HomeMy WebLinkAboutDRC-2012-001696 - 0901a068802f7a71DENISON
MINES
Dii
Pf!C-20I2-D01696
Denison Mines Corp
6425 S Highway 191, PO Box 809
Blanding. UT 84511
USA
Tel 435 678-2221
Fax 435 678-2224
www denisonmines com
VIA EMAIL AND FEDERAL EXPRESS
July 16, 2012
Mr Rusty Lundberg
Director
Utah Division of Radiation Control
State of Utah Department of Environmental Quality
168 North 1950 West
Salt Lake City, UT 84114-4850
Re. Response to Email Request of July 5, 2012 Regarding
Radiological Data for March 25, 2012
Dear Mr Lundberg
This letter responds to the email request which Denison Mines (USA) Corp ("Denison") received from
Mr Kevin Carney of the Utah Division of Radiation Control ("DRC") on July 5, 2012 regarding
Denison's June 27, 2012 letter to the Division of Air Quality descnbing a temporary imbalance in the
leach Circuit on March 25, 2012 Specifically, Mr Carney
1 Stated DRC's concern regarding the release of any radioactive matenal dunng the event,
2 Requested that Denison forward any radiological sample data available for this event, and
3 Stated that DRC disagrees that particulates, dust, and airborne solids can be ascertained
through human observation
No Release of Radiological Material
Based on all the information collected regarding the event, as provided below, Denison has
determined that no measurable level of radioactive matenal was released dunng the event Denison
submits the following information relative to radionuclides and radiation monitonng on and around the
date of the event
Radiological Data
Alpha
Radiation Safety Officer David Turk, and Safety Manager Wayne Palmer entered the leach plant
dunng the event on March 25, 2012 and were in intimate contact with the CO/NOx vapors in the
building That is, they stood directly inside vapors on and near the leach tanks Both of them
scanned themselves, their clothing, their personnel protective equipment, and Draeger tube sampling
devices with one of the Mill's personnel scanning 177 alpha meters when they left the leach area
Both recorded zero alpha contamination above background on their persons, clothing, PPE, samples,
sample devices, and samples That is, there was no detectable alpha contamination released dunng
the event Daily efficiency check data for each of the Mill's alpha meters is provided in Attachment 1
Beta/Gamma
Routine monthly beta/gamma results were collected in the leach area on March 28, (three days after
the event) Monthly beta/gamma data for March 2012, the month of the leach event, are lower than
results for February 2012 That is, there was no measurable increase in gamma radiation due to the
event Beta/gamma reports for the months of February and March 2012 are provided in Attachment
2
Radon
Routine monthly radon progeny concentration data (assessed in Working Levels ("WLs")) was
measured in the leach area on February 10, 2012 and March 30, 2012 Monthly radon progeny
results for March 2012, the month of the leach event, are lower than results for February 2012 (The
WL value for the month of March was zero) That is, there was no measurable increase in radon
progeny due to the event Radon Progeny Concentration Reports for the months of February and
March 2012 are provided in Attachment 3
Radioactive Particulates
Monthly area airborne particulate filters, including BA-8 located in the leach area, were collected and
counted on March 5, 2012 (before the event) and Apnl 6, 2012 (after the event) Airborne activity
concentration was reported as 0 uCi/mL for both months That is, there was no measurable increase
in airborne radioactive particulates due to the event Monthly area airborne sampling data for the
measurements in March and Apnl 2012 are provided in Attachment 4
Human Observation of Particulate Opacity
Contrary to DRC's assertion in the email of July 5, 2012, that the presence of particulates cannot be
ascertained by direct human observation, 40 CFR 60, Appendix A, Method 9 Visible Emissions
Evaluation, and Utah R307-201-3, expressly require that particulate opacity be determined by direct
human observation by a trained and certified observer The Mill's Utah Air Approval Order, in Part
II B 1 d, requires that measurement of particulate opacity be performed per 40 CFR Appendix A
Method 9, by direct human observation Mill Safety Manager Wayne Palmer, a currently-certified
opacity observer per U S EPA Method 9 who was present as a responder to the CO/NOx event,
observed no particulate opacity
Please contact me if you have any further questions or require any further infomnation
Yours very truly.
Jo Ann Tischler
Director, Compliance and Permitting
DENISON MINES (USA) CORP.
