Loading...
HomeMy WebLinkAboutDRC-2013-001661 - 0901a0688035d679State of Utah GARY R HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director MEMORANDUM TO: THROUGH FROM: DATE: SUBJECT: DRC-2013.001661 File Phil Goble, Section Manager Russell J. Topham, P.E. March 20, 2013 Engineering Module 75E, DMT/BAT Field Inspection - Follow up; Radioactive Materials License Number UTl 900479 (RML) and Ground water Discharge Permit UG370004 (GWDP). Energy Fuels Resources, Inc. (EFR) White Mesa Mill, Blanding, Utah On September 20 and 21, 2012,1 conducted an inspection of the tailings management facilities and office records pertaining to the operation and maintenance of discharge minimization technology and approved implementation of best available technologies for the White Mesa uranium mill, Energy Fuels resources (USA) Inc. (EFR). No items of noncompliance were fotmd. We forwarded a closeout letter to EFR on September 28, 2012, in which we listed three findings. The second and third of those findings included advisory comments, which I discuss below. On March 7, 2013, while conducting an inspection of ISL burial activities, I took the opportunity to check up on these two issues, and thought it best to document my observations in the file. I do not anticipate a need to write a response to EFR at this time, inasmuch as I will conduct a DMT inspection later this year, and will be evaluating these items at that time. Minor rill erosion on exterior dikes of Cells 4A and 4B The following is quoted from my report following the September, 2012 BAT inspection: Finding; Minor rill erosion was noted on the embankments forming the containment dikes along the south side of Cells 4A and 4B. I was informed that the bulldozer used for grooming these side slopes was down for repair, and mill personnel claimed the Mill had no funds to complete the repair. Recommendation: Groom the exterior side slopes of the Cells 4A and 4B containment dikes to eliminate rill erosion before it progresses to a point that it endangers the stability of the dikes. EFR has obtained a new bulldozer. During my March 7, 2013 site visit, I noted that the exterior side slopes of Cells 4A and 4B had been groomed, eliminating all signs of erosion. Placement of movement monitors on south side of Cell 4A 195 North 1950 West • Salt Lake City, UT Mailmg Address P.O Box 144850 • Salt Uke City, UT 84114-4850 Telephone(801) 536-4250-Fax (801) 5334097-TDD (801)536-4414 , www deq Utah gov Printed on 100% recycled paper Page 2 The following is quoted from my report following the September, 2012 BAT inspection: Finding: Several movement monitors in the roadway at the top of the Cell 4A containment dike may have been disturbed during grading activities. The placement of these monitors in the center of the roadway makes them vulnerable to such disturbance. Recommendation: Set movement monuments on the outer shoulder of the cell, as was done for Cell 4B. David Turk indicated to me that he now had frmding to relocate the movement monitors. EFR will include movement of the monitor points to the inside shoulder of the dike, inside the fence, during the annual movement monitor survey in May.