Loading...
HomeMy WebLinkAboutDRC-2014-004848 - 0901a0688047c0b5,«', OF r//jt>- OS State of Utah GARY R. HERBERT Governor Spencer J. Cox Lieutenant Governor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director MEMORANDUM TO: FROM: DATE: SUBJECT: //-/ 7 DRC-2014-004848 Phil Dean Henderson Aug 8,2014 Review ofthe 3rd Quarter and 4th Quarter 2013 and the 1st Quarter 2014 Nitrate Monitoring Report for the Nitrate Contamination Investigation, Energy Fuels Resources (USA) Inc. ("EFR") White Mesa Uranium Mill, near Blanding, Utah The Utah Division of Radiation Control ("DRC") has reviewed the November 18, 2013, White Mesa Uranium Mill 3rd Quarter 2013 Nitrate Monitoring Report ("3rd QR13"), February 21, 2013, White Mesa Uranium Mill 4th Quarter 2013 Nitrate Monitoring Report ("4th QR13") and May 19, 2014, White Mesa Uranium Mill 1st Quarter 2014 Nitrate Monitoring Report ("1st QR14") for the Nitrate Contamination Investigation. For the review of this Report the following regulatory enforcement documents were used: Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah, May 7, 2012, ("CAP") • The EFR Quality Assurance Plan, June 7, 2012, Revision. 7.2 ("QAP") REVIEW Monitor Well Sampling for 3rd and 4th 2013, and 1st 2014 Quarters In each quarter the following monitor wells were sampled and analyzed for inorganic chloride and nitrate + nitrite (as N) as required in the CAP: TWN-1, TWN-2, TWN-3, TWN-4, TWN-7, TWN-18, TW4-22, TWN-24, TWN-25, Piezometer 1, Piezometer 2, and Piezometer 3. In each quarter the monitoring wells were purged using the three approved QAP well purging strategies and meet QAP requirements for each strategy: 1. Purging two casing volumes with stable field parameters for specific conductivity, turbidity, pH, redox potential, and water temperature (within 10% RPD): 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414 www.deq.utah.gov Printed on 100% recycled paper Page 2 Wells: TWN-1, TWN-4, and TWN-18. 2. Purging a well to dryness and stability of field parameters for pH, specific conductivity, and water temperature only after recovery: Wells: TWN-3 and TWN-7 3. Continuously Pumped Wells that are considered sufficiently evacuated to immediately collect a sample: Wells: TW4-22, TW4-24, and TW4-25 Chloride and nitrate + nitrite (as N) were analyzed for methods consistent with the requirements of the QAP. QAQC Holding Times The method holding times for each quarter and parameter for samples collected at each monitor well were received and analyzed within the required holding times in the QAP. Receipt Temperature In each quarter all samples were received within the required QAP temperature limit of 6° C. Detection Limits In each quarter all sample sets for each were measured and reported to the required QAP reporting limits. Sample Duplicates One duplicate sample was collected for each quarter. All duplicate samples analytical results for the sample/duplicate pairs were within the 20% acceptance limits as required in the QAP (see Table 2 below). Groundwater Head Monitoring for 