Loading...
HomeMy WebLinkAboutDRC-2011-007215 - 0901a0688025e652State of Utah GARY R. HERBERT Governor GREG BELL Lieutenant Governor Department of Environmental Quality Amanila Smith Executive Director DIVISION OF RADIATION CONTROL Rusty Lundberg Director 201 1-00 7 215 August 15,2011 • • . ' Ms. Jo Ann Tischler Director, Compliance and Permitting Denison Mines (USA) Corp. (DUSA) 1050 17'^ Street, Ste. 950 Denver, CO 80225 Dear Ms. Tischler: SUBJECT: Denison Mines (USA) Corp. (DUSA) White Mesa Uranium Mill Faci^^ DRC Inspection Results: Dam Safety Inspection (Engineering Module 71) August 9, 2011: Inspection Findings and Close-out The subject inspection was held on August 9, 2011 at the DUSA mill facilities near Blanding, Utah. Messrs.David Rupp of DRC and Ryan Palmer of DUSA attended the inspection, which ended with an inspection closeout meeting, with the two individuals mentioned above and Mr. Daniel Hillsten, the mill manager. The exterior and interior exposed perimeteijs of the taihngs cells were observed. The following items were noted: i . 1. All the tailings cells have plastic liners on the interiors of the cell dikes. Many of the cells do not have distinguishable exterior dikes, as they blend into the topography. There are some distinguishable unlined dikes among the tailings cells. These are the exterior dikes of Cells 4A and 4B. On these particular dikes there was some 1-inch wide soil cracking noted. These cracks are a few feet long, and were only noted in a few areas, where it appears there are small surficial clay deposits. No cracks were observed or propagated beyond these few locations. There was no movement of any dike material observed, other than rivulet erosion noted below. 2. We observed locations where roughly 30-foot long exterior rivulet erosion showed 1-inch wide shallow channels in the exterior dikes at Cells 3 and 4A, an inch or two deep. These were observed at a few places. Although these defects appear minor, Mr. Rupp recommended to Mr. Hillsten that the above be repaired. We further recommend that they be repaired prior to the next Dam Safety Inspection to be performed by the Utah Dept. of Natural Resources in 2012. 195 North 1950 West • Salt Lake City, UT Mailing Address: P.O. Box 144850 • Sah Uke City, UT 84114-4850 Telephone (801) 536-4250 • Fax (801) 533-4097 • T.D.D. (801) 536-4414 www.deq.utah. gov Printed on 100% recycled paper Page 2 This concludes the findings of this inspection. This inspection is hereby closed-out. If you have any questions or comments on this inspection, please contact Mr. Rupp at (801) 536-4250. UTAH RADIATION CONTROL BOARD Rusty Lundberg, Executive Secretary DAR:dr Cc: Mr. Dan Hillsten, DUSA F:\drupp\DUSA\Inspections\Dam Safety 2006-2013\2011 Inspection.doc