 42.0 71 72.4 84.9 80 1st Qtr 2/18/2015 TWN-65 dup of TVI/N-1 2nd Qtr 5/13/2015 1.37 1.41 0.65 27.8 29.0 29.2 1st Qtr 2/18/2015 48.6 81 87.8 2nd Qtr 5/12/2015 52.8 83.6 Monitoring Event TWN-3 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Monitoring Event TWN-4 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/25/2010 2nd Qtr 6/3/2010 3rd Qtr 7/16/2010 4th Qtr12/10/2010 25.3 26 27 24 111 1st Qtr 3/16/2010 118 2nd Qtr 5/27/2010 0.9 1.0 22 22 106 3rd Qtr 9/27/2010 117 4th Qtr12/8/2010 0.9 1.0 19 21 1st Qtr 2/1/2011 2nd Qtr 4/28/2011 3rd Qtr 7/29/2011 4th Qtr 10/20/2011 24 26 25 25 138 1st Qtr 1/25/2011 128 2nd Qtr 4/20/2011 0.9 0.9 134 3rd Qtr 7/26/2011 129 4th Qtr 10/18/2011 1.1 0.9 21 21 35 20 1st Qtr 1/12/2012 2nd Qtr 4/20/2012 3rd Qtr 7/31/2012 4th Qtr 10/17/2012 25 24 27 12.1 143 1st Qtr 1/9/2012 152 2nd Qtr 4/18/2012 0.9 1.1 20 158 3rd Qtr 7/25/2012 149 4th Qtr 7/15/2012 1.4 1.45 24 ....25 26.4 Nitrate Purnping Systern Started in January 2013 1st Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4th Qtr10/17/2013 22.2 27.2 20.9 23.5 157 158 171 163 1st Qtr 2/18/2013 2nd Qtr 4/23/2013 3rd Qtr 8/27/2013 4th Qtr 7/16/2013 1.5 1.63 1.6 1.69 25.3 24.4 27.2 29.4 1st Qtr 1/15/2014 2nd Qtr 5/7/2014 3rd Qtr 8/6/2014 4th Qtr10/9/2014 19.6 23.6 19.5 19.1 160 168 174 1st Qtr 1/14/2014 2nd Qtr 5/6/2014 3rd Qtr8/5/2014 1.4 1.6 28.4 29.6 153 4th Qtr 10/8/2014 2.0 1.44 28 30.7 1st Qtr 2/19/2015 2nd Qtr 5/14/2015 19.4 17.2 164 141 1st Qtr 2/18/2015 2nd Qtr 5/13/2015 1.48 0.733 31.5 31.9 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I Table 1 of 2 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. TWN-5 Monitoring Event Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) TWN-6 Monitoring Event Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/16/2010 0.3 [2nd Qtr 5/26/2010 0.3 43 44 1st Qtr 3/23/2010 2nd Qtr 6/1/2010 3rd Qtr 7/13/2010 1.5 1.4 19 22 3rd Qtr 7/12/2010 0.3 4th Qtr 12/7/2010 0.3 43 45 1st Qtr 1/2572611 4th Qtr12/7/2010 lstQtr'l/26720iT' 1.4 1.2 73 21 0.4 47 44 1.1 1.5 18 222nd Qtr 4/20/2011 0.3 2nd Qtr 4/20/2011 3rd Qtr 7/26/2011 0.3 4th Qtr 10/17/2011 0.3 44 45 3rd Qtr 7/27/2011 4th Qtr i6/18/26i i 1.1 1.4 17 21 1st Qtr 1/9/2012 0.2 2nd Qtr4/18/2012 0.3 45 39 1st Qtr 1/10/2012 2nd Qtr 4/18/2012 3rd Qtr 7/25/2012 4th Qtr7/15/2012 1.2 1.1 20 22 3rd Qtr 7/24/2012 0.3 48 43.5 1.4 0.78 22 20.44th Qtr 10/15/2012 <0.1 1st Qtr 2013 NA 1st Qtr 2013 2nd Qtr 2013 3rd Qtr 2613 " NA NA2nd Qtr 2013 NA TWN-5 