3rd and 4th 2013, and 1st 2014 Quarters Depth to groundwater was measured in the following wells and/or piezometers as required in Part I.E.3 of the Permit: • The quarterly groundwater compliance monitoring wells. • Existing monitoring well MW-4 and all of the temporary chloroform investigation wells, • Piezometers P-1, P-2, P-3, P-4 and P-5. • MW-20, MW-22 and MW-34 • Nitrate monitoring wells. • The DR piezometers which were installed during the Southwest Hydrologic Investigation. • In addition to the above, depth to water measurements are routinely observed in conjunction with sampling events for all wells sampled during quarterly and accelerated efforts, regardless of the sampling purpose. All well levels used for groundwater contour mapping were measured and recorded within 5 calendar days of each other. Page 3 Estimation of Pumped Nitrate Mass Removal The 3rd QR13 reported an estimate of 177 lbs. of nitrate was removed from the chloroform pumping wells (MW-4, MW-26, TW4-4, TW4-19, and TW4-20) and the nitrate pumping wells (TWN-2, TW4-22, TW4- 24, and TW4-25). Of the 177 lbs. removed approximately 120 lbs. or 68%, was removed by the nitrate pumping wells. In the attached Table 3, the DRC shows calculations that verify these reported estimates. The 4th QR13 reported an estimate of 162 lbs. of nitrate was removed from the chloroform pumping wells (MW-4, MW-26, TW4-4, TW4-19, and TW4-20) and the nitrate pumping wells (TWN-2, TW4-22, TW4- 24, and TW4-25). Of the 162.3 lbs. removed approximately 138 lbs. or 85%, was removed by the nitrate pumping wells. In the Attached Table 3, the DRC shows calculations that verify these reported estimates. The 1st QR14 reported an estimate of approximately 103 lbs. of nitrate was removed from the chloroform pumping wells (MW-4, MW-26, TW4-4, TW4-19, and TW4-20) and the nitrate pumping wells (TWN-2, TW4-22, TW4-24, and TW4-25). Ofthe 103 lbs. removed approximately 91 lbs. or 88%, was removed by the nitrate pumping wells. In the attached Table 3, the DRC shows calculations that verify these reported estimates. Reporting Each Report included the following information as required in the CAP: a) Introduction b) Sampling and Monitoring Plan: i. Description of monitor wells sampled; ii. Description of sampling methodology, equipment and decontamination procedures; iii. Identification of all quality assurance samples, e.g. equipment blanks duplicate samples, etc. c) Data Interpretation: i. Interpretation of groundwater levels, gradients, and flow directions. The interpretation will include a discussion on: 1) current site groundwater contour map, 2) hydrographs to show groundwater elevation in each monitor well over time, 3) depth to groundwater measured and groundwater elevation from each monitor well summarized in data table that includes historic groundwater level data for each well, 4) calculations documenting quarterly nitrate mass removed by pumping; ii. Interpretation of all analytical results for each well including a discussion on: 1) a current nitrate isoconcentration