Loading...
HomeMy WebLinkAboutDRC-2014-005322 - 0901a06880491366^gg^ ^IBf Energy Fuels Resources (USA) Inc. MWtt 225 Union Blvd. Suite 600 M f Lakewood, CO, US, 80228 %T M ENERGY FUELS 303 974 2140 www.encrgyrucls.com VIA EMAIL AND OVERNIGHT DELIVERY September 11, 2014 M,B,yttcBW DRC-2014-005322 Division Director Utah Department of Environmental Quality Air Quality Division 195 North 1950 West Salt Lake City, Utah 84116 o or [ of i Re: Energy Fuels Resources (USA) Inc. Notification for the Fourth Quarter of 2014 - Schedule for the NESHAPs Radon Flux Measurements for Tailings Impoundment 3 at the White Mesa Mill Dear Mr. Bird: Energy Fuels Resources (USA) Inc. ("EFRI") plans to perform a fourth quarter sampling event for NESHAPs Radon Flux measurements for Tailings Impoundment 3 at the White Mesa Mill. As indicated in letters dated December 4, 2013, March 6, 2014, and August 7, 2014 the first quarter measurements were taken March 24-27, 2014, the second quarter measurements were taken June 2-5, 2014, and the third quarter measurements were taken September 8-11, 2014. Per 40 CFR 61.253, EFRI is permitted to monitor Radon Flux one or more times per year. EFRI is choosing to sample Tailings Impoundment 3 quarterly in 2014 to capture a wider range of climatic conditions. Consistent with 40 CFR 61.253, EFRI is permitted to submit a schedule for additional sampling periods either prior to or after the first measurement period. Therefore, EFRI is providing this schedule for the fourth quarter sampling event for Tailings Impoundment 3 in 2014. Sampling Dates Tailings Impoundment 3 October 13-16, 2014 Fourth Quarter Sampling Event Tellco Environmental of Grand Junction, Colorado ("Tellco") will perform approximately 100 measurements on the beach and cover area of Tailings Impoundment 3 during the fourth quarter sampling event. These measurements will be performed in accordance with methods and procedures set forth in 40 CFR Part 61, Appendix B, Method 115. Provided that there are no rainouts or events that require remobilization or a delay in measurement, the fourth quarter sampling event for Tailings Impoundment 3 is expected to conclude on October 16, 2014. EFRI will provide safety and radiological orientation for any Utah Department of Air Quality personnel observing this event. This orientation will be required before any individual enters the Mill Restricted Area. Individuals monitoring this event should bring their own mandatory lietfer to B. Bird September 11, 2014 Page 2 of 2 Personnel Protective Equipment as required at the Mill, specifically, safety glasses, hardhats, and steel-toed shoes. If you have any questions or require assistance, please contact Mr. Dan Hillsten, Mill Manager at 435-678-4105; or Mr. David Turk, Environmental Health and Safety Manager, at 435-678-4113. Yours very truly, / ENERGY FUELS RESOURCES (USA) INC. Jaime Massey Regulatory Compliance Specialist cc: Rusty Lundberg, Utah Division of Radiation Control David C. Frydenlund Dan Hillsten Harold R. Roberts David Turk Kathy Weinel Frank Filas Director, Air and Toxics Technical Enforcement Program, Office of Enforcement, Compliance and Environmental Justice, U.S. Environmental Protection Agency