HomeMy WebLinkAboutDRC-2014-004762 - 0901a06880479ef3ENERGYFUELS DRC-2014-004762
Energy Fuels Resources (USA) Inc.
225 Union Blvd. Suite 600
Lakewood, CO, US, 80228
303 974 2140
www.energyfuels.com
VIA EMAIL AND OVERNIGHT DELIVERY
August 7, 2014
Mr. Bryce C. Bird
Division Director
Utah Department of Environmental Quality
Air Quality Division
195 North 1950 West
Salt Lake City, Utah 84116
CE/p
O
AUG WK
9f
Re: Energy Fuels Resources (USA) Inc. Notification for the Third Quarter of 2014 -
Schedule for the NESHAPs Radon Flux Measurements for Tailings Impoundment 3 at
the White Mesa Mill
Dear Mr. Bird:
Energy Fuels Resources (USA) Inc. ("EFRI") plans to perform a third sampling event for
NESHAPs Radon Flux measurements for Tailings Impoundment 3 at the White Mesa Mill. As
indicated in letters dated December 4, 2013 and March 6, 2014, the first measurements were
taken March 24-27, 2014 and the second measurements were taken June 2-5, 2014. Per 40 CFR
61.253, EFRI is permitted to monitor Radon Flux one or more times per year. EFRI is choosing
to sample Tailings Impoundment 3 quarterly in 2014 to capture a wider range of climatic
conditions.
Consistent with 40 CFR 61.253, EFRI is permitted to submit a schedule for additional sampling
periods either prior to or after the first measurement period. Therefore, EFRI is providing this
schedule for the third sampling event for Tailings Impoundment 3 in 2014.
Sampling Dates Tailings Impoundment 3
September 8-11, 2014 Third Quarter Sampling Event
Tellco Environmental of Grand Junction, Colorado ("Tellco") will perform approximately 100
measurements on the beach and cover area of Tailings Impoundment 3 during the quarerly
sampling event. These measurements will be performed in accordance with methods and
procedures set forth in 40 CFR Part 61, Appendix B, Method 115. Provided that there are no
rainouts or events that require remobilization or a delay in measurement, the third sampling
event for Tailings Impoundment 3 is expected to conclude on September 11, 2014.
EFRI will provide safety and radiological orientation for any Utah Department of Air Quality
personnel observing this event. This orientation will be required before any individual enters the
Mill Restricted Area. Individuals monitoring this event should bring their own mandatory
Letter to B. Bird
August 7, 2014
Page 2 of 2
Personnel Protective Equipment as required at the Mill, specifically, safety glasses, hardhats, and
steel-toed shoes.
If you have any questions or require assistance, please contact Mr. Dan Hillsten, Mill Manager at
435-678-4105; or Mr. David Turk, Environmental Health and Safety Manager, at 435-678-4113.
Yours very truly,
ENERGY FUELS RESOURCES (USA) INC.
^ Jaime Massey
Regulatory Compliance Specialist
cc: David C. Frydenlund
Dan Hillsten
Ronnie Nieves
Harold R. Roberts
David Turk
Kathy Weinel
Frank Filas
Director, Air and Toxics Technical Enforcement Program,
Office of Enforcement, Compliance and Environmental Justice,
U.S. Environmental Protection Agency