HomeMy WebLinkAboutDRC-2013-002223 - 0901a0688037b690Department of
Environmental Quality
Amanda Smith
Executive Director
M DRC-2013-002223 M
State of Utah DIVISION OF RADIATION CONTROL
GARY R. HERBERT
Governor
Rusty Lundberg
Director
GREG BELL
Lieutenant Governor
April 8,2013
Jo Ann Tischler
Director, Compliance and Permitting
Energy Fuels Resources (USA), Inc.
225 Union Blvd., Suite 600
Lakewood, Co 80228
SUBJECT: Energy Fuels Resources (USA), Inc., Operations and Maintenance Plans for the Nitrate
Pumping System Revision 2.0 and Chloroform Pumping System Revision 2.2, White
Mesa Mill, Blanding, Utah, - Approval Letter.
Dear Ms. Tischler:
The Utah Division of Radiation Control ("UDRC") has reviewed the Energy Fuels Resources
(USA), Inc. ("EFRI") March 21, 2013 Operations and Maintenance Plan Nitrate Pumping System
Revision 2.0 and the March 21, 2013 Operations and Maintenance Plan Chloroform Pumping
System Revision 2.2 at the White Mesa Mill ("Mill"), near Blanding, Utah.
Based on our review, it is noted that in addition to the existing procedure in each plan addressing
the transfer of pumped groundwater from both the nitrate and chloroform pumping systems to the
tailings cells, the revisions provide for the option of utilizing the groundwater as makeup water for
the milling process. As nonradiological constituents that have been or are associated with the
overall milling process, the revisions in each plan will not create an increased occupational or
public dose and is therefore protective of health and safety and the environment and are hereby
approved.
If you have any questions please contact Dean Henderson at 801-536-0046.
Sincerely,
Rusty Lundberg
Director
RL/DH
195 North 1950 West • Salt Lake City, UT
Mailing Address P.O Box 144850 • Salt Lake City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D D (801) 536-4414
, www deq utah gov
Printed on 100% recycled paper