abandoned on July 31,2013 4th Qtr 2013 NA NA 1st Qtr 2014 2nd Qtr 2014 3rd Qtr 2014 NA NA NA 4th Qtr 2014 NA 1st Qtr 2015 2nd Qtr 2015 NA NA Monitoring Event TWN-7 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event TWN-8 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 0.8 1st Qtr 3/16/2010 <0.1 11 112nd Qtr 5/28/2010 3rd Qtr 7/14/2010 1.2 2nd Qtr 5/26/2010 <0.1 1.8 3rd Qtr 7/12/2010 <0.1 11 ...94th Qtr 12/10/2010 4th Qtr12/7/2010 <0.1 1st Qtr 1/27/2011 2nd Qtr 4/21/2011 1.3 1st Qtr 1/25/2011 <0.1 1.7 2nd Qtr4/19/2011 <0.1 13 10 183rd Qtr 7/29/2011 4th Qtr 10/19/2011 0.7 2.2 3rd Qtr 7/26/2011 4th Qtr 10/17/2011 <0.1<6.1 10 1st Qtr 1/11/2012 2nd Qtr 4/20/2012 3rd Qtr 7/26/2012 4th Qtr 16/16/2612 2.3 1.2 1st Qtr 1/9/2012 <0.1 2nd Qtr 4/18/2012 <0.1 0.9 0.64 6 867 3rd Qtr 7/24/2012 <0.1 4th Qtr 7/15/2012 <0.1 11 15 11 11.4 1st Qtr 2/19/2013 0.59 5.68 1st Qtr 2013 NA 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4th Qtr 10/16/2013 1st Qtr 1/15/2014 2nd Qtr 5/7/2014 3rd Qtr 8/6/2014 4th Qtr 10/9/2014 1st Qtr 2/19/2015 2nd Qtr 5/14/2015 1.16 5.88 2nd Qtr 2013 NA 0.835 6.96 TWN-8 abandoned on July 31,2013 0.986 5.7 0.882 5.75 0.564 5.26 0.9 0.968 5.93 1.04 5.58 0.779 6.18 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 3 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-9 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event TWN-10 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/23/2010 7.6 183 175 1st Qtr 3/23/2010 1.5 54 302nd Qtr 6/1/2010 3rd Qtr 7/15/2010 4th Qtr12/9/2010 1st Qtr 2/1/2011 2nd Qtr 4/28/2011 3rd Qtr 7/29/2011 4th Qtr 10/20/2011 7.7 10.7 8.0 ..9.5 10.0 11.0 10.9 2nd Qtr 6/2/2010 210 172 3rd Qtr 7/14/2010 4th Qtr 12/8/2010 217 192 1st Qtr 1/26/2011 2nd Qtr 4/21/2011 208 134 3rd Qtr 7/27/2011 4th Qtr 10/18/2011 1.0 0.2 1.3 0.3 1.2 0.1 0.2 21 28 40 28 28 33 1st Qtr 1/12/2012 2nd Qtr4/20/2012 3rd Qtr 7/31/2012 4th Qtr10/17/2012 12.2 10.6 12.3 12.5 202 209 1st Qtr 1/10/2012 2nd Qtr 4/19/2012 215 194 3rd Qtr 7/25/2012 4th Qtr 7/16/2012 0.8 0.9 0.6 0.12 44 28 ...33 30.8 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA 2nd Qtr 2013 NA TWN-9 abandoned on July 31, 2013 TWN-10 abandoned on July 31, 2013 Monitoring Event TWN-11 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event TWN-12 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 2nd Qtr 6/1/2010 3rd Qtr 9/27/2010 1.4 1.3 73 72 76 1st Qtr 3/17/2010 0.7 113 106 1.4 1.4 2nd Qtr 5/26/2010 3rd Qtr 7/12/2010 0.8 0.7 