DENISO
MINES Jiii
CC Bryce Bird, Utah Division of Air Quality
Kevin J Carney, Utah Division of Radiation Control
David C Frydenlund
Dan Hillsten
Sarah Malluche, Utah Division of Air Quality
Harold R Roberts
David Turk
KathenneA Weinel
Denison Central Files
DENISO
MINES
ATTACHMENT 1
Daily Efficiency Checks 177 Alpha Meters
DENISO
MINES
Jiii
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Senal # Location Rad Tech Alarm Background
\11'Q\ ^^74o 5o
Th 230 SNg;99^-o 9
DPM .-^^jcyr^
CPM -Z^£iO
EFF 9 0^.
Alpha Meter
EFF Factor JfO.^
Cal Date ^Jjf^l/Z^
MDA
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
/?? .^^
Th 230 SN ^^^i'O^
DPM_^^^^
CPM '^GVO
EFF ^.Q-y.,
Alpha Meter
EFF Factor
Cal Date c2^f;€:f//
MDA .^9-^
3
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
Th 230 SN
Alpha Meter
EFF Factor /f ^
DPM_^3^^£_
CPM
EFF J-/
Cal ^^X^JJlALCiL
MDA 7/7
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
J72 70 ^0
Th230SNj£2^^f^:^
DPM 33.tJ^£?
EFF
Alpha Meter
EFF Factor o^^fP
Cal Date H <hny/jL
MDA ^/D
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
m
Th 230 SN.<9:^--^^
DPM ^"^^^CxP
) CPM
EFF g.f 7
Alpha Meter
EFF Factor
Cal Date
MDA S/n
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
UV
Th 230 SN 5^)94^^^^
DPM
CPM
EFF ^r^y,
Alpha Meter
EFF Factor>^o2 <A
Cal Date^^/^/^
MDA
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
Alpha Meter
Th 230 SN f'9^^<^l>^ EFF Factor cJ^
DPM
CP M_3i^^^:^_
EFF '9 ^-^^
Cal Date
MDA ,^9^
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
Th 230 SN.
DPM
CPM
EFF
Alpha Meter
EFF Factor
Cal Date
MDA
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
Alpha Meter
Tn 2iU bN EFF Factor
DPM Cal Date
CPM MDA
EFF
Daily Efficiency checks 177 Alpha Meters
Date
Instrument
Model Serial # Location Rad Tech Alarm Background
Th 230 SN.
DPM
CPM
EFF
Alpha Meter
EFF Factor
Cal Date
MDA
ATTACHMENT 2
Beta/Gamma Data Sag Mill/Leach Areas
DENISO
MINES
Jiii
to
QJ
JC u
03
o
0
<S
•I 0
4|
ro
E £ ro
OJ CO
I rr>
>.
>
to
4
c
t^
01
*->
4-> ro Q
PA
Q E I-
<
CO
CD (U
U
03
0)
— 00
i. 2
— bO
5 s
-= ao
m
0
(§1
<
C-0
Ro
o
m
OJ in
c
h
Sh
i
f
t
e
r
'
s O
f
f
i
c
to
r
'
s L
t
Sh
i
f
t
e
r
'
s O
f
f
i
c
Op
e
r
a
i
•D •o O o
Ci
ft
o
ATTACHMENT 3
Radon Progeny Concentration Reports
February and March 2012
DENISO
MINES
Jiii
Radon Progeny Concentration Report for February 2012 Sampled By; Radiation Department
Sample
Date
Sample
No. Station
Elpsd.
Time
Count
Time
Total
Cnt. CPM Bkg.
Net
CPM
Instr.
Model
Time
Fctr.
Eff.
Fctr. Vol. (v)
Total
Vol. (V)
Working
Level Comments
Sample
Date
Sample
No. Station
Elpsd.
Time
CT TC
(TC/
CT)
Bkg.
CPM-
Bk§.
