Loading...
HomeMy WebLinkAboutDRC-2012-001628 - 0901a068802e84bbDENISO MINES RC-2012-001628 Denison Mines (USA) Corp 105017th Street, Suite 950 Denver, CO 80265 USA Tel 303 628-7798 Fax 303 389<4125 www denisonmines com July 3, 2012 VIA PDF AND FEDERAL EXPRESS Mr Rusty Lundberg Director of the Utah Division of Radiation Control State of Utah Department of Environmental Quality 168 North 1950 West PO Box 144850 Salt Lake City, UT 84114-4850 Dear Mr Lundberg Re Plan of Action and Work Schedule Revision 1 for the Installation of One or More Wells Downgradient of TW4-4 and TW4-26 - Notice of Violation and Compliance Order, Docket No UGW12-05 This letter is in response to the foregoing Notice of Violation (the "Notice") dated May 30, 2012, which Denison Mines (USA) Corp ("DUSA") received on June 4, 2012 The Notice lists two violations (the "Violations") of the White Mesa Mill's (the "Mill's") Plan of Action and Work Schedule Revision 1 for the Installation of One or More Wells Downgradient of TW4-4 and TW4-26 (the "Plan"), based on a review of the Mill's Chloroform Momtonng Report for the 4*^ Quarter of 2011 Pursuant to Utah Code Annotated 19-5-111 (1953 as amended), this letter addresses a) the root cause of the noncompliance, b) steps that have been or will be taken to correct the violation, c) date when compliance was or will be regained, and d) steps taken or to be taken to prevent reoccurrence of the noncompliance DUSA responds as follows 1 Section 2( a) of the Plan for failing to submit a Hydrogeologic Report within calendar 60 days of the Director approval of the Plan a) Root Cause of the Noncompliance DUSA respectfully submits that Violation Number 1 is in error and should be retracted Denison submitted the Hydrogeologic Report on November 28, 2011 as required via email and submitted hardcopies via overnight delivery Attachment 1 includes copies of the transmittal e-mail from November 28, 2011 as well as the Federal Express delivery confirmation information for the hardcopies In a telephone conversation with DRC Staff on June 5, 2012, DRC confirmed e-mail receipt of the Hydrogeologic Report on November 28, 2011 b) Steps That Have Been Taken to Correct the Violation Letter to Mr Rusty Lundberg July 3, 2012 Page 2 DUSA believes it is already in compliance with the requirements for delivery of the Hydrogeologic Report and no violation has occurred c) Date When Compliance Was or Will be Regained DUSA believes it is already in compliance with the requirements for delivery of the Hydrogeologic Report and no violation has occurred d) Steps Taken to Prevent Reoccurrence of the Noncompliance DUSA believes it is already in compliance with the requirements for delivery of the Hydrogeologic Report and no violation has occurred 2 Section 2(b) of the Plan for failing to sample well TW4-27 in the next regularly scheduled chloroform sampling campaign, which would have been the 4th quarter 2011 chloroform monitoring event Denison believes that well TW4-27 was sampled at the soonest possible time given the well development requirements and the hydraulic testing requirements specified by DRC and that this violation should be retracted a) Root Cause of the Noncompliance 1 Facts and Background Information a) Well TW4-27 was installed October 18, 2011 As the well produced no water during installation, but moist sands were encountered in the cuttings, the well was allowed to stabilize for several weeks to determine if sufficient water would enter the well to perform hydraulic testing and development activities b) New wells installed at the Mill are developed using surging and bailing and overpumping techniques as specified in DRC correspondence dated June 1, 2010 Based on Denison's understanding of the DRC requirements for development, valid samples cannot be collected from new wells pnor to the completion of all development activities c) Per the Groundwater Discharge Permit ("GWDP"), Part I F 6 (c), groundwater as-built reports must include aquifer permeability data including field data, data analysis, and interpretation of slug test, aquifer pump test or other hydraulic analysis to determine local aquifer hydraulic conductivity in each well d) The Plan dated October 3, 2011 required that TW4-27 be installed within 30 days of approval of the Plan The October 3, 2011 Plan also required that the as-built report along with the Hydraulic Report for TW4-27 be submitted to the Executive Secretary within 60 days of approval of the Plan, that is, by December 3, 2011 e) Following the submission of the October 3, 2011 Plan, Denison proceeded with the installation of TW4-27 and the development and hydraulic testing activities to meet the required schedule in the October 3, 2011 Plan TW4-27 was installed on October 2011, in compliance with the Plan f) The first step of the development of TW4-27, using surging and bailing, was initiated on November 8, 2011 Well development was temporanly suspended to allow hydraulic testing to be completed in time to prepare the hydraulic report by the required December 3, 2011 submittal