Apnl 18, 2012
CERTIFIED MAIL
(Retum Receipt Requested)
Jo Ann Tischler
Director, Compliance and Permitting
Denison Mines (USA) Corp (DUSA)
1050 Seventeenth Street, Suite 950
Denver, CO 80265
Dear Ms Tischler
SUBJECT Compliance New Decontamination Pad Pump (NDP) Sump Design Drawing,
White Mesa Uranium Mill Ground Water Discharge Permit No UGW3 70004,
Conditional Approval
On Apnl 12, 2012 the Utah Division of Radiation Control (DRC) received through email a single-
sheet plan for an improvement to the existing NDP recirculation pump at the DUSA White Mesa
Uranium Mill The plan sheet was submitted as an attachment to an Apnl 12, 2012 DUSA
response to the Notice of Violation and Compliance Order (Order), Docket No UGW 12-01, dated
March 7, 2012 The design drawing was submitted in response to Violation No 5, where DUSA
failed to control contact wash water at the New Decontamination Pad near the scale house This
violation was observed dunng an October 18, 2011 DRC inspection where DRC Staff observed
that the New Decontamination Pad pump back system was leaking to the ground
The proposed new design includes construction of a catchment to prevent release of contact water
to the soil DRC also understands that DUSA intends to complete construction of the sump within
15 calendar days of approval of the construction plan
After DRC review of the new design drawing for the existing NDP recirculation pump, the
Executive Secretary has determined that the design drawing can be approved on the following
conditions ,
168 North 1950 West • Salt Lake City, UT
Mailmg Address P O Box 144850 • Sah Uke City, UT 84114-4850
Telephone (801) 536-4250 • Fax (801) 533^097 'TDD (801) 536-4414
www deq Utah gov
Pnnted on 100% recycled paper
Jo Ann Tischler
Apnl 18, 2012
Page 2
1 Notify the DRC when construction is completed to allow the opportunity for inspection,
and
2 Submit As-Built drawings within 30 calendar days after completion of construction The
As-Built drawings must include specifications of the matenal used dunng construction
If you have any questions please contact Russell J Topham, P E at (801) 536-4256
UTAH WATER QUALITY BOARD
Rusty Lundberg ^
Co-Executive Secretary
RL RTrt
•
•
a
o
a
RE 4/18/12 conditional approvia / RT
Jo Ann Tischler
Denison Mines (USA) Corp
1050 Seventeenth ST, STE 950
Denver, CO 80265
PS Form 3»00, August 200S See Reverse for Instructions
SENDER: COMPLETE THIS SECTION
Complete items 1,2, and 3 Also complete
Item 4 if Restricted Delivery is desired
Print your name and address on the reverse
so that we can return the card to you
Attach this card to the back of the mailpiece,
or on the front if space permits
i OMPLETE THIS SECTION ON DELIVERY
natui
41 •S^Agent
• Addressee
B__gpceived by (Panted Name)
4^
B__geceived by (Par
D Isaeliveryaddress
C Date oi Dt
RE 4/18/12 conditional approvia / RT
Jo Ann Tischler ^
Denison Mines (USA) Corp
1050 Seventeenth ST, STE 950
Denver, CO 80265
D ^sclelivery address different from item 17 • Yes
YES, enter delivery address below O No
Delivery
1- * y
3 ^n^iceType
uL Certified Mail • Express Mail
• Registered • Return Receipt for Merchandise
• Insured Mail •COD
4 Restricted Delivery? (Extra Fee) • Yes
2 Article Number
(Transfer from sen/Ice label) 7D11 OllD DODl D4Hfl
PS Form 3811, February 2004 Domestic Return Receipt 102595^2-M-1540