Loading...
HomeMy WebLinkAboutDRC-2013-002223 - 0901a0688037b690Department of Environmental Quality Amanda Smith Executive Director M DRC-2013-002223 M State of Utah DIVISION OF RADIATION CONTROL GARY R. HERBERT Governor Rusty Lundberg Director GREG BELL Lieutenant Governor April 8,2013 Jo Ann Tischler Director, Compliance and Permitting Energy Fuels Resources (USA), Inc. 225 Union Blvd., Suite 600 Lakewood, Co 80228 SUBJECT: Energy Fuels Resources (USA), Inc., Operations and Maintenance Plans for the Nitrate Pumping System Revision 2.0 and Chloroform Pumping System Revision 2.2, White Mesa Mill, Blanding, Utah, - Approval Letter. Dear Ms. Tischler: The Utah Division of Radiation Control ("UDRC") has reviewed the Energy Fuels Resources (USA), Inc. ("EFRI") March 21, 2013 Operations and Maintenance Plan Nitrate Pumping System Revision 2.0 and the March 21, 2013 Operations and Maintenance Plan Chloroform Pumping System Revision 2.2 at the White Mesa Mill ("Mill"), near Blanding, Utah. Based on our review, it is noted that in addition to the existing procedure in each plan addressing the transfer of pumped groundwater from both the nitrate and chloroform pumping systems to the tailings cells, the revisions provide for the option of utilizing the groundwater as makeup water for the milling process. As nonradiological constituents that have been or are associated with the overall milling process, the revisions in each plan will not create an increased occupational or public dose and is therefore protective of health and safety and the environment and are hereby approved. If you have any questions please contact Dean Henderson at 801-536-0046. Sincerely, Rusty Lundberg Director RL/DH 195 North 1950 West • Salt Lake City, UT Mailing Address P.O Box 144850 • Salt Lake City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D D (801) 536-4414 , www deq utah gov Printed on 100% recycled paper