map, 2) graphs showing nitrate concentration trends in each well through time and, analytical results for each well summarized in data table that includes historic analytical results for each well; and iii. An electronic copy of all laboratory results for groundwater quality monitoring conducted during the quarter will be provided to the Executive Secretary. d) Conclusions and Recommendations e) Copies of EFR field reports, laboratory reports, and chain of custody forms. The nitrate plume is defined to include any monitoring well that has concentration of nitrate in excess of 10 mg/L. Page 4 Conclusions on Compliance with the CAP, QAP Per the DRC review it appears that the "3rd QR13", 4th QR13, and 1st QR14 reports complies with the CAP and QAP. Therefore, a letter will be drafted for the Director Signature, notifying EFR of the review and closing-out of these reports. Page 5 References Energy Fuels Resources (USA) Inc., June 7, 2012, White Mesa Uranium Mill, Ground Water Monitoring Quality Assurance Plan (Revision 7.2). HYDRO GEO CHEM, INC, May 7, 2012, Corrective Action Plan for Nitrate White Mesa Uranium Mill near Blanding, Utah Table 1 of 1 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-1 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) Monitoring Event TWN-2 (Pumping well starting in January 2013) Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) 1st Qtr 3/17/2010 2nd Qtr 5/26/2010 3rd Qtr 9/27/2010 4th Qtr 12/7/2010 1st Qtr 1/26/2011 2nd Qtr 4/20/2011 3rd Qtr 7/26/2011 4th Qtr 10/17/2011 1st Qtr 1/9/2012 2nd Qtr 4/18/2012 3rd Qtr 7/24/2012 4th Qtr 10/17/2012 1st Qtr 2/18/2013 2nd Qtr 4/23/2013 3rd Qtr 8/27/2013 4th Qtr 10/16/2013 1st Qtr 1/14/2014 0.5 0.6 0.6 0.6 0.5 0.5 0.5 0.5 0.6 0.6 0.6 0.43 Nitrate 0.68 0.84 1.24 1.61 1.47 17 20 19 14; 17 19 14 10 . _ 17 17 17.5 1st Qtr 3/24/2010 2nd Qtr 6/2/2010 3rd Qtr 9/29/2010 4th Qtr 12/9/2010 1st Qtr 2/1/2011 2nd Qtr 4/28/2011 3rd Qtr 7/28/2011 4th Qtr 10/20/2011 1st Qtr 1/12/2012 2nd Qtr 4/20/2012 3rd Qtr 7/31/2012 4th Qtr 7/17/2012 62.1 "69 69 7 48 Pumping System Started in January 2013 31 48 54 '22.10 17.6 17.4 24.1 26.8 29.2 1st Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/27/2013 4th Qtr 7/16/2013 1st Qtr 1/13/2014 57.3 57.7 80.0 111 42.6 85 97 104 93 93 85 74 76 86 103 93 79 80.5 82.1 75.9 70.4 72.4 Monitoring Event TWN-3 Chloride (mg/l) Nitrate, Nitrate + Nitrite (mg/l) 25.3 111 118 106 117 138 128 134 129 •i 143 152 21 158 12.1 149 Monitoring Event TWN-4 Nitrate, Nitrate -i Nitrite (mg/l) Chloride (mg/l) 1st Qtr 3/25/2010 2nd Qtr 6/3/2010 3rd Qtr 7/16/2010 4th Qtr 12/10/2010 1st Qtr 2/1/2011 2nd Qtr 4/28/2011 3rd Qtr 7/29/2011 4th Qtr 10/20/2011 1st Qtr 1/12/2012 2nd Qtr 4/20/2012 3rd Qtr 7/31/2012 4th Qtr 10/17/2012 1st Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4th Qtr 10/17/2013 1st Qtr 1/15/2Q14 "" 1st Qtr 3/16/2010 0.9 2nd Qtr 5/27/2010 1.0 3rd Qtr 9/27/2010 0.9 4th Qtr 12/8/2010 1.0 1st Qtr 1/25/2011 0.9 2nd Qtr 4/20/2011 0.9 3rd Qtr 7/26/2011 1.1 4th Qtr 10/18/2011 0.9 1st Qtr 1/9/2012 0.9 