August 14, 2012
VIA E-MAIL AND OVERNIGHT DELIVERY
Mr Rusty Lundberg
Director
Utah Division of Radiation Control
195 North 1950 West
PO Box 144850
Salt Lake City, UT 84114-4850
Re New Decontamination Pad Recirculation Pump
White Mesa Mill
Notice of Violation and Compliance Order Docket No UGW 12-01, March 7, 2012
Dear Mr Lundberg
This letter documents Energy Fuels Resources (USA) Inc's ("EFR's") August 13, 2012 discussion with
Mr Russ Topham of the Division of Radiation Control regarding construction of spill collection
improvements to the New Decontamination Pad ("NDP") recirculation pump
Drips from the NDP recirculation pump were the subject of Violation No 5 in DRC's Notice of Violation
("NOV") and Compliance Order UGW 12-01, dated March 7, 2012, resulting from DRC's October 8,
2011 stormwater inspection at the White Mesa Mill EFR responded to Violation No 5 by submitting a
single-sheet drawing for improvements to collect the drips from the recirculation pump The drawing was
approved in DRC's letter of April 18, 2012, which EFR received on April 25, 2012
The Mill's maintenance department has focused on
• response to and cleanup of the spill resulting from the Claricone failure during April and May,
2012, followed by
• equipment cleanouts and repairs required for restart of the Mill on conventional ore, which
restarted in July 2012
The Mill notified Corporate Environmental staff on August 13, 2012, that construction of the NDP pump
improvements had not been completed EFR contacted Mr Topham on August 13, 2012 to identify that
the construction has been scheduled, but has not been completed, and to commit that
1 EFR will complete construction the improvements to the NDP recirculation pump by August 31,
2012
2 As required by DRC's April 18, 2012 letter, EFR will notify DRC when construction is complete,
to permit DRC an early opportunity for inspection of the installation
Energy Fuels Resources (USA) Inc
Lakewood, CO 80228
225 Union Boulevard, Suite 600
Phone 303-974-2140
Letter to Director
August 14,2012
Page 2 of 2
3 As required by DRC's April 18, 2012 letter, EFR will submit As-Built drawings, including
specifications of the matenals used for construction, to DRC withm 30 days after completion of
construction
Mr Topham requested that EFR prepare this letter to update the commitment dates and confirm our
discussion
Please contact me if you have any questions or require any further information regarding this letter
Yours very truly,
ENERGY FUELS RESOURCES (USA) INC.
Jo Ann Tischler
Director, Compliance and Permitting
cc David C Frydenlund
Phillip Goble, DRC
Dan L Hillsten
John Hultquist DRC
Harold R Roberts
David E Turk
Katherine A Weinel