112 1034th Qtr12/8/2010 72 4th Qtr12/7/2010 0.7 1st Qtr 1/27/2011 2nd Qtr4/26/2011 1.4 1.4 84 1st Qtr 1/26/2011 4.2 87 109 102 87 3rd Qtr 7/27/2011 4th Qtr10/17/2011 0.1 1.6 76 76 2nd Qtr 4/26/2011 3rd Qtr 7/26/2011 1.0 0.6 76 4th Qtr 10/17/2011 1.2 1st Qtr 1/10/2011 1.6 1.6 69 71 1st Qtr 1/10/2012 0.9 104 106 102 101 2nd Qtr 4/19/2012 3rd Qtr 7/25/2012 4th Qtr10/16/2012 2nd Qtr 4/18/2012 1.2 1.8 1.84 77 76.4 3rd Qtr 7/25/2012 1.4 4th Qtr 7/16/2012 1.41 1st Qtr 2013 2nd Qtr 2013 NA 1st Qtr 2013 NA NA 2nd Qtr 2013 NA TWN-11 abandoned on July 31, 2013 TWN-12 abandoned on July 31, 2013 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 4 Historic Nitrate, Nitrate + Nitrite and Cioride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-13 Monitoring Event TWN-14 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I)Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/17/2010 <0.1 2nd Qtr 5/26/2010 3rd atr 9/27/2610 4th Qtr 12/7/2010 0.1 47 49 1st Qtr 3/24/2010 0.2 53 57 2nd Qtr 6/2/2010 3rd Qtr 7/15/2010 4th Qtr 12/10/2010 2.9 2.9 3.5 4.2 24 30 26 280.4 1st Qtr 1/25/2011 2nd Qtr 4/26/2011 3rd Qtr 7/26/2011 4th Qtr 10/17/2011 1.6 103 49 1st Qtr 1/28/2011 2nd Qtr 4/27/2011 3rd Qtr 7/29/2011 3.7 3.5 24 30<0.1 0.1 49 48 3.5 3.9 25 27<0.1 4th Qtr 10/19/2011 1st Qtr 1/9/2012 2nd Qtr 4/18/2012 3rd Qtr 7/24/2012 <0.1 46 53 1st Qtr 1/11/2012 2nd Qtr 4/20/2012 3.5 3.4 26 27<0.1 0.1 48 473 3rd Qtr 7/27/2012 4th Qtr 7/17/2012 3.7 4.03 27 27.44th Qtr 10/15/2012 <0.1 1st Qtr 2013 NA 1st Qtr 2013 NA 2nd Qtr 2013 NA TWN-13 abandoned on July 31,2013 2nd Qtr 2013 3rd Qtr 2013 NA NA 4th Qtr 2013 NA 1st Qtr 2014 NA 2nd Qtr 2014 3rd Qtr 2014 ’ NA NA 4th Qtr 2014 NA 1st Qtr 2015 2nd Qtr 2015"NA NA Monitoring Event TWN-15 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event TWN-16 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/18/2010 2nd Qtr 5/28/2010 0.7 43 39 1st Qtr 3/17/2010 2nd Qtr 5/27/2010 3rd Qtr 9/27/2010 4th Qtr 12/9/2010 1.2 1.3 35 351.0 3rd Qtr 7/13/2010 1.0 i4th Qtr 12/9/2010 1.2 36 38 2.6 ....2 35 30 1st Qtr 1/27/2011 2nd Qtr 4/27/2011 1.4 43 49 1st Qtr I/27/29II 2nd Qtr 4/27/2011 3rd Qtr 7/27/2011 4.6 1.6 34 391.6 3rd Qtr 7/28/2011 4th Qtr 10/19/2011 1.6 47 38 2.4 2.6 31 341.3 4th Qtr 10/18/2011 1st Qtr 1/11/2012 1.5 38 46 1st Qtr 1/10/2012 2nd Qtr 4/19/2012 2.8 2.0 33 50 ....33 32.1 2nd Qtr 4/20/2012 3rd Qtr 7/26/2012 4th Qtr10/17/2012 1.6 2.1 50 47 3rd Qtr 7/25/2012 4th Qtr 7/16/2012 2.4 2.501.79 1st Qtr 2013 