Loading...
The URL can be used to link to this page
Your browser does not support the video tag.
Home
My WebLink
About
DRC-2012-001947 - 0901a0688030af62
R 0^012 State of Utah JONM HUNTSMAN, JR Governor GARY HERBERT Lieutenant Governor August 22, 2012 001947 Department o^f ^/if Environmental Qualityaj/; Amanda Smith —— Acting Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director CERTIFIED MAIL (Retum Receipt Requested) Jo Arm Tischler Director, Compliance Energy Fuels Resources (USA) Inc 225 Union Blvd , Suite 600 Lakewood, CO 80228 Dear Ms Tischler ! SUBJECT Compliance New Decontamination Pad Recirculating Pump (NDP) Catchment Construction, White Mesa Uranium Mill Ground Water Discharge Permit No UGW370004, Confirmatory Action This letter acknowledges and confirms changes to the schedule for completion of construction of the above-captioned catchment History On Apnl 12, 2012 the Utah Division of Radiation Control (DRC) received through email a single- sheet plan for an improvement to the existing NDP recirculation pump at the Energy Fuels Resources (EFR) White Mesa Uranium Mill At the time, the owner of the mill was the Denison Mines (DUSA) The plan sheet accompanied an Apnl 12, 2012 DUSA response to the Notice of Violation and Compliance Order (Order), Docket No UGW 12-01, dated March 7, 2012 The design drawing responded to Violation No 5, where DUSA failed to control contact wash water at the New Decontamination Pad near the scale house The DRC observed this violation dunng an October 18, 2011 DRC inspection where DRC Staff noted leakage to the ground fi-om the New Decontamination Pad recirculation pump system On Apnl 18, 2012, the DRC extended a conditional approval of the NDP recirculating pump catchment At the time the DRC understood that DUSA intended to complete constmction of the catchment within 15 calendar days of approval of the constmction plan On August 13, 2012, EFR contacted the DRC to report that constmction had not been completed as of that date, but that 168 North 1950 West • Salt Uke City, UT Mailing Address P O Box 144850 • Salt Uke City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 -TDD (801) 5364414 www deq Utah gov | Pnnted on 100% recycled paper Jo Ann Tischler August 22, 2&r2 ' Page 2 constmction would commence immediately EFR now expects to complete constmction by August 31, 2012 EFR followed the August 13, 2012 telephone conversation with a wntten notice on August 14, 2012 Dunng the time between receiving plan approval and the August 13, 2012 telephone conversation with the DRC, the mill was offline for scheduled maintenance until the week of August 6, 2012 In addition to the scheduled maintenance activities, the maintenance crews also performed cleanup of the sulfunc acid release fi-om the Clancone failure, decommissioning and removing the Clancone in the process Confirmatory Action EFR committed to the following actions in its August 14, 2012 letter, with which the DRC concurs 1 EFR will complete constmction of the catchment by August 31, 2012, and 2 EFR will notify the DRC when constmction is completed to allow the opportunity for inspection, and 3 EFR will submit As-Built drawings, including specifications of the matenals used, withm 30 calendar days after completion of constmction If you have any questions please contact Russell J Topham, P E at (801) 536-4256 Sincerely Rusty Lundberg, Director RL RTrt Ul LT) n-ir HI IT ru ir HI CD C3 a o CO JD cr o a U.S. Postal Service rn CERTIFIED MAIL. RECEIPT (Domestic Mail Only; No Insurance Coverage Provided) For delivery information visit our widasite at wwv/.usps.com© Certified Fee Retum Receipt Fee (Endorsement Required) Restricted Deltveiy Fee (Endorsement Requimri) Postmark Here Total Postage & F Sent To ''Sire0f'Apt'"Klo''' or PO Box No City. State. Z/P-t4 Re Confirmatory Action / RT Jo Ann Tischler Energy Fuels Resources (USA) Inc 225 Union Blvd Suite 600 Lakewood, CO 80228 PS Form 3«00. August 2006 See Reverse for Instructions SENDER: COMPLETE THIS SECTION • Complete Items 1,2, and 3 Also complete Item 4 if Restncted Delivery is desired • Pnnt your name and address on the reverse so that we can return the card to you • Attach this card to the back of the mailpiece, or on the front if space permits 1 Article Addressed to COMPLETE THIS SECTION ON DELIVERY Re Confirmatory Action / RT Jo Ann Tischler ^ Energy Fuels Resources (USA) Inc 225 Union Blvd Suite 600 Lakewood, CO 80228 D^Sgent • Addressee 2 Article Number (Transfer from service label) 4 Restrlcted^Delivery? (Ertra Fee; 700T IbSO 0001 ^E'^iSI&SS^ • Yes PS Fomi 3811. February 2004 Domestic Return Receipt 102595-02-M-1540