Loading...
HomeMy WebLinkAboutDRC-2012-001956 - 0901a0688030af21State of Utah JONM HUNTSMAN, JR Governor GARY HERBERT Lieutenant Governor DRC-2012-001956 Department of Enviromnental Quality Amanda Smith Acting Executive Director DP/ISION OF RADIATION CONTROL Rusty Lundberg Director Apnl 18, 2012 CERTIFIED MAIL (Retum Receipt Requested) Jo Ann Tischler Director, Compliance and Permitting Denison Mines (USA) Corp (DUSA) 1050 Seventeenth Street, Suite 950 Denver, CO 80265 Dear Ms Tischler SUBJECT Compliance New Decontamination Pad Pump (NDP) Sump Design Drawing, White Mesa Uranium Mill Ground Water Discharge Permit No UGW3 70004, Conditional Approval On Apnl 12, 2012 the Utah Division of Radiation Control (DRC) received through email a single- sheet plan for an improvement to the existing NDP recirculation pump at the DUSA White Mesa Uranium Mill The plan sheet was submitted as an attachment to an Apnl 12, 2012 DUSA response to the Notice of Violation and Compliance Order (Order), Docket No UGW 12-01, dated March 7, 2012 The design drawing was submitted in response to Violation No 5, where DUSA failed to control contact wash water at the New Decontamination Pad near the scale house This violation was observed dunng an October 18, 2011 DRC inspection where DRC Staff observed that the New Decontamination Pad pump back system was leaking to the ground The proposed new design includes construction of a catchment to prevent release of contact water to the soil DRC also understands that DUSA intends to complete construction of the sump within 15 calendar days of approval of the construction plan After DRC review of the new design drawing for the existing NDP recirculation pump, the Executive Secretary has determined that the design drawing can be approved on the following conditions , 168 North 1950 West • Salt Lake City, UT Mailmg Address P O Box 144850 • Sah Uke City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533^097 'TDD (801) 536-4414 www deq Utah gov Pnnted on 100% recycled paper Jo Ann Tischler Apnl 18, 2012 Page 2 1 Notify the DRC when construction is completed to allow the opportunity for inspection, and 2 Submit As-Built drawings within 30 calendar days after completion of construction The As-Built drawings must include specifications of the matenal used dunng construction If you have any questions please contact Russell J Topham, P E at (801) 536-4256 UTAH WATER QUALITY BOARD Rusty Lundberg ^ Co-Executive Secretary RL RTrt • • a o a RE 4/18/12 conditional approvia / RT Jo Ann Tischler Denison Mines (USA) Corp 1050 Seventeenth ST, STE 950 Denver, CO 80265 PS Form 3»00, August 200S See Reverse for Instructions SENDER: COMPLETE THIS SECTION Complete items 1,2, and 3 Also complete Item 4 if Restricted Delivery is desired Print your name and address on the reverse so that we can return the card to you Attach this card to the back of the mailpiece, or on the front if space permits i OMPLETE THIS SECTION ON DELIVERY natui 41 •S^Agent • Addressee B__gpceived by (Panted Name) 4^ B__geceived by (Par D Isaeliveryaddress C Date oi Dt RE 4/18/12 conditional approvia / RT Jo Ann Tischler ^ Denison Mines (USA) Corp 1050 Seventeenth ST, STE 950 Denver, CO 80265 D ^sclelivery address different from item 17 • Yes YES, enter delivery address below O No Delivery 1- * y 3 ^n^iceType uL Certified Mail • Express Mail • Registered • Return Receipt for Merchandise • Insured Mail •COD 4 Restricted Delivery? (Extra Fee) • Yes 2 Article Number (Transfer from sen/Ice label) 7D11 OllD DODl D4Hfl PS Form 3811, February 2004 Domestic Return Receipt 102595^2-M-1540