2200 or
2929 TF EF L/Mm
V=v*Ts
(litre)
(Net
CPM*EF)/
(TF*V)
02/10/12 BAl Scalehouse 57 1 3 3 00 69 0 00 2929 116 4 09 4L 20 OOOO Monthly Samples
02/10/12 BA2 Ore Storage 60 1 9 9 00 69 2 07 2929 110 4 09 4L 20 0 004
02/10/12 BA6 Sample Plant 62 1 7 7 00 69 0 07 2929 106 4 09 4L 20 OOOO
02/10/12 BA7 SAG Mill 70 1 4 4 00 69 0 00 2929 90 4 09 4L 20 OOOO
02/10/12 BA8 Leach 65 1 29 29 00 69 22 07 2929 100 4 09 4L 20 0 045
02/10/12 BA9 CCD Circuit 48 1 6 6 00 69 0 00 2929 134 4 09 4L 20 OOOO
02/10/12 BAIO SX Building 50 1 5 5 00 69 0 00 2929 130 4 09 4L 20 OOOO
02/10/12 BA12 Y C Precip 51 1 5 5 00 69 0 00 2929 128 4 09 4L 20 OOOO Average - 0 004
02/10/12 BAI2A NYC Dryer Encl 50 1 10 10 00 69 3 07 2929 130 4 09 4L 20 0 005 Highest - 0 045
02/10/12 BA12B S Y C Dryer Encl 58 1 9 9 00 69 2 07 2929 114 4 09 4L 20 0 004 Area is Locked
02/10/12 BA13 Y C Drying Area 61 1 5 5 00 69 0 00 2929 108 4 09 4L 20 OOOO
02/10/12 BA13A Y C Pckg Encl 63 1 5 5 00 69 0 00 2929 104 4 09 4L 20 OOOO
02/10/12 BAM Y C Storage 65 1 7 7 00 69 0 07 2929 100 4 09 4L 20 oooo
02/10/12 BAl 5 Bucking Room 58 1 7 7 00 69 0 07 2929 114 4 09 4L 20 oooo
02/10/12 BAl 6 Lunch Room 55 1 13 13 00 69 6 07 2929 120 4 09 4L 20 0 010
02/10/12 BAl 7 Change Room 58 1 11 11 00 69 4 07 2929 114 4 09 4L 20 0 007
02/10/12 BAl 8 Admin Bldg 50 1 5 5 00 69 0 00 2929 130 4 09 4L 20 oooo
02/10/12 BAl 9 Warehouse 50 1 9 9 00 69 2 07 2929 130 4 09 4L 20 0 003
02/10/12 BA20 Maint Shop 52 1 1 1 00 69 0 00 2929 126 4 09 4L 20 oooo
02/10/12 BA21 Boiler 74 1 7 7 00 69 0 07 2929 84 4 09 4L 20 oooo
02/10/12 BA22 Vanadium Panel 63 1 7 7 00 69 0 07 2929 104 4 09 4L 20 oooo
02/10/12 BA22A Vanadium Dryer 67 1 14 14 00 69 7 07 2929 96 4 09 4L 20 0015
02/10/12 BA23 Van Fltr Belt 72 1 16 16 00 69 9 07 2929 87 4 09 4L 20 0 021
02/10/12 BA24 Tails 70 1 8 8 00 69 1 07 2929 90 4 09 4L 20 0 002
02/10/12 BA25 Control Room 55 1 11 11 00 69 4 07 2929 120 4 09 4L 20 0 007
02/10/12 BA26 Shifter's Office 70 1 5 5 00 69 0 00 2929 90 4 09 4L 20 OOOO
02/10/12 BA27 Oper's LR 71 1 12 12 00 69 5 07 2929 89 4 09 4L 20 0 012 \
02/10/12 BA29 Generator Station, 69 1 6 6 00 69 0 00 2929 92 4 09 4L 20 OOOO
02/10/12 BA30 Truck Shop i 75 1 8 8 00 69 1 07 2929 83 4 09 4L 20 0 003
02/10/12 BA31 Womens Locker Rni 53 1 9 9 00 69 2 07 2929 124 4 09 4L 20 0 003 ' (F ' 02/10/12 BA32 Oxidation i 65 1 11 11 00 69 4 07 2929 100 4 09 4L 20 0 008
02/10/12 BA33A AF Dump Station 75 1 6 6 00 69 0 00 2929 83 4 09 4L 20 OOOO
02/10/12 BA33B North AF PAD 77 1 5 5 00 69 0 00 2929 81 4 09 4L 20 OOOO
Radon Progeny Concentration Report for March 2012 Sampled By; Radiation Department
Sample
Date
Sample
No. Station
Elpsd.
Time
Count
Time
Total
Cnt. CPM Bkg.
Net
CPM
Instr.
Model
Time
Fctr.
Eff.
Fctr. Vol. (v)
Total
Vol. (V)
Working
Level Comments
Sample
Date
Sample
No. Station
Elpsd.
Time
CT TC
(TC/
CT)
Bkg.
CPM-
Bkg.
