Loading...
HomeMy WebLinkAboutDRC-2014-004762 - 0901a06880479ef3ENERGYFUELS DRC-2014-004762 Energy Fuels Resources (USA) Inc. 225 Union Blvd. Suite 600 Lakewood, CO, US, 80228 303 974 2140 www.energyfuels.com VIA EMAIL AND OVERNIGHT DELIVERY August 7, 2014 Mr. Bryce C. Bird Division Director Utah Department of Environmental Quality Air Quality Division 195 North 1950 West Salt Lake City, Utah 84116 CE/p O AUG WK 9f Re: Energy Fuels Resources (USA) Inc. Notification for the Third Quarter of 2014 - Schedule for the NESHAPs Radon Flux Measurements for Tailings Impoundment 3 at the White Mesa Mill Dear Mr. Bird: Energy Fuels Resources (USA) Inc. ("EFRI") plans to perform a third sampling event for NESHAPs Radon Flux measurements for Tailings Impoundment 3 at the White Mesa Mill. As indicated in letters dated December 4, 2013 and March 6, 2014, the first measurements were taken March 24-27, 2014 and the second measurements were taken June 2-5, 2014. Per 40 CFR 61.253, EFRI is permitted to monitor Radon Flux one or more times per year. EFRI is choosing to sample Tailings Impoundment 3 quarterly in 2014 to capture a wider range of climatic conditions. Consistent with 40 CFR 61.253, EFRI is permitted to submit a schedule for additional sampling periods either prior to or after the first measurement period. Therefore, EFRI is providing this schedule for the third sampling event for Tailings Impoundment 3 in 2014. Sampling Dates Tailings Impoundment 3 September 8-11, 2014 Third Quarter Sampling Event Tellco Environmental of Grand Junction, Colorado ("Tellco") will perform approximately 100 measurements on the beach and cover area of Tailings Impoundment 3 during the quarerly sampling event. These measurements will be performed in accordance with methods and procedures set forth in 40 CFR Part 61, Appendix B, Method 115. Provided that there are no rainouts or events that require remobilization or a delay in measurement, the third sampling event for Tailings Impoundment 3 is expected to conclude on September 11, 2014. EFRI will provide safety and radiological orientation for any Utah Department of Air Quality personnel observing this event. This orientation will be required before any individual enters the Mill Restricted Area. Individuals monitoring this event should bring their own mandatory Letter to B. Bird August 7, 2014 Page 2 of 2 Personnel Protective Equipment as required at the Mill, specifically, safety glasses, hardhats, and steel-toed shoes. If you have any questions or require assistance, please contact Mr. Dan Hillsten, Mill Manager at 435-678-4105; or Mr. David Turk, Environmental Health and Safety Manager, at 435-678-4113. Yours very truly, ENERGY FUELS RESOURCES (USA) INC. ^ Jaime Massey Regulatory Compliance Specialist cc: David C. Frydenlund Dan Hillsten Ronnie Nieves Harold R. Roberts David Turk Kathy Weinel Frank Filas Director, Air and Toxics Technical Enforcement Program, Office of Enforcement, Compliance and Environmental Justice, U.S. Environmental Protection Agency