2nd Qtr 4/18/2012 1.1 3rd Qtr 7/25/2012 1.4 4th Qtr 7/15/2012 [ 1.45 Nitrate Pumping System Started in January 2013 157 1st Qtr 2/18/2013 f "IS 158 2nd Qtr 4/23/2013 1.63 171 3rd Qtr 8/27/2013 1.6 163 4th Qtr 7/16/2013 1.69 19,6 160 1st Qtr 1/14/2014 L4 22.2 20.9 23.5 22 22 19 21 ' 21 21 35 20 20 24 25 26.4 25.3 24.4 27.2 29.4 28.4 Monitoring Event TWN-5 Nitrate, Nitrate • Nitrite (mg/l) Chloride (mg/l) Monitoring Event TWN-6 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) 1st Qtr 3/16/2010 2nd Qtr 5/26/2010 3rd Qtr 7/12/2010 4th Qtr 12/7/2010 1st Qtr 1/25/2011 2nd Qtr 4/20/2011 3rd Qtr 7/26/2011 4th Qtr10/17/2011 1st Qtr i/9/2012 2nd Qtr 4/18/2012 3rd Qtr 7/24/2012 4th Qtr 10/15/2012 1st Qtr 2013 2nd Qtr 2013 <0.1 NA NA 0.3 0.3 0.3 0.3 0.4 0.3 0.3 0.3 0.2 0.3 0.3 TWN-5 abandoned on July 31, 2013 43 44 43 45 47 44 44 45 "45 39 48 43.5 1st Qtr 3/23/2010 2nd Qtr 6/1/2010 3rd Qtr 7/13/2010 4th Qtr 12/7/2010 1st Qtr 1/26/2011 2nd Qtr 4/20/2011 3rd Qtr 7/27/2011 4th Qtr 10/18/2011 1st Qtr i/l'O/2012 2nd Qtr 4/18/2012 3rd Qtr 7/25/2012 4th Qtr 7/15/2012 1st Qtr 2013 2nd Qtr 2013 3rd Qtr 2013 4th Qtr 2013 1st Qtr 2013 NA NA NA NA NA 1.5 1.4 1.4 1.2 1.1 1.5 1.1 1.4 1.2' 1.1 1.4 0.78 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/l NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 2 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-7 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) Monitoring Event TWN-8 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) 1st Qtr 3/17/2010 2nd Qtr 5/28/2010 3rd Qtr 7/14/2010 4th Qtr 12/10/2010 1st Qtr 1/27/2011 2nd Qtr4/21/2011 3rd Qtr 7/29/2011 4th Qtr 10/19/2011 1st Qtr 1/11/2012 2nd Qtr 4/20/2012 3rd Qtr 7/26/2012 4th Qtr 10/16/2012 1st Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4th Qtr 10/16/2013 1st Qtr 1/15/2014 0.8 1.2 1.8 1 £'3 1.7 0.7 2.2 2.3 1.2 0.9 0.64 Nitrate 0.59 1.16 0.835 0.986 0.882 6 6 7 4 6 6 5 6 5 6 6 5.67 1st Qtr 3/16/2010 2nd Qtr 5/26/2010 3rd Qtr 7/12/2010 4th Qtr 12/7/2010 1st Qtr 1/75/7011 " 2nd Qtr 4/19/2011 3rd Qtr 7/26/2011 4th Qtr 10/17/2011 1st Qtr 1/9/2012 2nd Qtr 4/18/2012 3rd Qtr 7/24/2012 4th Qtr 7/15/2012 <0.1 <0.1 <0.1 <0.1 <o'l <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 11 11 11 9 . _.„„ 10 18 10 11 15 11 11.4 Pumping System Started in January 2013 5.68 5.88 6.96 5.7 5.75 1st Qtr 2013 2nd Qtr 2013 NA NA TWN-8 abandoned on July 31, 2013 Monitoring Event TWN-9 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) Monitoring Event TWN-10 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) 1st Qtr 3/23/2010 2nd Qtr 6/1/2010 3rd Qtr 7/15/2010 4th Qtr 12/9/2010 1st Qtr 2/1/2011 2nd Qtr 4/28/2011 3rd Qtr 7/29/2011 4th Qtr 10/20/2011 1st Qtr 1/12/2012 2nd Qtr 4/20/2012 3rd Qtr 7/31/2012 4th Qtr 10/17/2012 1st Qtr 2013 2nd Qtr 2013 jf&. 