Loading...
HomeMy WebLinkAboutDRC-2012-001943 - 0901a0688030af90State of Utah GARY R HERBERT Goverwor GREG BELL Lieutenant Governor DRC Department of Environmental Quality Amanda Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director 2012-001943 MEMORANDUM TO Through FROM DATE SUBJECT File Phil Goble, Section Manager Russell J Topham, P E August 30, 2012 Notes from conference call regarding 2012 Surety, Energy Fuels (EF) uramum mill at White Mesa, near Blanding, Utah At 8 30 this moming, Harold Roberts and David Frydenlund of EF, new owners of the former Denison uramum mill at White Mesa, joined Phil Goble and myself for a conference call to discuss outstanding issues relative to the mill's Surety The discussion centered on two outstanding issues, as summanzed below 1.0 Correlation of unit costs with an industry standard In response to the annual Surety Submittal dated March 2, 2012, the UDRC sent EF a Request for Information dated Apnl 19, 2012 (the RFI) seeking adjustment of unit costs in the Surety to align with the RSMeans data set for heavy constmction During subsequent teleconferences and exchanges of information, EF argued persuasively that the RSMeans database significantly overstated labor costs as compared with those available through local employment agencies serving the constmction industry In preparation to today's conference call Harold Roberts submitted an attached spreadsheet in an email The information presented includes labor unit costs reflective of the higher of those currently paid at the White Mesa mill, those available through the local employment agency, and those presented in the relevant General Decision posted on the US Department of Labor website Dunng the conference call we agreed to accept the labor rates as presented in the email attachment 2.0 Escalation of Contingency line item to 25% of direct costs ^ Dunng the conference call EF proposed escalating the Contingency line item from 15% to 25% in two equal steps (5% each year) in the 2013 and 2014 Surety submittals This staging would allow time to adjust corporate budgets without exposing the public to unreasonable risk 3.0 Next step At the request of EF the UDRC will delay issuing a Confirmatory Action Letter and Surety Approval until EF formally proposes the above resolution to the Apnl 19, 2012 RFI In the interim, the UDRC and EF 195 North 1950 West • Salt Uke City, UT Mailing Address P O Box 144850 • Salt Uke City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533^097 "TDD (801) 536-4414 www deq iilah gov Printed on 100% recycled paper Page 2 may exchange draft documents to allow for crafting of the document's wording to provide EF upper management clanty over the agreements reached UDRC can expect a draft of the proposal by September 7, 2012