2nd Qtr 2013 NA 1st Qtr 2013 2nd Qtr 2013 NA NANA TWN-15 abandoned on July 31,2013 3rd Qtr 2013 4th Qtr 2013 NA NA 1st Qtr 2014 2nd Qtr 2014 NA NA 3rd Qtr 2014 4th Qtr 2014 NA NA 1st Qtr 2015 2nd Qtr 2015 NA NA Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 5 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-17 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event TWN-18 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/24/2010 2nd Qtr 6/3/2010 10.4 78 1st Qtr 3/17/2010 3rd Qtr 7/15/2010 8.9 87 66 2nd Qtr 6/1/2010 4th Qtr12/10/2010 65 3rd Qtr 9/27/2010 4th Qtr12/9/2010 1.6 1.8 1.8 1.6 42 63 64 59 1st Qtr 2/1/2011 8.6 90 1st Qtr 1/27/2011 1.4 1.8 61 672nd Qtr4/28/2011 81 2nd Qtr 4/26/2011 3rd Qtr 7/29/2011 8.5 74 3rd Qtr 7/28/2011 1.8 1.9 65 604th Qtr 10/20/2011 8.1 71 4th Qtr 10/18/2011 1st Qtr 1/12/2012 8.7 79 1st Qtr 1/10/2012 1.9 2.1 64 642nd Qtr 4/20/2012 9.1 80 2nd Qtr4/19/2012 3rd Qtr 7/27/2012 9.5 85 3rd Qtr 7/26/2012 2.3 1.95 67 67.54th Qtr10/17/2012 9.65 84.8 4th Qtr 7/16/2012 Nitrate Pumping System Started in January 2013 1st Qtr 2013 2nd Qtr 2013 NA NA 1st Qtr 2/18/2013 2nd Qtr 4/23/2013 3rd Qtr 8/27/2013 4th Qtr 10/16/2013 2.27 2.32 68.7 64.3 3rd Qtr 2013 NA TWN-17 abandoned on July 31, 2013 1st Qtr /14/2014 2nd Qtr 5/6/2014 3rd Qtr 8/5/2014 4th Qtr10/8/2014 1st Qtr 2/18/2015 2nd Qtr 5/13/2015 TW4-65 dup of TW4-18 <0.10 2.04 2.15 2.33 2.18 1.8 1.47 1 1.35 70.4 67.3 68.4 76.5 70 74.8 73.3 76.6 76.9 Monitoring Event TWN-19 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event Upper Wildlife Pond (UMLP) Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/23/2010 2nd Qtr 6/1/2010 3rd Qtr 9/27/2010 7.2 6.2 118 113 1st Qtr 3/18/2010 2nd Qtr 6/2/2010 3rd Qtr 7/19/2010 <0.1 <0.1 <1.0 <1.0 <1.07.2 7.0 113 107 <0.1 <0.14th Qtr12/9/2010 4th Qtr12/10/2010 1st Qtr 2/1/2011 2nd Qtr4/28/2011 7.0 6.9 114 120 1st Qtr 1/31/2011 2nd Qtr 4/25/2011 0.1 <0.1 <0.1 <0.1 <1.0 <1.0 <1.0 3rd Qtr 7/28/2011 4th Qtr 10/18/2011 7.1 6.5 113 108 3rd Qtr 7/25/2011 4th Qtr 10/19/2011 1st Qtr 1/10/2012 7.0 6.8 114 117 1st Qtr 1/31/2012 0.1 2nd Qtr 4/19/2012 3rd Qtr 7/26/2012 2nd Qtr 2012 3rd Qtr 2012 NS NS NS NS NS 7.5 7.7 117 1184th Qtr 10/16/2012 4th Qtr 2012 NS 1st Qtr 2013 NA NA 1st Qtr 2013 NA 2nd Qtr 2013 3rd Qtr 2013 4th Qtr 2012 NA NA 2nd Qtr 2013 3rd Qtr 2013 NA NA 4th Qtr 2012 NA 1st Qtr 2014 NA 1st Qtr 2014 NA 2nd Qtr 2014 3rd Qtr 2014 4th Qtr 2014 NA NA NA 2nd Qtr 2014 3rd Qtr 2014 4th Qtr 2014 NA NA