7.6 7.7 10.7 8.0 9.5 10.0 w° liHI !'12.5 183 175 210 172 217 192 208 134 202 209 215 194 NA NA 1st Qtr 3/23/2010 2nd Qtr 6/2/2010 3rd Qtr 7/14/2010 4th Qtr 12/8/2010 1st Qtr 1/26/2011 2nd Qtr 4/21/2011 3rd Qtr 7/27/2011 4th Qtr 10/18/2011 1st Qtr 1/10/2012 2nd Qtr 4/19/2012 3rd Qtr 7/25/2012 4th Qtr 7/16/2012 1st Qtr 2013 2nd Qtr 2013 1.5 1.0 0.2 1.3 0.3 1.2 0.1 0.2 0.8 0.9 0.6 0.12 54 30 21 28 40 28 28 33 44 28 33 30.8 NA NA TWN-9 abandoned on July 31, 2013 TWN-10 abandoned on July 31, 2013 Monitoring Event TWN-11 Nitrate, Nitrate + Chloride (mg/l) Monitoring Event TWN-12 Nitrate, Nitrate + Chloride (mg/l) 1st Qtr 3/17/2010 2nd Qtr 6/1/2010 3rd Qtr 9/27/2010 4th Qtr 12/8/2010 1st Qtr l/27/201l" 2nd Qtr 4/26/2011 3rd Qtr 7/27/2011 4th Qtr 10/17/2011 1st Qtr 1/10/2011 2nd Qtr 4/19/2012 3rd Qtr 7/25/2012 4th Qtr 10/16/2012 1st Qtr 2013 " 2nd Qtr 2013 NA NA 1.4 1.3 1.4 1.4 l'4 1.4 0.1 1.6 1.6 1.6 18 1.84 73 72 76 72 84 76 76 76 69 71 77 76.4 1st Qtr 3/17/2010 2nd Qtr 5/26/2010 3rd Qtr 7/12/2010 4th Qtr 12/7/2010 1st Qtr 1/26/2011 2nd Qtr 4/26/2011 3rd Qtr 7/26/2011 4th Qtr 10/17/2011 1st Qtr 1/10/2012 2nd Qtr 4/18/2012 3rd Qtr 7/25/2012 4th Qtr 7/16/2012 1st Qtr 2013 2nd Qtr 2013 NA NA 0.7 0.8 0.7 0.7 4.2 1.0 0.6 1.2 0.9 1.2 1.4 1.41 113 106 112 103 "87 109 102 87 104 106 102 101 TWN-11 abandoned on July 31, 2013 TWN-12 abandoned on July 31, 2013 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/l NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 3 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-13 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) Monitoring Event TWN-14 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) 1st Qtr 3/17/2010 2nd Qtr 5/26/2010 3rd Qtr 9/27/2010 4th Qtr 12/7/2010 1st Qtr 1/25/2011 2nd Qtr 4/26/2011 3rd Qtr 7/26/2011 4th Qtr 10/17/2011 1st Qtr 1/9/2012 2nd Qtr 4/18/2012 3rd Qtr 7/24/2012 4th Qtr 10/15/2012 1st Qtr 2013 2nd Qtr 2013 <0.1 <0.1 <0.1 <0.1 <0.1 0.1 0.2 0.4 1.6 0.1 0.1 <0.1 NA NA 47 49 53 57 103 49 49 48 46 53 48 47.3 TWN-13 abandoned on July 31, 2013 1st Qtr 3/24/2010 2nd Qtr 6/2/2010 3rd Qtr 7/15/2010 4th Qtr12/10/2010 1st Qtr 1/28/2011 2nd Qtr 4/27/2011 3rd Qtr 7/29/2011 4th Qtr 10/19/2011 1st Qtr 1/11/2012 2nd Qtr 4/20/2012 3rd Qtr 7/27/2012 4th Qtr 7/17/2012 1st Qtr 2013 2nd Qtr 2013 3rd Qtr 2013 4th Qtr 2013 1st Qtr 2014 2.9 2.9 3.5 4.2 3.7 3.5 3.5 3.9 3.5 3.4 3.7 4.03 24 30 26 28 24 30 25 27 26 27 27 27.4 NA NA NA NA NA Monitoring Event TWN-15 Nitrate, Nitrate + Chloride (mg/l) Monitoring Event TWN-16 Nitrate, Nitrate + Chloride (mg/l) 1st Qtr 3/18/2010 2nd Qtr 5/28/2010 3rd Qtr 7/13/2010 4th Qtr 12/9/2010 1st Qtr 1/27/2011 2nd Qtr 4/27/2011 3rd Qtr 7/28/2011 4th Qtr 10/19/2011 1st Qtr 1/11/2012 2nd Qtr 4/20/2012 3rd Qtr 7/26/2012 4th Qtr 10/17/2012 1st Qtr 2013 2nd Qtr 2013 0.7 1.0 1.0 1.2 1.4 1.6 1.6 1.3 1.5 1.6 2.1 1.79 NA NA TWN-15 abandoned on July 31, 2013 1st Qtr 3/17/2010 2nd Qtr 5/27/2010 3rd Qtr 9/27/2010 4th Qtr 12/9/2010 1st Qtr i/27/2011 2nd Qtr 4/27/2011 3rd Qtr 7/27/2011 4th Qtr10/18/2011 1st Qtr 1/10/2012 2nd Qtr 4/19/2012 3rd Qtr 7/25/2012 4th Qtr 7/16/2012 1st Qtr 2013 2nd Qtr 2013 3rd Qtr 2013 4th Qtr 2013 1st Qtr 2014 1.2 1.3 2.6 2 4.6 1.6 2.4 2 6. 