2200 or
2929 TF EF L/Min
V=v*Ts
(litre)
(Net
CPM*EF)/
(TF*V)
03/30/12 BAl Scalehouse 61 1 4 4 00 69 0 00 2929 105 4 09 4L 20 OOOO Monthly Samples
03/30/12 BA2 Ore Storage 60 1 7 7 00 69 0 07 2929 110 4 09 4L 20 oooo
03/30/12 BA6 Sample Plant 56 1 11 11 00 69 4 07 2929 118 4 09 4L 20 0 007
03/30/12 BA7 SAG Mill 65 1 5 5 00 69 0 00 2929 100 4 09 4L 20 OOOO
03/30/12 BA8 Leach 67 1 3 3 00 69 0 00 2929 96 4 09 4L 20 oooo
03/30/12 BA9 CCD Circuit 74 1 7 7 00 69 0 07 2929 84 4 09 4L 20 oooo
03/30/12 BAIO SX Building 73 1 7 7 00 69 0 07 2929 85 4 09 4L 20 oooo
03/30/12 BA12 Y C Precip 83 1 9 9 00 69 2 07 2929 71 4 09 4L 20 0 006 Average- Ojm^'^-'f
03/30/12 BA12A NYC Dryer Encl 74 1 13 13 00 69 6 07 2929 84 4 09 4L 20 0 015 Highest - 0 021
03/30/12 BA12B S Y C Dryer Encl 78 1 15 15 00 69 8 07 2929 78 4 09 4L 20 0 021 Area is Locked
03/30/12 BAl 3 Y C Drying Area 77 1 8 8 00 69 1 07 2929 81 4 09 4L 20 0 003
03/30/12 BA13A Y C Pckg Encl 87 1 8 8 00 69 1 07 2929 65 4 09 4L 20 0 003
03/30/12 BAH Y C Storage 75 1 9 9 00 69 2 07 2929 83 4 09 4L 20 0 005
03/30/12 BAl 5 Bucking Room 70 1 9 9 00 69 2 07 2929 90 4 09 4L 20 0 005
03/30/12 BA16 Lunch Room 59 1 9 9 00 69 2 07 2929 112 4 09 4L 20 0 004
03/30/12 BA17 Change Room 57 1 10 10 00 69 3 07 2929 116 4 09 4L 20 0 005
03/30/12 BAl 8 Admin Bldg 60 1 6 6 00 69 0 00 2929 110 4 09 4L 20 OOOO
03/30/12 BA19 Warehouse 52 1 8 8 00 69 1 07 2929 126 4 09 4L 20 0 002
03/30/12 BA20 Maint Shop 54 1 4 4 00 69 0 00 2929 122 4 09 4L 20 OOOO
03/30/12 BA21 Boiler 60 1 3 3 00 69 0 00 2929 110 4 09 4L 20 OOOO
03/30/12 BA22 Vanadium Panel 80 1 8 8 00 69 1 07 2929 75 4 09 4L 20 0 003
03/30/12 BA22A Vanadium Dryer 81 1 9 9 00 69 2 07 2929 74 4 09 4L 20 0 006 I 03/30/12 BA23 Van Fltr Belt 83 1 6 6 00 69 0 00 2929 71 4 09 4L 20 OOOO
03/30/12 BA24 Tails 62 1 9 9 00 69 2 07 2929 106 4 09 4L 20 0 004
03/30/12 BA25 Control Room 82 1 10 10 00 69 3 07 2929 73 4 09 4L 20 0 009 A 1." /
03/30/12 BA26 Shifter's Office 79 1 9 9 00 69 2 07 2929 76 4 09 4L 20 0 006 r / 03/30/12 BA27 Oper's LR 80 1 5 5 00 69 0 00 2929 75 4 09 4L 20 OOOO
03/30/12 BA29 Generator Station 81 1 4 4 00 69 0 00 2929 74 4 09 4L 20 OOOO • r 03/30/12 BA30 Truck Shop 63 1 7 7 00 69 0 07 2929 104 4 09 4L 20 OOOO
03/30/12 BA31 Womens Locker Rm 54 1 7 7 00 69 0 07 2929 122 4 09 4L 20 oooo
03/30/12 BA32 Oxidation 62 1 5 5 00 69 0 00 2929 106 4 09 4L 20 OOOO
03/30/12 BA33A AF Dump Station 64 1 4 4 00 69 0 00 2929 102 4 09 4L 20 oooo
03/30/12 BA33B North AF PAD 60 1 9 9 00 69 2 07 2929 110 4 09 4L 20 0 004
03/30/12 BA33C CaFo DumoStation 71 1 12 17 Ofl (S q S 07 9Q9Q so A HQ A T on A f*1 O
ATTACHMENT 4
Monthly Area Airbome Sampling Field Sheet
DENISO
MINES
Jiii
Month March-12
Monthly Area Airborne Sampling Field Sheet
Denison Mines (USA) Corp. White Mesa Mill
Sampled By: Radiation Department