date DENISO MINES Letter to Mr Rusty Lundberg July 3, 2012 Page 3 g) Following hydraulic testing, well development was resumed Development by surging and bailing was completed on November 29, 2011 Development by over-pumping was initiated on December 20, 2011 and completed on January 5, 2012 h) The routine chloroform sampling for the fourth quarter 2011 was scheduled and conducted starting the week of November 14, 2011 Due to the Thanksgiving holidays, the routine fourth quarter sampling was completed the week of November 28, 2011 Energy Laboratories missed the holding times on several samples due to the Thanksgiving holidays and resampling of selected chloroform samples was completed dunng the week of December 6, 2011 i) Development of TW4-27 was completed and TW4-27 was suitable for collection of valid samples after January 5, 2012, that is, after the fourth quarter had ended and the sampling for the fourth quarter of 2011 had been completed The first quarter in which TW4-27 was suitable for collection of valid samples was first quarter 2012 TW4-27 was sampled during the first quarter 2012 Denison believes that, given the requirement to produce and report hydraulic testing data and to complete the full range of well development activities required prior to initial sampling, it was not possible to collect a valid sample from TW4-27 until the first quarter of 2012, and that TW4-27 was sampled at the earliest appropriate time penod Denison believes that no violation has occurred and that Violation Number 2 should be retracted b) Steps That Have Been Taken to Correct the Violation DUSA believes it is already in compliance with the requirements of the Plan and no violation has occurred c) Date When Compliance Was or Will be Regained DUSA believes it is already in compliance with the requirements of the Plan and no violation has occurred d) Steps Taken to Prevent Reoccurrence of the Noncompliance DUSA believes it is already in compliance with the requirements of the Plan and no violation has occurred If you have any questions or require any further information, please contact the undersigned Yours very truly, DUSA MINES (USA) CORP fo Ann Tischler Director, Compliance and Permitting CO David C Frydenlund Phillip Goble Dan Hillsten Harold R Roberts David E Turk Kathenne Weinel DENISO MINES Letter to Mr Rusty Lundberg July 3, 2012 Page 4 ATTACHMENT 1 Hydrogeologic Report Transmittal/Delivery Information DENISO MINES Kathy Weinel From: Sent: To: Co: Subject. Attachments: Kathy Weinel Monday, November 28, 2011 2 51 PM rlundberg@utah gov Dean Henderson, Dan Hillsten, David Frydenlund, Ron Hochstein, Harold Roberts, Jo Ann Tischler, David Turk, Ryan Palmer, N Tanner Holliday, Garnn Palmer, Stewart Smith As-Built Report for Perched Momtonng Well TW4-27 tw4-27 trans ltr_11 28 11 pdf, TW27 Installation Report pdf Dear Mr Lundberg, Attached please find the Denison Mines (USA) Corp's As-Built report for TW4-27 at the White Mesa Mill, in Blanding Utah If you have any questions regarding this transmittal please feel free to call me Kathy Weinel FW: FedEx Shipment 795449639409 Delivered Tanya Bentley Sent:Wednesday, June 20, 2012 4 15 PM To: Stewart Smith Here you go Tanya Bentley Corporate Secretary Hydro Geo Chem, IIK From: trackingupdates@fedex.com [mailto.trackingupdates@fedex com] Sent: Tuesday, November 29, 2011 10 03 AM To: Tanya Bentley Subject: FedEx Shipment 795449639409 Delivered This tracking update has been requested by Company Name Name E-mail HYDRO GEO CHEM Tanya Bentley tanyab@hgcinc com Our records indicate that the following shipment has been delivered Purchase order number Reference Ship (P/U) date Delivery date Sign for by Delivery location Delivered to Service type Packaging type Number of pieces Weight Special handling/Services 7180000 T2 0 TKB 7180000 12 0 SJS Nov 28, 2011 Nov 29, 2011 9 43 AM S HANSON SALT LAKE CITY, UT Receptionist/Front Desk FedEx Priority Overnight FedEx Pak 1 2 00 lb Direct Signature Required Deliver Weekday Tracking number 795449639409 Shipper Information Tanya Bentley HYDRO GEO CHEM 51 W Wetmore Rd Ste 101 Tucson AZ US Recipient Information Rusty Lundberg UDEQ 195 N 1950 W SALT LAKE CITY UT US 84116 85705 Please do not respond to this message This email was sent from an unattended mailbox This report was generated at approximately 10 49 AM CST on 11/29/2011 To learn more about FedEx Express, please visit our website at fedex com All weights are estimated To track the latest status of your shipment, click on the tracking number above, or visit us at fedex com This tracking update has been sent to you by FedEx on the behalf of the Requestor noted above FedEx does not validate the authenticity of the requestor and does not validate, guarantee or warrant the authenticity of the request, the requestor's message, or the accuracy of this tracking update For tracking results and fedex com's terms of use, go to fedex com Thank you for your business No virus found in this message Checked by AVG - www avg com Version 2012 0 1873 / Virus Database 2102/4646 - Release Date 11/29/11