2 8 2.0 2.4 2.50 35 35 35 30 ' 34 39 31 34 33 50 33 32.1 NA NA NA NA NA Monitoring Event TWN-17 Nitrate, Nitrate + Chloride (mg/l) Monitoring Event TWN-18 Nitrate, Nitrate + Chloride (mg/l) 1st Qtr 3/24/2010 2nd Qtr 6/3/2010 3rd Qtr 7/15/2010 4th Qtr 12/10/2010 1st Qtr 2/1/2011 2nd Qtr 4/28/2011 3rd Qtr7/29/2011 4th Qtr 10/20/2011 1st Qtr 1/12/2012 2nd Qtr 4/20/2012 3rd Qtr 7/27/2012 4th Qtr 10/17/2012 1st Qtr 2013 2nd Qtr 2013 3rd Qtr 2013 10.4' III 8.9 8.6 9 8.5 8.1 8.7 9.1 9.5 9.65 Nitrate Pumping NA NA NA TWN-17 abandoned on July 31, 2013 78 1st Qtr 3/17/2010 1.6 87 2nd Qtr 6/1/2010 1.8 66 3rd Qtr 9/27/2010 1.8 65 4th Qtr 12/9/2010 1.6 90 1st Qtr 1/27/2011 1.4 81 2nd Qtr 4/26/2011 1.8 74 3rd Qtr 7/28/2011 1.8 71 4th Qtr 10/18/2011 1.9 79 1st Qtr 1/10/7012 1.9 80 2nd Qtr 4/19/2012 2.1 85 3rd Qtr 7/26/2012 2.3 84.8 4th Qtr 7/16/2012 [ 1.95 System Started in January 2013 "lst Qtr 2/18/2013 [2.27 2nd Qtr 2/23/2013 2.32 3rd Qtr 8/27/2013 2.04 4th Qtr 10/16/2013 2.15 lst Qtr /14/2014 2.33 42 63 64 59 61 67 65 60 "' 64 64 67 67.5 68.7 64.3 70.4 67.3 68.4 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/l NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 4 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event TWN-19 Nitrate, Nitrate - Nitrite (mg/l) Chloride (mg/l) Monitoring Event Upper Wildlife Pond (UMLP) Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) lst Qtr 3/23/2010 2nd Qtr 6/1/2010 3rd Qtr 9/27/2010 4th Qtr12/9/2010 1st Qtr 2/1/2011 2nd Qtr 4/28/2011 3rd Qtr 7/28/2011 4th Qtr 10/18/2011 lst Qtr 1/10/2012 2nd Qtr 4/19/2012 3rd Qtr 7/26/2012 4th Qtr 10/16/2012 lst Qtr 2013 2nd Qtr 2013 3rd Qtr 2013 4th Qtr 2012 lst Qtr 2014 7.2 6.2 7.2 7.0 7.0 6.9 7.1 6.5 7.0 6.8 7.5 7.7 118 113 113 107 114 120 113 108 114 117 117 118 NA NA NA NA NA lst Qtr 3/18/2010 2nd Qtr 6/2/2010 3rd Qtr 7/19/2010 4th Qtr 12/10/2010 1st Qtr 1/31/2011 2nd Qtr 4/25/2011 3rd Qtr 7/25/2011 4th Qtr10/19/2011 lst Qtr 1/31/2012 2nd Qtr 2012 3rd Qtr 2012 4th Qtr 2012 1st Qtr'2013' 2nd Qtr 2013 3rd Qtr 2013 4 t h Qt r 2 012 lst Qtr 2014 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 <0.1 NS NS NS NA NA NA NA NA 0.1 0.1 <1.0 <1.0 <1.0 <1.0 <1.0 <1.0 NS NS NS Monitoring Event Piezometer 1 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) Monitoring Event Piezometer 2 Nitrate, Nitrate + Nitrite (mg/l) Chloride (mg/l) lst Qtr 2010 2nd Qtr 6/2/2010 3rd Qtr 7/19/2010 4th Qtr 12/10/2010 istQtr"i'/3i/2011 2nd Qtr 4/25/2011 3rd Qtr 7/25/2011 4th Qtr 10/19/2011 1st Qtr1/11/2012 lst Qtr 1/10/2012 2nd Qtr 4/20/2012 3rd Qtr 7/27/2012 4th Qtr 10/17/2012 lst Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4th Qtr 10/16/2013 1st Qtr 1/13/2014 NS NS 7.2 6.8 6.5 7 6.8 7 6.6 7.1 7.0 6.6 7.2 7.66 52 52 60 60 58 53 55 78 114 58 56 55 1st Qtr 2010 2nd Qtr 6/2/2010 3rd Qtr 7/19/2010 4th Qtr 12/10/10 lst Qtr 1/31/2011 2nd Qtr 4/25/2011 3rd Qtr 7/25/2011 4th Qtr10/19/2011 1st Qtr 1/11/2012 lst Qtr 1/31/2012 2nd Qtr 4/20/2012 3rd Qtr 7/27/2012 4th Qtr 7/17/2012 NS NS Nitrate Pumping System Started in January 2013 8.11 8.88 7.83 6.68 6.79 56.7 53.3 55.1 54.1 '56.2 lst Qtr 2/19/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4th Qtr 