NA Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/I NA = Per the CAP and SCO, these wells not sampled 2013 NS = Not sampled Table 1 of 6 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event Piezometer 1 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event Piezometer 2 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 2010 NS 2nd Qtr 6/2/2010 3rd Qtr 7/19/2010 4th Qtr 12/10/2010 NS 1st Qtr 2010 NS 7.2 52 2nd Qtr 6/2/2010 NS 0.6 0.6 0.2 6.8 6.5 52 60 3rd Qtr 7/19/2010 4th Qtr 12/10/10 6 9 _ 8 ...9 8 9' 1 '*8 ZA 9.5 1st Qtr 1/31/2011 2nd Qtr 4/25/2011 3rd Qt r 7/25/2011 4th Qtr 10/19/2011 60 1st Qtr 1/31/2011 6.8 6.6 58 J53 55 2nd Qtr 4/25/2011 3rd Qtr 7/25/2011 4th Qtr 10/19/2011 0.3 0.3 0.1 0.1 1st Qtr 1/11/2012 1st Qtr 1/10/2012 2nd Qtr 4/20/2012 3rd Qtr 7/27/2012 4th Qtr 10/17/2012 7.1 78 1st Qtr 1/11/2012 7.0 6.6 7.2 114 " 58 ..56 1st Qtr 1/31/2012 2nd Qtr4/20/2012 3rd Qtr 7/27/2012 0.1 0.1 ...0.2 0.2 0.197.66 55 4th Qtr 7/17/2012 Nitrate Pumping System StartedJinJanuary 2013 1st Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4th Qtr10/16/2613 8.11 8.88 7.83 56.7 53.3 55.1 1st Qtr 2/19/2013 2nd Qtr4/24/2013 3rd Qtr 8/28/2013 4th Qtr 10/16/2013 0.22 0.172 6.198 9.67 10.3 9.66 9.226.68 54.1 0.36 1st Qtr 1/13/2014 2nd Qtr 5/7/2014 3rd Qtr8/6/2014 6.79 56.2 1st Qtr 1/13/2014 2nd Qtr 5/7/2614 3rd Qtr 8/6/2014 0.169 11.4 11.47.57 5^1 52.1 55 0.736 0.8 12 12.24th Qtr 10/8/2014 5.75 57.6 4th Qtr 10/8/2014 0.755 1st Qtr 2/18/2015 2 n d Qt r 5 /12/ 2 015 6.41 5.95 55.9 57.5 1st Qtr 2/18/2015 2nd Qtr 5/12/2015 0.749 0.646 12.5 13.1 Monitoring Event Piezometer 3 Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event Pond D Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 3/24/2010 2nd Qtr 6/2/2010 3rd Qtr 7/19/2010 1.7 116 1st Qtr 2010 NS NS NS NS NS 1.6 36 2nd Qtr 2010 NS 4th Qtr 12/9/2010 1.8 1.8 35 25 3rd Qtr 2010 NS 4th Qtr 2010 NS 1st Qtr 1/31/2011 2nd Qtr 4/25/2011 1.8 40 1st Qtr 1/31/2011 0.1 1.7 35 2nd Qtr 2011 NS NS NS NS 3rd Qtr 7/25/2011 4th Qtr 10/19/2011 1.8 61 3rd Qtr 2011 NS 1.7 12 4th Qtr 2011 NS 1st Qtr 1/11/2012 2nd Qtr 4/20/2012 3rd Qtr 7/27/2012 4th Qtr 16/17/2612 1.8 1.7 1.8 20 53 21 1st Qtr 2012 2nd Qtr 2012 3rd Qtr 2012 NS NS NS NS NS NS NS2.75 20.1 4th Qtr 2012 NS Nitr.3te_.Pu_.mping System Started in January 2013 1st Qtr 2/24/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2613 1.85 21 1st Qtr 2013 NA 1.83 1.81 21.2 22.4 2nd Qtr 2013 3rd Qtr 2013 NA NA 4th Qtr 10/16/2013 1.8 23.5 