HomeMy WebLinkAboutDRC-2012-001811 - 0901a06880303be5State of Utah
GARY R HERBERT
Governor
GREG BELL
Lieutenant Governor
^1 department of
Environmental Quality
Amanda Smith
Executive Director
DIVISION OF RADIATION CONTROL
Rusty Lundberg
Director
001811
July 23, 2012
CERTIFIED MAIL
RETURN RECEIPT REQUESTED
Mr David C Frydenlund
Vice President and General Counsel
Denison Mines (USA) Corp (DUSA)
1050 Seventeenth St Suite 950
Denver, Colorado, 80265
Subject 1'* Quarter, 2012 DUSA DMT Performance Standards Momtonng Report and Cell 4A
and Cell 4B Performance Standards Momtonng Report (Dated May 30, 2012) Ground
Water Quality Discharge Permit UGW3 70004 DRC Findings, Notice of Enforcement
Discretion and Closeout
Dear Mr Frydenlund
On May 31, 2012, the Utah Division of Radiation Control (DRC) received the 1'^ Quarter, 2012
DMT Performance Standards Monitonng Report and Cell 4A and Cell 4B Performance Standards
Monitonng Report (dated May 30, 2012) for the DUSA White Mesa Mill near Blanding, Utah
This letter summanzes the outcome of our staff review of the Report The DRC findings were as
follows
1 Part I E 8(a)(1) of the GWDP requires DUSA to provide continuous operation of the Cell
4B leak detection system pumping and monitonng equipment, and to make such
equipment operational within 24 hours of discovery of a failure of such equipment On
March 14, 2012 Mill personnel discovered that the LDS programmable logic controller
(PLC) had ceased reporting and recording discharge flow rates Working with the
equipment vendor, on March 15, 2012 DUSA identified the need to replace the PLC
board DUSA received and installed the replacement on March 16, 2012
2 DUSA notified the DRC verbally of the failure on March 14, 2012 and in wnting on
March 19,2012
3 In all other respects it appears DUSA complied with applicable standards as detailed in the
DMT and BAT Plans
195 North 1950 West • Salt Uke City, UT
Mailing Address P O Box 144850 • Salt Uke City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533-4097 -TDD (801) 536-4414
www deq utah gov
Printed on 100% recycled paper
David C Frydenlund
Page 2
July 23,2012
Notice of Enforcement Discretion
Although DUSA failed to retum the Cell 4B leak detection system PLC to full fimctionality
within 24 hours of discovenng a failure of the product, the Division Director has determined to
use enforcement discretion m this matter, based on
1 DUSA personnel made reasonable efforts to troubleshoot and repair the flow totalizer
2 DUSA continued to monitor the system to ensure proper operation, and to detect recurrent
problems at the time they occurred, rather than days later
3 The product failure and protracted trouble shooting did not result in a violation of the
performance standards for the leak detection system, or result in failure to detect a liner
breach
4 Repairs which DUSA has made appear to have retumed the equipment to proper operation
Closeout
Inasmuch as no open issues remain, DRC considers the review of the 1st Quarter, 2012 DUSA
DMT Performance Standards Monitonng Report and the Cell 4A and Cell 43 Performance
Standards Monitonng Report and the failure of the flow totalizer to be hereby closed
Ifyou have any questions please contact at Russ Topham at (801) 536-4256
Sincerely,
Rusty Lundberg
Director
RL/RJT rjt
113
wD
I
a
r-=1
cr
o o
o
•
HI
HI
C3
r-
U.S. Postal Service™
CERTIFIED MAILT. RECEIPT
(Domestic Mail Only; No Insurance Coverage Provided)
For delivery information visit our website at www.usps.com,B
Postmark
Postage
Certified Fee
Retum Receipt Fee _>^.-.«I-MT
RE 7/23/12, NOTICE OF^ENFORCEMENT
RJT
David C Frydenlund
Vice President & General Counsel
Denison Mines (USA) Corp (DUSA)
1050 17th ST STE 950
Denver CO 80265
PS Form 3100. August 2006 See Reverse (or Instructions
ENDER: COMPLETE THIS SECTION
Complete items 1,2, and 3 Also complete
Item 4 if Restncted Delivery Is desired
• Pnnt your name and address on the reverse
so that we can return the card to you
• Attach this card to the back of the mailpiece,
or on the front if space permits
1 Article Addressed to
COMPLETE THIS SECTION ON DELIVERY
(J^Agent
• Addressee
b Date.oIX)elivery
RE 7/23/12, NOTICE OF ENFORC
RJT
David C Frydenlund
Vice President & General Counsel
Denison Mines (USA) Corp (DUSA)
105017th ST STE 950
Denver CO 80265
• Yes
2 Article Number
(Transfer from service label) 7D11 DUO DDOl 7T51 DbbD
PS Form 3811. February 2004 Domestic Return Receipt 102595-02-M-1540