10/16/2013 1st Qtr 1/13/2014 0.6 0.6 0.2 0.3 0.3 0.1 0.1 6.1 0.1 0.2 0.2 0.19 0.22 0.172 0.198 0.36 0.169 8 8 6 9 8 9 8 9 1 8 9 9.5 9.67 10.3 9.66 9.22 11.4 Monitoring Event Piezometer 3 Nitrate. Nitrate + Chloride (mg/l) Monitoring Event Pond D Nitrate. Nitrate + Chloride (me/I) 1st Qtr 3/24/2010 2nd Qtr 6/2/2010 3rd Qtr 7/19/2010 4th Qtr 12/9/2010 lst Qtr 1/31/2011 2nd Qtr 4/25/2U11 3rd Qtr 7/25/2011 4th Qtr 10/19/2011 lst Qtr 1/11/2012 2nd Qtr 4/20/2012 3rd Qtr 7/27/2012 4thi Qtr 10/17/2012 1st Qtr 2/24/2013 2nd Qtr 4/24/2013 3rd Qtr 8/28/2013 4thi Qtr10/16/2013 1st Qtr 1/13/2014 1.7 1.6 1.8 1.8 1.8 1./ 116 36 35 25 40 ib 61 12 20 53 21 20.1 lst Qtr 2010 2nd Qtr 2010 3rd Qtr 2010 4th Qtr 2010 1st Qtr 1/31/2011 2nd Qtr 2011 3rd Qtr 2011 4th Qtr 2011 lst Qtr 2012 2nd Qtr 2012 3rd Qtr 2012 4th Qtr 2012 NS NS NS NS 0.1 1.8 1.7 1.8 1.7 1.8 2.75, Nitrate Pumping System Started nVJahuary'2ul3' "L85 NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS NS 1.83 1.81 1.8 1.7 21 21.2 22.4 23.5 26 lst Qtr 2013 2nd Qtr 2013 3rd Qtr 2013 4th Qtr 2013 1st Qtr 2014 NA NA NA NA NA NS = Not sampled NA = Per the CAP and SCO, these wells not sampled 2013 Table 1 of 5 Historic Nitrate, Nitrate + Nitrite and Cloride Concentrations Nitrate Contamination Investigation White Mesa Uranium Mill Denision Mines Corp. Monitoring Event Chloride (mg/l) Nitrate, Nitrate + Nitrite (mg/l) 635 586 29.7 487 at. 45.2 501 5*6 598 TW4-22 (Pumping well starting in January 2013) Monitoring Event TW4-24 (Pumping well stating in January 2013) Chloride (mg/l) Nitrate, Nitrate + Nitrite (mg/l) 3S.9 596 23 / 916 32 h 998 34.6 1,030 809 lst Qtr 2/11/2013 2nd Qtr 6/5/2013 3rd Qtr 9/3/2013 4th Qtr 10/29/2013 1st Qtr 1/27/2614 lst Qtr 2/11/2013 2nd Qtr 6/5/2013 3rd Qtr 9/3/2013 4th Qtr 10/3/2013 lst Qtr 1/27/2014 Monitoring Event TW4-25 (Pumping well starting in January 2013) Nitrate, Nitrate - Nitrite (mg/l) lst Qtr 2/11/2013 2nd Qtr 6/5/2013 3rd Qtr 9/3/2013 4 th Qtr 10/29/2013 1st Qtr 1/27/2014 9 5.24 5.69 6.1 2.16 Chloride (mg/l) 190 136 119 88.6 85.7 Shaded = Nitrate, Nitrate + Nitrite concentrations greater than the Ground Water Quality Standard of 10 mg/l Table 2 Summary of QA/QC Duplicate Sample 3rd Quarter 2013 Parameter GWQS Duplicate of TWN-4 TWN-4 TWN-65 RPD Nitrate + Nitrite (as N) 10 mg/L Chloride none 1.58 ~27.2 1.57 0.6 29 -6.4 4th Quarter 2013 Parameter GWQS Duplicate of TWN-1 TWN-4 TWN-65 RPD Nitrate + Nitrite (as N) Chloride 10 mg/L none 1.61 1.48 8.4 28.6 27.1 5.4 1st Quarter 2014 Parameter GWQS Duplicate of TWN-4 TWN-4 TWN-65 RPD Nitrate + Nitrite (as N) Chloride 10 mg/L none 1.41 28.4 1.33 264 5^8 "7.3 Tabel 3 DRC Nitrate Mass Removal Calculations Energy Fuels Resorses Inc. White Mesa Mill, Bland, Utah 3rd Quarter 2013 Data Discriptions MW4 Chloroform Pumping MW-26 TW4-4 Wells Nitrate Pumping Wells TW4-19 TW4-20 TWN-2 TW4-22 TW4-24 TW4-25 Nitrate (mg/L) Nitrate (g/L) Nitrate (Ibs/L) Nitrate (lbs/gal) Total gallons pumped lbs of nitrate removed Gallons of nitrate removed 4.9 4.90E-03 1.08E-05 4.10E-05 69,834 2 9 0.23 20 1 