Filter Location Run Time Flow Rate Volume Sampled
Comments ID Date (Min.) (LPM) (mL) By Comments
BA-1 Scalehouse 03/05/12 60 40 2 40E+06 JP Collected on desk in front room
BA-2 Ore Storage 03/05/12 60 40 2 40E+06 JP Collected near the pandora ore storage
BA-7 Sag Mill 03/08/12 60 40 2 40E+06 JP Sample taken during non Operation tune
BA-8 Leach 03/07/12 60 40 2 40E+06 JP Collected above Pre-Leach tanks
Air Particulate Calculations Summary Sheet
Reviewed by
Count
Date/Time Filter ID
Instrument
Serial No Efficiency
Total
Count/Time CPM
Bkg
Count/Time
Net Count
(Tot-Bkg)
LLD
(uCi/mL)
Concentration
uCi/ mL
Percent of
DAC
Sample
Counted By
03/08/12 BAl 2200 27 19% 226 22 6 16 23 6 37 4 29E-12 4 40E-12 7 33% RN
03/08/12 BA2 2200 27 19% 59 59 7 27 0 00 2 93E-12 0 OOE+00 0 00% RN
03/11/12 BAT 2200 27 19% 122 12 2 16 23 0 00 4 29E-12 0 OOE+00 0 00% RN
03/10/12 BA8 2200 27 19% 121 12 1 16 23 0 00 4 29E-12 0 OOE+00 0 00% RN
Concentration ( pCi/cc)= (Net CPM)
(2 22 E6)(V)(EfFd)
LLD or MDA= 2 71+3 29 \/ Bkg *Ts(l+Ts/T"b)
(Ts)(Eff d)(Eff f)(FF)(V)(2 22E6)
Ts= Time of Sample
Tb= Background Count Time in Minutes
Eff d= Detector efficiency in Counts per Dismtegration
EfiF f = Filter Efficeincy
V= Total Volume m miUilitres or Cubic Centimeters
2 22E6 = Factor to convert DPM to uCi
Net CPM = Total Counts - Background Count
Percent of DAC= Actual Concentration
DAC
Month Apnl-12
Monthly Area Airborne Sampling Field Sheet
Denison Mines (USA) Corp. White Mesa Mill
Sampled By: Radiation Department
Filter Location Run Time Flow Rate Volume Sampled
Comments ID Date (Mm.) (LPM) (mL) By Comments
BA-1 Scalehouse 04/06/12 60 40 2 40E+06 JP Collected on desk m front room
BA-2 Ore Storage 04/06/12 60 40 2 40E+06 JP Collected near the pandora ore storage
BA-7 Sag Mill 04/05/12 60 40 2 40E+06 JP Sample taken during non Operation time
BA-8 Leach 04/05/12 60 40 2 40E+06 JP Collected above Pre-Leach tanks
Air Particulate Calculations Summary Sheet
Reviewed by
Count
Date/Time Filter ID
Instrument
Senal No Efficiency
Total
Count/Time CPM
Bkg
Count/Tune
Net Count
(Tot-Bkg)
LLD
(uCi/mL)
Concentration
uCi/mL
Percent of
DAC
Sample
Coimted By
04/09/12 BAl 3030 23 75% 15 1 5 12 00 0 00 4 25E-12 0 OOE+00 0 00% RN
04/09/12 BA2 2929 23 66% 75 75 7 27 0 23 3 37E-12 0 OOE+00 0 00% RN
04/08/12 BAT 2929 23 66% 87 87 6 47 2 23 3 19E-12 0 OOE+00 0 00% RN
04/08/12 BA8 2200 26 98% 58 58 15 73 0 00 4 26E-12 0 OOE+00 0 00% RN
Concentration ( pCi/cc)= (Net CPM)
(2 22 E6)(V)(Effd)
LLD or MDA= 2 71+3 29 V Bkg •Ts(l+Ts/Tb)
(Ts)(Eff d)(Eff f)(FF)(V)(2 22E6)
Ts= Time of Sample
Tb= Background Coimt Time m Mmutes
Eff d= Detector efficiency m Coimts per Dismtegration
Eff f= Filter Efficemcy
V= Total Volume m millilitres or Cubic Centimeters
2 22E6 = Factor to convert DPM to uCi
Net CPM = Total Counts - Background Count
Percent of DAC= Actual Concentration
DAC