4th Qtr 2013 NA 1st Qtr 1/13/2014 2nd Qtr 5/7/2014 1.7 26 1st Qtr 2014 NA 1.79 ..1.7 23.9 ....26 2nd Qtr 2014 3rd Qtr 2014 NA NA3rd Qtr 8/6/2014 4th Qtr 10/8/2014 1.74 28.3 4th Qtr 2014 NA 1st Qtr 2/18/2015 2nd Qtr 5/12/2015 1.82 1.75 27.3 30^2 1st Qtr 2015 2nd Qtr 2015 NA NA NS = Not sampled NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 7 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TW4-22(Pumping well starting in January 2013) Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) Monitoring Event TW4-24 (Pumping well stating in January 2013) Nitrate, Nitrate + Nitrite (mg/I) Chloride (mg/I) 1st Qtr 2/11/2013 2nd Qtr 6/5/2013 3rd Qtr 9/3/2013 4th Qtr10/29/2013 58 50.2 29.7 45.2 635 586 487 501 1st Qtr 2/11/2013 2nd Qtr 6/5/2013 3rd Qtr 9/3/2013 4th Qtr10/3/2013 35.9 23.7 32.6 34.6 596 916 998 1,030 1st Qtr 1/27/2014 2nd Qtr 5/19/2014 3rd Qtr 8/11/2014 4th Qtr 10/21/2014 54.6 47.2 41.5 54.9 598 614 1st Qtr 1/27/2014 2nd Qtr5/19/2014 540 596 3rd Qtr 8/11/2014 4th Qtr 10/21/2014 31.6 35 31.5 35.7 809 1,020 1,150 1,050 1st Qtr 3/9/2015 2nd Qtr 6/8/2015 69.2 47.1 675 390 1st Qtr 3/9/2015 2nd Qtr 6/8/2015 34.6 31.8 944 1290 Monitoring Event TW4-25 (Pumping well starting in January 2013) Nitrate, Nitrate + Nitrite (mg/l) 1st Qtr 2/11/2013 2nd Qtr 6/5/2013 3rd Qtr 9/3/2013 9 5.24 4th Qtr10/29/2013 5.69 6.1 1st Qtr 1/27/2014 2nd Qtr5/19/2014 2.16 1.21 3rd Qtr 8/11/2014 4th Qtr 10/21/2014 1st Qtr 3/9/2015 2nd Qtr 6/8/2015 1.6 1.03 1.14 Chloride (mg/l) 190 136 119 88.6 85.7 51.1 ....67 58.1 310 58.3 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/l Table 2 Summary of QA/QC Duplicate Sample 1st Quarter 2015 Parameter GWQS Duplicate of TWN-1 TWN-1 TWN-65 RPD Nitrate + Nitrite (as N)10 mg/L 27.8 29 -4.2 Chloride none 1.37 1.41 -2.9 2nd Quarter 2015 Parameter GWQS Duplicate of TWN-18 TWN-18 TWN-65 RPD Nitrate + Nitrite (as N)10 mg/L 1.35 <0.10 NC Chloride none 76.6 76.9 -0.4 NC= not calculated Tabel 3 DRC Nitrate Mass Removal Calculations Energy Fuels Resorses Inc. White Mesa Mill, Bland, Utah 1st Quarter 2015 Data Discriptions MW4 MW-26 TW4-1 ChlorofomPumgingWeJIs TW4-2 TW4-4 TW4-11 7W4-19 TW4-20 TWN-2 NitrateJ^um|imgJWeN8 TW4-22 TW4-24 TW4-25 Nitrate (mg/L)5.8 0.7 7.1 5.3 7.7 7.70E-03 1.70E-05 8.7 8.6 9.8 48.6 69.2 34.6 14.4 Nitrate (g/L)5.80E-03 7.32E-04 7.10E-03 5.30E-03 8.70E-03 1.92E-05 7.28E-05 8.56E-03 1.89E-05 7AQE-05 9.80E-03 2.17E-05 8.20E-05 4.86E-02 1.07E-04 4.06E-04 6.92E-02 1.53E-04 5.79E 04 