98E-03 4.37E-06 1.66E-05 25,763 0.4 0 03 72 7.22E-03 1.60E-05 6.04E-05 63,515 3.8 0 31 17.6 1 76E-02 3.89E-05 1 47E-04 329,460 48 5 3.95 8.7 8 70E-03 1 92E-05 7.28E-05 19,731 1.4 0 12 80 0 8.00E-02 1.77E-04 6 69E-04 50,037 33 5 2.72 29 7 2 97E-02 6.56E-05 2.48E-04 25,593 6.4 0.52 32 6 3.26E-02 7 20E-05 2 73E-04 267,704 73 0 5.94 5.7 5.70E-03 1.26E-05 4.77E-05 145,841 70 0 57 Total lbs of nitrate removed from chloroform pumping wells Total gallons of nitrate removed chloroform pumping wells 57.1 4.6 Total lbs of nitrate removed from nitrate pumping wells Total gallons of nitrate removed nitrate pumping wells 119.8 97 Total lbs nitrate removed from all pumping wells Total gallons of nitrate removed from all pumping wells % lbs of nitrate removed by nitrate pumping wells 176.8 14.4 67.7 4th Quarter 2013 Data Discriptions Chloroform Pumping MW4 MW-26 TW4-4 Wells TW4-19 TW4-20 Nitrate Pumping Wells TWN-2 TW4-22 TW4-24 TW4-25 Nitrate (mg/L) Nitrate (g/L) Nitrate (Ibs/L) Nitrate (lbs/gal) Total gallons pumped lbs of nitrate removed Gallons of nitrate removed 5.3 5 30E-03 1 17E-05 4 43E-05 70,340 3 1 0 25 1 4 1 40E-03 3 09E-06 1 17E-05 24,208 0 3 0 02 7 8 7 80E-03 1.72E-05 6.52E-05 60,234 3.9 0 32 4 7 4 70E-03 1 04E-05 3.93E-05 403,974 15.9 1 29 96 9 64E-03 2 13E-05 8 06E-05 19,280 1.6 0 13 111 0 1.11E-01 2.45E-04 9 28E-04 49,980 46 4 3.78 45.2 4 52E-02 9.99E-05 3.78E-04 24,952 94 0.77 34 6 3.46E-02 7.64E-05 2.89E-04 260,555 75 4 6 13 6.0 6.00E-03 1.33E-05 5.02E-05 126,577 64 0.52 Total lbs of nitrate removed from chloroform pumping wells Total gallons of nitrate removed chloroform pumping wells 24.8 2.0 Total lbs of nitrate removed from nitrate pumping wells Total gallons of nitrate removed nitrate pumping wells 137.6 11 2 Total lbs nitrate removed from all pumping wells Total gallons of nitrate removed from all pumping wells % lbs of nitrate removed by nitrate pumping wells 162.3 13.2 84.7 0.1 0 1 75 2 1st Quarter 2014 Data Discriptions Chloroform Pumping Wells MW4 MW-26 TW4-4 TW4-19 TW4-20 TWN-2 Nitrate Pumping Wells TW4-22 TW4-24 TW4-25 Nitrate (mg/L) Nitrate (g/L) Nitrate (Ibs/L) Nitrate (lbs/gal) Total gallons pumped lbs of nitrate removed Gallons of nitrate removed 4 7 4.70E-03 1.04E-05 3.93E-05 69,834 2 7 0 22 0 5 5.49E-04 1.21 E-06 4.59E-06 23,263 0.1 0 01 73 7 28E-03 1 61 E-05 6 09E-05 58,993 36 0 29 1 6 1 62E-03 3 58E-06 1 35E-05 304,851 4 1 0 34 7 6 7.56E-03 1.67E-05 6.32E-05 18,782 1.2 0 10 42 6 4 26E-02 9 41 E-05 3.56E-04 48,320 17 2 1.40 54 6 5 46E-02 1 21 E-04 4 57E-04 24,532 11.2 0.91 31.6 3.16E-02 6 98E-05 2.64E-04 229,064 60 5 4 93 2.2 2.16E-03 4 77E-06 1 81 E-05 129,979 2.3 0 19 Total lbs of nitrate removed from chloroform pumping wells Total gallons of nitrate removed chloroform pumping wells 11.8 1.0 Total lbs of nitrate removed from nitrate pumping wells Total gallons of nitrate removed nitrate pumping wells 91.3 7.4 Total lbs nitrate removed from all pumping wells Total gallons of nitrate removed from all pumping wells % lbs of nitrate removed by nitrate pumping wells 103.1 8.4 88.6