3.46E-02 7.64E-05 2.89E-04 1.44E-02 3.18E-05 T20E-04 Nitrate (Ibs/L)1.28E-05 1.62E-06 1.57E-05 1.17E-05 Nitrate (Ibs/gal)4.85E-05 6.12E-06 5.94E-05 4.43E-05 6.44E-05 ....36'941 ..........2.4 Total gallons pumped 76,454 24,005 24,569 24,157 ......1.1 0.09 9,899 ....0.7 0.06 60,553.......4.3 0.35 15,745.......1.3 0.10 47,262.....19.2 .....1.56 22,047 .....12.8 .....1.04 92,449 .....26.8 2.18 71,452 .......8.6 0.70 lbs of nitrate removed 3.7 0.15 1.5 Gallons of nitrate removed 0.30 0.01 0.12 0.19 Total lbs of nitrate removed from chloroform pumping wells Total gallons of nitrate removed chloroform pumping welis 15.1 1.2 Total lbs of nitrate removed from nitrate pumping wells Total gallons of nitrate removed nitrate pumping wells 67.3 5.5 Total lbs nitrate removed from all pumping wells Total gallons of nitrate removed from ail pumping wells %Jbs_of^itrateiremoved_b^=nitrate_pumgin£wens___e__=i 82.4 ......6.7 81.7 2nd Quarter 2015 Data Discriptions MW4 MW-26 TW4-1 Chloroform Pumping Wells TW4-2 TW4-4 TW4-11 TW4-19 TW4-20 TW4-21 TW4-37 TWN-2 Nitrate Pumping Wells TW4-22 TW4-24 TW4-25 Nitrate (mg/L)2.5 0.4 6.1 4.3 4.30E-03 9!50E-06 6.3 6!30E-03 1.39E-05 8.5 8.50E-03 1.88E-05 0.9 9.16E-04 2.02E-06 5.76 5.76E-03 13.1 T31E-62 2.89E-05 35.2 3.52E-02 7.78E-05 52.8 5.28E-02 1.17E-04 47.1 31.8 1.1 1.14E-03 2.52E-06 Nitrate (g/L)2.50E-03 4.19E-04 6.10E-03 Nitrate (Ibs/L)5.52E-06 9.26E-07 1.35E-05 1.27E-05 4.82E-05 .....18,754 .........0.90 0.07 4.71 E-02 1.04E-04 3.94E-04 3.18E-02 7.03E-05 Nitrate (Ibs/gal)2.09E-05 3.50E-06 5.10E-05 3.60E-05 ....22,030 ........0J9 0.06 5.27E-05 ....69,229 ........3.65 7.11E-05 ......5,243 ........0.37 0.03 7.66E-06 ....75,103 ........0.58 0.05 1.10E-04 ....30,744 ........3.37 0.27 2.94E-04 ....29,206 ........&60 070 4.42E-04 ....48,497 ......21.41 ........1.74 2.66E-04....62,664 ......16.66 .........1.316 9.53E-06 ....91,985 .....a’88 .........0.07 Total gallons pumped 60,715 27,805 23,990 lbs of nitrate removed 1.27 0.10 1.22 Gallons of nitrate removed 0.10 0.01 0.10 0.30 23,192 .....9.13 0.74 Total lbs of nitrate removed from chloroform pumping wells Total gallons of nitrate removed chloroform pumping wells 20.8 0.7 Total lbs of nitrate removed from nitrate pumping wells Total gallons of nitrate removed nitrate pumping wells 48.1 3.9 Total lbs njtrate removed from all pumping wells Total gallons of nitrate removed from all pumping wells %Jbsofnitrate>remwedby_nitratejgumgm£wens!=__^=>=_= 68.9 ....4.6 69.8